This document provides a deliverable items list and schedule for the Roman Space Telescope Attitude Control System thruster procurement. The National Aeronautics and Space Administration Goddard Space Flight Center is seeking proposals for 17 flight unit thrusters, a qualification unit if needed, and associated ground support equipment with a 12 month delivery schedule after contract award. Respondents must submit capability statements by June 12, 2020 indicating their ability to perform as the prime contractor or subcontractor, including descriptions of corporate size, socioeconomic category, teaming partners, and past experience meeting similar requirements. The deliverables list and schedule specifies 61 data items at various intervals related to requirements documentation, design reviews, analyses, test plans, reports, and end item data packages.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RST-PROP-SOW-0042_ACS Thruster_SOW DRAFT 20200531.pdf | ||
| RST-PROP-SPEC-0121_ACS_THRUSTER_SPEC_DRAFT20200531.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Effective Date: <Date> Expiration Date: <Date> [as required]
CHECK https://ipdtdms.gsfc.nasa.gov/
TO VERIFY THAT THIS IS THE CORRECT VERSION PRIOR TO USE.
National Aeronautics and Space Administration
Goddard Space Flight Center Greenbelt, Maryland
RST-PROP-LIST-0081, Revision -
Roman Space Telescope (RST), Code 448
Attitude Control System (ACS) Thruster Deliverable Items List and Schedule
DRAFT
May 31, 2020 https://ipdtdms.gsfc.nasa.gov/
ACS Thruster Deliverable Items List and Schedule RST-PROP-LIST-0081, Revision -i
ACS Thruster Deliverable Items List and Schedule
Review/Signature/Approval Page
Prepared by:
Alison Rao
Approved by:
Electronic Approval available on-line at: https://ipdtdms.gsfc.nasa.gov/ ii
Preface This document is a Roman Space Telescope (RST) Configuration Management (CM)-controlled document. Changes to this document require prior approval of the applicable Configuration Control Board (CCB) Chairperson or designee. Proposed changes shall be submitted to the RST CM Office (CMO), along with supportive material justifying the proposed change.
In this document, a requirement is identified by “shall,” a good practice by “should,” permission by “may” or “can,” expectation by “will,” and descriptive material by “is.”
Questions or comments concerning this document should be addressed to:
RST Configuration Management Office Mail Stop 448 Goddard Space Flight Center Greenbelt, Maryland 20771 iii
Change History Log
Revision Effective Date Description of Changes (Reference the CCR & CCB/ERB Approval Date) iv
Table of Contents
1 INTRODUCTION
1.1 Purpose
1.2 Scope
1.3 Related Documentation
1.3.1 Applicable Documents
1.3.2 Reference Documents
2 DELIVERABLES
APPENDIX A ABBREVIATIONS AND ACRONYMS
List of Tables
Table 1. Data Delivery Documentation and Schedule
1 INTRODUCTION
1.1 Purpose
The Roman Space Telescope (RST) is a mission responding to the 2010 National Research Council New Worlds, New Horizons (NWNH) Astronomy and Astrophysics Decadal Survey top priority recommendation in the large space mission category. The science program includes two dedicated investigations to tackle outstanding questions in dark energy research and exoplanet exploration, and includes a substantial General Observer program to enable targeted investigations of astrophysical phenomena to advance other goals from the Decadal Survey. A coronagraph instrument is included in the payload for purposes of advancing the present state of the art of coronagraph technology. This document is the RST attitude control system thrusters Deliverable Items List and Schedule (DILS).
1.2 Scope
This document lists all of the deliverables for the ACS thrusters, the Statement of Work (SOW) paragraph number where the deliverable is described further, the type of response required from NASA GSFC, the format of the deliverable, and the schedule for delivery.
1.3 Related Documentation
The latest versions of all documents below should be used. RST documents can be obtained from URL: https://ipdtdms.gsfc.nasa.gov/.
1.3.1 Applicable Documents
The following documents are referenced within this document and are directly applicable or contain policies or other directive matters that are binding for the contents of this document. In the event of conflict between an Applicable Document and the content of this document, the RST Project Configuration Change Board has the final authority for conflict resolution.
Document Number Title RST-PROP-SOW-0042 Attitude Control System Thruster Statement of Work
1.3.2 Reference Documents
The following documents are referenced herein and amplify or clarify the information presented in this document. These documents are not binding on the content of this document.
Document Number Title RST-PROP-SPEC-0121 Attitude Control System Thruster Specification
2 DELIVERABLES
Table 1 provides the list of data deliverables required for the ACS thruster program. Column descriptions are given below.
Description: This provides the Title of the deliverable item.
Reference: This provides the reference back to the pertinent document and section calling out the deliverable and providing further information for the deliverable’s content.
Category:
A = Approval – Items in this category require approval from the National Aeronautics and Space Administration (NASA)/Goddard Space Flight Center (GSFC) Contracting Officer (CO). In general, documents shall be provided in contractor format as long as required content, as specified in the ACS Thruster Statement of Work (RST-PROP- SOW-0042), is addressed. The NASA GSFC CO reserves the time-limited right of disapproval for each submission. The time-limited period is 30 working days from official (non-draft) receipt of documents.
R= Review – Items in this category do not require formal NASA GSFC CO approval, but will be reviewed by the GSFC or its designated representatives in order to determine contractor effectiveness in meeting contract objectives. When Government review reveals inadequacies, the contractor may be requested to correct the inadequacies. GSFC will review and comment within 20 working days of receipt.
I = Information – Items in this category are informal and are for information only.
Format: This provides the format for the deliverable. For documents, the following format applies:
E = Electronic – Provide submittal in electronic format to the Contracting Officer’s Representative (COR), and Contracting Officer. The vendor and COR shall jointly determine the type of electronic format (e.g., Word, Excel, PowerPoint, PDF, MATLAB) acceptable for each deliverable.
Table 1. Data Delivery Documentation and Schedule
Item
Description SOW Reference Schedule Category/ Format
1 SOW Compliance Matrix
SOW 2.1 Initial version provided with Proposal;
Updated version fourteen
(14) calendar days before
DCR (if necessary)
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
2 Milestone List SOW 2.2 With Proposal Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
3 Monthly Status Report
SOW 2.2 Fourteen (14) calendar days following the month being reported.
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
For Information
Purposes.
4 TIM SOW 2.4.6 Schedule As Negotiated In person at Contractor Facility.
Review Required.
5 Class I Configuration Management (CM) Changes
SOW 6.2 Seven (7) calendar days after Contractor CM review
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
6 Class II CM Changes SOW 6.2 With DIL #2 Monthly Status Report
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
7 Waivers/Deviations/ MRBs
SOW 6.2 Seven (7) calendar days after Contractor CM review
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
8 Notifications SOW 2.3 Seven (7) calendar days in advance of all mandatory hardware inspections, test activities, TIMs, and deliveries.
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
Description SOW Reference Schedule Category/ Format
9 Kick Off Meeting Package
SOW 2.4.1 Three (3) working days before the Kick Off meeting
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required
10 Kick Off Meeting SOW 2.4.1 Fourteen (14) calendar days after contract award
In person at Contractor Facility.
Review Required.
11 Interface Control Document(s)
SOW 3.1 Preliminary at Kick-off Meeting;
Final at fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
12 Mission Assurance Implementation Plan / Quality Assurance Plan
SOW 6.1 Twenty-eight (28) calendar days after contract award
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
13 Closed-Loop Product Nonconformance Plan
SOW 6.1 Twenty-eight (28) calendar days after contract award
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
14 Lead Free Control Plan
SOW 6.1 Thirty (30) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
15 EEE Parts Control Plan
SOW 6.7.1 Thirty (30) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
16 As-Designed Materials and Processes List
SOW 6.8.3 Thirty (30) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
17 Materials Usage Agreement
SOW 6.8.4 Thirty (30) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
Description SOW Reference Schedule Category/ Format
18 Fastener Integrity Control Plan
SOW 6.8.5.4.1 Thirty (30) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
19 List of Critical Fasteners
SOW 6.8.5.4.1 Thirty (30) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
20 Contamination Control Plan
SOW 6.9.1 Thirty (30) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
21 Foreign Object Debris Control Plan
SOW 6.9.1 Thirty (30) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
22 System Safety Program Plan
SOW 6.10.1 Thirty (30) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
23 Design Conformance Review Presentation Package
SOW 2.4.2 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
24 Drawing Package SOW 3.2 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
25 Computer Models SOW 3.3 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
For Information
Purposes.
Description SOW Reference Schedule Category/ Format
26 Structural Analysis Report
SOW 3.4 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
27 Structural Finite Element Model
SOW 3.5 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
28 Thermal Analysis Report
SOW 3.6 & 3.6.1 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
29 Thermal Model & Documentation
SOW 3.7 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
30 Catalyst Bed Heating Analysis Report (if separate from
DIL #28)
SOW 3.6.1 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
31 Error Analysis Report SOW 3.8 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
32 Failure Mode, Effects and Criticality Analysis
SOW 3.10 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
33 Reliability Analysis SOW 3.11 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Description SOW Reference Schedule Category/ Format
34 Individual Verification Test Plans (if needed)
SOW 5.1 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
35 Verification Plan (including Specification Verification Matrix)
SOW 5.1, 6.6.1 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
36 Limited-Life Items List
SOW 6.6.3 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
37 EEE Parts Analyses SOW 6.7.2 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
38 Worst-Case Analyses SOW 6.7.2 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
39 Recertification Plans for EEE Parts > 5 years old (if applicable)
SOW 6.7.3 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
40 Documentation on Use of Water Soluble Flux
SOW 6.8.5.5.1 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
41 Design Conformance Review (DCR)
SOW 2.4.2 Three (3) months after Award of Contract
In person at Contractor Facility.
Review Required.
42 Design Conformance Review Report
SOW 2.4.2 Fourteen (14) calendar days after completion of DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Description SOW Reference Schedule Category/ Format
43 Additive Manufacturing & Qualification Plan
SOW 6.8.5.2.2 Thirty (30) calendar days before hardware fabrication
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
44 Operations Hazard Analysis
SOW 6.10.2 Thirty (30) calendar days before QTRR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
45 Verification Test Procedure(s) - Qualification and Acceptance
SOW 2.4.3, 2.4.4,
5.2
Twenty-eight (28) calendar days before start of testing and as changes occur.
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
46 Thermal Vacuum Bakeout Plan
SOW 6.9.3 Twenty-eight (28) calendar days prior to beginning of Thermal Vacuum Bakeout
Tests
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
47 QTRR Package, if needed
SOW 2.4.3 Fourteen (14) calendar days before QTRR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
48 Qualification Test Readiness Review (QTRR), if needed
SOW 2.4.3 Seven (7) calendar days before start of testing on
Qualification Unit
In person at Contractor Facility.
Review Required.
49 QTRR Report SOW 2.4.3 Fourteen (14) calendar days after completion of QTRR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
50 ATRR Package SOW 2.4.4 Fourteen (14) calendar days before ATRR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
51 Acceptance Test Readiness Review
(ATRR)
SOW 2.4.4 Seven (7) calendar days before start of acceptance testing
In person at Contractor Facility.
Description SOW Reference Schedule Category/ Format
52 ATRR Report SOW 2.4.4 Fourteen (14) calendar days after completion of ATRR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
53 Thermal Vacuum Bakeout Test Results (if not part of Thermal Vacuum Report)
SOW 6.9.3 Fourteen (14) calendar days after completion of
Thermal Vacuum Bakeout Tests
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
54 User/Instruction Manual
SOW 3.9 Fourteen (14) calendar days before PSR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required
55 Flight Unit(s) Pre- Ship Review (PSR)
SOW 2.4.5 Seven (7) calendar days prior to delivery of each
Flight Unit
In person at Contractor Facility.
Approval Required.
56 Flight Unit(s) Pre- Ship Review Presentation Package
SOW 2.4.5 At PSR Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
57 Verification Test Report(s)
SOW 5.3 At PSR Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
58 Flight Unit(s) End Item Data Package(s)
(EIDP)
SOW 2.4.5, 6.6.2,
6.8.3, 6.8.6, 6.9.2
With each delivered Flight Unit and available at PSR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
See
As-Built Materials List
SOW 6.8.3 As part of EIDP (DIL #14), and thirty (30) calendar days prior to PSR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Description SOW Reference Schedule Category/ Format
See
Materials Certificate of Compliance
SOW 6.8.6 As part of EIDP (DIL #14) Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
See
Cleanliness Certification Report
SOW 6.9.2 As part of EIDP (DIL #14) Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
59 ACS Thruster Flight Units Qty: 17
SOW 4.2 12 months TBR after contract award (ACA)
As specified in Clause GSFC
52.247-94 Approval Required.
60 ACS Thruster Qualification Unit (if needed)
SOW 4.2 With Item #44 As specified in Clause GSFC
52.247-94 Approval Required.
61 ACS Thruster GSE (Test Plugs, Alignment Hardware, Nozzle Covers)
SOW 4.5 With Item #44 As specified in Clause GSFC
52.247-94 Approval Required.
Appendix A Abbreviations and Acronyms
Abbreviation/ Acronym
DEFINITION
A Approval ACA After contract award ACS Attitude Control System ATRR Acceptance Test Readiness Review CCB Configuration Control Board CCR Configuration Change Request CM Configuration Management CMO Configuration Management Office CO Contracting Officer COR Contracting Officer's Representative DCR Design Conformance Review DIL Deliverable Items List DILS Deliverable Items List and Schedule E Electronic EEE Electrical, Electronic, and Electromechanical EIDP End Item Data Package(s) ERB Engineering Review Board GSE Ground Support Equipment GSFC Goddard Space Flight Center I Information MRB Materials Review Board NASA National Aeronautics and Space Administration NWNH New Worlds, New Horizons PSR Pre-Ship Review QTRR Qualification Test Readiness Review R Review RST Roman Space Telescope SOW Statement of Work TIM Technical Interchange Meeting URL Uniform Resource Locator
| 1 Introduction |
| 1.1 Purpose |
| 1.2 Scope |
| 1.3 Related Documentation |
| 1.3.1 Applicable Documents |
| 1.3.2 Reference Documents |
| 2 Deliverables |
| Appendix A Abbreviations and Acronyms |