This is an Overhaul Description document detailing requirements for repairing and overhauling power supply units (NSN: 6130-01-500-4014, P/N: 700139-536-002) for the U.S. Coast Guard. The document outlines specific overhaul requirements including disassembly/cleaning, repair/replacement of failed parts, installation of field changes/modifications/firmware upgrades, and reassembly/testing procedures.
The contractor must perform final performance testing using operational equipment mock-ups or Automated Test Equipment, conduct visual inspections of workmanship and safety, and affix permanent vendor identification decals traceable to the repair date and contract. The work includes a standard manufacturer's warranty and requires government acceptance at destination. All items must be individually preserved and protected against deterioration for a minimum of 2 years, with specific packaging and marking requirements detailed. The document lists recommended sources as Thales Mackay Radio Inc. in Raleigh, NC and U.S. Technologies, with an estimated overhaul cost not to exceed $1,850 per unit.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| rn018 OD.pdf | ||
| 52.212-3.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OVERHAUL DESCRIPTION
FOR OFFICIAL USE ONLY
ITEM NAME POWER SUPPLY
STOCK NUMBER 6130-01-500-4014
PART NUMBER 700139-536-002
USED ON
Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.
OVERHAUL REQUIREMENTS:
Electronic equipment shall be processed for the return of unserviceable items to an operational status. This process shall accomplish with R-400-299-M and as stated below :
a. Disassembly and cleaning required to facilitate the equipment repairs.
b. Repair or replacement of parts that have failed or are of marginal quality due to wear, deterioration, or damage so as to return the item to ready for issue (RFI) condition.
c. Install all applicable field changes, modifications and firmware upgrades.
d. Re-assembly, alignment, and testing.
Disassembly and Cleaning. The degree of disassembly on any equipment or module processed by the Contractor shall be commensurate with the level of repair required. Items requiring cleaning during repair shall be cleaned prior to or during the pre-induction inspection and disassembly, whichever is deemed more practical by the Contractor. Final cleaning shall be conducted to ensure the component is free of obvious defects and corrosion, soil, grease, residue, fingerprints, perspiration, or other acid or alkali residues. All temporary markings and tags, to include the CG-5236 Serviceable/Unserviceable Tag shall be removed.
Final performance and acceptance testing. A dynamic test will be conducted to confirm acceptability of alignment and function. This must be accomplished using a fully operational equipment mock-up, or the use of Automated Test Equipment (ATE) with the ability to emulate live circuit conditions. The qualifying performance standard for the equipment shall be the test criteria contained in the equipment technical requirements. A record of the data obtained during the test shall be made on a test data record sheet. The Contractor is responsible for preparing and maintaining the documents. A copy of the applicable test data record shall be included with each item.
Final inspection. This inspection shall consist of 1) a visual inspection of workmanship, assembly and fit, mechanical and electrical safety and marking, workmanship, assembly and fit, mechanical and electrical safety and marking, materials, parts, and finish, and, treatment for prevention of corrosion and
2) verification of all operations specified in the equipment technical requirements. All final inspection observations and measurements shall be recorded, certified and a copy included with each item.
Marking - Contractor identification. The Contractor shall affix a permanent vendor identification decal that is traceable by the Coast Guard to the Contractor, date of repair and the contract under which the repair was accomplished.
NOTE: All previous markings and/or quality assurance decals shall be completely removed from a reusable shipping container prior to the application of any new markings.
REFERENCES:
SFLC SP-PPM-001
R-400-299-M
SHELF LIFE CD 0
Electronic equipment shall be processed for the return of unserviceable items to an operational status. This process shall accomplish with R-400-299-M and as stated below :
a. Disassembly and cleaning required to facilitate the equipment repairs.
b. Repair or replacement of parts that have failed or are of marginal quality due to wear, deterioration, or damage so as to return the item to ready for issue (RFI) condition.
c. Install all applicable field changes, modifications and firmware upgrades.
d. Re-assembly, alignment, and testing.
Disassembly and Cleaning. The degree of disassembly on any equipment or module processed by the Contractor shall be commensurate with the level of repair required. Items requiring cleaning during repair shall be cleaned prior to or during the pre-induction inspection and disassembly, whichever is deemed more practical by the Contractor. Final cleaning shall be conducted to ensure the component is free of obvious defects and corrosion, soil, grease, residue, fingerprints, perspiration, or other acid or alkali residues. All temporary markings and tags, to include the CG-5236 Serviceable/Unserviceable Tag shall be removed.
Final performance and acceptance testing. A dynamic test will be conducted to confirm acceptability of alignment and function. This must be accomplished using a fully operational equipment mock-up, or the use of Automated Test Equipment (ATE) with the ability to emulate live circuit conditions. The qualifying performance standard for the equipment shall be the test criteria contained in the equipment technical requirements. A record of the data obtained during the test shall be made on a test data record sheet. The Contractor is responsible for preparing and maintaining the documents. A copy of the applicable test data record shall be included with each item.
Final inspection. This inspection shall consist of 1) a visual inspection of workmanship, assembly and fit, mechanical and electrical safety and marking, workmanship, assembly and fit, mechanical and electrical safety and marking, materials, parts, and finish, and, treatment for prevention of corrosion and
2) verification of all operations specified in the equipment technical requirements. All final inspection observations and measurements shall be recorded, certified and a copy included with each item.
Marking - Contractor identification. The Contractor shall affix a permanent vendor identification decal that is traceable by the Coast Guard to the Contractor, date of repair and the contract under which the repair was accomplished.
NOTE: All previous markings and/or quality assurance decals shall be completely removed from a reusable shipping container prior to the application of any new markings.
REFERENCES:
SFLC SP-PPM-001
R-400-299-M
WARRANTY:
X A. Standard Manufacturer's Warranty
B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.
Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.
GOVERNMENT ACCEPTANCE:
Acceptance will be made at destination by a Government representative.
Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.
OVERHAUL DESCRIPTION
PACKAGING AND MARKING FOR SHIPMENT:
X
A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:
NATIONAL STOCK NUMBER
ITEM NAME
PART NUMBER
GOVERNMENT ORDER NUMBER
6130-01-500-4014
POWER SUPPLY
700139-536-002
PRESERVATION / PACKAGING:
A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.
X B. See Attachments
B. See Attachments
And the words: "Coast Guard SFLC Material, Condition "A"
RECOMMENDED SOURCES:
THALES MACKAY RADIO INC
5249 CAPITAL BLVD
RALEIGH, NC
240-864-7512
KIM CARROLL
240-864-7512
U.S. TECHNOLOGIES
WRITTEN BY:
DATE :
SEATON WOODY
14 JAN 25
Cost Estimate for Overhaul NOT TO EXCEED: $1,850