About this file
This solicitation requests quotes for the overhaul, inspection, and repair of power supply units used by the United States Coast Guard. The Coast Guard Surface Force Logistics Center requires quotes to open, inspect, report on, and overhaul four UPS1-1.25K-1G-SRNDTI-F2 power supplies manufactured by Nova Power Solutions. Quotes are due by December 19, 2023 and shall be submitted electronically. Award will be made to the lowest priced technically acceptable offer. The contractor must guarantee items against defects for up to two years after delivery.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OVERHAUL DESCRIPTION
FOR OFFICIAL USE ONLY
ITEM NAME POWER SUPPLY
STOCK NUMBER 6130-01-528-4046
PART NUMBER UPS1-1.25K-1G-SRNDTI-F2
USED ON VAR
Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.
OVERHAUL REQUIREMENTS:
REPAIR IAW SFLC SPEC NUMBER R-400-299-H DTD FEB 2004
ITEM IS NOT SOLE SOURCE REPAIRED, BUT BATTERIES MUST BE PURCHASED BY THE OEM,
NOVA POWER SOLUTIONS INC.
EACH UNIT TO BE INDIVIDUALLY PACKAGED I/A/W ASTM-D3951-04.
EACH UNIT TO BE INDIVIDUALLY MARKED I/A/W MIL-STD 129P.
BAR CODING REQUIRED.
WARRANTY:
X A. Standard Manufacturer's Warranty
B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.
Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.
GOVERNMENT ACCEPTANCE:
Acceptance will be made at destination by a Government representative.
Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.
SHELF LIFE CD 0
FOR OFFICIAL USE ONLY
PACKAGING AND MARKING FOR SHIPMENT:
X
A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:
NATIONAL STOCK NUMBER
ITEM NAME
PART NUMBER
GOVERNMENT ORDER NUMBER
6130-01-528-4046
POWER SUPPLY
UPS1-1.25K-1G-SRNDTI-F2
PRESERVATION / PACKAGING:
A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.
X B. See Attachments
B. See Attachments
And the words: "Coast Guard SFLC Material, Condition "A"
RECOMMENDED SOURCES:
NOVA POWER SOLUTIONS,INC
21515 RIDGETOP CIRCLE SUITE 210
STERLING, VA 20166
POC: JUSTIN PALMER
O: 703-581-6862 C: 703-298-7122
UNITED STATES TECHNOLOGIES
1701 POLLITT DR
FAIR LAWN NJ 07410
(800)234-0862 EXT 276
WWW.USTECHNOLOGIES.COM
WRITTEN BY:
DATE :
SEATON WOODY
02 JAN 24
Cost Estimate for Overhaul NOT TO EXCEED: $2,000