rn009 OD.pdf

PDF 6 KB Posted

Attached to
OIR POWER SUPPLY Federal contract opportunity
Solicitation number
70Z08024QRN009
Issued by
Department of Homeland Security US Coast Guard

About this file

This solicitation requests quotes for the overhaul, inspection, and repair of power supply units used by the United States Coast Guard. The Coast Guard Surface Force Logistics Center requires quotes to open, inspect, report on, and overhaul four UPS1-1.25K-1G-SRNDTI-F2 power supplies manufactured by Nova Power Solutions. Quotes are due by December 19, 2023 and shall be submitted electronically. Award will be made to the lowest priced technically acceptable offer. The contractor must guarantee items against defects for up to two years after delivery.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OVERHAUL DESCRIPTION

FOR OFFICIAL USE ONLY

ITEM NAME POWER SUPPLY

STOCK NUMBER 6130-01-528-4046

PART NUMBER UPS1-1.25K-1G-SRNDTI-F2

USED ON VAR

Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.

OVERHAUL REQUIREMENTS:

REPAIR IAW SFLC SPEC NUMBER R-400-299-H DTD FEB 2004

ITEM IS NOT SOLE SOURCE REPAIRED, BUT BATTERIES MUST BE PURCHASED BY THE OEM,

NOVA POWER SOLUTIONS INC.

EACH UNIT TO BE INDIVIDUALLY PACKAGED I/A/W ASTM-D3951-04.

EACH UNIT TO BE INDIVIDUALLY MARKED I/A/W MIL-STD 129P.

BAR CODING REQUIRED.

WARRANTY:

X A. Standard Manufacturer's Warranty

B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.

Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.

GOVERNMENT ACCEPTANCE:

Acceptance will be made at destination by a Government representative.

Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.

SHELF LIFE CD 0

FOR OFFICIAL USE ONLY

PACKAGING AND MARKING FOR SHIPMENT:

X

A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:

NATIONAL STOCK NUMBER

ITEM NAME

PART NUMBER

GOVERNMENT ORDER NUMBER

6130-01-528-4046

POWER SUPPLY

UPS1-1.25K-1G-SRNDTI-F2

PRESERVATION / PACKAGING:

A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.

X B. See Attachments

B. See Attachments

And the words: "Coast Guard SFLC Material, Condition "A"

RECOMMENDED SOURCES:

NOVA POWER SOLUTIONS,INC

21515 RIDGETOP CIRCLE SUITE 210

STERLING, VA 20166

POC: JUSTIN PALMER

O: 703-581-6862 C: 703-298-7122

UNITED STATES TECHNOLOGIES

1701 POLLITT DR

FAIR LAWN NJ 07410

(800)234-0862 EXT 276

WWW.USTECHNOLOGIES.COM

WRITTEN BY:

DATE :

SEATON WOODY

02 JAN 24

Cost Estimate for Overhaul NOT TO EXCEED: $2,000

File details come from the government source that posted it. Updated .