SOW - PHASE 2 - CONSULATE RENOVATIONS - 2021_RMID COMMENTS.doc
DOC document 79 KB Posted
- Attached to
- RFQ19CA1022R0001 US CONSULATE GENERAL CALGARY, AB, CANADA Federal contract opportunity
- Solicitation number
- RFQ19CA1022R0001
- Issued by
- Department of State
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2022 0202_CD_RMP_US CONSUL-ID4.2_Finish Schedule_REVISED.pdf | ||
| a. SF-1442.pdf | ||
| b. PART 1 THE SCHEDULE - SECTION B SUPPLIES OR SERVICES AND PRICES-COSTS.pdf | ||
| c. PART II - CONTRACT CLAUSES.pdf | ||
| e. ATTACHMENT 5 - MECHANICAL SPECIFICATION - DRAWINGS.pdf | ||
| h. PART IV - INSTRUCITONS, CONDITIONS AND NOTICES - SECTION L AND M.pdf | ||
| d. PART III DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS - ATTACHMENTS 1 - 4.pdf | ||
| f. ATTACHMENT 5 -MECHANICAL AND ELECTRICAL SPECIFICATIONS.pdf | ||
| g. PART IV - REPRESENTATIONS AND INSTRUCITONS - SECTION K.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
PHASE 2 - RENOVATIONS
Location: 1000, 615 Macleod Trail S.E.
Billing address: U.S. Consulate General
Calgary, AB, T2G 4T8
1000, 615 Macleod Trail S.E.
Calgary, AB, T2G 4T8
Scope of Work:
The United States Consulate General in Calgary is looking to upgrade and renovate some of its existing office space on the 10th floor of the Rocky Mountain Plaza. This is to increase office space to accommodate new staff and TDY personnel and to create a disability complaint bathroom.
IT Workspace
Renovate existing IT Office workspace to create a new office space for the IPO (Information Programs Officer). See A&E design. The doors should have a Medico key push pin locking mechanism. All electrical, data, telephone, lighting, HVAC and sprinkler system must meet local code and match the A&E design.
MPR (Multi Purpose Room) Remove existing storage area. All existing furniture and items in the room are to be moved to the main floor storage area. Existing electrical, data and telephone connections are to be utilised as much as possible. Build out two offices on the North side wall and two on the East wall as per A&E design. All doors are to have medico key push pin locks installed. All electrical, data, telephone, lighting, HVAC, and sprinkler system must meet local code and match the A&E design.
Existing PA&POL/ECON assistants office space
Existing office space is currently all separate offices. Create one open plan concept. See A&E Design. All electrical, data, telephone, lighting, HVAC, and sprinkler system must meet local code and match the A&E design.
EXEC office space
Redesign existing office space to increase office workspace to accommodate another 3 positions. Consul General’s office to be redesigned and upgraded. See A&E design. All electrical, data, telephone, lighting, HVAC, and sprinkler system must meet local code and match the A&E design.
Painting Remove wallpaper, sand, mud, etc. and prepare for painting for interior hallways, existing offices, and new spaces renovated as part of current A&E design. One undercoat and two coats of commercial grade paint. Paint trim on door and window frames. See A&E design for all office space being renovated. Coordinate for carpet tile removal and movers to move furniture and office materials.
Painting of all existing corridors and offices was not part of the design scope and does not appear on the drawings.
Finishes specifications sheet has been modified to include a new specification and notes to refer to Statement of Work.
Flooring
Replace carpeting in hallways, existing office spaces, and install new carpeting in new spaces renovated as part of current A&E design.
Replacing all of the carpet was not part of the design scope, which is why some carpet was asked to be salvaged for reuse.
Finishes specifications sheet has been modified to include a new specification and notes to refer to Statement of Work.
New ADAD Compliant bathroom and lactation room Renovate existing old kitchen near the Commercial section office space as per A&E design. Build an ADAD compliant bathroom and maternity room as per the A&E design. Bathroom should include a sink, vanity, mirror, toilet, toilet roll dispenser, hand sanitizer dispenser, electric hand dryer, support rails for ADAD bathrooms to meet local disability code, new door, new pot lights, new mirror lighting, new floor tile and wall tiles, new wall and ceiling paint, and paint doors & frames. Lactation room should include sink, vanity, mirror, hand sanitizer dispenser, electric hand dryer, new door, new floor tile and wall tiles, new wall and ceiling paint, and paint doors & frames. Signs on doors for both disability bathroom and maternity room respectively. All colours and fixtures to be approved by the contracting officer or in his absence the COR. All electrical, lighting, HVAC, and sprinkler system must meet local code and match the A&E design.
Update existing bathrooms near large kitchen Updating these washrooms in any way was not part of the design scope and is not on the drawings.
Replace urinals, toilets & flush valves There is no specification for urinals.
The toilet specifications could match the new toilet specified for the Universal washroom.
Replace sinks & faucets Would recommend the same sink & faucet as the lactation room be used (not the universal toilet room specifications) Replace mirrors The new mirrors specified (sheet ID7.0) require power. You can either use the same powered mirrors as specified for the lactation room and universal washroom, or a simple framed mirror. But if you use the pre-lit mirror ensure the contractor has supplied power.
Retile floor Use Floor Tile T1 as specified New pot lights and mirror lighting Ensure power for mirrors is supplied.
Update soap dispenser, paper towel holder, waste container, toilet partitions, toilet paper dispenser, and sanitary napkin disposal.
Use the same ones as specified for the Universal Washroom
Post One Entry
Is this the waiting area or the security vestibule?
Replace carpeting
Replace wall coverings with new paint
Repaint trim
Replace pot lights
Coordinate for carpet tile removal and movers to move furniture and office materials.
There is an LVT specified for the Lactation room. This should be the same one that was used in the kitchen and it can be used anywhere you might want LVT again.
The Contractor must remove all spoiled materials from the work site daily and keep the work site neat and clean throughout the construction process. The Contractor will work with building management company to coordinate all elements of the project and coordinating the use of elevator access. Upon receiving the ‘Notice to Proceed’ letter, the contractor can proceed with the work. All existing areas surrounding the site will be protected from damage and dirt throughout the construction phase. Any damage will be restored to its original position and condition at the cost of the contractor.
The U.S. Government's Contracting Officer (CO) or the Contracting Officer's Representative (COR) shall approve, in writing, any changes to this Scope of Work.
Personnel:
The Contractor shall furnish sufficient personnel, certified safety equipment and the technical knowledge and experience necessary to complete the work. The Contractor shall obtain, maintain and pay all national, provincial and local insurance, licenses, permits, fees and certifications needed/required to perform the work prior to commencement and for the duration of the work. All work shall be accomplished according to all national, provincial, and local building, fire, safety, environmental, health codes. All contractors working on site must complete the DS-7673 Consent to Release Information form, which will be provided by the Consulate Security office.
Performance of Work
Work will be performed during regular business hours (e.g., Monday – Friday, 8:30 am to 4:30 pm) and all contractor personnel will be escorted by post security personnel when in the office space. No work will be performed on statutory holidays or outside of regular business hours. Work staging will need to be coordinated with post management to ensure continuity of Consulate General operations. MPR space renovations should be prioritized to create swing space to allow for other office renovations. All contractor personnel agree to follow post instructions regarding masks and other COVID-19 precautions.
Payment:
The Contractor shall provide a fixed priced lump sum proposal in CANADIAN DOLLARS to the Contracting Officer. Please note that advance payments are not permitted and will not be granted. The contract will be a FIRM FIXED PRICE contract. No additional sums will be payable on account of any escalation in the cost of materials, equipment, or labor, or because of the contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required by this contract. The contractor should carefully review this document including all attachments. If a requirement is in one, it is considered to be in all and shall be priced accordingly. Nor will the contract price be adjusted on account of fluctuations in the currency exchange rates. Changes in the contract duration and/or cost will be made only due to changes made by the Government in the work to be performed, or by delays caused by the Government.
Liquidated Damages: The Contracting Officer shall withhold from the final payment liquidated damages in the amount of CAD 1% of the overall cost per day for each day of delay beyond the project completion date.
The Contractor shall submit one copy of all payment invoices, with the appropriate backup documents to the Contracting Officer’s Representative (COR). The COR will determine if the invoice is complete and correct as submitted. The COR will also determine if billed services have been satisfactorily performed and if expenses billed are correct. If it is determined that the amount billed is incorrect, the COR will, within seven days, request that the Contractor submit a revised invoice.
The Contractor shall specifically identify its last invoice as "FINAL INVOICE." The final invoice shall include the remaining payment due under the basic contract and all modifications issued, if any.
U.S. Government supplied equipment: NONE
Specifications:
· See approved A&E design
· The Contractor is required to submit completed security forms DS7673 Consent to Release of Information for release of for all workers and sub-contractors assigned to the project must have a security check performed.
The U. S. Government request a fixed price quotation in Canadian Dollars or US Dollars for US Companies All prices must be received by the U.S. Consulate, Calgary by 4:30pm, July 20th, 2021. If requested, a pre-quotation site visit will occur on Friday, July 9, 2021 at 10:00 am.
All quotations must be broken down between the costs of supplies and materials and a separated cost for labour.
The quotation can be emailed to ursellrc@state.gov or mail to:
U. S. Consulate, Calgary 1000, 615 Macleod Trail S.E.
Calgary, Alberta
T2G 4T8 For any questions, please contact Management Specialist Robert Ursell at (403)-444-5219