This request for quotation (RFQ) solicits quotes for the production of CKU 7 Tracks on a lowest price technically acceptable (LPTA) basis. The Naval Surface Warfare Center Indian Head Division intends to award a firm fixed price purchase order for 110 production units and 5 first article test units. Quotes are due by January 26, 2024 and the period of performance is 90 days for production items. Evaluation will be based on technical acceptability of the quote and price. The solicitation is set aside for small businesses only and involves delivery of units and data deliverables to NSWC Indian Head.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CKU-7 3153 SOW 10551421 Rev W .pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0017424Q0022
NSWC IHD
RECEIVING
4522 MCMAHAN ROAD B116
INDIAN HEAD MD 20640-5125
TEL: 301-744-4221 FAX:
REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER) 1
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED RATING
DO-A5N0017424Q0022 10-Jan-2024 5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this
Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. %
NOTE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)
THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
NSWC INDIAN HEAD
ATTN: DEANNA WILSON
4081 N. JACKSON RD. RM 221
INDIAN HEAD MD 20640
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ]X FOB
DESTINATION
[ ] OTHER
(See Schedule)
26-Jan-2024(Date)
PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
301-744-6891DEANNA L WILSON
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 5 Each CKU 7 Tracks (FAT)
FFP
First Article Testing Lot // Testing to be performed by the Government at IHEOD Test Facility FOB: Destination VENDOR PART NR: CKU 7 Tracks
PSC CD: 5342
NET AMT
0002 110 Each CKU 7 Tracks
FFP
Production Lot FOB: Destination
0003 1 Data
Records
CDRL A001 Test/Inspection Report
FFP
BLK 4: Contractor format acceptable.
BLK 9: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use. To protect technical or operational data or information from automatic dissemination under the international exchange program or by other means. This protection covers publications required solely for official use or strictly for administrative or operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data.) (10/7/2020). Other requests shall be referred to Commanding Officer or Technical Director, NSWC Indian Head Division.
BLK 12: Final Dimensional Inspection Report is due simultaneous with delivery of production units. Government has 15 working days from receipt of draft to review and comment. The Contractor has 10 working days from receipt of Government comments to submit revisions. If the Government does not submit revision request within 15 working days, draft submittal is approved.
BLK 14: Submit via e-mail in Microsoft Office or PDF format to the e-mail recipients listed below.
DISTRIBUTION ADDRESSEE -
Rockets/CAD/PAD Manufacturing Division
NSWC IHEODTD
Attn: David Dias, Code M13DAD 4341 Carpenter Road Building 1685 Indian Head, MD 20640-5088
David Dias david.a.dias.civ@us.navy.mil FOB: Destination
0004 1 Data
CDRL A002 Certification CoC
BLK 4: Contractor format acceptable.
BLK 9: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use. To protect technical or operational data or information from automatic dissemination under the international exchange program or by other means. This protection covers publications required solely for official use or strictly for administrative or operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data.) (10/7/2020). Other requests shall be referred to Commanding Officer or Technical Director, NSWC Indian Head Division.
BLK 12: Certificate of Compliance is due simultaneous with delivery of production units. Government has 15 working days from receipt of draft to review and comment. The Contractor has 10 working days from receipt of Government comments to submit revisions. If the Government does not submit revision request within 15 working days, draft submittal is approved.
BLK 14: Submit via e-mail in Microsoft Office or PDF format to the e-mail recipients listed below.
DISTRIBUTION ADDRESSEE -
Rockets/CAD/PAD Manufacturing Division
NSWC IHEODTD
Attn: David Dias, Code M13DAD 4341 Carpenter Road Building 1685 Indian Head, MD 20640-5088
David Dias david.a.dias.civ@us.navy.mil FOB: Destination
0005 1 Data
CDRL A003 Certification - CoA
BLK 4: Contractor format acceptable.
BLK 9: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use. To protect technical or operational data or information from automatic dissemination under the international exchange program or by other means. This protection covers publications required solely for official use or strictly for administrative or operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data.) (10/7/2020). Other requests shall be referred to Commanding Officer or Technical Director, NSWC Indian Head Division.
BLK 12: Certificate of Compliance is due simultaneous with delivery of production units. Government has 15 working days from receipt of draft to review and comment. The Contractor has 10 working days from receipt of Government comments to submit revisions. If the Government does not submit revision request within 15 working days, draft submittal is approved.
BLK 14: Submit via e-mail in Microsoft Office or PDF format to the e-mail recipients listed below.
DISTRIBUTION ADDRESSEE -
Rockets/CAD/PAD Manufacturing Division
NSWC IHEODTD
Attn: David Dias, Code M13DAD 4341 Carpenter Road Building 1685 Indian Head, MD 20640-5088
David Dias david.a.dias.civ@us.navy.mil FOB: Destination
0006 1 Data
CDRL A004 Inspection Test Plan
BLK 4: Contractor format acceptable.
BLK 9: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use. To protect technical or operational data or information from automatic dissemination under the international exchange program or by other means. This protection covers publications required solely for official use or strictly for administrative or operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data.) (10/7/2020). Other requests shall be referred to Commanding Officer or Technical Director, NSWC Indian Head Division.
BLK 12: Certificate of Compliance is due simultaneous with delivery of production units. Government has 15 working days from receipt of draft to review and comment. The Contractor has 10 working days from receipt of Government comments to submit revisions. If the Government does not submit revision request within 15 working days, draft submittal is approved.
BLK 14: Submit via e-mail in Microsoft Office or PDF format to the e-mail recipients listed below.
DISTRIBUTION ADDRESSEE -
Rockets/CAD/PAD Manufacturing Division
NSWC IHEODTD
Attn: David Dias, Code M13DAD 4341 Carpenter Road Building 1685 Indian Head, MD 20640-5088
David Dias david.a.dias.civ@us.navy.mil FOB: Destination
Section C - Descriptions and Specifications
SOW
MANUFACTURING OF HARDWARE USING NSWC IHD DRAWINGS
PERFORMANCE WORK STATEMENT
1.0 Scope of Work
The requirements in this document contain the information necessary to manufacture hardware for assembly in fleet-deliverable Aviation Critical Safety Items (ACSIs) at Naval Surface Warfare Center Indian Head Division (NSWC IHD).
2.0 Applicable Documents
CKU-7 - CDRL_A001_Inspection CKU-7 - CDRL_A002_CoC CKU-7 – CDRL_A003 CoA CKU-7 – CDRL_A004_Test Plan 10551421 Rev W – Track 10551421 Rev W Form 16
10551421 Form 43 5184307 Rev D – PPS Coating
SAE AMS 6348E
SAE AMS 6382R
2.1 General Specifications
American National Standards Institute (ANSI)/American Society for Quality (ASQ) Standards:
ANSI/ASQ Z1.4 Sampling Procedures and Tables for Inspection by Attributes
Code of Federal Regulations (CFR):
22 CFR 121 The United States Munitions List 22 CFR 122 Registration of Manufacturers and Exporters
Department of Defense (DoD) Directives:
5230.25 Withholding of Unclassified Technical Data From Public Disclosure
International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) Standards:
ISO 9001 Quality Management Systems ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration
Laboratories
2.2 Technical Drawings
Department of Defense Drawings:
10551421 Rev W Track
2.3 Conflicting Document Requirements
If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.
3.0 Requirements
3.1 General Manufacturing
The Contractor shall fabricate, inspect, test, and deliver components in accordance with the applicable drawings and specifications. Components shall be packaged by part number and ready for use. The Contractor shall provide, design, and fabricate all necessary tooling to manufacture and dimensionally inspect the components, and provide data as detailed herein.
The Prime Contractor shall bear the ultimate responsibility for all deliveries and performance of all requirements under this contract. The Prime Contractor shall monitor and maintain all subcontractor relationships. At the Government’s sole discretion, the Government may apply quality and/or on-time delivery issues stemming from the work of a subcontractor to the Prime Contractor’s quality performance metrics.
3.2 Test and Inspection
The Contractor shall maintain and control processes to inspect and test components as described in this PWS. These processes should cover all phases from the ordering of the material to the Government acceptance of the finished product.
3.2.1 First Article Testing
The Contractor shall submit First Article Test (FAT) samples to the Government if the Contractor has not provided contract deliverables for the same drawing numbers within the last 3 years.
The Contractor shall submit an Inspection Test Plan in accordance with DI-QCIC-81110 per CDRL A004 to the Government for review and approval prior to first article manufacture and delivery. The Contractor shall submit a first article sample of 5EA complete units prior to the first delivery of any production hardware. The first article units shall be fully representative of those proposed for production, and demonstrate the adequacy and suitability of the Contractor's processes and procedures in complying with the requirements set forth by the drawings and specifications.
Any production by the Contractor before formal acceptance of the first article sample shall be at the Contractor’s cost risk.
3.2.2 Dimensional Inspection
The Contractor is responsible for performing in-house inspections to ensure each first article or production component and dimension conforms 100% to the contract, PWS, and product dimensional requirements. The Contractor shall provide copies of in-process dimensional data and/or proof of inspections, such as floor shop travelers or final QA inspections, as requested by the Government.
The Contractor shall submit a Final Dimensional Inspection Report in accordance with DI-NDTI- 80809 per CDRL A001 for each deliverable line item. The final dimensional inspection report shall include either a list of all drawing dimensions and tolerances, and their actual measured values, or a marked-up copy of the drawing with actual measured values written in red next to the corresponding dimension.
3.2.3 Product Certification
The Contractor shall submit a certificate of compliance in accordance with DI-QCIC-81356 per CDRL A002 to accompany the shipment of each first article and/or production lot, as required by Table 3. The certificate shall state compliance of the material with its respective drawing or specification, and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date.
The Contractor shall submit a certificate of analysis/test in accordance with DI-QCIC-82386, showing the first article and/or production material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract, as required by Table
1. The certificate shall be forwarded to the Government; one (1) copy to accompany the shipment (in the packing list envelope), and one (1) copy mailed to arrive at time of receipt of the shipment (mark the certificate to the attention of the designated POC above). Each certificate must be traceable to the material covered by the certificate. The certificate shall state, above the signature of a legally authorized representative of the company the following:
Both Certificates of Analysis and Compliance shall state, above the signature of a legally authorized representative of the company, the following:
“This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001.”
Test Requirement
Certificate Dwg Location
Material 10551421 Rev W DWG Note #2 (M113). Analysis Hardness 10551421 Rev W DWG Note #2 (M113). Analysis Heat Treat 10551421 Rev W DWG Note #2 (M113). Compliance Plating 10551421 Rev W DWG Note #9 (M114) &
5184307 Rev D.
Compliance
Dimensional 10551421 Rev W DWG Note #10. Compliance
Table 1: Certification Requirements
3.3 Quality Control
3.3.1 Quality System and Quality Control Processes
The Contractor shall maintain a quality system which adheres, at minimum, to the requirements of ISO 9001:2015 standards.
The Contractor quality management system shall ensure products are in compliance with the applicable drawings, specifications, and contract. The quality management system shall outline processes to identify, record, and disposition nonconforming material or other characteristic discrepancies for the entire duration of this contract. Procedures, planning, and all other relevant documentation and data which comprise the quality management system, if requested, shall be made available to the Government for review.
3.3.2 Calibration of Measuring and Testing Equipment
Measuring and testing equipment used by the contractor shall, at a minimum, adhere to the requirements of ISO/IEC 17025:2017.
3.3.3 Acceptance of Product
Final acceptance of first article samples and production deliverables will be determined by Government dimensional inspection and certification verification at Government destination for each deliverable line item. The Government shall complete sample testing within 60 days of receipt of all documentation and deliverables relevant to the relevant line item. Unless otherwise stated, the Government sampling plan shall be in accordance with Table 2. The Government reserves the right to perform additional inspection and testing of hardware to verify acceptability.
This may include testing at other facilities.
ASQ Z1.4 [ANSI/ASQ Z1.4-2003 (R2013) – October 2013]:
Critical: 100% Major: Level II Minor: Level I
Table 2: ACSI Sampling Plan
3.3.4 Government-Identified Nonconformity Reporting Procedures The Government shall alert the Contractor to any nonconforming deliverables within one (1) working day of identifying the nonconformity. The Contractor shall respond with their recommended disposition on the deliverables within one (1) working day.
3.4 Export Control
The Contractor shall comply with either one, or both, of the export control options below.
3.4.1 International Trafficking in Arms Regulations (ITAR) Compliance The Contractor shall maintain ITAR compliance through registration in accordance with 22 CFR 122 to export Category III and IV munitions components, as defined by 22 CFR 121.
3.4.2 Joint Certification Program (JCP) Registration
The Contractor shall maintain JCP registration and a DD Form 2345 to comply with DoD Directive 5230.25.
3.5 Preservation
The Contractor shall be responsible for packing and packaging of deliverables to prevent any potential damage during transport. The Contractor shall label completed parts packaging to include component name, quantity, contract number, drawing number, revision, and manufacturer name and date. Packaging quantities and methods shall be in accordance with applicable Form 43.
4.0 Deliverables
The Technical Point of Contact and Contracting Officer (KO) for this contract will approve all deliverables as specified. The following Certificates shall include the signature of the Contractor’s representative authorized to make such certification.
CDRL Spec Section Title A001 DI-NDTI-80809 3.2.2 Final Dimensional Inspection Report A002 DI-QCIC-81356 3.2.3 Certificate of Compliance A003 DI-QCIC-82386 3.2.3 Certificate of Analysis A004 DI-QCIC-81110 3.2.1 Inspection Test Plan
4.1 Hardware Delivery
The Contractor shall notify the Contracting Officer 30 days in advance if the Contractor cannot meet the contract delivery schedule.
The Contractor shall be responsible for coordinating and shipping all the units below to the required destination.
Item Year Drawing Rev Nomenclature Qty UOI 1 Base 10551421 W Track (FAT) 5 EA
2 Base 10551421 W Track 110 EA
Delivery address provided below:
Naval Surface Warfare Center Indian Head Division ATTN: David Dias/Gabriel Ezimorah 4522 McMahon Road Bldg. 116, Suite 100 Indian Head, MD 20640
Section D - Packaging and Marking
SPECIAL PACKAGING INSTRUCTIONS
Special Packaging Instructions A. Primary physical protection for shipping and handling damage shall be provided by covering each part with a web-type sleeve (reference CAPLUG SW series or equivalent) of appropriate size as to ensure protection from physical damage.
B. Inserting a desiccant bag per MIL-D-3464, Type I or II of appropriate size, with each component, into any poly-bag with a minimum thickness .002 inch, which is necessary to provide moisture protection. Each unit may either be heat-sealed, or zip locked.
The bag must be legibly marked with part name, part number, revision letter and quantity.
C. After completion of the above requirements the parts are to be bulk packaged for shipment to the Indian head Division, Naval Surface Warfare Center.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996
CLAUSES INCORPORATED BY FULL TEXT
52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)
(Contracting Officer shall insert details)
(a) The Contractor shall deliver 5 unit(s) of Lot/Item CLIN 0001 within 60 calendar days from the date of this contract to the Government at NSWC Indian Head for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.
(b) Within 60 calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, the Contractor--
(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and
(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.
(f) If the Government does not act within the time specified in paragraphs (b) or (c) of this clause, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.
(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.
(End of clause)
E-246-H020 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (OCT 2018)
The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the requirements of ASQ/ANSI/ISO 9001:2015 “Quality Management Systems – Requirements” and supplemental requirements imposed by this contract. The quality management system procedures, planning, and all other documentation and data that comprise the quality management system shall be made available to the Government for review. Existing quality documents that meet the requirements of this contract may continue to be used. The Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the implementing procedures. The Contractor shall flow down such standards, as applicable, to lower-tier subcontractors under instances covered in FAR 52.246-11(b) or at the direction of the Contracting Officer. The Government reserves the right to disapprove the quality management system or portions thereof when it fails to meet the contractual requirements.
(End of text)
E-246-H022 INSPECTION AND TEST RECORDS (NAVSEA) (JAN 2019)
Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness. The data shall, on request, be identified and made available for on-site review by the Contracting Officer or designated Government representative.
E-246-W001 CERTIFICATE OF ANALYSIS (NAVSEA) (OCT 2018)
(a) A certificate of analysis/test showing that the material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract shall be submitted to the COR or TPOC. The certificate shall be maintained by the contractor for a minimum of one (l) year; one (1) copy to accompany the shipment (in the packing list envelope) and one (1) copy mailed at time of the shipment (mark the certificate to the attention of: Code 00Q).
(b) Each certificate must be traceable to the material covered by the certificate. The certificate shall state, above the signature of a legally authorized representative of the company the following:
This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.
(c) Beneath the signature include the typed name of the individual signing this certificate.
(d) Certificate for shipments of bulk chemicals shall state contract number, drawing or specification number, lot number, rail car number if shipped by rail or trailer number if by truck, and the date of shipment.
(e) Any demurrage accrued as a result of detaining commercial carriers because of nonreceipt of the certificate shall be the responsibility of the Contractor.
(f) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.
(g) The certificate shall read as follows:
I certify that on ______ [insert date], the ____ [insert Contractor’s name] furnished the supplies called for by the Order/Contract No._____ via ____ [Carrier] on ________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies have been sampled and/or tested and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document.
Date of Execution: ________________________________ Signature: _______________________________________ Typed Name: ____________________________________ Title: ___________________________________________
E-246-W002 CERTIFICATE OF COMPLIANCE (NAVSEA) (OCT 2018)
(a) A certification of material shall be provided by the Contractor, one (1) copy to accompany the shipment (in the packing list envelope) and (l) copy mailed to arrive at time of receipt of the shipment. Mark all certificates to the attention of Code 00Q.
(b) The certificate shall state compliance of material with drawing specification and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date. The certificate shall state, above the signature of a legally authorized representative of the company, the following:
This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.
(c) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.
(d) The certificate shall read as follows:
I certify that on ______ [insert date], the ____ [insert Contractor’s name] furnished the supplies called for by the Order/Contract No._____ via ____ [Carrier] on ________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies or services are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this document.
Date of Execution: ________________________________ Signature: _______________________________________ Typed Name: ____________________________________ Title: ___________________________________________
E-246-W005 SAMPLING OF RECEIVED MATERIAL – MAN-RATED MATERIAL (NAVSEA) (MAY 2021)
(a) When NAVSEA, Naval Surface Warfare Center Indian Head Division receipt inspects man-rated material under this contract for catapults, cartridge actuated devices, propellant actuated devices and their related component parts, the sampling plan utilized shall be as outlined in the applicable technical data package or as otherwise specified in other controlling documentation. If the sampling plan is not specified within any applicable controlling documentation, the sampling plan and the sampling size shall be as outlined by one of the following:
ASQ Z1.4 (ANSI/ASQ Z1.4 -2003 (R2018):
Critical: 100% Major: Level II
Minor: Level I MIL-STD-1916 (DTD 1 APR 96 with NOTICE 2 DTD 5 JUN 14):
Critical: Level V Major: Level II, N < 200 Level III, N > 200 Minor: Level I, N < 100 Level II, N > 100
(b) In all cases, the acceptance number of defects will be ZERO (0); the lot will be rejected for any defect unless specifically otherwise specified by the inspection type and code.
(c) Notwithstanding the above, NAVSEA, Naval Surface Warfare Center Indian Head Division may, at its discretion, accept a defect on an approved waiver on a case-by-case basis.
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 60 dys. ADC 5 NSWC IHD
RECEIVING
4522 MCMAHAN ROAD B116
INDIAN HEAD MD 20640-5125
301-744-4221 FOB: Destination
N00174
0002 90 dys. ADC 110 (SAME AS PREVIOUS LOCATION)
0003 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0004 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0005 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0006 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
52.211-17 Delivery of Excess Quantities SEP 1989
Section G - Contract Administration Data
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Invoice and Receiving Reports (Combo) Destination / Destination
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Invoice and Receiving Reports (Combo) Destination / Destination
(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC N62838
Issue By DoDAAC N00174
Admin DoDAAC** N00174
Inspect By DoDAAC N00174
Ship To Code N00174
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) ____
Service Acceptor (DoDAAC) ____
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”)
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
Send additional notifications to: david.a.dias.civ@us.navy.mil For invoicing questions: NAVSEA.NSWC.IHEODTDVendorPay@navy.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
G-232-H005 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN 2019)
(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the sub line item number (SLIN) or CLIN level, rather than at the total contract/TO level, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of other direct costs (ODCs), materials, and travel, by technical instruction (TI), SLIN, or CLIN level. For other than firm fixed price subcontracts, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal.
Subcontractors may email encryption code information directly to the Contracting Officer and Contracting Officer Representative (COR). Should the subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the Contracting Officer and COR; or other method as agreed to by the Contracting Officer.
(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and Contracting Officer on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and Contracting Officer email notification as required herein.
G-242-H002 HOURS OF OPERATION AND HOLIDAY SCHEDULE (NAVSEA) (JUL 2021)
(a) The policy of this activity is to schedule periods of reduced operations or shutdown during holiday periods.
Deliveries will not be accepted on Saturdays, Sundays or Holidays except as specifically requested by the [insert activity name]. All goods or services attempted to be delivered on a Saturday, Sunday or Holiday without specific instructions from the Contracting Officer or his duly appointed representative will be returned to the contractor at the contractor’s expense with no cost or liability to the U.S. Government.
(b) The federal Government observes public Holidays that have been established under 5 U.S.C. 6103. The actual date of observance for each of the holidays, for a specific calendar year, may be obtained from the OPM website at OPM.GOV or by using the following direct link:
https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/.
(c) Delayed Opening, Early Dismissal and Closure of Government Facilities. When a Government facility has a delayed opening, is closed or Federal employees are dismissed early (due to severe weather, security threat, security exercise, or a facility related problem) that prevents personnel from working, onsite contractor personnel regularly assigned to work at that facility shall follow the same reporting and/or departure directions given to Government personnel. The contractor shall not direct charge to the contract for such time off, but shall follow parent company policies regarding taking leave (administrative or other). Non-essential contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal, delayed opening, or during periods of inclement weather, onsite contractors should monitor the OPM website as well as radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.
(d) When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site contractors shall continue working established work hours or take leave in accordance with parent company policy. Those contractor employees who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, or closings in accordance with the FAR, applicable cost accounting standards, and the company’s established policy and procedures. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The Contracting Officer will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy and procedures.
(e) If you intend to visit the Contracts Office, it is advised that you call for an appointment at least 24 hours in advance.
(f) The hours of operation are as follows:
AREA FROM TO
Building 116 0730 – 1130 1230 – 1530
(g) All deliveries to the Receiving Officer, BLDG 116, shall be made Monday through Friday from 0730 - 1130 to 1230 – 1530, local time. Deliveries will not be accepted after 1530. No deliveries will be accepted on federal government holidays.
POC
The following contacts are provided for this contract:
Contract Administrator: Deanna Wilson Phone Number: (301) 744-6891 E-mail: deanna.l.wilson27.civ@us.navy.mil
Payments/Invoicing: Comptroller Vendor Pay Phone Number: (301) 744-6998 E-mail: NAVSEA.NSWC.IHEODTDVendorPay@navy.mil
Technical Representative: David Dias Phone Number: (301) 744-6709 E-mail: david.a.dias.civ@us.navy.mil
Any concerns regarding your contract, should be directed to the above mentioned personnel, or the Contracting Officer Marlene Ridgell at (301) 744-6617 or by email at marlene.l.ridgell.civ@us.navy.mil.
Section H - Special Contract Requirements
VPP CLAUSE
1. Voluntary Protection Program:
1.1. In August 2006, Indian Head Division (IHD) Naval Surface Warfare Center (NSWC) was nominated to participate in the DoD Voluntary Protection Program Center of Excellence Implementation Initiative of the Defense Safety Oversight Council (DSOC). The Voluntary Protection Program (VPP) was established by the Occupational Safety and Health Administration (OSHA) in 1982 to recognize and promote effective worksite-based safety and health management systems. IHD NSWC, through the utilization of VPP, desires to be a model of safety and health excellence. VPP's emphasis on trust and cooperation between OSHA, the employer, employees, employees representatives, and contractors complements the Agency's enforcement activity but does not take its place. All parties, including Contractors, are to work together to identify and resolve any safety and health problems that may arise, yet obtain Contracting Officer approval of any changes that would impact the terms of the contract. IHD NSWC as the VPP participant develops and implements systems to effectively identify, evaluate, prevent, and control occupational hazards so that injuries and illnesses to employees and contractors are prevented. Contractor and sub-contractor personnel are subject to occupational safety and health oversight. This oversight will be accomplished by IHD NSWC personnel and Contracting Officers. Contractors, sub-contractors, and their employees, while in performance of a contractual action on-site within the geographical boundaries of Naval Support Facility (NSF) Indian Head, shall be subject to the requirements of the IHDIVNAVSURFWARCENINST 5100.22, “Safety Manual” regardless of the type or duration of the contract.
Appendix 13-A, of the chapter 13 entitled “Contractor Safety Requirements When Performing Work at the Naval Support Facility (NSF) Indian Head, MD” shall be signed by the Contractor prior to commencement of services on-site at NSF Indian Head. The Contractor shall maintain one signed copy for future reference in educating its personnel and sub-contractors. A second signed copy shall be provided to the Contracting Officer to be maintained in the contract file. If an occupational safety or health related injury or illness occurs during the performance or as a result of this contractual action, the Contractor shall notify the Contracting Officer Representative (COR) as soon as practicable, who will notify the Safety Office and the Contracting Officer. 1.2 In support of VPP and in compliance with Chapter 13 of the Safety Manual, entitled “Contractor Safety,” all Contractors performing on-site at NSF Indian Head shall comply with the following:
1.2.1 Public Law 91-596 (and Amendments), also known as the Occupational Safety and Health Act of 1970, establishes that all employers, including Contractors, are responsible, as far as possible, for providing every employee a safe and healthful working environment. All employers, including Contractors, shall conform to the standards as issued by OSHA. Contractors are responsible for complying with safety requirements specified in the contract as well as all Federal, State, and local safety and security regulations. Non-compliance may be cause for the removal of a Contractor or any Contractor employee from the activity and such non-compliance may form the basis for contractual action, up to and including termination for default.
1.2.2 Contractor personnel shall participate in basic safety awareness and hazard identification training offered by the Government activity at the work area they are supporting. Contractors performing on-site shall attend area weekly safety meetings and annual safety stand-downs, as determined by the COR.
1.3 The best Safety and Health Programs involve every level of the organization, instilling a safety culture that reduces accidents for workers and improves the bottom line for managers. When Safety and Health are part of the organization and a way of life, everyone wins. IHD NSWC is committed to safety excellence. The Contractor shall familiarize itself with the IHDIVNAVSURFWARCENINST 5100.22, “Safety Manual,” Appendix 13-C entitled “OSHA Voluntary Protection program (VPP) Fundamentals Training for Contractors”.
2. Contractor On Site Training:
2.1 A Contractor providing support on-site at any IHD NSWC site may be required to have its on-site Contractor personnel participate in training covering rules, practices, procedures, equipment and systems, as needed, based on the type of support being provided. This training may include, but is not limited to: Operation Security training (OPSEC); Personally Identifiable Information training; DoD Information Assurance Awareness training;
Information Technology Security; Voluntary Protection Program (VPP) training; and Personnel Security training.
2.1.2 This training will be provided at no cost by the IHD NSWC site and will take place on-site during normal contract working hours without any additional compensation for the Contractor. This training does not relieve the Contractor of its responsibility to train its employees in such areas as environment, health, safety, security, sexual harassment, ethics, etc. to ensure compliance with all federal, state, and local laws and DoD regulations.
H-246-H001 CALIBRATION SYSTEM REQUIREMENTS (NAVSEA) (FEB 2023)
(a) Definitions:
(1) All definitions, with the exception of Commercial Service Provider, are found in OPNAVINST3960.16 (series).
(2) Commercial Service Providers. Suppliers of tools, instruments, fixtures, test, measurement, and diagnostic equipment, including original equipment manufacturers, who may calibrate their own products but are not engaged in calibration as a major line of business, and other commercial laboratories that provide either calibration services in support of Navy contracts, or low volume, model specific, or unique parameter calibration services.
(b) The accuracy of Navy and Contractor calibrated equipment used for quantitative and qualitative measurements are ensured through measurement traceability. The Contractor is required to ensure that all calibrated equipment used for quantitative or qualitative measurements required for the research, design, test, production, and maintenance of NAVSEA systems will be maintained and calibrated in accordance with references OPNAVINST
3960.16 and NAVSEAINST 4734.1. Calibration sources shall be accredited by a U.S. based, Navy approved accreditation body to U.S. national standards:
(1) ANSI/NCSL Z540.3, Requirements for the Calibration of Measuring and Test Equipment, dated 3 Aug 2006; or
(2) ISO/IEC 17025:2017, General Requirements for the Competence of Testing and Calibration Laboratories (3rd Edition), dated 29 Nov 2017; or
(3) Certified by the U.S. Navy to NAVSEA 04-4734, Navy and Marine Corps Calibration Laboratory Audit/Certification Manual.
(c) ISO/IEC 17025:2017 and ANSI/NCSL Z540.3 accreditations must be performed by a U.S. based accreditation body.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .