RFQ ATT.1 - SOW HVAC Office 25 May 2023.pdf

PDF 1 MB Posted

Attached to
Modular Office, Bldg. 60 on Scott AFB Federal contract opportunity
Solicitation number
FA440723QDEW1
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to Modular Office, Bldg. 60 on Scott AFB, newest first.
File Type Posted
RFQ ATT.2 - FAR DFARS Clauses and Provisions.pdf PDF
RFQ - HVAC Modular Bldg.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

HVAC Modular Office

Scott AFB, IL

25 May 2023

1. DESCRIPTION OF SERVICES

1.1 The Contractor shall provide all labor, tools and equipment to install a modular office within Building 60, 375 CES HVAC Shop. The modular office shall be Port-a-King, or government approved equal, and match the existing color to the best of your ability (Lazy Grey-LOWES) and structural material modular offices inside the facility. Approximate size shall be 19 feet long, 22 feet wide and 8.5 feet high.

1.2 The modular office shall be a two-wall unit constructed in the corner of the facility utilizing two existing walls to complete the office area. Unit shall be equipped with:

1.2.1 The 22’ wall section shall be equipped with a 3070 Heavy Duty Aluminum Door, with Half glass, Clear Anodized Finish, Clear Tempered Safety Glass and a Lever Lockset

1.2.2 The 22’ wall section shall be equipped with wall panels constructed with 3” Versa King prefinished wall panels with solid EPS with fixed window tempered safety glass.

1.2.3 The 19’ wall section shall be equipped with 3” Versa King prefinished wall panels with solid EPS without fixed window tempered safety glass.

1.2.4 Standard Light Switch w/ Modular Wiring, 115V Duplex Outlet w/ Modular Wiring 4 EA (minimum of 1 foot above the bottom of wall), Exit Sign (Only) w/ Modular Wiring, and 100-amp, Single Phase 12 Circuit Load Center w/Main Breaker w/ Modular Wiring.

1.2.5 Corrugated Type "B" Metal Roof Deck, Complete Acoustical Ceiling with 6” Batt Insulation.

1.2.6 Contractor shall provide and install five each 2’ x 4’ LED drop in light fixtures.

1.2.7 Contractor shall install all electrical services from contractor provided and installed

Single Phase 12 Circuit Load Center w/Main Breaker w/ Modular Wiring, to the electrical switches, outlets, lights etc… All circuits need to be labeled accordingly.

1.2.8 The contractor is not required to provide power to the Single Phase 12 Circuit Load Center w/Main Breaker. The government shall provide this power.

2. Construction

2.1 The contractor shall perform a site survey to verify site conditions and validate measurements. All work shall conform to industry standards and meet all applicable codes and standards.

2.2 Unless otherwise approved by the government, work shall be Monday thru Friday, excluding federal holidays, between 06:30 and 16:30 (6:30 a.m. – 4:30 p.m.)

2.3 Contractor shall submit design drawings for government approval of the new modular office.

2.3.1 Drawings shall show length, width and height of walls.

2.3.2 Drawings shall indicate location of door, windows, wall outlets, light switch and electrical panel.

2.3.3 Drawings shall show detail of roof and ceiling.

3. GOVERNMENT FURNISHED UTILITIES

3.1. The Contractor may have use of government electrical and water utilities that are available within Building 60. Any additional needed utilities that are not available within building 60 must be provided by the contractor, and the contractor will need to provide these at their own expense.

4. GOVERNMENT FURNISHED EQUIPMENT

4.1. There are no government furnished equipment provided for this SOW. The Contractor is responsible for all tools, training, supplies, materials, labor, vehicles, etc.

5. ENVIRONMENTAL AND SAFETY CONTROLS

5.1. Environment Management System (EMS) Policy. Scott Air Force Base (AFB) is committed to excellence in all aspects of environmental stewardship activities using the Air Force Environmental Management System (EMS). This commitment and use of EMS applies to all activities, products and services associated with Scott AFB partner units and contractors.

5.2 Contractor’s personnel shall work under this contract in a manner that is consistent with Scott AFB EMS and conforms to all applicable environmental laws, regulations and policies. Upon awarding of the contract, the Contractor shall review the Scott AFB, EMS Environmental Policy Letter.

5.3 Waste Management.

5.3.1 The contractor is responsible for the analysis, characterization and proper handling of waste generated by their operation. If hazardous wastes are generated, the contractor shall properly contain the waste and it will be government’s responsibility to properly dispose. The contractor shall anticipate 375 CES/CEI audits to ensure their hazardous waste program is compliant with requirements.

5.3.2 Under no circumstances shall the contractor remove any waste from Scott Air Force Base without ensuring complete and full compliance with all applicable existing environmental laws and regulations. A.II shipments must be prepared in accordance with Department of Transportation Regulations (40 CFR 172).

5.4 The contractor shall notify 375 CES/CEI of all chemical materials brought on base, to include quantity and the Safety Data Sheets.

5.5 Notification of Environmental Spills.

5.5.1 If the contractor spills or releases any hazardous substance that contacts or has the potential to contact water, soil or any drain (sanitary or storm) the contractor shall call 911 (256-4911 utilizing telephone on base) then the CO immediately. The contractor shall be liable for reimbursement of containment and environmental clean-up of the spill or release of such substance.

5.5.2 Spill Response. The contractor shall be responsible for the clean-up and disposal of all spilled materials. This includes all materials used to contain and absorb the spill. Spilled material must be cleaned-up promptly and reported to the CO. If any amount of spilled material contacts or has the potential to contact water, soil or any drain (sanitary or storm), the contractor shall call 911 (256-4911 if utilizing telephone on base) immediately. Spills of HAZMA.T or hazardous waste shall be managed in accordance with the current 375 CES Wing Integrated Contingency Plan for Oil and Hazardous Substances Spill Prevention and Response for Scott AFB. Disposal of wastes generated from spill clean-up shall be the contractor's responsibility. The contractor shall be liable for reimbursement of containment and environmental clean-up of the spills.

5.5.3 Training. The contractor is responsible to train their employees regarding Environmental and Hazardous Materials Handling. The contractor is also required to have and maintain Safety Data Sheets for all materials used by the contractor in accordance with but not and/or regulations limited to federal and state laws.

5.6 Fire Safety. The contractor shall obtain a burning permit from the Scott AFB Fire Department building 460, (256-5130) prior to welding, burning or cutting operations each day they anticipate performing this type of work. A.II welding and burning operations necessary for the completion of the OWS shall be accomplished in strict compliance with fire safety and applicable standards. The contractor shall provide and maintain fire extinguishers in accordance with NFPA standards during all welding and burning operations.

5.7 Performance of Service during a Crisis (Declared by the Secretary of Defense or Overseas Combatant Commander).

All services to be performed under this contract have been determined to be nonessential for performance during a crisis according to Department of Defense Instruction (DODI) 3020.37 and Air Force implementation thereof, unless otherwise directed by the CO.

6. SECURITY REQUIREMENTS

6.1. Contractor Responsibilities. The contractor will be responsible for the conduct of all employees working their control for this contract. This includes any subcontractors they have to fulfill contract requirements.

6.2 Contractor Consent to Background Checks: The contractor and, as applicable, subcontractor shall not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population, nor shall the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified by Law Enforcement Agency Data System (LEADS) through the National Crime Information Center. LEADS checks will verify if a person is wanted by local, state, and federal agencies. All contractor and subcontractor personnel must consent to LEADS background checks. Contractor and subcontractor personnel who do not consent to an LEADS check will be denied access to the installation. Information required to conduct an LEADS check includes: full name, driver’s license number, and/or social security number, date of birth of the person entering the installation, and completion of a background check questionnaire. The contractor shall provide this information using the Scott AFB Form 21, Contractors Consent for Background Check, and shall submit it in conjunction with the contractor’s request for either base or vehicle passes. Completion of a successful LEADS check does not invalidate the requirement for an escort when contractor or subcontractor personnel are working within controlled or restricted areas. All identifying credentials will be compliant with the REAL ID Act.

6.3 Contractors shall ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Persons later found to be undocumented or illegal aliens will be remanded to the proper authorities. The contractor shall not be entitled to any compensation for delays or expenses associated with complying with the provisions of this clause. Furthermore, nothing in this clause shall excuse the contractor from proceeding with the contract as required.

6.4 Badges: The contractor is required to provide identification badges for their employees. All contractor personnel shall wear these badges while on duty on the government site. Badges are required to identify the individual, company name, and be clearly and distinctly marked as contractor. Size, color, style, etc. are to be mutually agreed to by contractor and government. The contractor’s identification badge will not be used as an entry requirement for installation entry or into any government designated controlled or restricted area.

NOTE: All DBIDS cards/passes will be turned in to the Dixon Visitor Control Center upon expiration of pass and/or completion of contract.

6.5 Contractor Registration of Vehicles on Scott AFB: All contractor or contractor employees’ vehicles used for the performance of this contract shall comply with all local, state and federal regulations. Additionally, any pass shall be surrendered to Security Forces upon demand to positively identify a person’s need to be on Scott AFB.

6.6 Access to Installation during Force Protection Conditions (FPCONs):

Contractors will be assigned a mission essential designation IAW requirements contained in SAFBI 31-101/Installation Security Instruction. Only the installation commander or the unit commander requesting contract support will assign the mission essential designation.

6.7 Property Protection: Property protection for facility where the contractors’ primary work center is located will be the responsibility of the local facility manager and local Government

Security Manager, or their duly authorized representative IAW AFI 31-101, Integrated Defense and command/local directives. The contractor shall safeguard all government-owned equipment and materials in his/her possession or use.

6.8 Safeguarding Classified or Unclassified Information: The contractor shall meet Air Force standards for storing, processing, and handling classified information and systems. Additionally, all resources (e.g. maps, publication/instructions, photos) provided by the government to assist the contractor in the performance of their contract will be surrendered upon termination of employment or the end of the contract performance period.

6.9 Contractors Working in Controlled or Restricted Areas. The unit requesting contract support will provide escort (s) for contractors at all times when within a controlled area. Contractors shall not escort other contractor employees within controlled or restricted areas. In addition, contractors shall fulfill, maintain, and comply with all security requirements IAW AFI 31-101, Integrated Defense, and command/local directives.

6.10 Contractors Working in Controlled or Restricted Areas

The unit requesting contract support will provide escort (s) for contractors at all times when within a controlled area. Contractors shall not escort other contractor employees within controlled or restricted areas. In addition, contractors shall fulfill, maintain, and comply with all security requirements IAW AFI 31-101, Integrated Defense, and command/local directives.

6.11 Access to Government Facilities with Controlled or Restricted Areas The contractor shall comply with security regulations imposed by the installation commander and/or the agency responsible for the project location. Due to specific mission requirements inherent in the nature of controlled or restricted areas on Scott AFB, the government may direct the contractor to leave the controlled or restricted areas at any given time.

6.12 Contractors Responsibilities while Working within Controlled or Restricted Areas Only contractor personnel with proper authority and qualifications shall enter a controlled or restricted area. Certain facilities require the issuance of an AF Form 1199CD. The government, at any time, may revoke the AF Form 1199CD. The procedures for the issuance of an AF Form 1199CD are contained in SABFI 31-1 Integrated Defense/Antiterrorism Plan. Contractors shall not escort other contractor employees within controlled or restricted areas. Upon completion of the contract, all 1199CDs will be turned into the sponsor and in turn delivered to 375 th

SFS/S5B,

Line Badges. In addition, contractors shall fulfill, maintain, and comply with all security requirements contained in SABFI 31-1 Integrated Defense / Antiterrorism Plan.

6.13 Access to Government Facilities with Controlled or Restricted Areas for Replacement Contractors The unit requesting contract support will continuously escort replacement contractors, not initially possessing the proper clearances and requiring entry to controlled or restricted areas.

Replacement contractors shall submit paperwork within 30 days of being assigned to obtain an approved security clearance or favorable review. Replacement contractor personnel shall obtain a security clearance prior to working with, or having direct access to, classified material. In addition, replacement contractor personnel shall obtain a “Favorable review” prior to having access to a Controlled Area. The above information shall be submitted to 375 AMW/IP.

7. NON-PERSONAL SERVICES AND/OR INHERENTLY

GOVERNMENTAL SERVICES

7.1 The Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor feels that any actions constitute, or are perceived to constitute personal services, it shall be the contractor’s responsibility to notify the PCO immediately. These services shall not be used to perform work of a policy/decision making or management nature, (e.g., inherently governmental functions). All decisions relative to programs supported by the contractor shall be the sole responsibility of the Government.

8. ADMINISTRATION

8.1 The total amount of this order shall be a “not-to-exceed” amount and the services shall not exceed the dollar limitations specified on the contract without prior approval from the Government Contracting Officer. Services provided in excess of the “not-to-exceed” amount without prior approval from the Contracting Officer are done at the contractor’s risk and subject to non-payment.

8.2 The government reserves the right to add additional funds to each CLIN if the situation or conditions warrant such a need.

8.3 The Government reserves the right to purchase urgently required services from another source should the contractor be unable to provide the services to meet the accelerated delivery requirement.

8.5 The contractor is not required to provide service on weekends or federal holidays, except in emergency situations. Federal holidays are as follows:

New Year's Day - 1 January Martin Luther King Day - 3rd Monday in January President’s Day - 3rd Monday in February Memorial Day - Last Monday in May Independence Day - 4 July Juneteenth Day - 3rd Monday in June Labor Day -1st Monday in September Columbus Day - 2nd Monday in October Veteran's Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December

From: Darryl Weaver To: WEAVER, DARRYL E CIV USAF AMC 375 CONS/PKB1 Subject: [Non-DoD Source] HVAC Date: Wednesday, May 17, 2023 2:58:59 PM

Sent from my iPhone mailto:darryledweaver@yahoo.com mailto:darryl.weaver@us.af.mil

File details come from the government source that posted it. Updated .