RFQ 2031ZA24Q00353 - Gantry Table.pdf

PDF 838 KB Posted

Attached to
Gantry Table 800mm-by-800mm Federal contract opportunity
Solicitation number
2031ZA24Q00353
Issued by
Department of the Treasury Bureau of Engraving and Printing

About this file

This document is a Request for Quotation (RFQ) for two (2) 800mm by 800mm gantry tables to be used by the Bureau of Engraving and Printing (BEP), Office of Quality Operations (OQO) to attach a Keyence VK-X 3000 microscope head and analyze materials used in currency manufacturing. The RFQ provides detailed technical requirements for the gantry tables, including specifications for the granite base, air isolation, travel stage, fixture plate, Z-axis, and electrical compatibility. The RFQ requires delivery within 6 months of contract award and includes provisions for installation, acceptance testing, training, warranty, preventative maintenance, and calibration services. Quotes are due by September 4, 2024. This is an unrestricted, firm-fixed-price procurement under NAICS code 337127 Institutional Furniture Manufacturing.

View the file

Other files for this federal contract opportunity

Other files attached to Gantry Table 800mm-by-800mm, newest first.
File Type Posted
Attachment 2 - 75D-07.0-04 EHS Contractor Requirements.pdf PDF
Attachment 3 - 75D-07.0-06 EHS Requirements for Large Equipment Purchases.pdf PDF
Attachment 1 - 75D-05.0-01 Radiation and Laser Safety.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ IS IS IS NOT A SMALL BUSINESS SET-ASIDE

PAGE

OF PAGES

1. REQUEST NO.

2031ZA24Q00353

2. DATE ISSUED

08/22/2024

3 REQUISITION/PURCHASE REQUEST NO.

Multiple

4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG.1

RATING

5a. ISSUED BY 6. DELIVER BY (Date)

5B. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY OTHER

NAME

Bureau of Engraving and Printing 14th and C St., S.W., Washington, DC 20228

TELEPHONE NUMBER FOB DESTINATION (SEE SCHEDULE)

AREA CODE NUMBER 9. DESTINATION

202 874-0264

a. NAME OF CONSIGNEE

Bureau of Engraving and Printing Washington, DC Facility

8. TO BE COMPLETED BY QUOTER: b. STREET ADDRESS

a. NAME b. COMPANY

14 & C Streets SW

c. CITY

Washington

d. CITY e. STATE f. ZIP CODE d. STATE

DC

e. ZIP CODE 20228

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5A ON OR

BEFORE CLOSE OF BUSINESS (Date)

04-Sep-2024 at 2:00 PM (EST)

IMPORTANT: This is a request for information, and quotations furnished are not Quotes. If you are unable to quote, please so indicate on this form and return it to the address in Block 5A. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services.

Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO. SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT

(a) (b) € (d) € (f)

This is a Request for Quotation (RFQ) for the supplies listed on page 3 (Pricing Schedule). This RFQ synopsis/solicitation for commercial items is prepared in accordance with the Federal Acquisition Regulations (FAR) in Subpart 12 & 13. This is firm-fixed-price procurement under NAICS Codes: 337127 Institutional Furniture Manufacturing.

All quotes will be accepted no later than – see Block 10 above.

12. DISCOUNT FOR PROMPT PAYMENT QUOTEED a. 10 CALENDAR

DAYS (%)

b. 20 CALENDAR

DAYS (%)

c. 30 CALENDAR

DAYS (%)

d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

14. SIGNATURE OF PERSON AUTHORIZED

TO SIGN QUOTATION

15. DATE OF QUOTATION

a. NAME OF QUOTER:

b. STREET ADDRESS 16. SIGNER

c. NAME (Type or print) b. TELEPHONE

c. COUNTY

d. CITY e. STATE f. ZIP CODE c. TITLE (Type or print) NUMBER

2 Bureau of Engraving and Printing 2031ZA24Q00353

SECTION A – GENERAL INFORMATION

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in subpart 12 & 13, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.

A. This solicitation document and incorporated provisions and clauses are those in effect through

Federal Acquisition Circular FAC 2024-05/effective date of 22 May 2024.

B. This procurement is unrestricted and the associated NAICS code are 337127 Institutional Furniture Manufacturing.

C. The Defense Priorities and Allocations System (DPAS) and assigned rating are not applicable to this procurement.

[END OF SECTION]

3 Bureau of Engraving and Printing 2031ZA24Q00353

SECTION B – PRICING SCHEDULE

Base Year

CLIN SUPPLIES/SERVICES QTY UNIT UNIT

PRICE TOTAL

LF-B-800-GR-Z2-TA2-ESTOP-VK-LC1-VAC

Large Format Base Platform Travel: 800 x 800 mm XY Travel (-800) Base Material: Granite Base and Bridge (-GR) Z-Axis: 200 mm Motorized Z-Axis with Joystick (-Z2) Table: Air Table, Open-frame (-TA2) Monitor Arm: None Emergency Stop: Mushroom Button and Safety Circuit (-ESTOP) Measurement Head: VK-X1050, VK-X1100, VK- X3050, or VK-X3100 (-VK) Line Cord: US 115VAC Compatible Line Cord (-

LC1)

Vacuum Line: Vacuum Line Cable Routing (- VAC) (12-months warranty included)

2 EA $ $

PM-FP-800

Fixture Plate Plate: 800 mm Square Plate with M6 Holes on a 50 mm Grid (-P800) Vacuum Chuck: None Integration: None System Size: Used with 800 x 800 mm Size Systems (-800)

2 EA $ $

0003 Onsite Startup Days of On-Site Service for Startup and Training 2 EA $ $

0004 Shipping 2 EA $ $

Total Base Year $

Grand Total $

4 Bureau of Engraving and Printing 2031ZA24Q00353

SECTION C – STATEMENT OF WORK (SOW)

C.1 Introduction/Background:

The Bureau of Engraving and Printing (BEP) is a component of the Department of the Treasury that designs, engraves, and prints U.S. banknote currency and other U.S. security products. In support of these operations at BEP’s Eastern Currency Facility (ECF) located in Washington, DC, the BEP and Western Currency Facility (WCF) located in Fort Worth, Texas, Office of Quality Operations (OQO) has a need for two (2) new 800mm by 800mm Gantry Table.

The BEP, OQO seeks to add to its existing capabilities with two (2) new 800mm by 800mm gantry table that meets or exceeds the specified requirements. The 800mm-by-800mm gantry table will be used to attach a Keyence VK-X 3000 microscope head to analyze materials used in currency manufacturing.

C.2 Objective/Scope/Purpose:

C.2.1 The Contractor shall provide 800mm by 800mm gantry table that is new and shall include at a minimum all sub-systems and major components listed in the technical requirements below. Under this requirement, the contractor shall provide the delivery, installation, acceptance, associated deliverables, and training of the requirement herein. No prototypes, refurbished, one-of-a-kind, or two-of-a-kind systems will be considered.

C.2.1.1 The systems shall include an 800mm-by-800mm gantry table with the corresponding instrument controller, accessories, and the latest and current version of operating software.

C.2.2 Both a granite base and air isolation are required for the gantry table to allow the VK-X 3000 microscope head to perform measurements due to the increase in the metrology loop.

C.2.3 The contractor shall provide all personnel for the required labor, equipment and materials, transportation, and supervision to deliver and install the 800mm-by-800mm gantry table systems. The contractor shall be responsible for the performance of all activities and materials to install and make the systems ready for operation. The contractor shall provide startup assistance, training, calibration procedure, integration, and warranty for this requirement herein. Warranty, calibration, and maintenance operating assistance service will be required for one year.

C.3 Tasks/Requirements:

The following represents the operational capability, functionality, and performance characteristics of the listed major sub-systems and major components of the 800mm-by- 800mm gantry table. The Contractor shall supply the 800mm-by-800mm gantry tables with the following characteristics:

C.3.1 The instruments shall be capable of seamlessly integrating with the Keyence VK-X 3000 Microscope head.

C.3.1.1 The Keyence VK-X 3000 Microscope head must mount directly on top of product.

5 Bureau of Engraving and Printing 2031ZA24Q00353

C.3.1.2 The set-up must be streamlined and must not take more than 5 minutes to install and connect the Keyence VK-X 3000 microscope head.

C.3.1.3 Stage must be controlled with Keyence VK Viewer software. Integration must not require any additional software.

C.3.2 The gantry tables must include a granite base.

C.3.3 The gantry tables must include passive air isolation.

C.3.4 The gantry tables must have an 800mm-by-800mm X-Y travel stage.

C.3.5 The gantry tables must have an 800mm square fixture plate.

C.3.6 The gantry tables must have a 200mm motorized Z -axis.

C.3.7 The gantry tables shall weigh no more than 2,000 pounds.

C.3.8 The gantry tables electricals must be compatible with 115V AC/ 15A.

C.3.9 Instruments shall provide a control system and all necessary software.

C.3.10 All parts shall be new. The above listing must be provided to specification without replacement. If any supply is unavailable, Contractor shall notify the BEP technical representative with recommended parts.

C.3.11 Contractor shall supply all parts within 6 months of award. Preference will be given for an earlier delivery date.

C.3.12 If any item is deemed insufficient or damaged, the Contracting Officer Representative (COR) will notify the contractor.

C.3.13 Contractor shall provide a minimum one-year warranty for all parts under this contract. The contractor warrants and implies that all items delivered hereunder are merchantable and fit for use for the particular purpose described in this SOW.

C.3.13.1 The government prefers a service/preventive maintenance contract. Contractor shall provide a point of contact for warranty concerns and/or issues.

C.3.13.2 The Contractor shall provide information for extended preventive maintenance, calibration services, and warranty packages for the instrument and its major components (e.g., desktop computer, software, etc.).

C.3.14 Contractor shall provide standard operating procedures for operation.

C.3.15 The contractor shall ensure all necessary components are installed, connected, and able to communicate with the software.

C.3.16 Contractor shall provide expert engineer to perform preventative maintenance and calibration services for the equipment listed below.

C.3.17 Contractor shall provide calibration certificates and stickers to document condition of instruments, date of services, and expiration of next calibration.

C.3.18 The Contractor shall provide all necessary applicable licenses for the network for data processing.

C.3.19 The Contractor shall submit point of contact along with their contact information including name, phone number, email address. The instrument deliverable is to be provided within seven (7) calendar days after award and within seven (7) calendar days after any change.

6 Bureau of Engraving and Printing 2031ZA24Q00353

C.3.20 The Contractor shall provide a delivery schedule as part of their initial quote. If any item is deemed insufficient or damaged, the Contracting Officer Representative (COR) shall notify the Contracting Officer (CO) and the Contractor.

C.3.21 The gantry table shall meet all Federal, State, and local safety requirements.

C.4 Deliverables

SOW# Deliverable Frequency Medium/Format Submit to

C.6 Training Manual Two (2) weeks prior to training

PDF/Email/MS Word 2003 (or higher) format

COR

C.3.1.5 Certificate of Calibration and/or Verification

NLT five (5) business days from Calibration and/or Verification

PDF/Email/MS Word 2003 (or higher) format

COR

C.10.5.9 Calibration or verification stickers

Upon completion of the verification or calibration

Add required information to instrument verification or calibration sticker

COR

C.10.1.1 Preventive Maintenance Coordination

NLT three (3) business days after been reached by the COR

Stablish PM on site visit withing the next 30 calendar days

COR

C.10.9 Preventative Maintenance Summary Report

NLT five (5) Business Days from Preventative Maintenance performance

PDF/Email/MS Word 2003 (or higher) format

COR

C.11 Warranty Completion of full acceptance

PDF/Email/MS Word 2003 (or higher) format

COR

C.5 Government Furnished Resources and Information:

C.5.1 Safeguarding Government Furnished Materials. Under the performance of this contract, the BEP shall provide Government Furnished Materials that are considered items of security. The Contractor shall abide by all requirements and instructions of the BEP’s Office of Security during the performance of this contract.

C.5.2 Environmental, Health, and Safety:

C.5.2.1 All Contractors must comply with the requirements and procedures established through the

BEP Environmental, Health, and Safety (EHS) document(s): 75D-07.0-04 EHS Contractor Requirements, 75D-07.0-.06 EHS Requirements for Large Equipment Purchases, and 75D-

7 Bureau of Engraving and Printing 2031ZA24Q00353

05.0-.01 Radiation and Laser Safety. The applicable contents of the document(s) must be adhered to. The BEP shall furnish the document(s) as part of the contract.

C.5.2.2 The Contractor shall be required to attend a safety orientation to review the emergency response requirement established by the BEP EHS office. Any chemicals that shall be used must be EHS approved prior to the chemicals being brought on site. The COR shall coordinate all BEP EHS requirements.

C.5.3 Access to Government Facilities:

C.5.3.1 The BEP is a secure facility, and all instruction of the BEP Police must be obeyed:

C.5.3.1.1 Weapons, cameras, and alcohol or illegal drugs are not allowed on site and are subject to seizure.

C.5.3.1.2 During the life of the contract, access to the Government facility for the Contractor, its subcontractors, and suppliers shall be made available as required.

C.5.3.1.3 During all operations on Government premises, personnel for whom the Contractor is responsible shall comply with the rules and regulations governing the conduct of personnel and the operation of the facility.

C.5.3.1.4 The Government reserves the right to require the Contractor's employees to sign in and/or sign out of the Government facility.

C.5.3.2 The BEP shall not provide parking for the BEP DCF.

C.5.4 On-Site Work Restrictions

When performing services at the place of installation such work must be performed without:

C.5.4.1 Interfering with Government business.

C.5.4.2 Unduly restricting traffic.

C.5.4.3 Causing unsafe conditions for employees and visitors.

C.5.4.4 Adversely affecting the operation of the BEP facility.

C.5.4.5 Non-compliance with security regulations.

C.5.4.6 Failure to adhere to this requirement can be considered grounds for termination.

C.6 Applicable Documents:

The contractor shall provide English-language documentation that describes accurate and current technical information for system for the evaluation and prediction of banknotes durability. The documentation shall include operational manuals, maintenance manuals, training manuals and technical contact information.

C.7 Place of Performance:

Deliverables as required during the performance of this contract shall be delivered F.O.B.

destination. The equipment and supplies identified shall be delivered and installed through the life of the contract to the following address:

Bureau of Engraving and Printing Washington, DC Currency Facility Annex Building

8 Bureau of Engraving and Printing 2031ZA24Q00353

Shipping and Receiving D Street, Between 13th and 14th Streets, S.W. Washington, D.C. 20228-001

The Contractor shall contact the BEP Receiving Section on 2020-874-2333 at least forty-eight (48) hours in advance to schedule all deliveries. Receiving hours for deliveries to the BEP are 7:30 a.m. to 2:30 p.m., local time, Monday through Friday, excluding U.S. Federal Holidays and the BEP Year-End-Shutdown Period. The following Delivery information shall be provided when scheduling delivery appointments to the BEP:

o Name of Sender (e.g. Contractor) o Name of Carrier o Contract/Purchase Order number o Total number of cartons and/or pallets o Total weight o Date and time of delivery o Mode of transportation (e.g., van, truck, automobile) o Point of contact information

Shipping shall be F.O.B. Destination within Consignee's Premises.

C.8 Performance/Delivery Period:

The Contractor shall provide the equipment to DCF within six (6) months of contract award.

C.9 Training and Trainer Requirements:

Training shall be provided for the 800mm-by-800mm gantry table before performing the Bureau Acceptance Test (BAT) and after installation at the BEP DCF and WCF. The training session shall occur on days determined by, and mutually agreed to, with the COR.

C.9.1 The Contractor shall inform the BEP COR two (2) weeks prior to installation to coordinate and schedule installation and training.

C.9.2 The Contractor shall provide at least three (3) days of training starting after initial installation for up to three (3) operators. The Contractor shall provide all training materials and labor required for the installation and training.

C.9.3 The Contractor shall provide all training materials to the COR two (2) weeks prior to installation for review and approval by the BEP. The training materials shall be provided in electronic form (MS Word, PDF, MS Power Point, etc.) to the COR for distribution to training attendees. All training documents and aids shall be in English language and become the property of the Government. The BEP reserves the right to reproduce training material and aids for internal training.

C.9.4 The Contractor shall provide a Training Plan and schedule the installation of the systems and testing of all features such that the installation, testing, and training is performed on all functional components and accessories. Training shall include at a minimum:

C.9.4.1 800mm by 800mm gantry table operation including all components/accessories C.9.4.2 Software operation C.9.4.3 Data view/stats/analysis C.9.4.4 Test or procedure method setup/modification C.9.4.5 Data retrieval/storage/export

9 Bureau of Engraving and Printing 2031ZA24Q00353

C.9.4.6 Print data/test method C.9.4.7 Preventive maintenance C.9.4.8 Equipment verification C.9.4.9 Equipment startup/shutdown C.9.4.10 Basic troubleshooting C.9.4.11 Optical radiation and laser hazards

C.9.5 A demonstration of the system shall be provided following installation. Training personnel shall be qualified representative(s) with the knowledge of the equipment purchased, with hands-on experience in setting up analytical applications and experience in customer training in the use of the equipment.

C.9.6 The Contractor shall provide the name(s) and number of years the representative(s) has conducted customer training two (2) weeks prior to installation. Qualified representative(s) shall be determined by and mutually agreed to with the COR.

C.9.7 Training personnel shall also be fluent in the English language.

C.9.8 The Contractor shall provide specialized training to familiarize BEP personnel on the operation of the system, parts, and to help ensure reliable performance and maximum service life during normal usage.

C.9.9 The Contractor shall provide training at the BEP facility during local business hours, 9:00 AM to 5:00 PM (Eastern Time), excluding any federal holidays and weekends, and immediately after installation and BAT, should time permit during local business hours or within the next three (3) days to minimize downtime.

C.10 Preventative Maintenance (PM) C.10.1 Contractor shall provide a recommended preventative maintenance and calibration schedule.

C.10.2 The Contractor shall provide information for preventive maintenance and calibration services on the 800mm-by-800mm gantry table equipment and its major components.

C.10.3 Service repair technicians shall perform service using the most up-to-date maintenance techniques, instrument operation and modifications, latest state-of-the-art applications for service/repair being performed on equipment according to 800mm-by-800mm gantry table specifications.

C.10.4 The Contractor shall provide a certificate of calibration after each recalibration. If a certificate is not available after service, a service report and/or interim calibration document shall be provided until the certificate is provided.

C.10.5 In the case of repair service, a new calibration certificate (if applicable) and service report shall be provided if repair(s) is made to the instrument such that the previous calibration is no longer valid.

C.10.6 A service report shall be provided if only repair service is completed.

C.10.7 Certificates or service reports shall be provided within five (5) business days following the service/repair.

C.10.8 The Contractor shall provide a Point of Contact (POC) for maintenance and calibration support. At minimum, the certificate of calibration shall include:

C.10.8.1 Title (i.e. Certificate of Calibration, Calibration Certificate)

10 Bureau of Engraving and Printing 2031ZA24Q00353

C.10.8.2 Instrument component serial number(s) C.10.8.3 Location of where calibration service was performed C.10.8.4 Unique identification of the calibration certificate (e.g. the certificate number) C.10.8.5 Identification of calibration method(s) C.10.8.6 Identification of the items calibrated C.10.8.7 “As Found” and “As Left” results with tolerances C.10.8.8 List of measuring equipment and/or standards used to perform calibration and traceability to NIST, ASTM, or equivalent.

C.10.8.9 Name and address of the Contractor.

C.10.8.10 Date of service and name of technician C.10.8.11 Identity of any parts that require replacement or repair C.10.8.12 Notes/suggestions to BEP.

C.11 Warranty:

C.11.1 The Contractor shall provide one (1) year (12 calendar months) warranty on the 800mm-by-800mm gantry table equipment, associated accessories and for all replacement parts and components.

C.11.2 The Contractors warranty shall begin after completion of the equipment’s installation, successful performance test, and full acceptance of the system by the Government.

C.11.3 The Contractor warranty shall also include materials, labor, and associated transportation and shipping costs to correct any latent defects that prevent BEP for being able to attain the capabilities in SECTION III.

C.11.4 During the warranty period, the Contractor shall correct or re-perform any defective or nonconforming services within seventy-two (72) hours or less.

C.11.5 The Contractor shall provide a POC for any warranty issues or concerns.

C.11.6 The Contractor shall provide information for extended warranty on the 800mm by 800mm gantry table equipment and its major components.

C.12 Bureau Acceptance Test (BAT):

C.12.1 Responsibility for Inspection and Testing: The BEP reserves the right to perform any inspections and tests set forth for this equipment, to include inventory of parts list and supplies listed in the contract. After the inspection, the COR shall notify the Contractor’s POC and the Contracting Officer (CO) if services were found to be non-compliant with contract requirements and/or unacceptable services were performed.

C.12.2 Verification: Following installation, a demonstration of the systems and training shall be provided and performed by the Contractor. Verification shall require one (1) day and shall be conducted as part of the training. The Contractor shall provide certified standard to verify the instrument performance.

C.12.3 Validation/ BEP Acceptance Testing (BAT):

C.12.3.1 The BEP will validate the 800mm-by-800mm gantry table is in compliance with the requirements stated in Section III above. Validation shall require up to seven

(7) calendar days performance.

C.12.3.2 After installation and training, a BAT requirement for the 800mm-by-800mm gantry table system shall be performed by the BEP to ensure features performs

11 Bureau of Engraving and Printing 2031ZA24Q00353 as expected in production and there are no unintended consequences of the system. Note: If the equipment does not successfully pass the BAT and must be retested till success, the Contractor shall assume all costs of retesting including personnel lodging, travel, materials, and any other related fees.

C.12.3.3 BAT requirements for the 800mm-by-800mm gantry table system shall include at minimum:

C.12.3.1 All 800mm-by-800mm gantry table and VK-X 3000 system components including desktop computer must be fully operational.

C.12.3.2 The system shall quantitatively/qualitatively analyze a plate sample supplied by BEP.

C.12.3.3 The system shall be capable of analyzing a reflective engraved plate supplied by the BEP.

C.12.3.4 A report should be generated with analysis information, measurement information, analytic results, etc.

C.12.4 Final Acceptance: The system shall be utilized (after validation) by BEP for a minimum of fifteen (15) calendar days without any problems or issues being noted prior to final acceptance by the BEP.

12 Bureau of Engraving and Printing 2031ZA24Q00353

SECTION D – PACKAGING AND HANDLING

The following instructions are required for any shipments to the BEP:

D.1 Notice of Packaging Slip Requirements:

The following outlines the Bureau of Engraving and Printing’s packaging slip requirements to ensure efficient processing of shipments:

• The Bureau of Engraving and Printing requires that all packaging slips be placed in a self-adhesive pack list envelope and affixed to the outside a shipment.

• Must be durable, in English, and printed on or affixed to the surface of a package or on a label, tag, or sign.

• Must not be unobscured by labels or attachments; and

• Must be located away from any other marking (such as advertising) that could substantially reduce its effectiveness.

D.2 General Items – Information Required for Each Shipment:

• Contract Number – The contract number BEP assigned to this purchase.

• Shipping Address – Point from which the merchandise was shipped.

• Telephone Number – The telephone number of the vendor contact to be called for inquires related to the merchandise.

• Customer Information – The name and telephone number of the party to which the merchandise is being shipped.

• Total Weight of Packages, Item number and the total number of items within the current shipment.

• If items are drop shipped from a supplier, you must ensure the proper contract number is written on the packaging slip by your supplier.

D.3 Line Items – Information Required for Each Line Item Included in the Shipment:

• Manufacturer Product Identification – Item Number assigned by manufacturer/supplier.

• Quantity Ordered – Quantity on the purchase order or unit of measurement.

• Quantity Shipped – With the packing slip.

• Quantity Backordered, where applicable.

D.4 Notice of Shipping Label Requirements:

Every box/skid must have at least one shipping label applied to it. The label is to include, at minimum, the following information:

• Manufacturer or Supplier – Name of Manufacturer or supplier/and

• Shipping Address – Point from which the merchandise was shipped/and

• BEP Contract Number – PO# or CC order #/and

• Customer Name & Telephone Number – First and last name, building and room #.

The vendor shall ensure that all items shipped to the BEP are properly labeled. Items may include but not be limited to closed containers, sealed boxes, wrapped packages, or strapped palettes. Failure to adhere to the packing slip and shipping label requirements could result in shipment rejection, processing delay, and payment delay. **

13 Bureau of Engraving and Printing 2031ZA24Q00353

SECTION E – INSPECTION AND ACCEPTANCE

E.1 FAR CLAUSE 52.252-1 CLAUSES INCORPORATED BY REFERENCE

(FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address:

www.acquisition.gov/ (End of Clause)

CLAUSE

NUMBER

TITLE DATE

52.246-1 Contractor Inspection Requirements APR 1984 52.246-2 Inspection of Supplies-Fixed-Price AUG 1996 52.246-4 Inspection of Services-Fixed-Price AUG 1996 52.246-16 Responsibility for Supplies APR 1984 52.247-34 F.o.b. Destination JAN 1991

14 Bureau of Engraving and Printing 2031ZA24Q00353

SECTION F – DELIVERY OR PERFORMANCE

F.1 FAR Clause 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be assessed electronically at this/these address(es): www.acquisition.gov/ (End of Clause)

CLAUSE

NUMBER

TITLE DATE

52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay of Work APR 1984 52.247-34 F.o.b. Destination JAN 1991

F.2 Place of Delivery:

Bureau of Engraving and Printing Washington, DC Currency Facility Annex Building Shipping and Receiving

D Street, Between 13th and 14th Streets, S.W. Washington, D.C. 20228-001

The BEP will not provide parking for the BEP Washington D.C. Facility.

F.3 Notification of Delivery:

The vendor shall be responsible for providing all materials and services required for the delivery and placement of the equipment, all support equipment and supplies at the designated installation site(s) within the BEP. The delivery services shall also include all freight, rigging, unpacking, and removal of packing materials from BEP premises. The BEP will not provide any assistance during deliveries.

The vendor shall notify the COR seven (7) days prior to scheduling equipment deliveries.

Copies of the packing lists shall be included with this notification and a list of vendor employees who will need access to the BEP to perform installation and testing of the equipment.

F.4 Deliveries to Washington, DC Annex Building:

LOADING DOCK ON “D” STREET SW, BETWEEN 13th & 14th STREETS SW):

Vendors must call the appointment hotline at (202) 874-2333 twenty-four (24) hours in advance to schedule approximate delivery times. The hotline is manned from 6:30 am to 2:15 pm Monday through Friday. A voicemail message maybe left after normal working hours.

Deliveries are accepted between 8:00 am and 2:15 pm, Monday through Friday, excluding holidays.

Over the road vehicles having an overall height exceeding 12”6” (3.8 meters) empty, or an overall length exceeding 42’ (12.2 meters) cannot be accommodated at our receiving platform.

http://www.acquisition.gov/

15 Bureau of Engraving and Printing 2031ZA24Q00353

To resolve any delivery issue, please contact Shipping & Receiving at (202) 874-3620 care of Material Handler/Leader.

F.5 Performance/Delivery Period:

The Contractor shall provide the equipment to DCF within six (6) months of contract award.

F.6 BEP Year End Shutdown Period and Federal Holidays:

(a) BEP observes the federal holidays that are listed on the Office of Personnel website at:

https://www.opm.gov/fedhol/. The Presidential Inauguration Day is applicable only to the Washington, DC Currency Facility (DCF).

(b) BEP’s Y.E.S. Period typically occurs December 25th through January 1st of each calendar year.

F.7 Notice to the Government of Delays:

In the event the Contractor encounters difficulty in meeting performance requirements, or when it anticipates difficulty in complying with the contract or any delivery schedule or date, or whenever the Contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this contract or of a delivery, the Contractor shall immediately notify the CO and the COR, in writing, giving pertinent details, provided;

however, that this data shall be informational only in character and that receipt thereof shall not be construed as a waiver by BEP of any delivery schedule or date or of any rights or remedies provided by law or under this contract.

https://www.opm.gov/fedhol/

16 Bureau of Engraving and Printing 2031ZA24Q00353

SECTION G – CONTRACT ADMINISTRATION DATA

G.1 CONTRACT ADMINISTRATION OFFICE

(a) This contract will be administered by:

Bureau of Engraving and Printing Attn: To be completed upon award.

14th and C Streets, S.W.

Washington, D.C. 20228-0001

(b) Written communication to the Contracting Officer shall make reference to the contract number.

G.2 DTAR 1052.201-70, Contracting Officer’s Representative (COR) Appointment and

Authority (APR 2015)

(a) The COR WILL BE APPOINTED AT CONTRACT AWARD.

(b) Performance of work under this contract is subject to the technical direction of the COR identified above, or a representative designated in writing. The term “technical direction” includes, without limitation, direction to the Contractor that directs or redirects the labor effort, shifts the work between work areas or locations, and/or fills in details and otherwise serves to ensure that tasks outlined in the work statement are accomplished satisfactorily.

(c) Technical direction must be within the scope of the contract specification(s)/work statement.

The COR does not have authority to issue technical direction that:

(1) Constitutes a change of assignment or additional work outside the contract specification(s)/work statement;

(2) Constitutes a change as defined in the clause entitled “Changes”;

(3) In any manner causes an increase or decrease in the contract price, or the time required for contract performance;

(4) Changes any of the terms, conditions, or specification(s)/work statement of the contract;

(5) Interferes with the Contractor's right to perform under the terms and conditions of the contract;

or

(6) Directs, supervises or otherwise controls the actions of the Contractor's employees.

(d) Technical direction may be oral or in writing. The COR must confirm oral direction in writing within five workdays, with a copy to the Contracting Officer.

(e) The Contractor shall proceed promptly with performance resulting from the technical direction issued by the COR. If, in the opinion of the Contractor, any direction of the COR or the designated representative falls within the limitations of (c) above, the Contractor shall immediately notify the Contracting Officer no later than the beginning of the next Government work day.

(f) Failure of the Contractor and the Contracting Officer to agree that technical direction is within the scope of the contract shall be subject to the terms of the clause entitled “Disputes.”

(End of clause)

G.3 DTAR 1052-232-7003, Electronic Submission of Payment Requests (APR 2015)

(a) Definitions. As used in this clause—

17 Bureau of Engraving and Printing 2031ZA24Q00353

(1) “Payment request” means a bill, voucher, invoice, or request for contract financing payment with associated supporting documentation. The payment request must comply with the requirements identified in FAR 32.905(b), “Content of Invoices” and the applicable Payment clause included in this contract.

(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests electronically using the Invoice Processing Platform (IPP). Information regarding IPP, including IPP Customer Support contact information, is available atwww.ipp.gov or any successor site.

(c) The Contractor may submit payment requests using other than IPP only when the Contracting Officer authorizes alternate procedures in writing in accordance with Treasury procedures.

(a) If alternate payment procedures are authorized, the Contractor shall include a copy of the Contracting Officer's written authorization with each payment request. (End of clause)

18 Bureau of Engraving and Printing 2031ZA24Q00353

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 Type of Contract:

This is a Firm Fixed-Price type contract.

H.2 Identification of Contract Employees:

No interpretation of any provision of this contract, including applicable specification(s)/statement of work, shall be binding on the Government unless furnished or agreed to in writing by the Contracting Officer (CO).

H.3 Notice to the Government of Delays:

In the event the Contractor encounters difficulty in meeting performance requirements, or when it anticipates difficulty in complying with the contract delivery schedule or date, or whenever the Contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this contract, the Contractor shall immediately notify the CO and the COR, in writing, giving pertinent details, provided, however, that this data shall be informational only in character and that this provision shall not be construed as a waiver by BEP of any delivery schedule or date or of any rights or remedies provided by law or under this contract.

H.4 Non-Disclosure of Non Public Information and Data:

During the period of performance of the contract, the Contractor may be granted access to Non Public information and data, which is the sole property of BEP, as well as proprietary information and data, which is the sole property of entities other than the contracting parties.

In particular, the Contractor agrees that all information provided by representatives of BEP, either before or after contract award, concerning the design, manufacture, processing or transporting of United States currency is nonpublic. Such information will be shared only with employees or agents of the company having a need to know, and will not be disclosed to other persons without the written consent of the CO.

Further, the Contractor agrees to maintain the confidentiality of all such information and data and shall not disclose any information and data, interpretations of, and/or derivatives of, such information and data to any unauthorized party without the express written approval of the CO, or of the party in which title is wholly vested. The Contractor hereby agrees to include this clause in all subcontracts or consulting agreements relating to work under this contract.

The Contractor shall be required to sign a Non-Disclosure Agreement.

H.5 Indemnification

(a) Responsibility for Government Property: The Contractor assumes full responsibility for and shall indemnify the Government against any and all losses or damage of whatsoever kind and nature to any and all Government property, including any equipment, supplies, accessories, or parts furnished, while in his custody and care for storage, repairs, or service to be performed under the terms of this contract, resulting in whole or in part from the negligent acts or omissions of the Contractor, any subcontractor, or any employee, agent or representative of the Contractor or subcontractor.

19 Bureau of Engraving and Printing 2031ZA24Q00353

If due to the fault, negligent acts (whether of commission or omission) and/or dishonesty of the Contractor or its employees, any Government-owned or controlled property is lost or damaged as a result of the Contractor's performance of this contract, the Contractor shall be responsible to the Government for such loss or damage, and the Government, at its option, may in lieu of payment thereof, require the Contractor to replace at his own expense, all property lost or damaged.

(b) Hold Harmless and Indemnification Agreement: The Contractor shall save and hold harmless and indemnify the Government against any and all liability claims, and cost of whatsoever kind and nature for injury to or death of any person or persons and for loss or damage to any Contractor property or property owned by a third party occurring in connection with or in any way incident to or arising out of the occupancy, use, service, operation, or performance of work under the terms of this contract, resulting in whole or in part from the acts or omissions of the Contractor, any subcontractor, or any employee, agent, or representative of the Contractor or subcontractor.

(c) Government's Right of Recovery: Nothing in the above paragraphs shall be considered to preclude the Government from receiving the benefits of any insurance the Contractor may carry which provides for the indemnification of any loss or destruction of, or damages to property in the custody and care of the Contractor where such loss, destruction or damage is to Government property. The Contractor shall do nothing to prejudice the Government's right to recover against third parties for any loss, destruction of, or damage to Government property, and upon the request of the Contracting Officer shall, at the Government's expense, furnish to the Government all reasonable assistance and cooperation (including assistance in the prosecution of suit and the execution of instruments of assignment in favor of the Government) in obtaining recovery.

(d) Government Liability: The Government shall not be liable for any injury to the Contractor's personnel or damage to the Contractor's property unless such injury or damage is due to negligence on the part of the Government and is recoverable under the Federal Torts Claims Act, or pursuant to other Federal statutory authority.

H.6 Organizational Conflicts of Interest

(a) The Contractor warrants that, to the best of the Contractor’s knowledge and belief, there are no relevant facts or circumstances which could give rise to an organizational conflict of interest (OCI), as defined in FAR 9.5, Organizational and Consultants Conflicts of Interest, or that the Contractor has disclosed all such relevant information.

(b) The Contractor agrees that if an actual or potential OCI is discovered after award, the Contractor shall make a full disclosure in writing to the Contracting Officer. This disclosure must include a description of actions, which the Contractor has taken or proposes to take, after consultation with the Contracting Officer, to avoid, mitigate, or neutralize the actual or potential conflict.

(c) The Contracting Officer may terminate this contract for convenience, in whole or in part, if it deems such termination necessary to avoid an OCI. If the Contractor was aware of a potential OCI prior to award or discovered an actual or potential conflict after award and did

20 Bureau of Engraving and Printing 2031ZA24Q00353 not disclose or misrepresented relevant information to the Contacting Office, the Government may terminate the contract for default, debar the Contractor from Government contracting, or pursue such other remedies as may be permitted by law or this contract.

(d) The Contractor must include this clause in all subcontracts and in lower tier subcontracts unless a waiver is requested from, and granted by, the Contracting Officer.

(e) In the event that a requirement changes in such a way as to create a potential conflict of interest for the Contractor, the Contractor must:

1) Notify the Contracting Officer of a potential conflict, and;

2) Recommend to the Government an alternate approach which would avoid the potential conflict, or

3) Present for approval a conflict of interest mitigation plan that will:

• Describe in detail the changed requirement that creates the potential conflict of interest; and

• Outline in detail the actions to be taken by the Contractor or the Government in the performance of the task to mitigate the conflict, division of subcontractor effort, and limited access to information, or other acceptable means.

4) The Contractor must not commence work on a changed requirement related to a potential conflict of interest until specifically notified by the Contracting Officer to proceed.

5) If the Contracting Officer determines that it is in the best interest of the Government to proceed with work, notwithstanding a conflict of interest, a request for waiver must be submitted in accordance with FAR 9.503.

H.7 Disclosure of Conflicts of Interest

It is the BEP policy to award contracts to only those Offerors whose objectivity is not impaired because of any related past, present, or planned interest, financial or otherwise, in organizations regulated by BEP or in organizations whose interests may be substantially affected by Departmental activities. Based on this policy, if at any time during the performance of this contract the Contractor knows of any Conflict of Interest situation affecting the organization, any of its officers or Key Persons working under this contract, has reason to believe that a conflict of interest situation might arise, or is made aware of an actual or potential conflict of interest situation:

(a) The Contractor shall immediately provide to the Contracting Officer a written statement which describes in a concise manner all past, present or planned organizational, financial, contractual or other interest(s) with that organization regulated by BEP, or with that organization or individual whose interests may be substantially affected by Departmental activities, and which is related to the work under this contract. The interest(s) described shall include those of the Contractor, its affiliates, consultants, Subcontractors and key personnel of any of the above. Past interest shall be limited to within one year of the date of the offeror's technical quote. Key personnel shall include any person owning more than 20% interest in the organization, and the organization's corporate officers, its senior managers and any employee who is responsible for making a decision or taking an action on this contract where the decision or action can have an economic or other impact on the interests of a regulated or affected organization.

21 Bureau of Engraving and Printing 2031ZA24Q00353

(b) The Contractor shall describe in detail when it became aware of the actual or potential conflict of interest, what action the organization has taken or proposes to take to mitigate and / or rectify the situation, and why it believes, in light of the interest(s) identified in (a) above, that performance of the contract can still be accomplished in an impartial and objective manner.

(c) In the absence of any relevant interest identified in (a) above, the Contractor shall certify in its statement that to its best knowledge and belief no affiliation exists relevant to possible conflicts of interest. The Contractor must obtain the same information from any potential Subcontractors prior to award of a subcontract.

(d) The Contracting Officer will review the statement submitted and may require additional relevant information from the Contractor. All such information, and any other relevant information known to BEP, will be used to determine whether a conflict of interest exists or a situation exists that may create a conflict of interest. If any such conflict of interest is found to exist, the Contracting Officer may (1) terminate the contract, or (2) determine that it is otherwise in the best interest of the United States to continue the contract with the Contractor and (3) modify the contract to include appropriate provisions to mitigate or avoid such conflicts in the contract.

(e) If the Contractor refuses to provide the written statement called for in paragraph (a), or any additional information that the Contracting Officer may require, the Contracting Officer may terminate the Contract for convenience if he or she deems that termination is in the best interest of the Government.

H.8 Identification of Contract Employees

All contract personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. All Contractor personnel shall clearly identify themselves as a Contractor and shall be required to wear identification (ID) badges in a visible location on the front of exterior clothing, above the waist, (except when safety or health reasons prevent such placement). ID badges shall be worn at all times when performing work. ID badges shall have an identification picture, and shall state the name of the individual and the company they represent. Contractor personnel are prohibited from possessing weapons, firearms or ammunition, on themselves or within their Contractor-owned or privately owned vehicle while on BEP premises.

H.9 Evaluation of Contractor Performance:

(a) Interim and final evaluations of Contractor performance will be prepared for this contract in accordance with FAR 42.1503. The final performance evaluations will be prepared at the time of completion of work.

(b) The Contractor can elect to review the evaluation and submit additional information or a rebuttal statement. The Contractor will be permitted 60 calendar days to respond.

Contractor response is voluntary. If the Contractor does not respond within 60 days, the Government will presume that the Contractor has no comment. Any disagreement

22 Bureau of Engraving and Printing 2031ZA24Q00353 between the parties regarding an evaluation will be referred to an individual at a level above the Contracting Officer, whose decision is final.

(c) Copies of the evaluations, Contractor responses, and review comments, if any, will be retained as part of the contract file, and may be used to support future award decisions.

Bureau of Engraving and Printing utilizes the Contractor Performance Assessment Reporting System (CPARS) and the Federal Awarded Performance and Integrity Information System (FAPIIS) to record and maintain past performance information. The past performance systems hosts a suite of web-enabled applications that are used to document Contractor performance information that is required by Federal Regulations.

The CPARS module assesses performance on contracts for Systems, Services, Information Technology, and Operations Support, Architect-Engineer contracts and performance on Construction contracts. CPARS reference material can be accessed at https://cpars.cpars.gov/cpars/app/home.do

Federal Awarded Performance and Integrity Information System (FAPIIS) http://www.fapiis.gov/fapiis/govt/datareports.jsp

The registration process requires the Contractor to identify an individual that will serve as a primary contact. This individual will be authorized access to the evaluation for review and comment. In addition, the Contractor is encouraged to identify a secondary contact in the event the primary contact is unavailable to process the evaluation within the required 60-day time period. After the BEP Contract Specialist registers the contract in one of the systems listed above, the Contractor will receive a system generated e-mail notifying him/her that the contract is registered. A system generated e-mail will also provide the Contractor with a User ID if the person does not already have a system User ID.

Once a performance evaluation has been prepared and is ready for comment, the Contractor representative will receive a system generated e-mail notification that the performance evaluation is electronically available for review and comment. The Contractor representative will receive an automated e-mail whenever an assessment is completed and can subsequently retrieve the completed assessment from system. Contractors may access evaluations at one of the website listed above for review and comment in CPARS.

H.10 Safety:

State “Right to Know” laws and 29 CFR 1910.1200, Employees…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .