RFQ 02Q0183 GEN MAINT.pdf

PDF 423 KB Posted

Attached to
GENERATOR MAINTENANCE Federal contract opportunity
Solicitation number
N6426720Q0183
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to GENERATOR MAINTENANCE, newest first.
File Type Posted
CDRL A001.RS33.Maintenance Schedule - Signed - Copy.pdf PDF
DI-MGMT-81928.pdf PDF
DI-MGMT- 81117A.pdf PDF
CDRL A002.RS33.Service Report - Signed.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6426720Q0183

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot

ANNUAL MAINTENANCE, GENERATOR

FFP

SEE SECTION C FOR SPECIFICATIONS

FOB: Destination

PSC CD: J059

NET AMT

0002 1 Lot

ANNUAL MAINTENANCE, ATS

FFP

PSC CD: J059

1001 1 Lot

OPTION ANNUAL MAINTENANCE, GENERATOR

FFP

1002 1 Lot

OPTION ANNUAL MAINTENANCE, ATS

2001 1 Lot

OPTION ANNUAL MAINTENANCE, GENERATOR

2002 1 Lot

OPTION ANNUAL MAINTENANCE, ATS

3001 1 Lot

OPTION ANNUAL MAINTENANCE, GENERATOR

3002 1 Lot

OPTION ANNUAL MAINTENANCE, ATS

4001 1 Lot

OPTION ANNUAL MAINTENANCE, GENERATOR

4002 1 Lot

OPTION ANNUAL MAINTENANCE, ATS

Section C - Descriptions and Specifications

GENERAL

SALES TAX EXEMPTION

The contractor is hereby advised that the United States Government and Agencies thereof are exempt from State and Local Government tax by virtue of Article 6 of the United States Constitution. No exemption certificate is required.

STATEMENT OF WORK–

BLDG 1270 EMERGENCY GENERATOR MAINTENANCE

CONTRACT

1. Introduction The Naval Surface Warfare Center, Corona (NSWC CO) has been tasked to assess, repair and service the infrastructure systems supporting the data centers for the Marine Corps Installations in the western region (MCIWEST). This contract will address the services needed to maintain the backup generator system supporting the MCIWEST data center located at Marine Corps Base Camp Pendleton, Building. The generator system supplies electricity to the MCIWEST data center when utility power is not available.

2. Background This Statement of Work (SOW) is referenced in the contract to describe contractor’s commitments for the maintenance of two (2) government-furnished backup generators and the four (4) associated automatic static transfer switches (ASTS). There are eight (8) additional automatic transfer switches (ATS) that will also be covered by this contract.

The Government’s objectives are to maintain the backup generators and automatic transfer switches using best commercial practices at the lowest possible cost. The Government requires a Firm-Fixed-Price contract with a one (1) base period and four (4) option years.

3. Scope The contractor shall be responsible for maintaining and repairing the data center generators and automatic transfer switches such that emergency power from the generators is available in the event of an electrical power interruption. The contractor shall perform remote monitoring, maintenance, scheduled and emergency repairs as listed in Section 5. The generators and automatic transfer switches are located at Marine Corps Base Camp Pendleton, Building 1270. A government escort will be required to access the generators and automatic transfer switches.

Post award, a maintenance schedule (MS)(A0001) will be updated as required, but at a minimum it will be reviewed and updated each year upon renewal of contract option. Any intellectual, real, or personnel property created or procured as a result of this SOW is the property of the government.

4. List of Equipment and Site Details Marine Corps Base Camp Pendleton, Building 1270: 2 Generators, 12 Automatic Transfer Switches Telecommunications Backup Generator System (to include the enclosure and fuel tank)

4.1. CUMMINS MASTER CONTROLLER

S/N: L170290697 Model: DMCCDAABAA0110

4.2. CUMMINS GENERATORS, 2000 KW (2 MW)

Model: QSK60-G6 S/N: 33211738

Model: QSK60-G6

S/N: 33211890

4.3. ASTS INFO

ASTS A

Brand: PDI Wavestar S/N: 411-0343 Model: Unit #2

ASTS A1

Brand: PDI Wavestar S/N: 411-0343 Model: Unit #4

ASTS B

Brand: PDI Wavestar S/N: 411-0343 Model: Unit #1

ASTS B1

Brand: PDI Wavestar S/N: 411-0343 Model: Unit #3

4.4. SWITCHGEAR ATS INFO

4.4.1. SWITCHGEAR A

2600A 480V Eaton ATS

GO#: LSN0018432

CAT#: BIC9F5E42600XSU

S/N: 180228TA06B0

800A 480V Eaton ATS

GO#: LSN0018432

CAT#: BIC9C5X40800XSU

S/N: 180228TA05D5

400A 480V Eaton ATS

GO#: LSN0018432

CAT# BIC9C5X40400XSU

S/N: 180228TA05B3

4.4.2. SWITCHGEAR B

2600A 480V Eaton ATS

GO#: LSN0018432

CAT#: BIC9F5E42600XSU

S/N: 180320TA0322

800A 480V Eaton ATS

GO#: LSN0018432

CAT#: BIC9C5X40800XSU

S/N: 180228TA0585

400A 480V Eaton ATS

GO#: LSN0018432

CAT#: BIC9C5X40400XSU

S/N: 180228TA05B7

400A 480V Eaton ATS

GO#: LSN0018432

CAT#: BIC9C5X40400XSU

S/N: 180102TA00AB

4.4.3. SWITCHGEAR C

2600A 480V Eaton ATS

GO#: LSN0018432

CAT#: BIC9F5E42600XSU

S/N: 180320TA02F0

4.4.4. LOADBANK

Simplex Saturn-1750KW 480V

5. Requirements

CLIN Description Qty (yearly) Unit Cost Extended Cost 001 Continuous Remote

Monitoring

002 Monthly Service 9 003 Quarterly Service 2 004 Annual Service 1 005 Emergency Service- Optional

(as needed)

The contractor shall provide preventative maintenance services for the generator system including the automatic transfer switch, associated fuel tank, batteries and accessories. This will include the Gen Tracker Batteries and associated equipment. The contractor shall provide a service report (SR)(A0002) of all preventive maintenance performed on the generator system upon work completion. The service report (SR)(A0002) shall be delivered to the government within 5 days of the completion of the work.

The contractor shall also include operational test of the generator system as part of preventative maintenance measures. Operational tests shall be performed by the contractor with government personnel present. Operational tests shall be scheduled with the government at least one week prior to start.

Operational tests shall include all monthly checks and 30 minute generator runs with installed load bank.

The contractor shall fill out the generator log book after each operational test. Any items necessitating additional work shall be given to verbally to the government at the time of inspection. A service report (SR) shall be written and delivered to the gov’t within 5 days. Operational test documentation includes monthly and annual test results, written up as a service report (SR)(A0002)

Contractor shall provide the following maintenance services:

5.1. Continuous Remote Monitoring: The contractor shall remotely monitor the status and operation of the generator system continuously. The government shall provide the GenTracker monitoring system or the contractor can implement their own methods of monitoring subject to government approval. The contractor shall monitor the generator fuel tank levels, battery condition, and transfer switch start contacts in an effort to ensure generator reliability/availability in the event the data center experiences a loss of commercial power and requires generator backup.

5.2. Monthly Service: The contractor shall apply touch up paint as necessary. The contractor shall preserve the overall appearance of equipment, by wiping down leaks and picking up trash. The contractor shall note any needed repairs and notify the government of any corrective maintenance required. The contractor shall perform a Monthly Service of the generator system to include assessment of the following:

Generator Enclosure:

o Inspect generator enclosure for obstruction or debris and remove/clean as required.

o Inspect and repair interior and exterior generator cabinet lighting.

o Starting Batteries o Clean the starting batteries.

Diesel Fuel Tank o Inspect fuel tank and fuel lines for defects and repair as necessary.

Engine o Inspect the engine for any fuel, oil or coolant leaks and tighten all bolts as necessary.

o Inspect all belts for proper tension and signs of age and wear; replace as necessary.

Cooling System o Inspect radiator exterior for debris, leaks or corrosion and repair as necessary.

o Check radiator cap for proper seal and repair as necessary.

o Check cooling system hoses connections and tighten all clamps as necessary.

Generator Controller o Check switches and gauges are operational and repair as necessary.

o Check panel lights are operational and repair as necessary.

Automatic Transfer Switch o Visually inspect automatic transfer switch and repair as necessary.

Monthly Operational Test o For Building 1270, startup and run generators under load from the installed load banks for 30 minutes each month.

o Observe Engine and control gauges for proper operation.

o Check equipment for abnormal speed, operation, vibration, leaks and noises.

o Check engine water pump for leaks and signs of water.

o Check voltage and frequency outputs.

o Record generator operation in log book.

5.3. Quarterly Service: In addition to the Monthly Service defined above, the contractor shall perform a

Quarterly Service of the generator system to include at a minimum assessment of the following:

Generator Enclosure o Inspect the enclosure for corrosion (including rust) and perform repairs as required.

o Inspect the enclosure access doors and openings and perform repairs as required.

Starting Batteries o Verify and document the electrolyte levels and specific gravity.

o Recharge or replace batteries as necessary. Include as part of the maintenance report when batteries require recharge or replacement.

o Verify the battery charging system for proper operation and repair as necessary.

Engine o Inspect air cleaners and replace filters as necessary.

o Inspect the governor system and linkage for binding and proper operation and repair as necessary.

o Check engine fluid levels and top off as necessary (diesel fuel not included).

o Check the engine block heater(s) and associated plumbing for proper operation and repair as necessary.

Cooling System o Test coolant for proper mixture with a coolant test strip and remedy as necessary.

Generator Controller o Check electrical connections and wiring for any abrasion or chaffing; repair as necessary.

o Tighten all electrical connections.

o Check switchgear and repair as necessary.

Quarterly Operational Test o Test electrical and mechanical shutdowns.

5.4. Annual Service: In addition to the Monthly and Quarterly Service defined above, the contractor shall perform an Annual Service of the generator system to include at a minimum assessment of the following:

Engine o Change engine lubricating oil and oil filters.

o Change engine fuel filters.

o Change air filter elements.

o Change water fuel separator.

o Obtain oil sample and submit for analysis by fluid testing laboratories. Provide analysis results to the government as part of annual inspection o Test diesel fuel on hand in the storage tanks to ascertain the need for polishing

Automatic Transfer Switches o Clean the automatic transfer switch enclosure; brush and vacuum away any excessive dust accumulated and remove any moisture with a clean cloth.

o Inspect the transfer switch contacts and replace contacts that are pitted or worn.

o Inspect all movements and linkages of the automatic transfer switch and renew the factory lubrication as necessary.

o Inspect cable connections and retighten as necessary

5.5. Emergency Call Back Service: The contractor shall be available for 8/5/40 (normal working hours) emergency service based on a 24 hour turnaround. The 24 hour time window shall begin when the contractor is contacted and continue until the technician is on site at the location in question. A gov’t sponsor will be on hand to meet the technician and allow him (her) access to the facility. The contractor shall give a quick non-binding estimate of time and materials needed to repair the equipment on site at the time of the emergency service call. This will be followed up within 3 days by a Service Report (SR)(A0002). The Service Report (SR)(A0002) will have a binding written estimate of materials needed, time necessary to complete the repair, and any equipment down time required to complete the repair. This will be delivered via email to the government technical POC (See #8 below). A service report (SR)(A0002) noting work performed and materials used will be provided to the government NLT than 5 days after successful repair of the equipment. No work is to be performed without prior approval of the Technical POC.

CLAUSES INCORPORATED BY FULL TEXT

C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)

(a) Department - means the Department of the Navy.

(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.

(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

(End of text)

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)

(OCT 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)

The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) CDRL A001, CDRL A002, DI-MGMT 81117A, DI-MGMT81923, attached hereto.

(End of Text)

C-246-H001 EXTENSION OF COMMERCIAL WARRANTY (NAVSEA) (OCT 2018)

The Contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that such warranty is available at no additional cost to the Government. The Contractor shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software.

Acceptance of the standard commercial warranty does not waive the Government's rights under the "Inspection" clause, nor does it limit the Government's rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.

C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.

Section D - Packaging and Marking

D-211-H001 PACKAGING OF DATA (NAVSEA) (OCT 2018)

Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.

All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.

Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), DOD 5220.22-M dated 28 February 2006 incorporating Change 2 dated 18 May 2016.

D-211-H002 MARKING OF REPORTS (NAVSEA) (OCT 2018)

All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:

(1) name and business address of the Contractor

(2) contract number

(3) sponsor: TBD (Name of Individual Sponsor)

TBD

(Name of Requiring Activity)

TBD

(City and State)

D-211-H004 IDENTIFICATION MARKING OF PARTS--BASIC (NAVSEA) (OCT 2018)

For all parts not subject to the marking requirements in DFARS 252.211-7003 – Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:

(1) Parts shall be marked in accordance with generally accepted commercial practice.

(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.

D-246-H002 WARRANTY NOTIFICATION FOR ITEM(S) 0001-4002—BASIC (NAVSEA) (OCT 2018)

The Contractor shall apply a permanent warranty notification stamping or marking on each warranted deliverable end item and its container. The notification shall be placed in close proximity to other required stamping or markings so as to be easily readable by personnel. The warranty notification shall read:

THIS ITEM WARRANTED UNDER CONTRACT TBD TO CONFORM TO DESIGN,

MANUFACTURING, AND PERFORMANCE REQUIREMENTS AND BE FREE FROM DEFECTS IN

MATERIAL AND WORKMANSHIP FOR TBD FROM DATE OF ACCEPTANCE. IF ITEM IS

DEFECTIVE NOTIFY TBD AND PCO.

D-247-H002 PACKAGING OF SUPPLIES—BASIC (NAVSEA) (OCT 2018)

Item(s) 0001-4002 - The supplies furnished hereunder shall be packaged in accordance with ASTM-D-3951-15 approved 1 December 2015, Standard Practice for Commercial Packing.

D-247-H004 MARKING AND PACKING LIST(S) – BASIC (NAVSEA) (OCT 2018)

(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with ASTM- D-3951-15 approved 1 December 2015, Standard Practice for Commercial Packing.

(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items. Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.

(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.

(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number.

D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018)

The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government NAVAL SURFACE WARFARE

CENTER CORONA DIV.

1999 FOURTH STREET

BUILDING 204

NORCO CA 92860

Government

0002 Destination Government NAVAL SURFACE WARFARE

CENTER CORONA DIV.

1999 FOURTH STREET

BUILDING 204

NORCO CA 92860

Government

1001 Destination Government NAVAL SURFACE WARFARE

CENTER CORONA DIV.

1999 FOURTH STREET

BUILDING 204

NORCO CA 92860

Government

1002 Destination Government NAVAL SURFACE WARFARE

CENTER CORONA DIV.

1999 FOURTH STREET

BUILDING 204

NORCO CA 92860

Government

2001 Destination Government NAVAL SURFACE WARFARE

CENTER CORONA DIV.

1999 FOURTH STREET

BUILDING 204

NORCO CA 92860

Government

2002 Destination Government NAVAL SURFACE WARFARE

CENTER CORONA DIV.

1999 FOURTH STREET

BUILDING 204

NORCO CA 92860

Government

3001 Destination Government NAVAL SURFACE WARFARE

CENTER CORONA DIV.

1999 FOURTH STREET

BUILDING 204

NORCO CA 92860

Government

3002 Destination Government NAVAL SURFACE WARFARE

CENTER CORONA DIV.

1999 FOURTH STREET

BUILDING 204

NORCO CA 92860

Government

4001 Destination Government NAVAL SURFACE WARFARE

CENTER CORONA DIV.

1999 FOURTH STREET

BUILDING 204

NORCO CA 92860

Government

4002 Destination Government NAVAL SURFACE WARFARE

CENTER CORONA DIV.

1999 FOURTH STREET

BUILDING 204

NORCO CA 92860

Government

E-246-H013 INSPECTION AND ACCEPTANCE OF DATA (NAVSEA) (OCT 2018)

Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form 1423.

E-246-H016 INSPECTION AND ACCEPTANCE OF F.O.B. DESTINATION DELIVERIES (NAVSEA) (OCT 2018)

Item(s) 0001-4002 - Inspection and acceptance shall be made at destination by a representative of the Government.

E-246-H022 INSPECTION AND TEST RECORDS (NAVSEA) (JAN 2019)

Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness. The data shall, on request, be identified and made available for on-site review by the Contracting Officer or designated Government representative.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 12 mths. ADC 1 MCI WEST G-6

TBD

PO BOX 5550

1278 SPECTRUM CIRCLE

CAMP PENDLETON CA 92055 - 5018

TBD

M33000

0002 12 mths. ADC 1 (SAME AS PREVIOUS LOCATION)

1001 12 mths. AOE 1 (SAME AS PREVIOUS LOCATION)

1002 12 mths. AOE 1 (SAME AS PREVIOUS LOCATION)

2001 12 mths. AOE 1 (SAME AS PREVIOUS LOCATION)

2002 12 mths. AOE 1 (SAME AS PREVIOUS LOCATION)

3001 12 mths. AOE 1 (SAME AS PREVIOUS LOCATION)

3002 12 mths. AOE 1 (SAME AS PREVIOUS LOCATION)

4001 12 mths. AOE 1 (SAME AS PREVIOUS LOCATION)

4002 12 mths. AOE 1 (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY REFERENCE

52.247-34 F.O.B. Destination NOV 1991

F-247-H001 DELIVERY OF DATA (NAVSEA) (OCT 2018)

All data to be furnished under this contract shall be delivered prepaid to the destination(s) and at the time(s) specified on the Contract Data Requirements List(s), DD Form 1423.

Section G - Contract Administration Data

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

Invoice and Receiving Report (Combo) – Destination/Destination (D/O)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Contract Number TBD

Delivery Order / Task Order Number TBD

Cage Code TBD

Pay Official DoDAAC N62827

Issue By DoDAAC N64267

Admin DoDAAC** N64267

Inspect By DoDAAC N/A

Ship To Code M33000

Ship From Code N/A

Mark For Code N/A

Service Approver (DoDAAC) N/A

Service Acceptor (DoDAAC) N/A

Accept at Other DoDAAC N64267

LPO DoDAAC N/A

DCAA Auditor DoDAAC N/A

Other DoDAAC(s) N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact. - CRNA_1072_W.H.OP@navy.mil

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

- For WAWF issues contact Scott Wobken at 951-393-5131 or scott.wobken@navy.mil

- For vendor pay issues contact Dolores Gonzalez at 951-393-4459 or dolores.gonzalez@navy.mil

- WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional

Email Notifications” field of WAWF once a document is submitted in the system. tbd@navy.mil

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

G-232-H002 PAYMENT INSTRUCTIONS AND CONTRACT TYPE SUMMARY FOR PAYMENT

OFFICE (NAVSEA) (JUN 2018)

(a) The following table of payment office allocation methods applies to the extent indicated.

For Government Use Only

Contract/Order Payment Clause

Type of Payment Request

Su pp ly

Se rv ic e

C on st ru ct io n

Payment Office Allocation Method

52.212-4 (Alt I), Contract Terms and Conditions— Commercial Items 52.216-7, Allowable Cost and Payment 52.232-7, Payments under Time-and-Materials and Labor-Hour Contracts

Cost Voucher X X N/A Line item specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested.

52.232-1, Payments Navy Shipbuilding Invoice (Fixed Price)

X N/A N/A Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.

52.232-1, Payments;

52.232-2, Payments under Fixed-Price Research and Development Contracts;

52.232-3, Payments under Personal Services Contracts;

52.232-4, Payments under Transportation Contracts and Transportation-Related Services Contracts; and 52.232-6, Payments under Communication Service Contracts with Common Carriers

Invoice X X N/A Line Item Specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested.

Contract/Order Payment Clause

Type of Payment Request

Su pp ly

Se rv ic e

C on st ru ct io n

Payment Office Allocation Method

52.232-5, Payments Under Fixed-Price Construction Contracts

Construction Payment Invoice

N/A N/A X Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.

52.232-16, Progress Payments

Progress Payment*

X X N/A Contract-wide proration. Funds shall be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN. Progress Payments are considered contract level financing, and the “contract price” shall reflect the fixed price portion of the contract per FAR 32.501-3.

52.232-29, Terms for Financing of Purchases of Commercial Items;

52.232-30, Installment Payments for Commercial Items

Commercial Item Financing*

X X N/A Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2).

52.232-32, Performance- Based Payments

Performance- Based Payments*

X X N/A Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2).

252.232-7002, Progress Payments for Foreign Military Sales Acquisitions

Progress Payment*

X X N/A Allocate costs among line items and countries in a manner acceptable to the Administrative Contracting Officer.

*Liquidation of Financing Payments. Liquidation will be applied by the payment office against those ACRNs which are identified by the payment instructions for the delivery payment and in keeping with the liquidation provision of the applicable contract financing clause (i.e., progress payment, performance-based payment, or commercial item financing).

(b) This procurement contains the following contract type(s): This entire Contract is Firm Fixed Price.

G-232-H005 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN 2019)

(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the sub line item number (SLIN) or CLIN level, rather than at the total contract/TO level, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of other direct costs (ODCs), materials, and travel, by technical instruction (TI), SLIN, or CLIN level. For other than firm fixed price subcontracts, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal.

Subcontractors may email encryption code information directly to the Contracting Officer and Contracting Officer Representative (COR). Should the subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the Contracting Officer and COR; or other method as agreed to by the Contracting Officer.

(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and Contracting Officer on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and Contracting Officer email notification as required herein.

G-242-H001 GOVERNMENT CONTRACT ADMINISTRATION POINTS-OF-CONTACT AND

RESPONSIBILITIES (NAVSEA) (OCT 2018)

(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.

(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel

- that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.

(c) The points of contact are as follows:

(i) The Procuring Contracting Officer (PCO) is:

Tashell Richmond Naval Surface Warfare Center, Corona Division P.O. BOX 5000, CORONA, CA 92878-5000 Telephone No. 951-393-4047 Email Address: tashell.a.richmond@navy.mil

(ii) The Contract Specialist is:

William T. Dudley Naval Surface Warfare Center, Corona Division, P.O. BOX 5000, CORONA, CA 92878-5000 Telephone No. 951-393-4973 Email Address: william.t.dudley@navy.mil

(d) The Technical Point of Contact (TPOC) is the contracting officer’s representative for technical matters when a COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government Furnished Material (GFM) and Government Furnished Equipment (GFE) if specified in the contract as well as the inspection.

The Contracting Officer’s Technical Point of Contact (TPOC) is:

Name: TBD Address: TBD Phone: TBD E-mail: TBD

G-242-H002 HOURS OF OPERATION AND HOLIDAY SCHEDULE (NAVSEA) (OCT 2018)

(a) The policy of this activity is to schedule periods of reduced operations or shutdown during holiday periods.

Deliveries will not be accepted on Saturdays, Sundays or Holidays except as specifically requested by the NSWC Corona. All goods or services attempted to be delivered on a Saturday, Sunday or Holiday without specific instructions from the Contracting Officer or his duly appointed representative will be returned to the contractor at the contractor’s expense with no cost or liability to the U.S. Government.

(b) The federal Government observes the following holidays:

HOLIDAYS*

New Year's Day Martin Luther King's Birthday Presidential Inauguration Day (Washington DC metro area only) President's Day Memorial Day Independence Day Labor Day Columbus Day Veteran's Day Thanksgiving Day Christmas Day

* Except for the Presidential Inauguration Day, if the actual date falls on a Saturday, the holiday will be observed the preceding Friday. If the holiday falls on a Sunday, the observance shall be on the following Monday.

The actual date of observance for each of the above holidays, for a specific calendar year, may be obtained from the OPM website at OPM.GOV or by using the following direct link: https://www.opm.gov/policy-data-oversight/snow-dismissal-procedures/federal-holidays/#url.

(c) Delayed Opening, Early Dismissal and Closure of Government Facilities. When a Government facility has a delayed opening, is closed or Federal employees are dismissed early (due to severe weather, security threat, security exercise, or a facility related problem) that prevents personnel from working, onsite contractor personnel regularly assigned to work at that facility shall follow the same reporting and/or departure directions given to Government personnel. The contractor shall not direct charge to the contract for such time off, but shall follow parent company policies regarding taking leave (administrative or other). Non-essential contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal, delayed opening, or during periods of inclement weather, onsite contractors should monitor the OPM website as well as radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.

(d) When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site contractors shall continue working established work hours or take leave in accordance with parent company policy. Those contractor employees who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, or closings in accordance with the FAR, applicable cost accounting standards, and the company’s established policy and procedures. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The Contracting Officer will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy and procedures.

(e) If you intend to visit the Contracts Office, it is advised that you call for an appointment at least 24 hours in advance. (End of text)

G-242-W001 CONTRACT ADMINISTRATION FUNCTIONS (NAVSEA) (OCT 2018)

(a) In accordance with FAR 42.302(a) all functions listed are delegated to the ACO except the following items to be retained by the PCO: N/A

(b) In accordance with FAR 42.302(b), the following additional functions are delegated to the ACO: N/A

Section I - Contract Clauses

52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-21 Basic Safeguarding of Covered Contractor Information

Systems

JUN 2016

52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

252.203-7000 Requirements Relating to Compensation of Former DoD Officials

SEP 2011

252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7009 Limitations on the Use or Disclosure of Third-Party

Contractor Reported Cyber Incident Information

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

DEC 2019

252.211-7008 Use of Government-Assigned Serial Numbers SEP 2010 252.225-7001 Buy American And Balance Of Payments Program-- Basic DEC 2017 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Transportation of Supplies by Sea FEB 2019

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS--COMMERCIAL ITEMS (JUN 2020)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (JUN 2020) (41 U.S.C. 3509).

____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L.

109-282) (31 U.S.C. 6101 note).

___ (5) [Reserved]

___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div.

C).

___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.

L. 111-117, section 743 of Div. C).

X (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (JUN 2020) (31 U.S.C. 6101 note).

____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C. 2313).

____ (10) [Reserved]

____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (MAR 2020) (15 U.S.C. 657a).

____ (ii) Alternate I (MAR 2020) of 52.219-3.

(12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (MAR 2020) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

____ (ii) Alternate I (MAR 2020) of 52.219-4.

____ (13) [Reserved]

X (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (MAR 2020) (15 U.S.C. 644).

____ (ii) Alternate I (MAR 2020).

____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (MAR 2020) (15 U.S.C. 644).

____ (ii) Alternate I (MAR 2020) of 52.219-7.

____ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C. 637(d)(2) and (3)).

____ (17)(i) 52.219-9, Small Business Subcontracting Plan (JUN 2020) (15 U.S.C. 637(d)(4)).

____ (ii) Alternate I (NOV 2016) of 52.219-9.

____ (iii) Alternate II (NOV 2016) of 52.219-9.

____ (iv) Alternate III (JUN 2020) of 52.219-9.

____ (v) Alternate IV (JUN 2020) of 52.219-9.

X (18) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

____ (19) 52.219-14, Limitations on Subcontracting (MAR 2020) (15 U.S.C. 637(a)(14)).

____ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (MAR 2020) (15 U.S.C. 657f).

X (22) (i) 52.219-28, Post Award Small Business Program Rerepresentation (MAR 2020) (15 U.S.C. 632(a)(2)).

____ (ii) Alternate I (MAR 2020) of 52.219-28.

____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women- Owned Small Business (EDWOSB) Concerns (MAR 2020) (15 U.S.C. 637(m)).

____ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (MAR 2020) (15 U.S.C. 637(m)).

____ (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).

____ (26) 52.219-33, Nonmanufacturer Rule (MAR 2020) (15 U.S.C. 637(a)(17)).

X (27) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

X (28) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (JAN 2020) (E.O. 13126).

X (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

X (30)(i) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).

____ (ii) Alternate I (FEB 1999) of 52.222-26.

____ (31)(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

____ (ii) Alternate I (JUL 2014) of 52.222-35.

X (32)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).

____ (ii) Alternate I (JUL 2014) of 52.222-36.

(33) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).

____ (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O.

13496).

X (35)(i) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).

____ (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

____ (36) 52.222-54, Employment Eligibility Verification (OCT 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

____ (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).

____ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners

(JUN 2016) (E.O. 13693).

____ (40) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (OCT 2015) of 52.223-13.

____ (41)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).

____…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .