SF_33.pdf

PDF 216 KB Posted

Attached to
Secure Juvenile Services Federal contract opportunity
Solicitation number
RFP-200-1476-ES
Issued by
Department of Justice Bureau of Prisons Central Office

About this file

SF 33

View the file

Other files for this federal contract opportunity

Other files attached to Secure Juvenile Services, newest first.
File Type Posted
Attachments.zip ZIP file
JuvenileSOWSecure_FEBRUARY-_2016.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER, AND AWARD 1. THIS CONTRACT IS A RATED ORDER UNDER DPAS

(15 CFR 700)

RATING

2. CONTRACT NUMBER 3. SOLICITATION NUMBER

RFP-200-1476-ES

SEALED BID (IFB)

X NEGOTIATED

4. TYPE OF SOLICITATION 5. DATE

ISSUED

03/21/2017

6. REQUISITION/PURCHASE

NUMBER

CODE BCO

Federal Bureau of Prisons Central Office

320 FIRST STREET NW

WASHINGTON, DC 20534

7. ISSUED BY 8. ADDRESS OFFER TO (If other than Item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

L.4 500 1st St. NW, Washington, DC 02:00:00 05/22/2017

(Hour) (Date) CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

9. Sealed offers in original and ____________ copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in ______________________________________________________ until ________________ local time _________________

10. FOR

INFORMATION

CALL:

A. NAME

AREA CODE NUMBER EXT.

B. TELEPHONE (NO COLLECT CALLS) C. E-MAIL ADDRESS

11. TABLE OF CONTENTS

(X) SEC. DESCRIPTION PAGE(S) (X) SEC. DESCRIPTION PAGE(S)

PART I - SCHEDULE PART II - CONTRACT CLAUSES

X A SOLICITATION/CONTRACT FORM 2 X I CONTRACT CLAUSES 9

X B SUPPLIES OR SERVICES AND PRICES/COSTS 2 PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH

X C DESCRIPTION/SPECS./WORK STATEMENT 1 X J LIST OF ATTACHMENTS 1

X D PACKAGING AND MARKING 1 PART IV - REPRESENTATIONS AND INSTRUCTIONS

X E INSPECTION AND ACCEPTANCE 1 X K REPRESENTATIONS CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

X F DELIVERIES OR PERFORMANCE 2

X L INSTRS., CONDS., AND NOTICES TO OFFERORS 5X G CONTRACT ADMINISTRATION DATA 3

X M EVALUATION FACTORS FOR AWARD 4X H SPECIAL CONTRACT REQUIREMENTS 2

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

In compliance with the above, the undersigned agrees, if this offer is accepted within _______________________ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

12.

13. DISCOUNT FOR PROMPT PAYMENT (See Section I, Clause No. 52.232-8)

10 CALENDAR DAYS(%) 20 CALENDAR DAYS(%) 30 CALENDAR DAYS(%) 0 CALENDAR DAYS(%)

14. ACKNOWLEDGEMENT OF AMENDMENTS (The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

AMENDMENT NO. DATE AMENDMENT NO. DATE

15A. NAME AND

ADDRESS OF

OFFEROR

CODE FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or Print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXT.

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER SUCH

ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION: 23. SUBMIT INVOICES TO ADDRESS SHOWN IN (4 copies unless otherwise specified)

ITEM

CODE24. ADMINISTERED BY (if other than Item 7) CODE BCO

Federal Bureau of Prisons Accounting Operations 320 1st Street NW, Room 5009 Washington, DC 20534

25. PAYMENT WILL BE MADE BY

26. NAME OF CONTRACTING OFFICER (Type or print) Jonathan Gant

(Signature of Contracting Officer)

27. UNITED STATES OF AMERICA 28. AWARD DATE

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA - FAR (48 CFR) 53.214(c)

RFP-200-1476-ES Page 1 of 46

Table of Contents

Section Description Page Number

A Solicitation/Contract Form B Supplies or Services and Prices/Costs C Description/Specifications/Statement of Work D Packaging and Marking E Inspection and Acceptance F Deliveries and Performance G Contract Administration Data H Special Contract Requirements

DJAR-PGD-15-02-1A Corporate Representation Regarding Felony Conviction Under Any Federal Law or Unpaid Delinquent Tax Liability - (DEVIATION 2015-02) (March 2015)

I Contract Clauses 52.204-21 Basic Safeguarding of Covered Contractor Information Systems (June 2016) 2852.201-70 Contracting Officer's Technical Representative (COTR) (JAN 1985) DJAR-PGD-15-02-2A Corporate Representation Regarding Felony Conviction Under Any Federal Law or Unpaid Delinquent Tax Liability - Award (DEVIATION 2015-02) (March 2015) 52.222-17 Nondisplacement of Qualified Workers (May 2014) 52.242-5 Payments to Small Business Subcontractors (Jan 2017)

J List of Attachments K Representations, Certifications and Other Statements of Offerors

52.209-12 Certification Regarding Tax Matters (Feb 2016) 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation (Jan 2017)

L Instructions, Conditions and Notices to Offerors 52.204-22 Alternative Line Item Proposal (Jan 2017)

M Evaluation Factors for Award

RFP-200-1476-ES Page 2 of 46

Section B - Supplies or Services and Prices/Costs

SCHEDULE OF SUPPLIES/SERVICES

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 To provide Secure Juvenile In House Services within the states of District of Columbia, Maryland, Virginia, and Pennsylvania 10 bed facility (can be filled with males or fem ales)

Base Period: Start Date of Performance through 12 months

12.000000 MO $____________ $___________________

0002 To provide Secure Juvenile In House Services within the states of District of Columbia, Maryland, Virginia, and Pennsylvania 10 bed facility (can be filled with males or fem ales)

Option Year 1: 13 months through 24 months

12.000000 MO $____________ $___________________

0003 To provide Secure Juvenile In House Services within the states of District of Columbia, Maryland, Virginia, and Pennsylvania 10 bed facility (can be filled with males or fem ales)

Option Year 2: 25 months through 36 months

12.000000 MO $____________ $___________________

0004 To provide Secure Juvenile In House Services within the states of District of Columbia, Maryland, Virginia, and Pennsylvania 10 bed facility (can be filled with males or fem ales)

Option Year 3: 37 months through 48 months

12.000000 MO $____________ $___________________

0005 To provide Secure Juvenile In House Services within the states of District of Columbia, Maryland, Virginia, and Pennsylvania 10 bed facility (can be filled with males or fem ales)

Option Year 4: 49 months through 60 months

12.000000 MO $____________ $___________________

0006 To provide Secure Juvenile In House Services within the states of District of Columbia, Maryland, Virginia, and Pennsylvania 10 bed facility (can be filled with males or fem ales) one month pricing

In accordance with FAR 52.217-8, the Government may exercise an option to extend the performance of services for up to six months. This line item may be used anytime during the life of the contract, not to exceed six months.

1.000000 $____________ $___________________

Clauses By Full Text

B.1 Services and Prices/Costs

The contract resulting from this solicitation will be a Firm Fixed-Price contract for services.

The period of performance for any contract which the Government may award under the terms and conditions of the RFP will be for a one-year base period with four one-year option periods. Offerors must submit pricing for the base period and each option period. Ser-vices are required to be provided in accordance with Section C, Statement of Work, with documentation as required.

Contractor shall provide Secure Juvenile Services for male and female Federal offenders, located within the states of Maryland, Pennsylvania, Virginia or the District of Columbia

Secure Juvenile In-House Services will consist of a 10 bed facility (can be males or females). Provide monthly operating cost for a 10

RFP-200-1476-ES Page 3 of 46 bed facility.

The services will be provided on a Firm-Fixed Price Service type contract with a one year base period, and four one-year option peri-ods.

The Government reserves the right to award without discussions and to make an award which is deemed to be in the best interest of the Government.

Pursuant to FAR 17.203(b) and (d), the Government's evaluation shall be inclusive of options and offerors may offer varying prices for options.

The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic require-ment.

[END OF SECTION]

RFP-200-1476-ES Page 4 of 46

Section C - Description/Specifications/Statement of Work

Clauses By Full Text

C.1 Statement of Work/Specification

A description of the services to be performed is given in the Statement of Work (see attachment) in this section identified as: Contract Secure Juvenile Facility with Work Release, February 2016.

[END OF SECTION]

RFP-200-1476-ES Page 5 of 46

Section D - Packaging and Marking

This Section Is Intentionally Left Blank

RFP-200-1476-ES Page 6 of 46

Section E - Inspection and Acceptance

Clauses By Reference

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.

Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov

Clause Title

52.246-4 Inspection of Services - Fixed-Price (Aug 1996)

Clauses By Full Text

E.2 Place of Acceptance

In accordance with FAR 46.403(a)(6) and FAR 46.503, the place of acceptance for services under this contract shall be at destination.

E.3 Performance Summary Table

Please see attached table (7 pages).

RFP-200-1476-ES Page 7 of 46

Section F - Deliveries and Performance

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.

Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov

Clause Title

52.242-15 Stop-Work Order (Aug 1989)

Clauses By Full Text

F.2 Performance

(a) The Contractor's facility must be fully operational and ready for performance to begin within 120 days after the date of contract award. (For the purpose of this solicitation, "contract award" is defined as the date the award document (either the Standard Form 33 or Standard Form 26) is signed by the Contracting Officer).

(b) The Bureau anticipates the period of performance to being approximately on or by February 1, 2017. However, due to the nature of the procurement this date is approximate. Therefore, the anticipated periods of performance are:

Base Period: Date of performance through 12 months Option Year 1: 13 months through 24 months Option Year 2: 25 months through 36 months Option Year 3: 37 months through 48 months Option Year 4: 49 months through 60 months

(c) The contract shall be effective from date of award. The period of performance shall be effective from date of performance through 12 months, with the Government's unilateral right to exercise four indiviudal option periods in accordance with the terms of this con-tract.

(d) The anticipated period(s) of performance are based on the assumptions that funds are available. The initial performance period will depend on the actual date of award and the issuance of a written award or acceptance of offer mailed or otherwise furnished to the successful offeror to result in a binding contract.

F.3 Place of Performance

(a)The Place of Performance for Secure Juvenile services is: within the states of Maryland, Pennsylvania, Virginia or the District of Columbia

(b) In accordance with FAR 46.503 and FAR 46.403(a)(6), the Place of Acceptance for services under this contract shall be at

DES-TINATION.

RFP-200-1476-ES Page 8 of 46

[END OF SECTION}

RFP-200-1476-ES Page 9 of 46

Section G - Contract Administration Data

G.1 Contracting Officer's Representative

(a) The local Residential Re-Entry Manager (RRM), or his successor, is designated as the Contracting Officer's Representative.

(b) The COR is responsible for the technical direction of the performance of all work under this contract. The term "technical direc-tion" is defined to include, without limitation, the following:

(1) Directions to the contractor which re-direct the contract effort, shift work emphasis between areas or tasks, require pursuit of cer-tain lines of inquiry, fill in details or otherwise serve to accomplish the contractual scope of work.

(2) Supply information to the Contractor which assists in the interpretation of technical portions of the Statement of Work.

(3) Review, inspect, and accept reports and information to be provided by the Contractor to the Government under the contract.

(4) Evaluate the performance and certify all invoices for payment.

(c) Technical direction must be within the general scope of work stated in the contract. The COR does not have authority to, and may not issue, any direction which:

(1) Constitutes an assignment of additional work outside the general scope of the contract.

(2) Constitutes a change as defined in the contract clause entitled "Changes".

(3) Change any of the expressed terms, conditions, fixed price, or time for contract performance. Any such revisions shall be author-ized in writing only by the Contracting Officer.

(d) In the event the COR desires a change to the contract within one or more of the categories as defined in (1) through (3) of para-graph (b), he must direct such request to the Contracting Officer. The Contracting Officer will handle such request within applicable laws and regulations.

(e) During the term of the contract, the Contracting Officer, or his successor, shall administer the contract on behalf of the Govern-ment. Technical matters which cannot be resolved by the Contractor and the COR as well as other contractual difficulties, are to be brought to his immediate attention. The Contracting Officer may be reached at the address and telephone number shown on the SF 33, block 10.

G.2 Payment Schedule

In consideration of the Contractor's satisfactory performance of services called for under this contract, the Government shall make payment to the Contractor at the fixed monthly rates identified in the schedule.

G.3 Billing Procedure

(a) The Government will make payments to the Contractor on a monthly basis, promptly after receipt of an appropriate invoice.

In-voices must include the appropriate contract number.

(b) In accordance with FAR 52.232-33, Payment by Electronic Funds Transfer - System for Award Management (Jul 2013), payment will be made via Electronic Funds Transfer to the account designated by the Contractor.

(c) For reimbursements not covered in the computed In-House RRC and/or Home Confinement computed services pricing (i.e., hos-pital, prescriptions, etc.) which have been authorized by the COR, a separate invoice shall be submitted.

(d) Submit Invoices to:

Federal Bureau of Prisons Dallas Residential Reentry Office 344 Marine Forces Drive Grand Praire, TX 75051

RFP-200-1476-ES Page 10 of 46

G.4 Key Personnel

In accordance with the clause entitled "Change in Key Personnel" included in Part I, Section H, the following positions are considered key personnel for Secure Juvenile Facilities:

Facility Director

Assistant Facility Director

School Principal

Food Service Manager

Director of Psychology

Security Supervisor

Casework Supervisor

G.5 Electronic Subcontracting Reporting System (eSRS)

In accordance with FAR 52.219-9, the offeror agrees to submit the Individual Subcontracting Report (ISR), formerly theSF-294, and Summary Subcontracting Report (SSR), formerly the SF-295, as applicable. Pursuant to FAR 19.704, the Federal Bureau of Prisons requires submission of these reports as follows:

The ISR is due semi-annually and at contract completion, always within 30 days after the close of each reporting period unless oth-er-wise directed by the Contracting Officer. Normally, these deadlines are April 30th for the period ending March 31st and October 30th for the period ending September 30th. A separate report is also due within 30 days after contract completion. Reports are re-quired when due, regardless of whether there has been any subcontracting activity since the inception of the contract or since the last reporting period.

The SSR must be submitted annually (for twelve months ending September 30th). Reports are due 30 days after the close of each re-porting period.

Additional information concerning the Electronic Subcontracting Reporting System (eSRS) program can be located at www.acquisition.gov/far.

G.6 CPARS Contractor Evaluation Factors and Rating Descriptions

Contractor performance will be assessed using seven (7) evaluation factors as follows:

FACTOR: ACCOUNTABILITY

Has the contractor ensured that offenders are accurately accounted for while (1) in the facility; (2) at work assignments; (3) in all other activities outside the facility? Is the approach tailored to the geographic area? Have there been any patterns or unresolved breaches of accountability during this rating period? Have you discussed the strengths and weaknesses, and the effectiveness of any corrective ac-tions?

FACTOR: PROGRAMS

Does the contractor have a process for assessing the individual needs of each offender to assist with their reentry into the community?

Has the contractor initiated the Transitional Skills Journaling program? How well does the contractor administer the program? How effective has the process been this rating period in assisting offenders to find employment and housing, and to develop skills to pre-pare the offender for reentry and prevent them from returning to a criminal lifestyle? How effective and extensive is the community resources network? What are the methods or avenues taken to obtain medical or mental health treatment? Have you discussed the

RFP-200-1476-ES Page 11 of 46 strengths and weaknesses, and the effectiveness of any corrective actions?

FACTOR: COMMUNITY RELATIONS

Does the contractor have a process for educating and interacting with the local community in order to acquire and maintain public support? What efforts have been made during this rating period to foster positive community relations? Discuss the workings and make-up of the contractor's community relations efforts. During this rating period have there been any concerns relating to the con-tractor's position in the community? Have you discussed the strengths and weaknesses, and the effectiveness of any corrective actions?

FACTOR: SITE VALIDITY AND SUITABILITY

During this rating period, has the contractor complied with all applicable local, state, and national health, safety, environmental laws, regulations, Executive Orders, and building codes? Has the contractor maintained appropriate liability insurance? Are there any new areas of public concern within a ½ mile radius of the facility? Are zoning and occupancy permits still valid? Is the contractor's sanita-tion plan and maintenance plan effective? Have you discussed the strengths and weaknesses, and the effectiveness of any corrective actions?

FACTOR: PERSONNEL

How effective has the contractor been in ensuring competent staff have been recruited, trained, and retained? Have staff met the annual training requirements? Are new staff receiving orientation in accordance with SOW requirements? Have new staff received and signed for integrity guidelines? Are there any concerns involving staff integrity? Have you discussed the strengths and weaknesses, and the effectiveness of any corrective actions?

FACTOR: COMMUNICATION/RESPONSIVENESS

Communication: During the rating period, has the contractor maintained open lines of communication with Bureau staff? Does the contractor establish and maintain effective communication with U.S. Probation and local authorities?

Responsiveness: Is the contractor responsive to Bureau requirements, directions, and requests for information? How well does the contractor deal with significant incidents? Have you discussed the strengths and weaknesses, and the effectiveness of any corrective actions?

The Government shall consider both positive and negative attributes in the areas above and provide a written narrative for each that describes the contractor's strengths and weaknesses, and the effectiveness of any corrective actions, during each of the contract's re-porting periods (generally, a one-year term beginning with the start of the Base Period). Strengths equate to performance that exceeds contract requirements and show definite and measurable benefit to the Government. Weaknesses equate to performance problems that do not meet contract requirements and result in negative impact on the Government. The CPAR will include all information from fa-cility monitoring reports and any corrective actions taken by the contractor and the effectiveness of those corrective actions taken. All applicable information up to and including the close of each monitoring conducted during the specified rating period will be included in the narrative.

Based on the narrative, an adjectival rating will be assigned to each factor. Once all factors have been rated, the overall rating will be an objective rating that most accurately reflects the overall performance of the facility. In CPARS, the overall rating will be denoted as "Quality of Product or Service." The Government will provide a detailed explanation outlining the justification for the overall rating.

In accordance with FAR Part 42, the contractor will be given an opportunity to submit comments, rebutting statements, or additional information in response to an evaluation in CPARS. The ultimate conclusion on the performance evaluation is the decision of the Government.

The ratings and associated descriptions for the factors above are as follows:

Exceptional: Contractor's performance exceeds requirements of the contract in many areas. Benefits to the Government/Bureau of Prisons (BOP) are identifiable. Minor problems may exist. Corrective actions are highly effective.

Very Good: Contractor's performance meets requirements of the contract and exceeds requirements in some areas. Benefits to the Government/BOP are identifiable. Problems may exist, but are minor. Corrective actions are effective.

Satisfactory: Contractor's performance meets contract requirements. Some minor problems exist, but the contractor has satisfactory corrective actions in place.

Marginal: Contractor's performance does not meet some of the requirements of the contract. Contractor's performance has shown there are problems resulting in a negative impact on service delivery (a negative impact on the Government). Problems are serious, but re-covery is still possible. Corrective actions have shown to be marginally effective and/or not fully implemented.

Unsatisfactory: Contractor's performance fails to meet most of the requirements of the contract. Contractor's performance shows there are problems resulting in a negative impact on service delivery (a negative impact on the Government). Problems are serious, and recovery is unlikely. Corrective actions are ineffective and/or not fully implemented.

RFP-200-1476-ES Page 12 of 46

Section H - Special Contract Requirements

H.3 Protected Religious Activities

Protected Religious Activities. Religious exercise can come up in Secure Juvenile Centers in a variety of ways and is gov-erned by the Department's regulation guaranteeing "Equal Treatment For Faith-Based Organizations" [28 CFR 38.1(b)], as well as by federal constitutional and statutory law.

(1) An offender may ask for a time and place to individually pray, study, or worship. Federal law requires that a federally-funded Con-tractor allow offenders in a Secure Juvenile center reasonably frequent opportunity to engage on their own in these "inherently re-ligious activities" throughout the week.

(2) An offender may ask a Secure Juvenile center staff to lead or join him or her in inherently religious activity. If an offender in a Secure Juvenile center makes such a request, Contractor staff may accommodate the request when such activity would not interfere with the contracted services, when the religious activity occurs in a separate time or location from the services provided under the con-tract and if attendance or participation by offenders and staff is voluntary. A separate location does not need to be a separate building but must be an area that, at the time of religious activity, is not being used to provide services under the contract and is not otherwise open to the offender population.

(3) A Secure Juvenile Contractor may offer inherently religious services to offenders outside of, and in addition to, its contract with the Govern-ment as long as the services are offered in a separate time or location (as defined above in paragraph 2) from the services provided un-der the contract and if attendance or participation by offenders is voluntary. For example, the BOP permits-but would not reimburse a contractor to provide offenders with a chaplain to assist offenders who request spiritual counsel, prayer, instruction from a sacred text, or the opportunity to worship. Unless specifically requested in the solicitation, such services should not be included as part of a pro-posal and will not be considered in the evaluation process.

[END OF SECTION]

H.1 Change in Key Personnel

Following contract award, any change in key personnel during contract performance is subject to the review and approval of the Residential Re-Entry Manager. The Contractor shall submit evidence that the qualifications of the prospective replacement person-nel are equal to or greater than personnel vacating the positions. Such requests for review and approval shall be in writing.

H.2 Contract Performance

(a) Any request to alter the facility following contract award must provide evidence supporting the contractor's right to use the pro-posed facility. Acceptable evidence of right to use is limited to deeds, leases, bills of sale, options to lease, options to buy, contin-gency leases or contingency deeds.

(b) Offerors shall submit proof that the local law enforcement agency with primary justification (e.g., Chief of Police, Sheriff) and at least two levels of local government officials (e.g., City Council Member, Mayor, County Board Member, City Commissioner) have been notified of their intent to change facility location. The notification will identify the specific location of the new facility.

The proof shall be a signed copy of each notification* sent via registered or certified mail to the Chief Executive Officer of the law en-forcement agency and two levels of public officials of the geographical area in which the new facility is located. The notification shall provide an accurate description of the program services the contractor provides under their contract to include, but not limited to, the contractor's mission statement; the size of the new facility; the specific address location of the new facility; the type of offender the Statement of Work indicates will be placed at the new facility; and the contractor's inmate accountability practices.

*[The offerors shall use the mandatory Sample Community Notification Letter in Section J, Attachment 5, when notifying the above-mentioned officials.]

(c) Subsequent to award the contractor shall notify the Contracting Officer's Representative (COR) advising of any request to change facility locations. The Bureau of Prisons will inspect the contractor's place of performance to ensure compliance with the Safety and Sanitation requirements of the Statement of Work. The contractor will be advised of identified areas of non-compliance and will be re-quired to correct the non-compliant areas in accordance with the Statement of Work and reasonable guidance provided by the COR. If the place of performance is not in compliance by the established performance date, the contract may be terminated for default.

(d) The contractor, when requesting a change in performance location, is required to provide proof of zoning. This proof shall be provided with the initial request to change locations.

(e) The initial request to change performance sites will be made to the COR. The request shall be in writing and accompanied by the

RFP-200-1476-ES Page 13 of 46 following documentation: (1) proof of right to use; (2) proof of zoning; (3) proof of law enforcement/ geopolitical notification; and (4) evidence that the Bureau of Prisons will receive some benefit for modifying the contract to change the place of performance.

The Contracting Officer, with the assistance of Legal Counsel and the COR, shall determine whether substantial evidence of proper zoning and other ordinance or regulatory compliance has been provided by the Contractor.

The contractor's failure to provide satisfactory proof may result in termination of the contract for default.

For purposes of this provision, a "necessary local official" means an employed or elected person whose opinion, approval, or con-cur-rence as to the propriety of the use of proposed sites is required under any and all applicable laws of the city, town, village, or muni-cipality in which the RRC is to be located.

DJAR-PGD-15-02-1A Corporate Representation Regarding Felony Conviction Under Any Federal Law or Unpaid Delinquent Tax Liability - (DEVIATION 2015-02) (March 2015)

(a) None of the funds made available by the Department's current Appropriations Act may be used to enter into a contract, memorandum of understanding, or cooperative agreement with a corporation -

(1) convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this further action is not necessary to protect the interests of the Government, or

(2) that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrat-ive remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability , unless an agency has considered suspension or debarment of the corporation and made a determination that this further action is not necessary to protect the interests of the Government.

(b) By submitting a response to this solicitation, the offeror represents that, as of the date of this offer -

(1) the offeror is not a corporation convicted of a felony criminal violation under any Federal or State law within the preceding 24 months; and,

(2) the offeror is not a corporation that has any unpaid Federal or State tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability.

(End of Provision)

RFP-200-1476-ES Page 14 of 46

Section I - Contract Clauses

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.

Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov

Clause Title

52.202-1 Definitions (Nov 2013)

52.203-5 Covenant Against Contingent Fees (May 2014)

52.203-3 Gratuities (Apr 1984)

52.203-7 Anti-Kickback Procedures (May 2014)

52.203-6 Restrictions On Subcontractor Sales To The Government (Sept 2006)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014)

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014)

52.203-13 Contractor Code of Business Ethics and Conduct (Oct 2015)

52.203-12 Limitation On Payments To Influence Certain Federal Transactions (Oct 2010)

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011)

52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights

(Apr 2014)

52.204-13 System for Award Management Maintenance (Oct 2016)

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016)

52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014)

52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or

Proposed for Debarment (Oct 2015)

52.204-14 Service Contract Reporting Requirements (Oct 2016)

52.204-18 Commercial and Government Entity Code Maintenance (Jul 2016)

52.210-1 Market Research (APR 2011)

52.215-2 Audit and Records - Negotiation (Oct 2010)

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013)

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)

52.215-13 Subcontractor Certified Cost or Pricing Data - Modifications (Oct 2010)

RFP-200-1476-ES Page 15 of 46

Clause Title

52.215-15 Pension Adjustments and Asset Reversions (Oct 2010)

52.215-8 Order of Precedence - Uniform Contract Format (Oct 1997)

52.215-11 Price Reduction for Defective Certified Cost or Pricing Data - Modifications (Aug 2011)

52.219-4 Notice of Price Evaluation preference for HUBZone Small Business Concerns (Oct 2014)

52.219-8 Utilization of Small Business Concerns (Nov 2016)

52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits (PRB) Other than Pensions (July 2005)

52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -

Modifications (Oct 2010)

52.222-3 Convict Labor (June 2003)

52.219-28 Post-Award Small Business Program Rerepresentation (Jul 2013)

52.219-16 Liquidated Damages - Subcontracting Plan (Jan 1999)

52.219-9 Alt II Small Business Subcontracting Plan (Jan 2017) - Alternate II (Nov 2016)

52.222-35 Equal Opportunity for Veterans (Oct 2015)

52.222-26 Equal Opportunity (Sept 2016)

52.222-21 Prohibition of Segregated Facilities (Apr 2015)

52.222-4 Contract Work Hours and Safety Standards - Overtime Compensation (May 2014)

52.222-41 Service Contract Labor Standards (May 2014)

52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010)

52.222-37 Employment Reports on Veterans (Feb 2016)

52.222-36 Equal Opportunity for Workers with Disabilities (Jul 2014)

52.222-55 Minimum Wages Under Executive Order 13658 (Dec 2015)

52.222-54 Employment Eligibility Verification (Oct 2015)

52.222-50 Combating Trafficking in Persons (Mar 2015)

52.222-43 Fair Labor Standards Act and Service Contract Labor Standards - Price Adjustment (Multiple Year and Option

Contracts) (May 2014)

52.232-23 Assignment of Claims (May 2014)

52.229-3 Federal, State and Local Taxes (Feb 2013)

52.232-1 Payments (Apr 1984)

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving (Aug 2011)

52.223-6 Drug Free Workplace (May 2001)

52.224-2 Privacy Act (Apr 1984)

52.225-13 Restrictions on Certain Foreign Purchases (June 2008)

RFP-200-1476-ES Page 16 of 46

Clause Title

52.232-18 Availability Of Funds (Apr 1984)

52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004)

52.232-25 Prompt Payment (Jan 2017)

52.232-33 Payment by Electronic Funds Transfer - System for Award Management (Jul 2013)

52.232-8 Discounts For Prompt Payment (Feb 2002)

52.224-1 Privacy Act Notification (Apr 1984)

52.232-11 Extras (Apr 1984)

52.232-17 Interest (May 2014)

52.237-3 Continuity Of Services (Jan 1991)

52.242-13 Bankruptcy (July 1995)

52.233-1 Alt I Disputes (May 2014) - Alternate I (Dec 1991)

52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013)

52.243-1 Alt I Changes - Fixed-Price (Aug 1987) - Alternate I (Apr 1984)

52.246-25 Limitation of Liability - Services (Feb 1997)

52.232-9 Limitation on Withholding of Payments (Apr 1984)

52.249-8 Default (Fixed-Price Supply and Service) (Apr 1984)

52.233-3 Protest after Award (Aug 1996)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013)

52.249-2 Termination for Convenience of the Government (Fixed-Price) (Apr 2012)

52.244-6 Subcontracts for Commercial Items (Jan 2017)

52.248-1 Value Engineering (Oct 2010)

52.253-1 Computer Generated Forms (Jan 1991)

Clauses By Full Text

52.21-603-70 Contracting Officer's Representative (COR) (June 2012)

(a)Local ,Residential Reentry Manager or designee , ,, is hereby designated as the Contracting Officer's Representative (COR) under this contract.

(b) The COR is responsible, as applicable, for: receiving all deliverables, inspecting and accepting the supplies or services provide hereunder in accordance with the terms and conditions of this contract; providing direction to the contractor which clarifies the con-tractor effort, fills in details or otherwise serves to accomplish the contractual Scope of Work; evaluating performance; and certifying all invoices/vouchers for acceptance of the supplies or services furnished for payment.

(c) The COR does not have the authority to alter the contractor's obligations under the contract, and/or modify any of the expressed terms, conditions, specifications, or cost of the agreement. If as a result of technical discussions it is desirable to alter/change contrac-tual obligations or the Scope of Work, the Contracting Officer shall issue such changes.

RFP-200-1476-ES Page 17 of 46

52.252-6 Authorized Deviations in Clauses (Apr 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized devi-ation is indicated by the addition of (DEVIATION) after the date of the clause.

(b) The use in this solicitation or contract of any Justice Acquisition Regulation. (48 CFR 2801) clause with an authorized deviation is indicated by the addition of (DEVIATION) after the name of the regulation.

(End of clause)

52.24-403-70 Notice of Contractor Personnel Security Requirements (OCT 2005)

Compliance with Homeland Security Presidential Directive-12 (HSPD-12) and Federal Information Processing Standard Publication 201 (FIPS 201) 1 entitled "Personal Identification Verification (PIV) for Federal Employees and Contractors," Phase I.

1.Long-Term Contractor Personnel:

In order to be compliant with HSPD-12/PIV I, the following investigative requirements must be met for each new long-term 2 con-tractor employee whose background investigation (BI) process begins on or after October 27, 2005:

a. Contractor Personnel must present two forms of identification in original form prior to badge issuance (acceptable documents are listed in Form I-9, OMB No. 1615-0047, "Employment Eligibility Verification," and at least one document must be a valid State or Federal government-issued pic-ture ID);

b. Contractor Personnel must appear in person at least once before a DOJ official who is responsible for checking the identification documents. This identity proofing must be completed sometime during the clearance process but prior to badge issuance and must be documented by the DOJ official;

c. Contractor Personnel must undergo a BI commensurate with the designated risk level associated with the duties of each position.

Outlined below are the minimum BI requirements for each risk level:

• High Risk -Background Investigation (5 year scope)

• Moderate Risk -Limited Background Investigation (LBI) or Minimum Background Investigation (MBI)

• Low Risk -National Agency Check with Inquiries (NACI) investigation

d. The pre-appointment BI waiver requirements for all position sensitivity levels are a: 1) Favorable review of the security question-naire form; 2) Favorable fingerprint results; 3) Favorable credit report, if required;3 4) Waiver request memorandum, including both the Office of Personnel Management schedule date and position sensitivity/risk level; and 5) Favorable review of the National Agency Check (NAC) 4 portion of the applicable BI that is determined by position sensitivity/risk level.

A badge may be issued following approval of the above waiver requirements. If the NAC is not received within five days of OPM's scheduling date, the badge can be issued based on a favorable review of the Security Questionnaire and the Federal Bureau of In-vest-igation Criminal History Check (i.e., fingerprint check results).

e. Badge re-validation will occur once the investigation is completed and favorably adjudicated. If the BI results so justify, badges is-sued under these procedures will be suspended or revoked.

2. Short-Term Contractor Personnel: It is the policy of the DOJ that short-term contractors having access to DOJ information systems and/or DOJ facilities or space for six months or fewer are subject to the identity proofing requirements listed in items 1a. and 1b.

above. The pre-appointment waiver re-quirements for short-term contractors are:

a. Favorable review of the security questionnaire form; b. Favorable fingerprint results; c. Favorable credit report, if required;5 and d.

Waiver request memorandum indicating both the position sensitivity/risk level and the duration of the appointment. The commen-sur-ate BI does not need to be initiated.

A badge may be issued following approval of the above waiver requirements and the badge will expire six months from the date of is-suance. This process can only be used once for a short-term contractor in a twelve month period. This will ensure that any consecut-ive short-term appointments are subject to the full PIV-I identity proofing process.

For example, if a contractor employee requires daily access for a three or four-week period, this contractor would be cleared according to the above short-term requirements. However, if a second request is submitted for the same contractor employee within a twelve-month period for the purpose of extending the initial contract or for employment under a totally different contract for another three or four-week period, this contractor would now be considered "long-term" and must be cleared according to the long-term re-quirements as stated in this interim policy.

3. Intermittent Contractors: An exception to the above-mentioned short-term requirements would be intermittent contractors.

a. For purposes of this policy, "intermittent" is defined as those contractor employees needing access to DOJ information systems and/ or DOJ facilities or space for a maximum of one day per week, regardless of the duration of the required intermittent access. For ex-ample, the water delivery contractor that delivers water one time each week and is working on a one-year contract.

b. Contractors requiring intermittent access should follow the Department's escort policy. Please reference the August 11, 2004, and January 29, 2001, Department Security Officer policy memoranda that conveys the requirements for contractor facility escorted ac-cess.

c. Due to extenuating circumstances, if a component requests unescorted access or DOJ IT system access for an intermittent con-tract-or, the same pre-employment background investigation waiver requirements that apply to short-term contractors are required.

d. If an intermittent contractor is approved for unescorted access, the contractor will only be issued a daily badge. The daily badge will be issued upon entrance into a DOJ facility or space and must be returned upon exiting the same facility or space.

RFP-200-1476-ES Page 18 of 46

e. If an intermittent contractor is approved for unescorted access, the approval will not exceed one year. If the intermittent contractor requires unescorted access beyond one year, the contractor will need to be re-approved each year.

4. An individual transferring from another department or agency shall not be re-adjudicated provided the individual has a current (within the last five years), favorably adjudicated BI meeting HSPD-12 and DOJ's BI requirements.

5. The DOJ's current escorted contractor policy remains unchanged by this acquisition notice.

Notes:

1. FIPS 201 is available at: www.csrc.nist.gov/publications/fips/fips201/FIPS-201-022505.pdf

2. Under HSPD-12, long-term contractors are contractors having access to DOJ information systems and/or DOJ facilities or space for six months or longer. The PIV-I identity proofing process, including initiation and adjudication of the required background invest-iga-tion, is required for all new long-term contractors regardless of whether it is the current practice to issue a badge. The second phase of HSPD-12 implementation (PIV-II) requires badge issuance to all affected long-term contractors.

3. For contractors in position sensitivity/risk levels above level 1, a favorable review of a credit check is required as part of the pre-appointment waiver package.

4. In order to avoid a delay in the hiring process, components should request an Advance NAC Report when initiating in-vestigations to OPM. Per OPM ' s instructions, to obtain an Advance NAC Report, a Code " 3" must be placed in block " B " of the " Agency Use Only " section of the investigative form. This report is available for all case types.

5.For contractors in position sensitivity/risk levels above level 1, a favorable review of a credit check is required as part of the pre-appointment waiver package.

(End of Clause)

52.218-000 CONTINUING CONTRACT PERFORMANCE DURING A PANDEMIC INFLUENZA OR OTHER NATIONAL EMERGENCY (May 2008)

During a Pandemic or other emergency we understand that our contractor workforce will experience the same high levels of absentee-ism as our federal employees. Although the Excusable Delays and Termination for Default clauses used in Government contracts list epidemics and quarantine restrictions among the reasons to excuse delays in contract performance, we expect our contractors to make a reasonable effort to keep performance at an acceptable level during emergency periods.

The Office of Personnel Management (OPM) has provided guidance to federal managers and employees on the kinds of actions to be taken to ensure the continuity of operations during emergency periods. This guidance is also applicable to our contract workforce.

Contractors are expected to have reasonable policies in place for continuing work performance, particularly those performing mission critical services, during a pandemic influenza or other emergency situation.

The types of actions a federal contractor should reasonably take to help ensure performance are:

• Encourage employees to get inoculations or follow other preventive measures as advised by the public health ser-vice.

• Cross-train workers as backup for all positions performing critical services. This is particularly important for work such as guard services where telework is not an option.

• Implement telework to the greatest extent possible in the workgroup so systems are in place to support successful re-mote work in an emergency.

• Communicate expectations to all employees regarding their roles and responsibilities in relation to remote work in the event of a pandemic health crisis or other emergency.

• Establish communication processes to notify employees of activation of this plan.

• Integrate pandemic health crisis response expectations into telework agreements.

• With the employee, assess requirements for working at home (supplies and equipment needed for an extended tele-work period). Security concerns should be considered in making equipment choices; agencies or contractors may wish to avoid use of employees' personal computers and provide them with PCs or laptops as appropriate.

• Determine how all employees who may telework will communicate with one another and with management to accom-plish work.

• Practice telework regularly to ensure effectiveness.

• Make it clear that in emergency situations, employees must perform all duties assigned by management, even if they are outside usual or customary duties.

• Identify how time and attendance will be maintained.

It is the contractor's responsibility to advise the Government Contracting Officer if they anticipate not being able to perform and to work with the Department to fill gaps as necessary. This means direct communication with the Contracting Officer or in his/her ab-sence, another responsible person in the contracting office via telephone or email messages acknowledging the contractor's notifica-tion. The incumbent contractor is responsible for assisting the Department in estimating the adverse impacts of nonperformance and to work diligently with the Department to develop a strategy for maintaining the continuity of operations.

The Department does reserve the right in such emergency situations to use Federal employees, employees of other agencies, contract support from other existing contractors, or to enter into new contracts for critical support services. Any new contracting efforts would

RFP-200-1476-ES Page 19 of 46 be acquired following the guidance in the Office of federal Procurement Policy issuance "Emergency Acquisitions", May, 2007 and Subpart 18.2. Emergency Acquisition Flexibilities, of the Federal Acquisition Regulations.

[End of Clause]

52.222-1 Notice to the Government of Labor Disputes (Feb 1997)

If the Contractor has knowledge that any actual or potential labor dispute is delaying or threatens to delay the timely performance of this contract, the Contractor shall immediately give notice, including all relevant information, to the Contracting Officer.

(End of clause)

DJAR-PGD-15-03 Security of Department Information and Systems

I. Applicability to Contractors and Subcontractors

This clause applies to all contractors and subcontractors, including cloud service providers (“CSPs”), and personnel of contractors,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .