RFP W15QKN-20-R-0144 - CLIN Structure High Energy Attrition Milling.docx
DOCX document 18 KB Posted
- Attached to
- High Attrition Milling Equipment Federal contract opportunity
- Solicitation number
- W15QKN-20-R-0144
About this file
This document contains a request for proposal for a high energy attrition milling equipment system. The U.S. Army Contracting Command at Picatinny Arsenal is seeking a base system and four options for additional equipment, including collecting and monitoring system performance for various grinding operations and cryomilling capabilities. Proposals are due no later than October 1, 2020 and shall include pricing using the provided contract line item numbers for the base system and options. Award will be made as a firm fixed price contract to a small business. The evaluation will utilize the lowest priced technically acceptable approach based on technical acceptability and price.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP W15QKN-20-R-0144 - CDRL A003 Training Materials.pdf | ||
| RFP W15QKN-20-R-0144 - FAR 52 204 26 and 52 204-24.pdf | ||
| RFP W15QKN-20-R-0144 - CDRL A001 Manuals.pdf | ||
| RFP W15QKN-20-R-0144 - Evaluation Criteria.pdf | ||
| RFP W15QKN-20-R-0144 - CDRL A002 Certificate of Compliance.pdf | ||
| RFP W15QKN-20-R-0144 - SOW High Energy Attrition Milling.pdf | ||
| RFP W15QKN-20-R-0144 - CDRL A005 Accident Incident Report.pdf | ||
| RFP W15QKN-20-R-0144 - Disclosure of Lobbying Activities SF LLL.pdf | ||
| RFP W15QKN-20-R-0144 - CDRL A004 SecurityTraining.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W15QKN-20-R-0144 High Energy Milling System CLIN Item Description QTY Unit Price Total ____________
| 0001 | Base | High Energy Milling System | 1 EA | $____________.__ | $______________.__ | In accordance with |
| Statement of Work (SOW) |
Paragraph 4.1
0002 Option 1 Collect and Monitor 1 EA $____________.__ $______________.__ System Performance for 20L Grinding Operation In auto-batch operation In accordance with SOW paragraph 4.2.1.
0003 Option 2 Cryomilling for 20L 1 EA $____________.__ $______________.__ Grinding Operation In auto-batch operation In accordance with SOW paragraph 4.2.2.
0004 Option 3 Collect and Monitor 1 EA $____________.__ $______________.__ System for 8L Grinding Operation in manual operation In accordance with SOW Paragraph 4.2.3.
0004 Option 4 Cryomilling for 8L 1 EA $____________.__ $______________.__ Grinding Operation In manual operation In accordance with SOW paragraph 4.2.4.
0005 CDRLs Contract Data Requirements ***********Not Separately Priced***************** Lists (CDRLs) A001-A004 In accordance with the SOW For the base and all options.
File details come from the government source that posted it. Updated .