RFP N0017422R0041.pdf

PDF 535 KB Posted

Attached to
MK70 Ballast Kits Federal contract opportunity
Solicitation number
N0017422R0041
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 03:00 PM local time 29 Aug 2022

X

A X B X C X D

EX

X

G F 64 - 76

77 - 83 X H 84 - 86 waylin.duhon@navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-C9 1 86

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00174 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

WAYLIN M. DUHON 301-744-6746

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 9

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

10 - 26 27 - 28

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

29 - 31 32 - 33

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 34 - 46 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 47 - 48 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

49 - 62

PART II - CONTRACT CLAUSES

NSWC IHD C02

4081 N. JACKSON RD

BLDG 841

INDIAN HEAD MD 20640-5116

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

28 Jul 2022

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0017422R0041

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QTY U/I UNIT PRICE AMOUNT

0001 First Article Testing (FAT)

Base Year

In accordance with PWS 3.3.2.

FOB: Destination

FFP

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 29 Each

MK70 BOOSTER BALLAST KITS

FFP

Base Year

NET AMT

STEPLADDER PRICING

STEPLADDER NAME ITEM NO FROM QUANTITY TO QUANTITY UNIT PRICE

Base Year 0002 10.00 15.00

16.00 20.00

21.00 29.00

0003 1 Lot Data

FFP

Base Year (In Support of CLIN 0002)

Data to be provided in accordance with Contract Data Requirements Lists (CDRLs) A001 through A0013, in support of CLIN 0002.

NOTE THIS CLIN IS NOT SEPARATELY PRICED (NSP)

0004 1 Lot Shipping

FFP

Base Year

Shipping and Freight Cost for CLIN 0002

1001 26 Each

MK70 BOOSTER BALLAST KITS

FFP

Option Year I

Option Years 1001 10.00 15.00

21.00 26.00

1002 1 Lot Data

FFP

Option Year I (In Support of CLIN 1001)

Data to be provided in accordance with Contract Data Requirements Lists (CDRLs) A001 through A0013, in support of CLIN 1001.

Shipping

FFP

Option Year I

Shipping and Freight Cost for CLIN 1001.

2001 26

MK70 BOOSTER BALLAST KITS

FFP

Option Year II

Option Years 2001 10.00 15.00

2002 1 Lot Data

FFP

Option Year II (In Support of CLIN 2001)

Data to be provided in accordance with Contract Data Requirements Lists (CDRLs) A001 through A0013, in support of CLIN 2001

Shipping

FFP

Option Year II

Shipping and Freight Cost for CLIN 2001.

3001 26 Each

MK70 BOOSTER BALLAST KITS

FFP

Option Year III

Option Years 3001 10.00 15.00

3002 1 Lot Data

FFP

Option Year III (In Support of CLIN 3001)

Data to be provided in accordance with Contract Data Requirements Lists (CDRLs) A001 through A0013, in support of CLIN 3001.

Shipping

FFP

Option Year III

Shipping and Freight Cost for CLIN 3001.

4001 26 Each

MK70 BOOSTER BALLAST KITS

FFP

Option Year IV

Option Years 4001 10.00 15.00

4002 1 Lot Data

FFP

Option Year IV (In Support of CLIN 4001)

Data to be provided in accordance with Contract Data Requirements Lists (CDRLs) A001 through A0013, in support of CLIN 4001.

Shipping

FFP

Option Year IV

Shipping and Freight Cost for CLIN 4001.

Section C - Descriptions and Specifications

PWS

MANUFACTURING OF MK70 BOOSTER BALLAST KITS USING NASA SOUNDING

ROCKET OPERATIONS CONTRACT (NOSROC) DRAWINGS

PERFORMANCE-BASED STATEMENT OF WORK

1.0 General

1.1 Introduction

The Naval Surface Warfare Center Indian Head Division (NSWC IHD) (Government) requires a contract for fabrication, acceptance inspection, and delivery of Mk 70 Booster Ballast Hardware Kits. The Mk 70 Booster Ballast Hardware is critical to the GQM-163A Coyote target.

2.0 Applicable Documents

Drawings associated with this requirement are unclassified controlled technical information (CUI) assigned a restricted distribution statement. To receive this CUI, requests should be directed via email to Waylin Duhon at waylin.m.duhon.civ@us.navy.mil, which will then be distributed via DoD SAFE.

2.1 General Specifications

Code of Federal Regulations (CFR):

22 CFR 121 The United States Munitions List 22 CFR 122 Registration of Manufacturers and Exporters

Commercial Specifications:

LS-1512 PSA20 or PSA21 Polyurethane Foam SP-032-2 Fastener, Self-Clinching .190-32

Department of Defense (DoD) Directives:

5230.25 Withholding of Unclassified Technical Data From Public

Disclosure

Orbital Technical Drawings:

1030-2040-001 Plate, Nut 1030-2042-001 Bracket Ballast Adapter 1030-5043-001 Ballast Connector Block 1030-2044-001 Ballast Launching Lug 1030-2046-001 Ballast Aft Mounting Pad Strap 1030-2048-001 Ballast, Mid 1030-5052-001 Strap Ballast Radial

1030-2052-001 Strap Ballast, Aft/Mid 1030-2054-001 Strap Ballast , Long 1030-5022-001 Cover, Internal Booster 1030-5080-001 Bracket, Conn-press cartridge 1030-5211-001 Bracket, Connector 1030-5214 Adapter, Pressure Transducer 1030-2017 Cover Counterbore Adapter 1030-5802 Release Housing Assembly C23816 Release Housing B23818 Piston Housing A23819 Bumper 170332 Piston Actuator

Society of Automotive Engineers (SAE) Standards:

SAE AS6174 Counterfeit Material; Assuring Acquisition of Authentic and

Conforming Material

2.2 Conflicting Document Requirements

If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.

3.0 Requirements

3.1 General Manufacturing

The Contractor shall fabricate, inspect, test, and deliver the Ballast Kits in accordance with the requirements of the drawings and this PWS. A single (1) kit shall consist of the components in Table 1.

Table 1: Single Ballast Kit Composition Drawing Rev Description Qty [-] UOI [-]

1030-2040-001 NR Plate, Nut 4 EA

1030-2042-001 A Bracket Ballast Adapter 4 EA

1030-5043-001* NR Ballast Connector Block 2 EA

1030-2044-001* NR Ballast Launching Lug 2 EA

1030-2046-001* NR Ballast Aft Mounting Pad Strap 1 EA

1030-2048-001* NR Ballast, Mid 3 EA

1030-5052-001 NR Strap Ballast Radial 4 EA

1030-2052-001 NR Strap Ballast, Aft/Mid 4 EA

1030-2054-001 NR Strap Ballast, Long 4 EA

1030-5022-001 NR Cover, Internal Booster 1 EA

1030-5080-001 NR Bracket, Conn-press cartridge 1 EA

SP-032-2

Fastener, Self-Clinching .190-32 (3EA per 1030-5080-

001) 3

EA

1030-5211-001 NR Bracket, Connector 1 EA

1030-5214 NR Adapter, Pressure Transducer 1 EA

1030-2017 NR Cover Counterbore Adapter 1 EA

C23816** F Release Housing Assembly 1 EA

B23818 C Piston Housing 1 EA

A23819 NR Bumper 1 EA

170332 G Piston Actuator 1 EA

*Components with Isoloss Foam, applied per PWS 3.1.2 **Components with bonded cork, applied per PWS 3.1.3

3.1.1 Engineering Change Orders

Table 2: MK70 Ballast Kit Engineering Change Orders

Engineering Change Document

Drawing Number

Description

ECN-00000006713 1030-2042-001 Bracket Ballast Adapter ECN-00000014624 1030-5022-001 Cover, Internal Booster ECN-00000014587 1030-5080-001 Bracket, Conn-press cartridge

ECN-00000012638

ECN-00000014540

ECN-00000039193

1030-5211-001 Bracket, Connector

ECN-00000000580

ECN-00000014601

1030-2017 Cover Counterbore Adapter

3.1.2 Foam Application

The Contractor shall apply Isoloss LS Foam, 15PCF (with pressure sensitive adhesive back), P/N LS-1512 PSA20, to inside surfaces identified in Table 3 after priming and painting. The contractor shall trim edges of foam to match each plate and not remove the foam at the thru-holes.

Table 3: Foam Application Requirements Drawing Nomenclature Surface Drawing Zone 1030-5043-001 Ballast Connector Block R9.12+.03 C6 1030-2044-001 Ballast Launching Lug R9.12+.03 A5 1030-2046-001 Ballast Aft Mounting Pad Strap R9.12+.03 C5 1030-2048-001 Ballast Mid R9.12+.03 B6

3.1.3 Cork Application

The Contractor shall apply composite cork to the Release Housing Pin Pusher (Dwg C23816) in accordance with the instructions on the Release Housing Assembly (Dwg 130-5802 Rev. A).

3.1.4 Workmanship

All components shall be free of rust, burrs, blemishes, contamination, sharp edges, or other foreign matter that could result in malfunction of the booster ballast components. The cleaning methods used shall not be injurious to any part, nor shall the parts be contaminated by the cleaning agent(s). Surface coatings shall be continuous except for light surface scratches that do not expose the base material.

3.1.5 Unit Traceability

The contractor shall keep traceability records of the raw material and/or sub-component lot numbers used in each ballast kit. The government reserves the right to request traceability records at any time.

3.1.6 Serialization

Contractor shall number booster part kits consecutively starting at K1000 and increasing incrementally by 1 for each subsequent kit. Each part should be traceable to individual inspection reports.

3.1.7 Deviations

Any necessary deviations from the stated contract requirements or contractor’s qualified process must receive prior approval from the government. Deviations from the technical data package shall be submitted to the government as a Request for Variance (RFV) in accordance with DI- SESS-80640 per CDRL A001.

3.1.8 Subcontractor and Supplier Performance

The Prime Contractor shall bear the ultimate responsibility for all deliveries and performance of all requirements under this contract. At the Government’s sole discretion, the Government may apply quality and/or on-time delivery issues stemming from the work of a subcontractor to the Prime Contractor’s quality performance metrics.

3.2 Process Documentation

3.2.1 Manufacturing Plan

The contractor shall identify, establish, and maintain its fabrication process using a manufacturing plan. The manufacturing plan shall be documented and submitted to the Government in accordance with DI-MGMT-81889 per CDRL A002 no later than 60 days after contract award. The Government shall review the Manufacturing Plan and conduct a prime contractor site visit within 30 working days of receipt of the first draft submission. Final review and approval of the Manufacturing Plan shall occur no more than 15 working days after conclusion of the site visit. The Manufacturing Plan shall be approved before start of First Article Production.

3.2.2 Sourcing Documentation

The Contractor shall submit Diminishing Manufacturing Sources and Materials Shortages (DMSMS) data for the kit components in PWS 3.1 to the Government in accordance with DI- PSSS-81656 per CDRL A003 at the same time as the Manufacturing Plan from PWS 3.2.1. The Government shall review the DMSMS data within 15 working days of receipt of the first draft submission. Final review and approval of the DMSMS data shall occur no more than 15 working days after Government review of first draft.

3.2.3 Quality Program Plan (QPP)

The contractor shall provide a QPP to the government in accordance with DI-QCIC-81722 per CDRL A004 at the same time as the Manufacturing Plan from PWS 3.2.1. The Government shall review the QPP within 15 working days of receipt of the first draft submission. Final review and approval of the QPP shall occur no more than 15 working days after Government review of first draft.

All production, inspection, and testing shall adhere to the requirements of this plan for the life of the contract. If any changes are made to the quality program plan during the use of this contract, the contractor shall notify the government in writing of these changes. Changes to the QPP shall be submitted to the Government for review and approval. The Government reserves the right to require first article testing (FAT) for any changes deemed unacceptable.

3.3 Test and Inspection

The Contractor shall maintain and control processes to inspect and test components as described in this PWS. These processes should cover all phases from the ordering of the material to the Government acceptance of the finished product.

3.3.1 Test Plan

The contractor shall submit an acceptance test plan in accordance with DI-QCIC-80553 per CDRL A005 prior to starting production of either first article or production deliverables. The Inspection Test Plans shall consist of shop travelers, flow charts, and final Quality Assurance (QA) inspection sheets for the Government to ensure Contractor in-process inspections capture all drawing and PWS requirements. The Government shall review the Test Plan within 15 working days of receipt of the first draft submission. Final review and approval of the Test Plan shall occur no more than 15 working days after Government review of first draft.

3.3.2 First Article Testing (FAT) and Qualification

The Contractor shall submit First Article Test (FAT) samples to the Government if the Contractor has not provided contract deliverables for the same drawing numbers within the last 5 years.

The Contractor shall submit a first article sample prior to the first delivery of any production hardware. Any production by the Contractor before formal acceptance of the First Article sample shall be at the Contractor’s cost risk. Contractors which have already passed these tests shall be exempt from First Article requirements. Once the First article of an item is accepted, the contractor shall not change sub-contractors without prior approval from the Government.

Additional testing may be required before approval can be granted.

For a new contractor to become a qualified source, the contractor shall perform dimensional inspection on 100% of FAT samples in accordance with PWS 3.3.4.

3.3.3 Lot Acceptance Test

All testing shall be performed as stated in the approved test plan. The contractor shall perform dimensional inspection on 100% of FAT samples in accordance with PWS 3.3.4. The government reserves the right to witness any or all of the inspections/testing.

Inspection acceptance test documentation shall be maintained and retained by the contractor for at least 10 years after contract closeout.

3.3.4 Dimensional Inspection

The Contractor shall perform dimensional inspections to ensure each component built to a Government drawing conforms 100% to the contract, PWS, and product dimensional requirements. All drawing dimensions of each individual part shall be inspected with coordinate measuring machine (CMM) technology by third party prior to application of paint, foam, cork insulation or finishing, and shall be within the tolerances specified on each drawing.

The Contractor shall submit a Final Dimensional Inspection Report in accordance with DI- NDTI-80809 per CDRL A006 with each production lot. The Final Dimensional Inspection Report shall consist of shop travelers and final QA inspections for the Government to verify in-process dimensional data and/or proof of inspections. Final dimensional inspection reports shall include a list of all drawing dimensions and tolerances, and their actual measured values.

3.3.5 Product Certification

The Contractor shall submit a Certificate of Compliance in accordance with DI-QCIC-81356 per CDRL A007 to accompany the shipment of each lot, as required by Table 4. The certificate shall state compliance of the material with its respective drawing or specification, the approved acceptance test and inspection plans from PWS 3.3.3, and contract/order requirements. The certificate shall, as a minimum, state the company name, contract/order number, drawing or specification number, and date.

The Contractor shall submit a certificate of analysis/test in accordance with DI-MISC-80678 per CDRL A008 showing the material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract (PWS 3.3.3), as required by Table

4. The certificate shall be forwarded to the Government; one (1) copy to accompany the shipment (in the packing list envelope), and one (1) copy mailed to arrive at time of receipt of the shipment (mark the certificate to the attention of the designated POC above). Each certificate must be traceable to the material covered by the certificate.

Both Certificates of Analysis and Compliance shall state, above the signature of a legally authorized representative of the company, the following:

“This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001.”

Table 4: Certificate Requirements Test Requirement Certificate CDRL

Dwg Location Spec Compliance LS-1512 PSA20 or PSA21 N/A Compliance A007 Material 1030-2040-001 Note 2 Analysis A008 Plating 1030-2040-001 Note 3 Compliance A007 Material 1030-2042-001 Note 2 Analysis A008 Plating 1030-2042-001 Note 3 Compliance A007 Material 1030-5043-001 Note 1 Analysis A008 Prime and Paint 1030-5043-001 Note 2 Compliance A007 Material 1030-2044-001 Note 1 Analysis A008 Prime and Paint 1030-2044-001 Note 2 Compliance A007 Material 1030-2046-001 Note 1 Analysis A008 Prime and Paint 1030-2046-001 Note 2 Compliance A007 Material 1030-2048-001 Note 1 Analysis A008 Prime and Paint 1030-2048-001 Note 2 Compliance A007 Material 1030-5052-001 Note 1 Analysis A008 Prime and Paint 1030-5052-001 Note 2 Compliance A007 Material 1030-2052-001 Note 1 Analysis A008 Prime and Paint 1030-2052-001 Note 2 Compliance A007 Material 1030-2054-001 Note 1 Analysis A008 Prime and Paint 1030-2054-001 Note 2 Compliance A007 Material 1030-5022-001 Note 1 Analysis A008 Passivate 1030-5022-001 Note 2 Compliance A007 Weld 1030-5022-001 Note 3 Compliance A007 Dye Penetrant 1030-5022-001 Note 4 Compliance A007 Material 1030-5080-001 Note 1 Analysis A008 Passivate 1030-5080-001 Note 2 Compliance A007

Fasteners 1030-5080-001 Find 2 Compliance A007 Material 1030-5211-001 Note 1 Analysis A008 Passivate 1030-5211-001 Note 3 Compliance A007 Heat Treat 1030-5211-001 Note 4 Compliance A007 Match Drill 1030-5211-001 Note 5 Analysis A008 Material 1030-5211-001 Note 6 Analysis A008 Weld 1030-5211-001 Note 7 Compliance A007 Dye Penetrant 1030-5211-001 Note 8 Compliance A007 Material 1030-5210-001 Note 1 Analysis A008 Heat Treat 1030-5210-001 Note 2 Compliance A007 Passivate 1030-5210-001 Note 6 Compliance A007 Weld 1030-5210-001 Note 7 Compliance A007 Material 1030-5214 Notes 1 or 2 Analysis A008 Weld 1030-5214 Note 3 Compliance A007 Passivate 1030-5214 Note 5 Compliance A007 Dye Penetrant 1030-5214 Note 6 Compliance A007 Material 1030-2017 Note 1 Analysis A008 Passivate 1030-2017 Note 2 Compliance A007 Material C23816 Matl. Block Analysis A008 Cork Installation 1030-5802 Compliance A007 Cork Material 1030-5802 Find 2 Compliance A007 Epoxy Material 1030-5802 Find 3 Compliance A007 Curing Agent Material 1030-5802 Find 3 Compliance A007 Material B23818 Matl. Block Analysis A008 Material A23819 Matl. Block Compliance A007 Material 170332 Matl. Block Compliance A007 Heat Treat 170332 Note 3 Compliance A007 Passivate 170332 Note 6 Compliance A007

3.4 Quality Control

3.4.1 Quality System and Quality Control Processes

The Contractor shall maintain a quality system in compliance with ISO 9001:2015 standards, or equivalent, for the duration of the contract. The Contractor shall provide the Government a compliance certificate in accordance with DI-MISC-80678 per CDRL A014 within 15 working days of contract award. The Contractor shall submit a new compliance certificate to the Government within 15 working days of any subsequent certification changes.

The Contractor shall maintain quality control processes to ensure products are in compliance with the applicable drawings, specifications, and contract. The Contractor shall maintain documentation to identify, record, and track the disposition of nonconforming material or other discrepancies to material features for the entire duration of this contract.

3.4.2 Process Accreditation

The Contractor or its Suppliers shall be accredited by the National Aerospace and Defense Contractors Accreditation Program (NADCAP) to perform the processes in Table 5. NADCAP Certificates, if requested, shall be made available to the Government for review. The Contractor shall provide the Government an accreditation certificate in accordance with DI-MISC-80678 per CDRL A014 within 15 working days of contract award. The Contractor shall submit a new accreditation certificate to the Government within 15 working days of any subsequent accreditation changes.

Table 5: NADCAP Accreditation Requirements

Process Requirement

Dwg Location Plating 1030-2040-001 Note 3

1030-2042-001 Note 3 Prime and Paint 1030-5043-001 Note 2

1030-2044-001 Note 2 1030-2046-001 Note 2 1030-2048-001 Note 2 1030-5052-001 Note 2 1030-2052-001 Note 2 1030-2054-001 Note 2

Passivate 1030-5022-001 Note 2 1030-5080-001 Note 2 1030-5211-001 Note 3 1030-5214 Note 5 1030-2017 Note 2 170332 Note 6

Weld 1030-5022-001 Note 3 1030-5211-001 Note 7 1030-5214 Note 3

Dye Penetrant 1030-5022-001 Note 4 1030-5211-001 Note 8 1030-5214 Note 6

Heat Treat 1030-5211-001 Note 4 170332 Note 3

3.4.3 Calibration System

Calibration of measuring and testing equipment shall, as a minimum, adhere to the requirements of either ANSI/NCSL Z540.3 or ISO/IEC 17025. The Contractor shall provide the Government a compliance certificate in accordance with DI-MISC-80678 per CDRL A014 within 15 working days of contract award. The Contractor shall submit a new compliance certificate to the Government within 15 working days of any subsequent certification changes.

3.4.4 Acceptance of Product

Final acceptance of first article samples and production deliverables will be determined by certificate verification (PWS 3.3.5), and 100% dimensional verification of all components built to Government drawings from one (1) kit, at the Government destination. Inspections should be completed within 30 working days of receipt of deliverables and appropriate certificates. The Government reserves the right to perform additional inspection and testing of hardware to verify acceptability. This may include testing at other facilities.

3.4.5 Failure Analysis and Corrective Action Report (FACAR)

The Government may request a FACAR from the Contractor in accordance with DI-SESS-81927 per CDRL A009 if it is determined a defect requires corrective action. The FACAR is due 30 working days after it is requested by the Government. The Government has 15 working days from receipt of draft to review and comment. The Contractor has 15 working days from receipt of Government comments to submit revisions.

3.4.6 Government-Identified Nonconformity Reporting Procedures The Government shall alert the Contractor to any nonconforming deliverables within one working day of identifying the nonconformity. The Contractor shall respond to with its recommended disposition on the deliverables within one working day. The Government reserves the right to deviate from the Contractor’s recommended disposition.

3.5 Export Control

The Contractor shall comply with either one or both of the export control options below for the duration of the contract. The Contractor shall provide the Government a compliance certificate in accordance with DI-MISC-80678 per CDRL A014 within 15 working days of contract award.

The Contractor shall submit a new compliance certificate to the Government within 15 working days of any subsequent certification changes.

3.5.1 International Trafficking in Arms Regulations (ITAR) Compliance The Contractor shall maintain ITAR compliance through registration in accordance with 22 CFR 122 to export Category III and IV munitions components, as defined by 22 CFR 121.

3.5.2 Joint Certification Program (JCP) Registration

The Contractor shall maintain JCP registration and a DD Form 2345 to comply with DoD Directive 5230.25.

3.6 Administrative

3.6.1 Government Inspection of Facilities

The government, through any authorized representative, may visit/inspect the plant or plants of the contractor, or of any subcontractors, engaged in the performance of this contract to witness lot acceptance testing.

3.6.2 Post-Acceptance Meeting

The Contractor shall hold a meeting or telecom no more than 15 days after Government acceptance of all production lot deliverables to discuss risks, schedule, funding, quality, and corrective actions. The Contractor shall record meeting minutes and track action completion in accordance with DI-ADMN-81250 per CDRL A010. Meeting minutes shall be provided to the Government no more than 3 working days after the system review. The Government has 3 working days from receipt of draft to review and comment. The Contractor has 3 working days from receipt of Government comments to submit revisions.

3.6.3 Progress Reports

The contractor shall submit monthly progress reports to the government in accordance with DI- MGMT-80555 per CDRL A011 on the last working day of each month. Any sections deemed not applicable by the contractor shall be marked as such; a brief justification may be provided.

Monthly progress reports shall be the vehicle whereby the government is apprised as to work accomplished, issues, and other reporting requirements.

3.6.4 Kickoff Meeting

The Contractor shall host a Government/Contractor Kickoff Meeting or telecom to establish Government/Contractor interfaces within 15 workings days after contract award, or as mutually agreed to by the Government and the Contractor. The anticipated meeting objectives shall include team introduction, general program discussions, as well as more specific information in regards to the supported program.

3.7 Preservation

The vendor is responsible for the shipping container design and purchase of all packing materials. The container’s interior structure and all packaging materials should be designed for multiple use(s). The contractor shall be responsible for ensuring all containers meet the stated requirements in PWS 3.7.1.

This design shall be submitted to the government in accordance with DI-SESS-80776 per CDRL A012 prior to first article delivery. The Government shall review the design within 15 working days of receipt of the first draft submission. Final review and approval of the design shall occur no more than 15 working days after Government review of first draft.

3.7.1 Design Requirements

The container shall hold parts 1030-5043, 1030-2044, 1030-2046 and 1030-2048 upright with reinforced and padded dividers. This is to protect parts from scratches and to prevent the foam-backing from compressing. The remaining of the parts, considered small, shall each be wrapped with packing material and packed in boxes or containers, each container segregated by part number.

The shipping container’s design may be any suitable material acceptable to the contractor.

Container shall contain space for a copy of fabrication documents and manufacturing materials COC /COA to be enclosed.

The containers’ exterior surfaces must be painted with outdoor water-resistant paint.

If container and its content exceed 100-lbs then the bottom of the container must include fork pockets for lifting and transfers.

For safety margin/reduce risks; the load capacity for a single container, must be 4-times the gross weight of one loaded container.

Containers must be permanently marked by any method. Marking locations are front, and one-adjacent side, and shall include the following information which must be legible and printed in at least ½-inch characters:

o Item Name: MK 70 GQM-163A BOOSTER o Drawing Number: 1030-XXXX o CONTRACT NUMBER:

o CAGE CODE- XXXX o QUANTITY and GROSS WEIGHT o FRAGILE DO NOT DROP OR TIP OVER o THIS SIDE UP o DO NOT LIFT, STORE OR SHIP THIS CONTAINER ON IT’S SIDE

Anti-pilfer, or tamper evident seal (such as tape/lock wire) shall be used.

3.7.2 Container Re-Use

The Contractor shall coordinate re-use of shipping containers, provided containers are available.

Prior to first article delivery the contractor shall submit a re-use inspection test plan in accordance with DI-QCIC-80553 per CDRL A013. The Government shall review the Test Plan within 15 working days of receipt of the first draft submission. Final review and approval of the Test Plan shall occur no more than 15 working days after Government review of first draft.

Re-used containers which successfully meet the requirements of the test plan shall be stenciled “Re-Use” in ½-inch characters on the opposite side of the box from the markings described in PWS 3.7.1. The cost for shipping empty containers is paid by the contractor.

3.7.3 Records

The Contractor shall photograph all sides of the shipping container and retain the photos for its records. Copies of the photographs may be requested if damage to the shipping container is observed upon receipt.

If a container is damaged in shipping or handling, the entire kit will be returned to vendor for re-inspection of the container and enclosed hardware. Acceptance testing must be repeated on all components in the damaged container. If photographs taken show damage was pre-existing, then re-inspection may be waived.

3.8 Counterfeit Material

The Contractor shall maintain a counterfeit material prevention program in accordance with SAE AS6174, or comparable. The Contractor shall notify the KO within five working days if material cannot be obtained from an authorized supplier.

4.0 Deliverables

The TPOC and KO for this contract will approve all deliverables as specified in the order. If required by the order, the following Certificates shall include the signature of the Contractor’s representative authorized to make such certification.

CDRL Spec Section Title A001 DI-SESS-80640 3.1.7 Request for Variance (RFV) A002 DI-MGMT-81889 3.2.1 Manufacturing Plan A003 DI-PSSS-81656 3.2.2 Diminishing Manufacturing Sources and Material Shortages

(DMSMS) Life Cycle Management Data A004 DI-QCIC-81722 3.2.3 Quality Program Plan (QPP) A005 DI-QCIC-80553 3.3.1 Kit Acceptance Test Plan A006 DI-NDTI-80809 3.3.4 Inspection Test Report A007 DI-QCIC-81356 3.3.5 Certificate of Compliance A008 DI-MISC-80678 3.3.5 Certificate of Analysis A009 DI-SESS-81927 3.4.5 Failure Analysis and Corrective Action Report (FACAR) A010 DI-ADMN-81250 3.6.2 Conference Minutes A011 DI-MGMT-80555 3.6.3 Program Progress Report A012 DI-SESS-80776 3.7 Container Technical Data Package (TDP) A013 DI-QCIC-80553 3.7.2 Container Acceptance Test Plan

A014 DI-MISC-80678 3.4.1 /

3.4.2 /

3.4.3 / 3.5

Qualification Certification

4.1 Hardware Delivery

The Contractor shall notify the KO 30 days in advance if the Contractor cannot meet the contract delivery schedule.

The Contractor shall be responsible for coordinating and shipping all the units below to the required destination. Lead times listed below represent the maximum allowable delivery timeframe; early deliveries are permitted.

Item Year Reference Nomenclature Quantity UOI Lead [wks] 1 FAT PWS 3.1 MK 70 Ballast Kit 2 EA 42 ARO 2 Base PWS 3.1 MK 70 Ballast Kit 29 EA 34 AFA* 3 Option 1 PWS 3.1 MK 70 Ballast Kit 26 EA 34 ARO 4 Option 2 PWS 3.1 MK 70 Ballast Kit 26 EA 34 ARO 5 Option 3 PWS 3.1 MK 70 Ballast Kit 26 EA 34 ARO 6 Option 4 PWS 3.1 MK 70 Ballast Kit 26 EA 34 ARO *ARO if FAT is waived ARO – After receipt of order AFA – After first article

Delivery address provided below:

Naval Surface Warfare Center Indian Head Division 4522 McMahon Road Bldg. 116, Suite 100 Indian Head, MD 20640

CLAUSES INCORPORATED BY FULL TEXT

C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)

(a) Department - means the Department of the Navy.

(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.

(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

(End of text)

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)

(OCT 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)

(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal To be filled in at time of award dated To be filled in at time of award in response to Solicitation No. N0017422R0041.

(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.

C-223-W001 ACCIDENT REPORTING (NAVSEA) (OCT 2018)

(a) In accordance with DFARS 252.223-7002 (d), the Contractor shall immediately notify the Administrative Contracting Officer (ACO) and Procuring Contracting Officer (PCO) following an accident or incident. Also, the Contractor shall provide a written report within (insert number of days) days of the accident or incident containing, at a minimum, the following:

(1) Location, date and local time of the occurrence;

(2) Category of accident (fire, explosion, natural disaster, etc.);

(3) Identification of equipment, material and type of activity involved;

(4) Contract number;

(5) Procuring activity (name of PCO and ACO);

(6) Narrative of occurrence, including cause(s), if known;

(7) Personnel involved and degree of injury, if any. Specify whether Contractor and/or Government personnel;

(8) Assessment of damage. Estimate in dollars for contractor and/or government owned material, property, equipment;

(9) Was a news release made? If so, by whom? If not, will a news release be made?

(10) Was a request made for any assistance?

(11) Will there be any effect on production? If so, explain in detail.

(12) Corrective action taken, if any.

(13) Name and title of person submitting this report.

(b) The Contractor shall forward weekly written reports to the ACO and PCO until the accident or incident no longer affects production or when contract deliveries are on schedule.

C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)

The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A001 through A013, attached hereto.

(End of Text)

C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.

Section D - Packaging and Marking

D-211-H001 PACKAGING OF DATA (NAVSEA) (OCT 2018)

Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.

All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.

Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), DOD 5220.22-M dated 28 February 2006 incorporating Change 2 dated 18 May 2016.

D-211-H002 MARKING OF REPORTS (NAVSEA) (OCT 2018)

All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:

(1) name and business address of the Contractor To be filled in at time of award

(2) contract number

(3) sponsor:

(Name of Individual Sponsor)

(Name of Requiring Activity)

(City and State)

D-211-H004 IDENTIFICATION MARKING OF PARTS--BASIC (NAVSEA) (OCT 2018)

For all parts not subject to the marking requirements in DFARS 252.211-7003 – Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:

(1) Parts shall be marked in accordance with generally accepted commercial practice.

(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.

D-247-H004 MARKING AND PACKING LIST(S) – BASIC (NAVSEA) (FEB 2022)

(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with ASTM- D-3951-18 approved 1 May 2018, Standard Practice for Commercial Packing.

(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items. Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.

(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.

(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number.

D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018)

The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 N/A N/A N/A Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 N/A N/A N/A Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 N/A N/A N/A Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 N/A N/A N/A Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 N/A N/A N/A Government

CLAUSES INCORPORATED BY REFERENCE

52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-16 Responsibility For Supplies APR 1984

E-246-H013 INSPECTION AND ACCEPTANCE OF DATA (NAVSEA) (OCT 2018)

Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form 1423.

E-246-H016 INSPECTION AND ACCEPTANCE OF F.O.B. DESTINATION DELIVERIES (NAVSEA) (OCT 2018)

Item(s) 0002, 1001, 2001, 3001, and 4001 - Inspection and acceptance shall be made at destination by a representative of the Government.

E-246-H022 INSPECTION AND TEST RECORDS (NAVSEA) (JAN 2019)

Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness. The data shall, on request, be identified and made available for on-site review by the Contracting Officer or designated Government representative.

E-246-W002 CERTIFICATE OF COMPLIANCE (NAVSEA) (OCT 2018)

(a) A certification of material shall be provided by the Contractor, one (1) copy to accompany the shipment (in the packing list envelope) and (l) copy mailed to arrive at time of receipt of the shipment. Mark all certificates to the attention of Code 00Q.

(b) The certificate shall state compliance of material with drawing specification and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date. The certificate shall state, above the signature of a legally authorized representative of the company, the following:

This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.

(c) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.

(d) The certificate shall read as follows:

I certify that on ______ [insert date], the ____ [insert Contractor’s name] furnished the supplies called for by the Order/Contract No._____ via ____ [Carrier] on ________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies or services are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this document.

Date of Execution: ________________________________ Signature: _______________________________________ Typed Name: ____________________________________ Title: ___________________________________________

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 90 dys. ADC 2 NSWC IHD C02

RECEIVING OFFICER

RECEIVING OFFICER BLDG 116

4522 MCMAHAN RD, SUITE 100

INDIAN HEAD MD 20640-5035

301-744-4221

N00174

0002 238 dys. ADC 29 (SAME AS PREVIOUS LOCATION)

0003 238 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0004 238 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

1001 238 dys. ADC 26 (SAME AS PREVIOUS LOCATION)

1002 238 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

1003 238 dys. ADC (SAME AS PREVIOUS LOCATION)

2001 238 dys. ADC 26 (SAME AS PREVIOUS LOCATION)

2002 238 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

2003 238 dys. ADC (SAME AS PREVIOUS LOCATION)

3001 238 dys. ADC 26 (SAME AS PREVIOUS LOCATION)

3002 238 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

3003 238 dys. ADC (SAME AS PREVIOUS LOCATION)

4001 238 dys. ADC 26 (SAME AS PREVIOUS LOCATION)

4002 238 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

4003…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .