Revised 1129-01 - Bruker Spectrometer - SOW.docx
DOCX document 18 KB Posted
- Attached to
- Bruker Spectrometer Federal contract opportunity
- Solicitation number
- N0017822Q6655
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1129-01 - Bruker Spectrometer - Deliverables List.docx | DOCX document | |
| SF18 Mod.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FT-IR SPECTROMETER SYSTEM
STATEMENT OF WORK (SOW)
1.0 BACKGROUND
B43 (Precision Sensing Branch) is responsible for making laboratory characterization measurements of imaging sensor systems. Required lab measurements include characterization of the SWIR and MWIR spectral response of the detector arrays. In order to perform comparable spectral measurement for verification testing, there is a need for B43 to procure a broad-spectrum (Fourier Transform Infrared) FT-IR spectrometer system. The spectrometer system identified is the Bruker Scientific Invenio-X FT-IR Spectrometer System. The system needs to be delivered and installed in the B43 lab. This SOW covers the requirements for installation and setup of the FT-IR Spectrometer System and initial training on the system operation.
| 2.0 | APPLICABLE DOCUMENTS |
| 2.1 | Original Equipment Manufacturer (OEM) Specifications |
| 2.2 | Deliverables |
| 3.0 | REQUIREMENTS |
| 3.1 | The contractor shall provide all materials and labor for installation of one (1) Invenio-X FT-IR Spectrometer System, part number INV-X, manufactured by Bruker Scientific, LLC, along with all necessary options and accessories noted on the Government provided deliverables list. |
| 3.2 | The contractor shall provide the following: |
3.2.1 The contractor shall provide all required hardware and software to fully install the FT-IR Spectrometer System.
3.2.2 After installation is complete, the contractor shall provide initial operator training for up to three (3) Government personnel. This training will consist of basic introductory operation, including how to perform baseline scans, basic reflectivity and transmission measurements, data manipulation and data exporting.
| 4.0 | GOVERNMENT-FURNISHED PROPERTY/MATERIAL/INFORMATION (GFP/GFM/GFI) |
| 4.1 | The government will provide access to the lab for work completion. |
| 4.2 | The government will provide a suitable benchtop and electrical power. |
| 5.0 | SECURITY |
All work to be performed under this contract is unclassified.
6.0 TRAVEL
The contractor will be required to travel in performance of this contract. The number of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements and shall be coordinated with the technical point of contact. All travel shall be conducted in accordance with the Federal Travel Regulations (FTR). The following travel is anticipated:
One (1) contractor personnel shall travel to Dahlgren, VA for a period of no more than two (2) days for the installation and training. It is anticipated that the personnel will be travelling from their primary contractor facility located in Billerica, MA.
8.0 TECHNICAL POINT OF CONTACT
Will be provided at time of award