Requirements List.pdf

PDF 422 KB Posted

Attached to
Cleanroom Federal contract opportunity
Solicitation number
N0017823Q6926
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document outlines requirements for a cleanroom project for the Department of the Navy Naval Sea Systems Command. It specifies the need for six ISO class 6 cleanroom modules totaling 84 square meters, including extruded aluminum framework, LED lighting panels, blank vinyl-covered wall panels, clear vinyl perimeter curtains and entry strips, and six 99.99% efficient fan filter units. It also requires a prewiring package for variable speed motor controls, on/off lighting switch, and single-point field power connection. Bidders must be authorized resellers and include such letters with their submissions.

View the file

Other files for this federal contract opportunity

Other files attached to Cleanroom, newest first.
File Type Posted
N0017823Q6926 - SF18.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUIREMENTS LIST

Description: SoftWall Cleanroom ISO (6) class

Quantity: 1

Configuration

1 12’x14’x9’h

1 Ceiling system of extruded aluminum framework finished with white powder baked enamel. All parts are coded and marked on a plan for field assembly

6 3"x 3" extruded aluminum legs with leveling pads.

6 LED Light Panel - 4'x2', 45W, 4920 Lumens, 4000K, Universal Voltage

1 Lot of blank panels - 1/2" gypsum, vinyl covered on both sides

1 Curtains around of perimeter are 40 mil clear standard vinyl mechanically fastened to structure in extruded track

2 Strip entry - 14' wide, 8” strips of 80 mil clear vinyl with 2” overlap

Description: Fan Filter Unit

Quantity: 6

Configuration

1 99.99% efficient @ 0.3 microns

1 Max 680 CFM @ 436 Watts

1 Painted white, expanded metal face screen

1 120V 1/4 HP permanent split capacitor (PSC) motor

1 Powder-coated 20-gauge steel construction

1 30% efficient ASHRAE pre-filter

Description: Prewiring Package

Quantity: 1

Configuration

1 Prewiring package with variable speed controls for motors, on/off switch for lights

1 Mounted control panel with fused circuits

1 Snap together wiring leads for all components

1 Single point connection for field power inside of panel to be hooked up by others

Must be an authorized reseller to quote. Please include authorized reseller letters with your submission.

File details come from the government source that posted it. Updated .