Requirements and Specifications.pdf

PDF 315 KB Posted

Attached to
Zemax License renewal Federal contract opportunity
Solicitation number
NB1870002301513
Issued by
Department of Commerce National Institute of Standards and Technology

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements / Specifications: Zemax License Renewal 1 Version 1.0 (2019) Double-click on for further assistance.

TITLE: Zemax License Renewal Requesting Lab/Division/Group: OISM/RSO 187

General Statement of Need License and support renewal for the Zemax OpticsStudio Pro analysis used by research staff at

NIST.

Items and/or Ancillary Services

Item 1: Ansys Zemax OpticStudio Pro - TECSDates: 05/19/2023 - 05/18/2024Migrate L106290 Quantity: 2 Specifications: TECS / Exchange

Separately Priced Options and Services:

Item 2: Ansys Zemax OpticStudio Pro - Regional WAN FeeDates: 05/19/2023 - 05/18/2024Migrate L106290 Quantity: 2 Specifications: TECS / Exchange

Service Requirements / Item Specifications Section Requirements/Specifications Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain requirement here]

☐ US citizen required on-site (foreign nationals require preregistration 30 days prior) ☐ Vendor rep on-site more than three days ☐ Other considerations: [List other considerations to ensure an accurate quote]

Shipping & Delivery ☒ N/A

[Enter shipping and delivery information by item here.] Shipping criteria:

☐ Partial delivery acceptable ☐ Direct delivery to building required

[Explain need for requirement here] Building has: ☐ Loading dock

☐ Containerization preference: [Choose container] Other requirements: [List any other requirements here]

Delivery date criteria:

☐ Delivery of goods, installation, and training shall be completed no later than:

[Insert date here] ☐ Deliver no earlier than: [Insert date here]

Requirements / Specifications: Zemax License Renewal 2

☐ Other: [List other shipping, delivery, or specil requirements] Electronic Media ☐ N/A

[Enter electronic media requirements by item here.] ☒ Software ☐ Electronic manuals ☒ License Key ☐ Other: [List any other Electronic Media requirements here] [Enter email address for software delivery here]

Installation ☒ N/A

[Enter installation requirements by item here.] ☐ Vendor technician on site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of packaging material ☐ Equipment set up ☐ Start-up services ☐ Turn key installation ☐ Other [Enter details here.] Note: When installation is required, TPOC or COR shall be the coordination point.

Facility / Utility Considerations ☒ N/A

[List site specific utility considerations by item here.] ☐ OFPM Work Order Number(s)

[List any Work Order Number(s) here] ☐ Power available

Voltage: [Enter voltage here] (V) Max Current: [Enter max current draw here] (A) Phase: [Choose phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter plug type here] (i.e.: NEMA L5-20P) Environment: [Choose environment] Other power consideration: [List any other power considerations here]

☐ Utility connections: [List relevant available utilities, pressure(s), and flowrate(s)] ☐ Other considerations: [List other considerations to ensure an accurate quote]

Requirements / Specifications: Zemax License Renewal 3

Warranty ☒ N/A

[Choose warranty type here.] [If you require an Extended Manufacturer Warranty, describe the warranty requirements per item here.] What is included?

☐ Labor ☐ Parts ☐ Travel ☐ Cost and liability for returns ☐ Other: [Enter other requirements here] ☐ Warranty length: [Enter warranty length here] Period Length:[Ex. month, 6 month, year etc.]

Training ☒ N/A

[Training requirements (who, when, what, where) here. If on-site, is travel necessary?] ☐ On-site ☐ Off-site location: [Enter location(s) here] ☐ Number of trainees: [Enter number of trainees here] Scope of training:

☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other: [Enter other scope requirements here]

Inspection and Acceptance ☒ N/A

Maintenance ☒ N/A

Government Furnished Material / Equipment ☒ N/A

☐ Training materials to be provided: [Describe requirement here] ☐ Other: [Enter other training requirements here] Note: When training is required, TPOC or COR shall be the coordination point.

[Enter inspection requirements per item here] ☐ Planned government acceptance testing (7 business days) ☐ Gov’t acceptance expected to take longer than 7 business days: [Duration] ☐ Inspection and acceptance plan: [Explain here] ☐ Other: [Enter other requirements her

Serial Number: [Enter Serial Number here] Description: [Enter description here] x

Requirements / Specifications: Zemax License Renewal 4

Travel ☒ N/A https://oaam.nist.gov/OAAMAcquisitions/FormFeedback/default.aspx

Use this document to detail specifications/requirements for an item and/or ancillary services.
TITLE: Zemax License Renewal
Requesting Lab/Division/Group: OISM/RSO 187
General Statement of Need
Provide suggestions to improve this form by clicking here.

File details come from the government source that posted it. Updated .