RELEASED_W9128F24B0011_Step-One_GP Spillway Bridge Repair and Paint.pdf

PDF 1 MB Posted

Attached to
Gavins Point Spillway Bridge Structural Repairs and Paint Federal contract opportunity
Solicitation number
W9128F24B0011
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This document is a federal solicitation for the "Gavins Point Spillway Bridge Structural Repairs and Paint" project issued by the U.S. Army Corps of Engineers, Omaha District. The solicitation is set aside for small businesses and requires the repair and restoration of a hydraulic structure, including tasks such as repairing corroded or distorted components, addressing concrete cracks, replacing failed elements, and removing and replacing an existing failed paint system. The solicitation will close on August 9, 2024, and the successful contractor will be required to commence work upon contract award and complete the project 547 calendar days after receipt of the Notice to Proceed. The estimated construction cost for this project is between $1,000,000 and $5,000,000, with the primary NAICS code being 237990 (Other Heavy and Civil Engineering Construction). A site visit is scheduled for July 17, 2024, and potential offerors must submit questions through the ProjNet system.

View the file

Other files for this federal contract opportunity

Other files attached to Gavins Point Spillway Bridge Structural Repairs and Paint, newest first.
File Type Posted
Abstract of Bids - GP Spillway Repair and Paint - Certified.pdf PDF
Amendment - AM0001 - W9128F24B0011 - 08.05.2024.pdf PDF
01 12 00 Am-0001.pdf PDF
240717 Gavins Spillway Bridge - Pre-bid Site Visit Sign-In Sheet_Redacted.pdf PDF
GP67 - ADVERTISEMENT-reduced.pdf PDF
W9128F24B0011 Spillway Bridge Structural Repairs and Painting Gavins Point specs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPILLWAY BRIDGE STRUCTURAL REPAIRS AND PAINTING, GAVINS POINT DAM, NE

This is a total Small Business Set-Aside.

This solicitation and resulting contract are utilizing a Tw o-Step Sealed Bidding procurement method as described in FAR Part 14.5. This solicitation is the Step-One w hich is a request for technical proposals only. Bid bonds are NOT required to be submitted w ith the Step-One technical proposal.

Bid bonds ARE required to be submitted w ith the Step-Tw o sealed bid.

X

BRIANNA WOHLERS 402-995-2668

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

09-Jul-2024

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________547 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________09 Aug 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

W9128F

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9128F24B0011 88

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W9128F24B0011

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule

PRICING SCHEDULE

SPILLWAY BRIDGE STRUCTURAL REPAIRS AND PAINTING, GAVINS POINT DAM, NE

SECTION 00 10 00

BID SCHEDULE

ITEM

NO.

DESCRIPTION

ESTIMATED

QUANTITY

UNIT

UNIT PRICE

AMOUNT

BASE ITEMS

All plant, material, and labor required for steel repairs related to grinding out rolling flaws identified by the government for repair.

SF

required for repairing bridge bearing mortar.

EA

Entire work complete, all other base bid work excluding items 0001-0002.

JOB

XXX

TOTAL BASE AMOUNT (ITEMS 0001 THRU 0003) $_____________________________

OPTION ITEM

Option 1 required for repairs of steel repairs related to removal and replacement of welds.

LF

Option 2 required for repairs of steel repairs related to replacement of bottom flange splice plate.

EA

Option 3 required for overcoating walkway framing, equipment platform framing, equipment housing, guardrails, and kickplates beneath the bridge.

JOB

XXX

Option 4 required to remove and replace corroded sections of bridge rail.

LF

TOTAL OPTION AMOUNT (ITEMS 0004 THRU 0007) $_____________________________

TOTAL AMOUNT (BASE PLUS OPTIONS, ITEMS 0001 THRU 0007) $_____________________________

NOTES:

1. The Government reserves the right to exercise the options within 180 calendar days after issuance of Notice to Proceed. No additional construction days will be given to the Contractor should the Option be awarded.

2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. In case of variation between the Job (Line Item total) prices and the cumulative total amount, the Line Item total prices will be considered the price submitted. In case of variation between the unit prices and the Line Item total, the unit prices will be considered the price submitted.

3. A modification to a proposal which provides for a single adjustment to the total amounts, should state the application of the adjustment to each respective Line Item total price and unit price affected. If the modification is not so apportioned, the single adjustment will be applied to Line Item No. 0003.

4. Quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to General Conditions (Contract Clauses) Clause “Variation in Estimated Quantities”.

***NOTE: THIS BID SCHEDULE IS DRAFT ONLY AND IS PROVIDED IN

STEP-ONE FOR INFORMATIONAL PURPOSES ONLY. THE OFFICIAL BID

SCHEDULE WILL BE INCLUDED IN STEP-TWO. NO PRICING

INFORMATION SHALL BE SUBMITTED OR WILL BE ACCEPTED BY THE

GOVERNMENT IN STEP-ONE.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Job

SEE BID SCHEDULE

FFP

FOB: Destination

PSC CD: Y1KA

NET AMT

Section 00 21 00 - Instructions

00 21 00

INSTRUCTIONS FOR PROCUREMENT

This solicitation and resulting contract are utilizing a Two-Step Sealed Bidding procurement method as described in FAR Part 14.5.

This solicitation is the Step-One which is a request for technical proposals only. The technical drawings and specifications for Step-One are approximately 95% complete and not considered final or for construction.

Submitted technical proposals in response to this solicitation shall not include prices or pricing information. Bid bonds are not required to be submitted with the Step-One technical proposal. Bid bonds will be required to be submitted with the Step-Two bid submission.

Step-One submissions will be reviewed for acceptability only. In Step-One, a proposal shall be rated acceptable for all evaluation factors in order to receive an overall “Acceptable” rating and to be eligible to participate in the Step-Two bid.

In Step-Two only offers who submitted acceptable technical proposals in Step One will be allowed to submit bids. The 100% final technical drawings, final bid schedule and other final bidding information will be provided to all technically acceptable firms during Step-Two via a solicitation amendment.

The Step-One request for technical proposal is due no later than the date and time listed on the Standard Form 1442, Block 13 A.

CLAUSES INCORPORATED BY FULL TEXT

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- 17 July 2024 @ 0900 CDT

(c) Participants will meet at-- Gavins Point Dam Visitor Center

55245 NE-121

Crofton, NE 68730-3015

POC for SITE VISIT ONLY is Mike Nuss, michael.y.nuss@army.mil, 605-595-0082.

All questions shall be submitted via PROJNET. See Section 00 22 00.

(End of provision)

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018

52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-23 Late Submission, Modifications, And Withdrawals Of

Technical Proposals Under Two-Step Sealed Bidding

NOV 1999

52.222-5 Construction Wage Rate Requirements--Secondary Site of the Work

MAY 2014

52.225-10 Notice of Buy American Requirement--Construction Materials

MAY 2014

52.228-1 Bid Guarantee SEP 1996 252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2023 252.204-7024 Notice on the Use of the Supplier Performance Risk System MAR 2023 252.215-7008 Only One Offer DEC 2022 252.215-7013 Supplies and Services Provided by Nontraditional Defense

Contractors

JAN 2023

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)

(a) Payment of price. The Government shall pay the Contractor the contract price as provided in this contract.

(b) Progress payments. The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.

(1) The Contractor's request for progress payments shall include the following substantiation:

(i) An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment requested.

(ii) A listing of the amount included for work performed by each subcontractor under the contract.

(iii) A listing of the total amount of each subcontract under the contract.

(iv) A listing of the amounts previously paid to each such subcontractor under the contract.

(v) Additional supporting data in a form and detail required by the Contracting Officer.

(2) In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be taken into consideration. Material delivered to the Contractor at locations other than the site also may be taken into consideration if--

(i) Consideration is specifically authorized by this contract; and

(ii) The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform this contract.

(c) Contractor certification. Along with each request for progress payments, the Contractor shall furnish the following certification, or payment shall not be made: (However, if the Contractor elects to delete paragraph (c)(4) from the certification, the certification is still acceptable.)

I hereby certify, to the best of my knowledge and belief, that--

(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;

(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of chapter 39 of Title 31, United States Code;

(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and

(4) This certification is not to be construed as final acceptance of a subcontractor's performance.

(Name)

(Title)

(Date)

(d) Refund of unearned amounts. If the Contractor, after making a certified request for progress payments, discovers that a portion or all of such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the "unearned amount"), the Contractor shall--

(1) Notify the Contracting Officer of such performance deficiency; and

(2) Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph (j) of this clause) equal to interest on the unearned amount from the 8th day after the date of receipt of the unearned amount until--

(i) The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or

(ii) The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the unearned amount.

(e) Retainage. If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future progress payments that amount the Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage.

(f) Title, liability, and reservation of rights. All material and work covered by progress payments made shall, at the time of payment, become the sole property of the Government, but this shall not be construed as--

(1) Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work; or

(2) Waiving the right of the Government to require the fulfillment of all of the terms of the contract.

(g) Reimbursement for bond premiums. In making these progress payments, the Government shall, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (e) of this clause shall not apply to that portion of progress payments attributable to bond premiums.

(h) Final payment. The Government shall pay the amount due the Contractor under this contract after--

(1) Completion and acceptance of all work;

(2) Presentation of a properly executed voucher; and

(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of 1940 (31 U.S.C. 3727 and 41 U.S.C. 6305).

(i) Limitation because of undefinitized work. Notwithstanding any provision of this contract, progress payments shall not exceed 80 percent on work accomplished on undefinitized contract actions. A "contract action" is any action resulting in a contract, as defined in FAR Subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes.

(j) Interest computation on unearned amounts. In accordance with 31 U.S.C. 3903(c)(1), the amount payable under subparagraph (d)(2) of this clause shall be--

(1) Computed at the rate of average bond equivalent rates of 91-day Treasury bills auctioned at the most recent auction of such bills prior to the date the Contractor receives the unearned amount; and

(2) Deducted from the next available payment to the Contractor.

(End of clause)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

USACE Omaha – Contracting Division ATTN: Jessica Jackson 1616 Capitol Avenue Omaha, NE 68102-4901

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

Section 00 22 00 - Supplementary Instructions

00 22 00

TWO-STEP SEALED BID OVERVIEW,

GENERAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS, EVALUATIONS AND CONTRACT

AWARD

1. OVERVIEW

a. This is a “Two-Step Sealed Bid” Invitation for Bid for the Spillway Bridge Structural Repair and Paint at Gavins Point Dam, SD. The Contracting Officer will award one (1) firm fixed-price construction contract to the responsive and responsible bidder whom the Government determines to have an acceptable Step-One technical proposal, conforms to the solicitation requirements, is fair and reasonable, and bids the lowest overall price in Step-Two.

b. The Step-One Request for Technical Proposals is issued with approximately 95% complete sufficiently descriptive technical specifications and construction drawings. The information contained in Step-One is not binding on the Government, and the actual delivery or performance requirements will be contained in the invitation issued under Step-Two. The 95% specifications and drawings are not final or to be used for construction. Only those firms determined to be technically acceptable during Step-One will be issued the 100% final technical specifications during Step-Two.

c. The Two-Step Sealed Bidding procedure is a combination of competitive procedures designed to obtain the benefits of sealed bidding while ensuring only technically acceptable firms participate in the priced sealed bid. The process allows for the Step-One technical proposal submission and evaluation to be performed concurrent with the development of the final 100% technical specifications and construction drawings. Step-One ensures that only technically acceptable firms participate in the Step-Two, the sealed bid process.

d. Step-One under this process consists of the request for, submission of, evaluation and (if necessary) discussion of a technical proposal. Only one technical proposal may be submitted by each Offeror. The proposals are evaluated for technical acceptability. The Step-One technical proposal shall not include prices or pricing information.

e. In Step-One, Offerors shall submit technical proposals that are complete and acceptable without the need for additional explanation or information. The Government may make a final determination regarding a proposal’s acceptability solely on the basis of the proposal as submitted. The Government may proceed with Step-Two without requesting further information from any Offeror; however, the Government may request additional information from, or enter into discussions with, the Offerors of proposals that are determined to be reasonably susceptible of being made acceptable. Discussions will only be held if necessary, and if determined to be in the best interest of the Government.

f. A notice of “Acceptable” or “Unacceptable” will be forwarded to each Step-One Offeror upon completion of the technical proposal evaluation and final determination. The names of the Offerors that submitted acceptable technical proposals will be listed on the Government’s https://sam.gov website for the benefit of prospective subcontractors.

g. In Step-Two, an amendment with the final 100% technical specifications and construction drawings will be issued to only those Offerors whose technical proposals are determined to be acceptable in Step-One. The normal sealed bidding process in FAR Part 14 will be followed. In Step-Two, only bids based upon technical proposals determined to be acceptable, either initially or as a result of discussions, will be considered for award. Each bid submitted in Step-Two shall be based on the bidder’s own technical proposal that was submitted, evaluated, and determined to be acceptable in Step-One. Bidders shall comply with the 100% technical specifications and construction drawings and the bidder’s acceptable technical proposal.

h. Contractor Team Arrangements are considered an arrangement in which (1) two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one (1) or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program.

The Government will recognize the integrity and validity of Contractor Team Arrangements provided the arrangements are identified and company relationships are fully disclosed in an offer or, for arrangements entered into after submission of an offer, before the arrangement becomes effective. The Government will not normally require or encourage the dissolution of Contractor Team Arrangements. The Offeror shall identify the major or critical aspects of the requirement to be performed by those identified in the Contractor Team Arrangement.

i. Any Offeror submitting an offer in the name of a Joint Venture shall include a fully executed copy of the Joint Venture

Agreement with the offer. Joint Venture Agreements which require SBA approval may be submitted absent the requisite SBA Servicing Agency approving authorities’ signature; however, the Offeror shall submit evidence from the Offeror’s SBA Servicing Agency that the Offeror has notified and discussed the proposed Joint Venture for this project with the appropriate SBA personnel.

2. STEP-ONE TECHNICAL PROPOSAL SUBMISSION INSTRUCTIONS

All Offerors are required to submit a technical proposal with the minimum content as specified herein. Proposals without the minimum content will be rated other than “Acceptable.” Step-One Technical Proposals shall be emailed to the below individuals no later than the date and time established in Block 13 of the Standard Form (SF) 1442, or Block 14 of the most recent SF 30, as applicable:

Contracting Officer: Jessica R. Jackson at Jessica.R.Jackson@usace.army.mil

Contract Specialist: Brianna Wohlers at Brianna.N.Wohlers@usace.army.mil

Each email shall contain the following information:

a. Solicitation No. W9128F24B0011

b. Bid Due Date and Time: [Block 13 of the SF 1442 or Block 14 of the most recent SF 30, as applicable]

c. Bid Validity Date: 60 Days

Proposals received after the date and time stated within Block 13 of the SF 1442 or Block 14 of the most recent SF 30, as applicable, will be considered late and will not be considered for award. To avoid rejection of a proposal, the Offeror shall ensure the e-mail submission is virus-free. The Government will follow FAR 14.406 if an e-mail bid is unreadable.

Offerors shall be registered in the System for Award Management (SAM) when sending the submission to comply with the annual representations and certifications requirements. The Offeror certifies with its offer that the representations and certifications included in SAM are current, accurate, and complete.

3. STEP-ONE TECHNICAL PROPOSAL FORMAT REQUIREMENTS

Submit the Step-One technical proposal via email in PDF format and Optical Character Recognition (OCR)* compatible and word searchable. Each section shall be clearly labeled by solicitation number, project name, and Offeror’s name.

*OCR is a common method of digitizing printed texts so that they can be electronically searched, stored more compactly, displayed on-line, and used in machine processes such as machine translation, text-to-speech, key data extraction and text mining.

Submitted files should be named according to the following format: SOLICITATION NUMBER COMPANY NAME Technical Proposal # of #. Offerors should separate files over 20 megabytes (MB) into smaller files and send separate e-mails. Offerors shall identify each e-mail with the number relative to the total number of e-mails submitted (i.e., “e-mail 1 of 4”). Offerors should request Government receipt upon sending all e-mails. Offerors should not assume e-mail submissions are instantaneous and shall consider file size and number of files sent. Offerors should send email submissions at least 1 hour early to ensure delivery and may send test e-mails to USACE the day before bid opening.

Technical proposals will be organized with a table of contents as follows:

COVER LETTER - Solicitation number; Name, address, email, and telephone number of the Offeror; Names, titles, emails, and telephone numbers of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this IFB. Name, title and signature of the person authorized to sign the proposal.

A statement specifying agreement with all terms, conditions and provisions included in the IFB, CAGE Code and UEI number for the Offeror, and all teaming partners and / or Joint Ventures.

Note: The inclusion of any exceptions to the terms and conditions of the solicitation in the technical proposal, or the inclusion of any other terms and conditions that conflict with the terms and conditions of the solicitation may result in a determination that the proposal is unacceptable and thus ineligible for award. Resolve questions about the terms and conditions or technical requirements of the solicitation prior to submission of the proposal.

TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror, include the Offeror’s DUNS number in Block 14.

Acknowledgement of all amendments to the IFB in accordance with the instructions on the Standard Form 30 (amendment form).

TAB B – Section 00 45 00 – Representations and Certifications, Printed Entity Record from the online System for Award Management (SAM) database.

TAB C – Teaming & Joint Venture Arrangements: Offers submitting proposals using a teaming arrangement shall submit a fully executed copy of the teaming arrangement signed both by the subcontractor/teaming partner and the Offeror and the narrative described in Section 00 21 00 paragraph 1.h above. If a teaming arrangement is not fully executed by all parties and provided with the Proposal, team member submission material will not be evaluated or considered.

Offers submitted in the name of a Joint Venture shall be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal, including letters of commitment from the joint venture firms. See Section 00 21 00 paragraph 1.i above.

TAB D – All submission requirements for Factor 1: Past Performance

TAB E – All submission requirements for Factor 2: Personnel Qualifications

4. STEP-ONE TECHNICAL PROPOSAL INQUIRIES AND QUESTIONS

Technical inquiries and questions relating to this solicitation shall be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org. To submit and review inquiry items, prospective Offerors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective Offeror who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective Offeror once the reply is available for viewing.

***Please Note: Offerors shall only submit one (1) question per inquiry. All inquiries containing multiple questions may be rejected. Please review all previous inquiries to limit redundant inquiries.

The Project ID is: GP67 Project Name: Gavins Point Spillway Bridge Structural Repair and Paint Bidder Inquiry Key: 84XWCV-DRNDIE

Instructions for first-time ProjNet Bid Inquiry Access:

a. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

b. Identify the Agency. Select agency USACE.

c. Key. Enter the Bidder Inquiry Key listed above.

d. Email. Enter the email address you would like to use for communication.

e. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

f. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and

Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

g. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Instructions for future ProjNet Bid Inquiry Access:

a. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.

b. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

c. Identify the Agency. Select agency USACE.

d. Key. Enter the Bidder Inquiry Key listed above.

e. Email. Enter the email address you used to register previously in ProjNet.

f. Click Continue. A page will then open asking you to enter the answer to your SecretQuestion.

g. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

The Bidder Inquiry System will be unavailable for new inquiries 10 calendar days before proposal due date in order to ensure adequate time is allotted to form an appropriate response to inquiries and amend the solicitation if necessary.

Proposing firms are requested to review the specification in its entirety and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) or by appointment for OCONUS. The telephone number for the Call Center is 1-800-428-HELP. Email to staff@rcesupport.com.

5. ELIGIBILITY FOR CONTRACT AWARD

In accordance with the requirements of Part 9 of the Federal Acquisition Regulation (FAR), no contract shall be entered into unless the Contracting Officer ensures that all requirements of law, executive orders, regulations, and all other applicable procedures, including clearances and approvals, have been met. This includes the FAR requirement that no award will be made unless the Contracting Officer makes an affirmative determination of responsibility. To be determined responsible, a prospective prime contractor shall meet the general standards in FAR Part 9 and any special standards set forth in the solicitation.

6. STEP-ONE REQUEST FOR TECHNICAL PROPOSALS EVALUATION

The Government will evaluate each Offeror’s technical proposal based on how well the proposal addresses each of the evaluation factors listed below. Each of the evaluation factors will be evaluated by the Government. For Factor 1, a rating of either an “Acceptable,” or “Unacceptable” will be determined by consensus of the Government evaluation board. For Factor 2, a rating of either an “Acceptable”, “Unacceptable,” or “Reasonably Susceptible of Being Made Acceptable” rating will be determined by consensus of the Government evaluation board. There are no relative weights assigned to the factors. A Step-One acceptable technical proposal must be rated “Acceptable” for all evaluation factors in order to receive an overall “Acceptable” technical proposal rating.

General Technical Proposal and Evaluation Information:

a. The evaluation will be conducted in accordance with FAR Subpart 14.5, Two-Step Sealed Bidding. For this procurement, only one (1) technical proposal may be submitted by each Offeror. The proposal shall be complete without the need of additional explanation or information. The Government may proceed with Step-Two without requesting further information from any Offeror; however, the Government may request additional information from Offerors of proposals that it considers “Reasonably Susceptible of Being Made Acceptable.”

b. Technical Proposals will be rated at the factor level. If any factor is determined to be “Unacceptable”, the entire proposal will be determined “Unacceptable”. A technical proposal may be determined to be “Reasonably Susceptible of Being Made Acceptable”, and therefore eligible for discussions. However, a proposal with a factor that is determined to be “Unacceptable” will be eliminated from further consideration.

c. Technical proposals which do not provide the specified information in the specified location in accordance with the submission instructions may be rated other than “Acceptable”. The Government is under no obligation to search for information that is not in the specified locations. If an Offeror submits alternate proposal elements that are not requested, the information will not be evaluated.

d. In general, example projects or experience that the Government does not consider relevant for the purposes of evaluating experience will not be considered as a part of the minimum project requirement.

e. The degree of acceptability to the Government inherent in the content of the Offeror’s technical proposal will be a consideration under every evaluation factor.

f. If discussions are held with Offerors whose proposals are considered “reasonably susceptible of being made acceptable” and a request for proposal revisions are requested, the revised proposal will be reevaluated in accordance with the criteria in the solicitation. After completion of discussions and evaluation of any revised proposals, the proposal will be determined as “Acceptable” or “Unacceptable”. If determined “Unacceptable”, a notice of unacceptability will be forwarded to the Offeror upon completion of the proposal’s evaluation.

g. Any proposal which modifies or fails to conform to the essential requirements or specifications of the request for technical proposals will be considered nonresponsive and categorized as “Unacceptable”.

h. The Offeror’s conformance with the specified format and submission requirements will be considered during the technical evaluation. Failure to comply with the formatting and/or submission requirements may be seen as indicative of the type of problems that could be expected during contract performance. Lack of conformance and material omission(s) may cause the technical proposal to be rejected as “Unacceptable”.

i. The Step-One submission instructions are written to give prospective Offerors, where feasible, an indication of the level of detail desired by the Government. The Offeror’s failure to include information that the Government has indicated shall be included will result in the proposal being found other than “Acceptable” if inadequate detail is provided.

j. Do not include exceptions to the terms and conditions of the solicitation in the technical proposal submissions. The inclusion of any terms and conditions in the proposals that conflict with the terms and conditions of the solicitation may result in a determination that the proposal/bid is “Unacceptable” and thus ineligible to bid in Step-Two. Resolve questions about the terms and conditions or technical requirements of the solicitation prior to submission of the proposal/bid; see “Proposal Inquiries and Questions”, located above in Section 00 21 00.

k. Factor Ratings. Each Factor will be given one of the ratings identified and defined as follows:

FACTOR 1 RATINGS

(Past Performance)

DEFINITION

Acceptable Proposal meets the requirements of the Step-One request for technical proposal, and based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown.

Unacceptable Proposal does not meet the requirements of the Step-One request for technical proposal, and / or based on the Offeror’s performance record, the Government does not have a reasonable expectation that the Offeror will be able to successfully perform the required effort.

FACTOR 2 RATINGS

(Personnel Qualifications)

DEFINITION

Acceptable The proposal meets the requirements of the Step-One request for technical proposal and indicates an adequate approach and understanding of the requirements.

Reasonably Susceptible of Being Made Acceptable (Note: This rating is not used for the overall technical proposal rating)

The proposal, as proposed, cannot be rated as Acceptable because of error(s), omissions(s) or deficiency(ies) which are capable of being corrected without a major rewrite or revision of the proposal.

Unacceptable The proposal does not meet the requirements of the Step-One request for technical proposal.

Submission Requirements and Evaluation Criteria for the Technical Proposal

The information provided in this section will be used in evaluating the Offeror’s specialized technical experience specific to this solicitation

Factor 1 – Past Performance

There are three (3) aspects to the performance confidence evaluations: recency, relevancy, and quality of pas performance. In accordance with FAR 15.305(a)(2), the currency and relevance of the information, source of the information, context of the data, and general trends in the contractor’s performance shall be considered. Relevance and quality of performance will be combined to establish one performance confidence assessment rating for each Offeror. The project examples requested within this factor must be of relevant scope and complexity to the solicited project.

Submission Requirements:

Submit three (3) example projects which best illustrate the experience of the contractor on projects of similar scope, complexity, and size as this project. If more than three (3) projects are submitted, only the first three (3) will be evaluated. Submitted projects shall be completed or substantially complete within the past six (6) years. The projects submitted shall be limited to no more than two (2) pages for each project submission. Additional pages above the limit may not be evaluated.

Multiple Award Task Order Contracts (MATOCs) or any other type of task-order contracts that provide for the issuance of task orders for the performance of tasks will not be considered projects for the purposes of this evaluation.

Only individual task orders issued under such contracts will be evaluated as projects. However, a phased project using phased task orders for a single customer with multiple inter-dependent facilities on a single site may be considered a project for the purposes of this evaluation. Project descriptions that do not clearly describe the proposing firm’s or team member’s experience, the scope of the project, or the periods of project performance will not be considered.

The information that is required for Factor 1, below, is provided in the template Attachment A, Experience in Relevant Projects, which can be extended as necessary. Offerors are not required to use the form itself as part of their proposal, but the information request for Factor 1 must be in the offeror’s proposal and should be in the same format as the template.

The following information is required for each submitted example project:

1) Project Title

2) Location

3) Contract Number

4) Type of Contract: Indicate Firm Fixed Price; Cost Plus Fixed Fee; etc.

5) Total Dollar Amount at Award and Completion: Total amount of the proposing firm’s contract or subcontract (if a key subcontractor)

6) Project Delivery Method: Indicate Design/Bid/Build; Design/Build; Integrated Design; Design Only; etc.

7) Role of Proposing Firm: Prime contractor or key subcontractor. If a subcontractor, state who is the prime contractor. State if the example project represents a Joint Venture. If a Joint Venture, name the Joint Venture’s parties. Indicate type of work and percentage of work performed by the parties.

8) Brief Description of Project: Provide a narrative with details about the proposing firm’s role and the relevancy to this project.

9) Project Relevancy: Address any relevancy of the submitted project using, at a minimum, the relevancy criteria below

10) Construction Start and Completion Dates: Project construction shall be identified as complete or substantially complete. If a proposing firm presents a project that is substantially complete, the proposal shall include an explanation of why that project should be considered.

11) Customer / End User’s Primary Point of Contact: Name, relationship to project, agency/firm, phone number, and e-mail address. The Government may contact and interview project references. Reference information will not be revealed to other parties.

12) Procuring Activity Point of Contact: Name, relationship to project, agency/firm, phone number, and e-mail address. The Government may contact and interview project references. Reference information will not be revealed to other parties.

A recent project is a project that is complete, or substantially complete within six (6) years of this request for Step- One technical proposal issue date. If a proposing firm submits a project as substantially complete within the 6-year period, the proposal must include an explanation why that project should be considered substantially complete. Project should be substantially complete, meaning more than 90% invoiced and paid.

The relevancy of submitted projects must be substantiated by the proposing firm’s role, work, size, scope, and complexity similar to the requirements in this project. In making this determination, the Government will use the following criteria to establish the acceptable relevancy of a submitted project:

a. Projects shall demonstrate a comprehensive ability in structural repair and reinforcement of bridges and bearing repairs, including steel and weldment repairs, similar in scope, dollar value exceeding $1,500,000, and complexity to the requirements of this project.

b. Each project shall showcase experience with non-destructive testing (NDT) on critical structural steel components and weldments in large-scale infrastructure, aligning with industry standards for quality and safety.

c. Experience shall be demonstrated in the application of System No. 23-C-Z, System No. 23-E, and 23-D paint systems (moisture-cured urethanes) on large-scale infrastructure or hydraulic structures, ensuring adherence to project-specific environmental and durability requirements.

d. The Government will consider any additional aspects of the proposal that, in the evaluators' judgment, enhance the proposal's merit or likely success in fulfilling the project requirements efficiently and effectively.

The project descriptions and relevancy narratives must clearly articulate the relevancy in sufficient detail to determine technical capability.

Quality: In addition, submit a completed CPARS for each submitted example project. DO NOT provide past performance information for projects other than project examples provided for this factor. The quantity of CPARS submitted is the same as the quantity of projects submitted.

If a completed CPARS is not available, the Past Performance Questionnaire (PPQ)(Attachment B) is provided for the offering firms to submit to the client of each project the offering firm includes in its submission requirements for Factor 1. Ensure correct phone numbers and email addresses are provided for the client’s point of contact. The completed PPQs should be submitted with the Step-One technical proposals. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Contract Specialist Brianna Wohlers (Brianna.N.Wohlers@usace.army.mil) via email prior to the Step-One technical proposal closing date and time.

Previously completed PPQs are acceptable.

Evaluation Criteria:

The Government’s overall rating for this factor will be based on the Offeror’s Past Performance to include recency and relevancy of the projects submitted and the quality of performance.

The burden of providing detailed, current, accurate and complete past performance information rests with the proposing firm. If any firm has multiple functions or divisions, the Government will only evaluate past performance of the division or unit submitting the offer or of the team member. The prime contractor will be rated on its own performance. A prime contractor may not establish past performance based on the past performance of its proposed key personnel, apart from that of the entity.

In accordance with FAR 15.305 and DFARS 215.305, the currency and relevance of the information, source of the information, context of the data, and general trends in contractor’s performance will be considered. However, the comparative assessment in FAR 15.305(a)(2)(i) does not apply. Therefore, past performance will be rated on an “acceptable” or “unacceptable” basis only.

In the case of an offeror for whom information on past performance (CPARS or PPQs) is not available or so sparse that no meaningful past performance quality rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably (see FAR 15.305(a)(2)(iv)). Therefore, the offeror will be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered acceptable.

The Government may also review past performance information from any sources available to the Government, to include, but not limited to, the Federal Awardee Performance and Integrity Information System (FAPIIS), Contractor Assessment Reporting System (CPARS) or other databases using all CAGE/ UEI numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency. The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction. The evaluation may take into account the number and severity of problems, the demonstrated effectiveness of corrective actions taken, and the overall work record.

Minimum Acceptability Criteria:

Past performance information must be submitted for three (3) example projects completed or substantially completed within the last 6 years from the date of…

This is the start of the file's text. The full file is on GovTribe.