Redacted Sole Source Justification_CIPS.pdf
PDF 222 KB Posted
- Attached to
- Composite Impact Protection System Installation Federal contract opportunity
- Solicitation number
- N0016722Q0254
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N0016722Q0254 CSS.pdf | ||
| CDRL A001 Schedule Report.pdf | ||
| CDRL A001 DI-FNCL-82229 _ Contractor Cost and Schedule Forecast.pdf | ||
| CDRL A002 DI-MISC-80759A.pdf | ||
| CDRL A003 DI-MISC-81920.pdf | ||
| CDRL A004 Coatings OQE Sheets.pdf | ||
| CDRL A004 MilSpec _ MIL-PRF-24667D.pdf | ||
| CDRL A002 Composite Workbook OQE Sheets.pdf | ||
| CDRL A003 Installed Composite Impact Protection System.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSWCCD Sole Source/Brand Name Justification SAT rev 1 Effective September 2020
USE OF OTHER THAN FULL AND OPEN COMPETITION LESS THAN
SIMPLIFIED ACQUISITION THRESHOLD MEMO
FROM:
CODE: 655
SUBJECT: Sole Source/Brand Name Justification / Limited Source Justification for Use of Other than Full &
Open Competition for an Acquisition under the Simplified Acquisition Threshold (SAT)
I. BACKGROUND
1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available.
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.
3. This memorandum is derived from Enclosure 3, Department of Navy Simplified Acquisition Procedures Guide (April 2018) and is only applicable to acquisitions under the SAT.
II. DESCRIPTION OF ITEM OR SERVICE
The contractor will provide shipboard manufacturing and installation support of the 57mm Composite Impact Protection System (CIPS) for the forward 02 level of the USS TULSA (LCS-16). This tasking requires experience and knowledge of the vacuum assisted resin transfer molding (VARTM) process, execution of the NSWCCD developed aluminum surface preparation process, and the ability to perform both processes pier side and shipboard as defined in the Owners’ Manual for LCS-2 Class Composite Impact Protection System, Maintenance and Repair Manual (GFI item 6.1 in the Performance Work Statement).
In addition to the installation defined by the Owners’ Manual, the contractor will be responsible for material ordering and logistics, supporting Regional Maintenance and Modernization Coordination Office (RMMCO) approval to perform the installation (DoD Instruction TS9090-310G), and installation must be completed prior the end of the LCS-16 USS TULSA Drydock Selected Restricted Availability (DSRA) at Vigor Industrial 5555 N Channel Ave Portland, Oregon, 97217.
MANUFACTURER: R&P Technologies ADDRESS: 1545 Tidelands Ave STE. F
National City CA 91950
PHONE: 619-399-5521
POC: Matthew Rowland
III. BASIS FOR DETERMINATION FOR USE OF OTHER THAN FULL & OPEN COMPETITION
A. BRAND NAME:
Item required must be a brand name product, or feature of a product, particular to one manufacturer.
1. Restrictive Rights: The source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service required.
2. Exclusive Licensing Agreements: The item or service is only available from the Original Equipment Manufacturer (OEM).
3. Other Reasons:
B. SOLE SOURCE (select all that apply)
1. Restrictive Rights: The source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service required.
2. Exclusive Licensing Agreements: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.
3. Other Reasons: R&P Technologies LLC is uniquely qualified and the only known source with the technical knowledge, experience and capability to perform the VARTM process remotely in a shipboard environment and at a large scale as required on LCS-16 USS TULSA without causing unacceptable delays to the DSRA schedule.
R&P has gained extensive knowledge and experience as the contractor currently performing the VARTM process shipboard on DDG-1000. Should the Government use a different contractor for the required services, additional time and work would be needed for technical review of contractor certifications and proof of production capability Objective Quality Evidence (OQE) along with additional time and training for the new contractor to obtain the level of knowledge and familiarity with installation of the CIPS. This additional work would result in a 1-2 month delay in project initiation resulting in DSRA schedule milestones for installation approval being missed and the high risk of not performing the installation on LCS-16. Missing the FY23 installation delays installation of the CIPS to FY26, incurring aluminum repair costs of up to $ per year. In addition to missed milestones, there would be an estimated re-work costs to the Government for the vetting of the new contractor plus the time and training on the installation of the CIPS.
IV. CERTIFICATIONS & APPROVALS
A. Technical/Requirements Certification: I certify that the facts and representation under my cognizance, which are included in this justification, are complete and accurate to the best of my knowledge and belief.
Date
First Line Supervisor Signature Name / Title / Phone Date
8/11/2022
8/11/2022
B. Certification/Approval per FAR 13.501: Upon the basis of the above justification, I hereby approve the solicitation of the proposed procurement(s) described herein using other than full and open competition, pursuant to the authority of 10 U.S.C. 2304(c).
Contracting Officer Signature Name / Title / Phone Date
File details come from the government source that posted it. Updated .