Red Run - 100 pct Schedule of Items.pdf

PDF 93 KB Posted

Attached to
Monongahela National Forest FR209 AOP Replacement Federal contract opportunity
Solicitation number
12445523B0006
Issued by
Department of Agriculture Forest Service

About this file

This document contains a schedule of items for the replacement of the Red Run structure on the Monongahela National Forest. The United States Forest Service is soliciting bids to replace the existing structure over Red Run with a new bridge. The schedule of items lists over 50 separate construction items with estimated quantities and space for bidders to provide unit pricing and total pricing. Items include mobilization, surveying, erosion control measures, excavation and backfill, concrete work, precast beams, reinforcing steel, guardrails, seeding and mulching. Bidders are instructed to use the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects and that optional bid items will be awarded based on available funds. The solicitation number is provided for the Monongahela National Forest FR209 AOP Replacement opportunity through the Department of Agriculture Forest Service.

View the file

Other files for this federal contract opportunity

Other files attached to Monongahela National Forest FR209 AOP Replacement, newest first.
File Type Posted
FR209_Plans_signed.pdf PDF
Red Run - 100 pct Supplemental Specs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - SCHEDULE OF ITEMS

SECTION B – SERVICES AND PRICES

FR 209-0.2 over Red Run

Structure Replacement

Greenbrier Ranger District

Monongahela National Forest

Randolph County, West Virginia

B- 1 - SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101 Mobilization Lump Sum 1

15201

Construction Survey and Staking, Method 1, Tolerance

Class C Lump Sum 1 $________ $________

15702 Silt Sock Foot 285

20102 Clearing and Grubbing, Disposal Method A Acre 0.2

20304 Removal of Old Structure, Disposal Method A Lump Sum 1

20401

Roadway Excavation, Compaction Method B, Finishing

Method A Cubic Yard 280

20411 Embankment, Placement Method 1 Cubic Yard 81

20801 Structure Excavation Cubic Yard 292 $________ $________

20803 Structural Backfill Cubic Yard 183

21101 Roadway Obliteration, Method 1 Mile 0.08

25101 Riprap, Class IV, Machine Placed Cubic Yard 313 $________ $________

30103 Aggregate Base, Grading D, Compaction Method D Cubic Yard 184 $________ $________

30107 Subbase, Grading B, Compaction Method D Cubic Yard 197

40312.1 Asphalt Cement, WV Base 1 Ton 60

40312.2 Asphalt Cement, Wearing IV Ton 30

41403 Joint Sealant, Hot Poured Rubber Foot 36

55103 Micropile, Load Test Each 1

55151 Furnish Pile Drilling Equipment Lump Sum 1 $________ $________

55201 Structural Concrete, Class A Cubic Yard 100

55210 Tremie Concrete Cubic Yard 8

55302 Precast, Prestressed Concrete Box Beam Foot 444

55404 Epoxy Coated Reinforcing Steel Pound 8176

55601 Bridge Railing Foot 163

56401 Bearing Device Each 12

56701 Micropile Foot 172

58701 Post-Tensioning System Lump Sum 1

60501 Underdrain System, 6-inch Foot 100

61701 Guardrail, Class I Foot 38

61702 Guardrail, Flared End Terminal Each 4

61706 Guardrail Anchorage Each 4

62404 Placing Conserved Topsoil, 3-inch Square Yard 870

62503 Seeding, Hydraulic or Dry Method Lump Sum 1

62509 Mulching, Hydraulic or Dry Method Lump Sum 1

62901 Rolled Erosion Control Product, Type 2.D Square Yard 870

63305 Posts, Steel, 3 LB Foot 40

63306 Object Markers, Type 3 Each 4

63501 Temporary Traffic Control Lump Sum 1

Total:

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction

Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.

1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.

2. Optional bid items will only be awarded based on available funds. Zero or all items or a combination of items may be awarded. Contractor shall provide pricing for all optional items.

3. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05

4. Quantities for aggregate are compacted in place volumes.