Q A - Pasadena Roof R4.doc

DOC document 24 KB Posted

Attached to
RECOVERY- Pasadena Roof Replacement Federal contract opportunity
Solicitation number
Not on record
Issued by
General Services Administration Public Buildings Service Region 9

About this file

Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY- Pasadena Roof Replacement, newest first.
File Type Posted
Additional Contractual documents.zip ZIP file
Amended Scope of Work.doc DOC document
SIGN_IN_SHEET_PASADENA_ROOF.pdf PDF
Pasadena Roof Assessment - Clock Tower Ledge.pdf PDF
Summary of Work Specification review.pdf PDF
FBO docs.zip ZIP file
Specs drawings.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pasadena Roof Replacement

Rev. 2-26-2010

General Questions During Meeting:

Questions Asked at the Pasadena Pre-bid Roof Meeting

1. Can they self-certified that they are a small business?

Answer. Contact the local SBA office

2. What are the Fire and Safety guidelines that should be followed? We have the guidelines, what else should be posted on the FBO website to be referenced?

Answer: Please refer to PBS P-100 and the GSA “PV Fire Safety Guide” as posted on the FBO website.

3. Why an SRI 112?

Answer: SRI of 112 was an error in the Summary of Work, please see published amendment for corrected section and SRI. Also, note Cool Roof performance justification amendment.

4. What will we be using as staging Area?

Answer: Each staging will be done by roof sections.

5. Will we be raising the height of any flashing?

Answer: Please see summary of work and added amendment.

6. Was Asbestos testing done?

Answer: "GSA has performed asbestos surveys, and may perform additional testing prior to construction. Nonetheless if the Contractor suspects previously unidentified ACMs the Contractor should notify GSA and with GSA's concurrence may test for asbestos. If ACMs are detected GSA will reimburse the Contractor for the direct cost of reasonable testing as agreed when GSA approved the testing, and also GSA will be responsible for any necessary abatement (to be performed by a third party hired by GSA). If no ACMs are detected the Contractor is responsible for testing costs."

Further – the tests performed by the designing company are attached this solicitation.