20.07.17 FINAL Solicitation_Snake Creek Pumping Plant Structural Safety Modificiations

34 MB Posted

Attached to
DK-SNAKE CREEK PUMPING PLANT STRUCTURAL SAFETY MODIFICATION Federal contract opportunity
Solicitation number
R17PS01153
Issued by
Department of the Interior Bureau of Reclamation

About this file

Solicitation R17PS01153

Text of this file

U.S. Department of the Interior Bureau of Reclamation 2021 4th Ave. North Billings, MT 59107 JULY 2017

Solicitation No. R17PS01153

Snake Creek Pumping Plant Structural Safety Modifications

Pick Sloan Missouri Basin Program Garrison Division Garrison Diversion Unit North Dakota

FOR OFFICIAL USE ONLY

U.S. Department of the Interior Bureau of Reclamation 2021 4th Ave North Billings, MT 59107 JULY 2017

THIS PAGE INTENTIONALLY LEFT BLANK.

SNAKE CREEK PUMPING PLANT

STRUCTURAL SAFETY MODIFICATIONS

Pick Sloan Missouri Basin Program North Dakota

FOREWORD

Work is located at Snake Creek Pumping Plant No. 1 approximately 6 miles northwest of Coleharbor, North Dakota, in McLean County.

The principal components of work to be performed under these specifications include the following:

A. Visitor Gallery:

1. Remove and relocate existing HVAC ductwork and vent for visitor gallery ceiling access location. Fabricate new ductwork transition and connect to existing HVAC ductwork sections.

2. Furnish and install metal ladder, grating, guardrails, platform, and braces for visitor gallery ceiling access.

3. Removal and disposal of asbestos containing ceiling tiles at visitor gallery ceiling.

B. Observation Room Ceiling:

1. Remove and dispose of existing steel flooring, guardrail, joists, lighting, and hatch from observation room ceiling access location.

2. Removal and disposal of asbestos containing materials, including tiles in adjacent room, stored tiles, gaskets, and wire.

3. Modify existing HVAC ductwork for observation room ceiling.

C. Discharge Pipe Platforms:

1. Furnish and install metal stair, guardrail, handrail, platform, grating, and bracing for three

(3) discharge pipe manhole access locations.

D. Gate Hoist Platforms:

1. Remove, disassemble, and dispose of three (3) existing platforms, ladders, and oil reservoir stands.

2. Remove and reinstall three (3) existing oil reservoirs.

3. Furnish and install metal ladder, guardrails, platform, floor plates, safety gates, and bracing for three (3) gate hoist platforms.

4. Furnish and install oil reservoir stand for three (3) gate hoist platforms.

Coordinate oil transfer or filling, to holding tanks and provide oil spill prevention measures.

E. Crane Rail Fall Restraint System:

1. Furnish and install a fall restraint safety cable system for west crane rail access location.

i

2. Remove existing cable system.

POINT OF CONTACT:

The point of contact is Contract Specialist Darlene Dillon. All questions and correspondence concerning this solicitation shall be directed to the Contract Specialist via email at ddillon@usbr.gov.

Phone calls will not be accepted to ensure all communication will be properly documented for record purposes.

PROPOSAL CLOSING DATE:

See Section “A”: “SOLICITATION, OFFER, AND AWARD, STANDARD FORM 1442” immediately following the “TABLE OF CONTENTS.” If the closing date is subject to change, notification will be provided by Amendment to the Solicitation.

METHOD OF SUBMISSION OF PROPOSALS:

See Section L of this Solicitation.

TYPE OF CONTRACT:

This requirement is solicited as an “Invitation for Bids” (IFB) using Federal Acquisition Regulation Part 14, Sealed Bidding. Results from this solicitation will be an anticipated award of a Firm Fixed Price Contract.

COMPETITION REQUIREMENTS:

This acquisition is restricted to Total Small Businesses.

RECLAMATION SAFETY AND HEALTH STANDARDS (2014 EDITION):

For information regarding the Bureau of Reclamation’s publication “RECLAMATION SAFETY AND HEALTH STANDARDS” (2014 Edition): http://www.usbr.gov/ssle/safety/RSHS/rshs.html) which is applicable to work under this contract. See Clause “WBR 1452.223-81 SAFETY AND HEALTH.

PRE-BID ORGANIZED SITE VISIT:

A pre-bid organized site visit will be held August 10, 2017 at 10:00 AM, (Coleharbor, ND Timezone), by meeting at Reclamation's Snake Creek Pumping Plant located at 1401 Hwy 83 NW, Coleharbor, North Dakota. Prospective Offerors should make arrangements by contacting Mr. Scott Jacobson at Telephone Number (701)221-1215. Attendees are to provide and wear safety boots, hard hats and safety vests.

SAM:

Effective July 29, 2012, any contractor interested in doing business with the Government must register in the system for award management (SAM) database prior to award of a contract or agreement. SAM is a Federal Government owned and operated FREE website that consolidates the Central Contractor Registration (CCR), the Online Representations and Certifications Application (ORCA), and the excluded parties list system (EPLS). The vendor’s DUNS and Bradstreet number and banking information are required for registration. Contractors may obtain information on registration and annual confirmation requirements via the SAM website at https:// www.sam.gov/portal/public/sam or by the Federal Service Desk at telephone number 1-866-606-8220.

PAYMENTS:

Payment requests for the anticipated contract must be submitted electronically through the U.S.

Department of the Treasury’s Internet Payment Platform (IPP) System. The IPP website is https:// www.ipp.gov. The contractor must use the IPP website to register, access, and use IPP for submitting requests for payment. Contractor assistance with enrollment can be obtained by contacting the IPP production helpdesk via email at ippgroup@bos.frb.org or at telephone number 1-866-973-3131. If the contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the contractor must submit a waiver request in writing to the contracting officer with their proposal.

ii

Snake Creek Pumping Plant Structural Safety Modifications Solicitation No. R17PS01153

Table of Contents 00 01 10 - 1

TABLE OF CONTENTS

PART 1 – THE SCHEDULE

SECTION A – SOLICITATION, OFFER and AWARD, STANDARD FORM 1442

SECTION B – SCHEDULE

SECTION C – DESCRIPTION / SPECIFICATIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 14 10 Use of Site 01 14 12 Work Restrictions 01 14 30 Interruption of Service 01 33 00 Submittals 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 56 10 Protection of Existing Installations 01 57 20 Environmental Controls 01 57 35 Oil Transfer and Spill Prevention 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents

DIVISION 02 - EXISTING CONDITIONS

02 41 07 Removal and Disposal of Existing Features 02 41 19 Selective Electrical Demolition 02 80 10 General Requirements for Hazardous Materials 02 82 20 Removal and Disposal of Asbestos Containing Materials 02 83 35 Removal and Disposal of Coatings and Equipment with Coatings Containing

Regulated Metals 02 87 20 Removal and Disposal of Used Oil

DIVISION 03 - CONCRETE

03 62 20 Nonshrink Grout For Equipment and Metalwork

DIVISION 05 - METALS

05 50 00 Metal Fabrications

Table of Contents 00 01 10 - 2

05 52 20 Fall Restraint Cable System

DIVISION 09 - FINISHES

09 96 20 Coatings

DIVISION 23 - HEATING, VENTILATING AND AIR-CONDITIONING (HVAC)

23 31 00 HVAC Ducts and Casings

DIVISION 26 - ELECTRICAL

26 05 02 Basic Electrical Materials and Methods 26 05 19 Low-Voltage Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 33 Raceways and Boxes for Electrical Systems 26 27 26 Wiring Devices 26 51 19 LED Interior Lighting

DIVISION 28 - FIRE PROTECTION

28 46 10 Detection and Initiation

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 21 23 Hydraulic Piping Modifications

DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS

51 00 00 51 00 90 51 02 80

Information Available to Offerors Photographs Sampling Travel Report and Analytical Results

DIVISION 52 - DRAWINGS

52 00 00 Drawings

SECTION D – NOT USED

SECTION E – INSPECTION OR PERFORMANCE

E.1 52.236-5 Material and Workmanship E.2 52.246-12 Inspection of Construction E.3 52.246-21 Warranty of Construction

DIVISION 32 - SEEDING AND SOIL SUPPLEMENTS

32 92 20 Seeding and Soil Supplements

Table of Contents 00 01 10 - 3

SECTION F – DELIVERIES OR PERFORMANCE

F.1 52.211-10 Commencement, Prosecution, and Completion of Work F.2 52.242-14 Suspension of Work

SECTION G – CONTRACT ADMINSTRATION DATA

G.1 1452.201-70 Authorities and Delegations G.2 DOI-AAAP-0028 Electronic Invoicing and Payment Requirements –

Invoice Processing Platform (IPP) G.3 DOI-AAAP-00050 Notice to Contractors – Contractor Performance Assessment

Reporting

SECTION H – SPECIAL PURCHASE ORDER REQUIREMENTS

H.1 GP-7 Site Security

PART II

SECTION I – CONTRACT CLAUSES

I.1 52.252-2 I.2 52.204-18 I.3 52.214-29 I.4 52.222-55 I.5 52.222-57

I.6 52.222-58

I.7 52.222-59 I.8 52.222-60 I.9 52.222-62 I.10 52.223-9

I.11 52.225-9 I.12 52.228-1 I.13 52.228-2 I.14 52.228-15 I.15 52.232-5 I.16 52.232-27 I.17 52.236-2 I.18 52.236-13 Alt I I.19 52.236-14 I.20 52.236-15 I.21 52.236-21 Alt II I.22 52.243-4 I.23 52.252-6

Clauses Incorporated by Reference Commercial and Government Entity Code Maintenance Order of Precedence -- Sealed Bidding Minimum Wages under Executive Order 13658 Representation Regarding Compliance with Labor Laws Under Executive Order 13673 Subcontractor Responsibility Matters Regarding Compliance with Labor Laws Under Executive Order 13673 Compliance with Labor Laws Under Executive Order 13673 Paycheck Transparency Under Executive Order 13673 Paid Sick Leave Under Executive Order 13706 Estimate of Percentage of Recovered Material Content for EPA Designated Items Buy American–Construction Materials Bid Guarantee Additional Bond Security Performance and Payment Bonds – Construction Payments under Fixed-Price Construction Contracts Prompt Payment for Construction Contracts Differing Site Conditions Accident Prevention Availability and Use of Utility Services Schedules for Construction Contracts Specifications and Drawings for Construction Changes Authorized Deviations in Clauses

Table of Contents 00 01 10 - 4

I.24 WBR 1452.203-70 Restriction on Endorsements--Department of the Interior I.25 WBR 1452.204-70 Release of Claims--Department of the Interior I.26 WBR 1452.223-80 Asbestos-Free Warranty I.27 WBR 1452.223-81 Safety and Health -- Bureau of Reclamation I-28 WBR 1452.223-82 Protecting Federal Employees and the Public from Exposure to

Tobacco Smoke in the Federal Workplace – Bureau of Reclamation

Department of Labor General Decision Number: CO170012 Standard Form 24 – Bid Bond Company Experience Reference List Past Performance Questionnaire Subcontracting Percentage Worksheet

ATTACHMENT NUMBER 001

ATTACHMENT NUMBER 002

ATTACHMENT NUMBER 003

ATTACHMENT NUMBER 004

ATTACHMENT NUMBER 005

PART IV

SECTION K -- REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

K.1 52.204-08 K.2 52.209-7

Annual Representations and Certifications Information Regarding Responsibility Matters

I.29 WBR 1452.228-70 Liability Insurance -- Department of the Interior I.30 WBR 1452.228-84 Certification of Representatives for Corporate Sureties – Bureau of Reclamation I.31 WBR 1452.231-81 Equipment Ownership and Operating Expense –

Bureau of Reclamation I.32 WBR 1452.232-81 Payment for Mobilization and Preparatory Work I.33 WBR 1452.233-81 Claims Accounting -- Bureau of Reclamation I.34 WBR 1452.236-08 Other Contracts (Deviation) I.35 WBR 1452.236-84 Preservation of Cultural Resources--Bureau of Reclamation I.36 WBR 1452.237-80 Security Requirements-Bureau of Reclamation

Alt III I.37 WBR 1452.243-80 Modification Proposals– Bureau of Reclamation

ALT IV

I.38 WBR 1452.246-81 Failure to Meet Performance Warranties

PART III

SECTION J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

Table of Contents 00 01 10 - 5

SECTION L -- INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

System for Award Management (SAM) Commercial and Government Entity Code Reporting Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29 Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisition Streamlining and

Standardization Information System (ASSIST) Amendments to Invitations for Bids False Statements in Bids Submission of Bids Explanation to Prospective Bidders Late Submissions, Modifications, and Withdrawals of Bids Preparation of Bids – Construction Submission of Offers in the English Language Submission of Offers in U.S. Currency Type of Contract Construction Wage Rate Requirements – Secondary Site of the Work Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction Notice of Buy American Requirement – Construction Materials Site Visit (Construction) – Alternate I

L.1 52.204-7 L.2 52.204-16 L.3 52.211-1 L.4 52.211-2

L.5 52.214-3 L.6 52.214-4 L.7 52.214-5 L.8 52.214-6 L.9 52.214-7 L.10 52.214-18 L.11 52.214-34 L.12 52.214-35 L.13 52.216-1 L.14 52.222-5

L.15 52.222-23

L.16 52.225-10

L.17 52.236-27 ALT I

L.18 52.252-5

Authorized Deviations in Provisions L.19 WBR 1452.233-02 Service of Protest -- Department of the Interior L.20 WBR 1452.222-81 Employment Verification L.21 WBR 1452.233-82 Notice of Proposed Partnering – Bureau of Reclamation L.22 WBR 1452.236-71 Additive or Deductive Item – Department of the Interior L.23 WBR 1452.236-85 Instruction for Mobilization and Preparatory

WorkSchedule Line Item

SECTION M -- EVALUATION FACTORS FOR AWARD

M.1 52.214-19 Contract Award -- Sealed Bidding – Construction M.2 WBR 1452.225-82 Notice of World Trade Organization Government

Procurement Agreement Evaluations-Bureau of Reclamation

END OF CONTENTS

Table of Contents 00 01 10 - 6

This page intentionally left blank.

PART I – THE SCHEDULE

This page intentionally left blank

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

DOI-Bureau of Reclamation 2021 4th Ave. North Billings, MT 59107 Attn: Darlene Dillon, Contract Specialist c/o GP-5000

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040329967

Bureau of Reclamation

Great Plains Region

Regional Office PO Box 36900

R60

Billings MT 59107

Darlene Dillon 406-247-7820 x

08/02/2017

R17PS01153

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

YES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

calendar days and complete it within 10 180 calendar days after receiving

12b. CALENDAR DAYS

08/29/2017

NSN 7540-01-155-3212

x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time

120calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Snake Creek Pumping Plant Structural Safety Modification, Pick Sloan Missouri Basin Program, Garrison Division, Garrison Diversion Unit North Dakota

The estimated price range for this project is $500,000 to $1,000,000

This procurement is set-aside as Total Small Business.

The North American Industrial Classification Code (NAICS) is 236210 Industrial Building Construction, which has an associated Small Business size standard of $36.5 million.

Bids are required to be submitted by Hard Copy. Bids will be accepted by hand carried delivery or by express mail bids, and must be in a sealed package/envelope. Bids will be received at the Bureau of Reclamation, Great Plains Regional Office, at the address identified in Block 8 (above). Individuals delivering bids in person shall allow sufficient time to pass and depart through security. Bids will not be accepted by facsimile or email.

Taxpayer Identification Number: ________________________________________ Data Universal Numbering System:______________________________________ Commercial and Government Entity Code:________________________________ x x

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

U.S. Department of the Treasury Invoice Processing Platform https://www.ipp.gov

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Bureau of Reclamation Great Plains Region

Regional Office PO Box 36900

R60

Billings MT 59107

Gerri Voto-Braun

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

R17PS01153

00010

SECTION B Supplies or Services and Prices FOB: Destination

SCPP Structural Safety Modification

(Price Schedule CLINS 1 through 10)

See following continuation pages.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

1 AU $________________

Price Schedule B - 1

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

Snake Creek Pumping Plant Structural Safety Modifications

Pick Sloan Missouri Basin Program North Dakota

B.1 PRICE SCHEDULE

(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.

(d) Definitions:

(1) CLIN – Contract Line Item Number.

PRICE SCHEDULE

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

1 WBR

1452.232 -81

Mobilization and Preparatory Work

For the lump sum of $

2 02 41 07 Removal and Disposal of Existing Features

For the lump sum of $

3 05 50 00 Miscellaneous Metalwork- Visitor Gallery Ceiling

For the lump sum of $

4 05 50 00 Miscellaneous Metalwork- Discharge Pipe Platforms

For the lump sum of $

5 05 50 00 Miscellaneous Metalwork- Gate Hoist Platforms

For the lump sum of $

6 05 52 20 Fall Restraint Cable System For the lump sum of $

7 23 31 00 HVAC Ducts and Casings For the lump sum of $

8 26 05 02 Electrical Wiring and Lighting

For the lump sum of $

Price Schedule B - 2

PRICE SCHEDULE

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

9 28 46 10 Fire Protection System For the lump sum of $

10 35 21 23 Hydraulic Control System Disconnect and Reinstall

For the lump sum of $

TOTAL FOR PRICE SCHEDULE $_________________

END OF SUPPLIES OR SERVICES AND PRICES/COSTS

SECTION C – SPECIFICATIONS

Summary of Work 01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 LOCATION

A. Work is located at Snake Creek Pumping Plant No. 1 approximately 6 miles northwest of Coleharbor, North Dakota in McLean County.

1.02 PRINCIPAL COMPONENTS OF WORK

A. Visitor Gallery:

1. Remove and relocate existing HVAC ductwork and vent for visitor gallery ceiling access location. Fabricate new ductwork transition and connect to existing HVAC ductwork sections.

2. Furnish and install metal ladder, grating, guardrails, platform, and braces for visitor gallery ceiling access.

3. Removal and disposal of asbestos containing ceiling tiles at visitor gallery ceiling.

B. Observation Room Ceiling:

1. Remove and dispose of existing steel flooring, guardrail, joists, lighting, and hatch from observation room ceiling access location.

2. Removal and disposal of asbestos containing materials, including tiles in adjacent room, stored tiles, gaskets, and wire.

3. Modify existing HVAC ductwork for observation room ceiling.

C. Discharge Pipe Platforms:

1. Furnish and install metal stair, guardrail, handrail, platform, grating, and bracing for three (3) discharge pipe manhole access locations.

D. Gate Hoist Platforms:

1. Remove, disassemble, and dispose of three (3) existing platforms, ladders, and oil reservoir stands.

2. Remove and reinstall three (3) existing oil reservoirs.

3. Furnish and install metal ladder, guardrails, platform, floor plates, safety gates, and bracing for three (3) gate hoist platforms.

4. Furnish and install oil reservoir stand for three (3) gate hoist platforms.

Coordinate oil transfer or filling, to holding tanks and provide oil spill prevention measures.

Summary of Work

01 11 00 - 2

E. Crane Rail Fall Restraint System:

1. Furnish and install a fall restraint safety cable system for west crane rail access location.

2. Remove existing cable system.

1.03 SPECIFICATIONS REQUIREMENTS

A. Requirements in Division 1, General Requirements, apply to all other Divisions.

B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.

C. Where specifications are written in streamlined form, the words “shall be” are included by inference where a colon (:) is used within the sentence or phrase.

1.04 DEFINITIONS

A. When the specifications use a word or term defined in the Federal Acquisition Regulations (FAR), the definition of the word or term shall be in accordance with FAR sections in effect at the time the solicitation was issued.

1.05 ACRONYMS

A. The following acronyms apply to all specifications Divisions:

1. CO: Contracting Officer

2. COR: Contracting Officer’s Representative

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

END OF SECTION

Use of Site 01 14 10 - 1

SECTION 01 14 10

USE OF SITE

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 14 10-1, Land Use and Land/Landscape Rehabilitation Plan:

1. For each Contractor use site on Government land:

a. Show use location and extent of impact. Uses include but are not limited to the following:

1) Buildings and service areas including field offices, trailers, shops, storage areas, fuel and oil storage areas, and fabrication areas.

2) Parking areas, temporary roads, and haul routes.

3) Utilities including air, power, non- potable water, and water lines;

fire hydrants; and compressor station, elevator, restrooms.

4) First-aid and medical facilities.

5) Areas for processing, storing, and disposing of Hazardous Waste and Waste materials from construction operations.

6) Temporary fences.

b. Describe methods to preserve, protect, and repair if damaged, vegetation (such as trees, shrubs, and grass) and other landscape features on or adjacent to the jobsite, which are not to be removed and which do not interfere with the work required under this contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.

c. Describe methods to protect, and repair if damaged, existing improvements and utilities at or near the jobsite.

d. Describe methods for removing temporary structures and facilities, cleanup, and rehabilitating site after completion of construction activities.

2. Submit revised drawings of changes in use of Government land made during design and erection stages or after use of Government land is in operation.

Use of Site 01 14 10 - 2

1.03 PROJECT CONDITIONS

A. Government land may be used for temporary facilities required to perform work.

B. Location, construction, operation, maintenance, and removal of construction facilities on Government land will be subject to approval of the COR.

C. Do not interfere with work of other contractors or the Government in vicinity, or with reservations made by the Government for use of such land.

D. Housing for construction personnel will not be permitted on Government land.

E. Government crane is not available for Contractor use. The Contractor is to provide own crane for lifting.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 CLEANING

A. Construction equipment:

1. Before bringing on site, clean construction equipment to remove dirt, vegetation, and other organic material to prevent introduction of noxious weeds, and invasive plant and animal species.

2. Contractor cleaning procedures shall result in equipment being cleaned as well or better than the procedures described in Cleaning Manual.

3. COR will inspect construction equipment following procedures described in Cleaning Manual before allowing equipment onsite.

3.02 RESTORATION

A. After completion of work, regrade and scarify Government land used for construction purposes and not required for completed installation so that surfaces blend with natural terrain and are in a condition that will facilitate revegetation, provide proper drainage, and prevent erosion.

Work Restrictions

01 14 12 - 1

SECTION 01 14 12

WORK RESTRICTIONS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 WORK RESTRICTIONS

A. Snake Creek Pumping Plant is owned, operated, and maintained by the Bureau of Reclamation.

B. Contractor shall not perform construction activities at the Snake Creek Pumping Plant between May 1 and September 1 of any year, unless coordinated with and approved by the COR.

C. Contractor shall coordinate work with the COR throughout the duration of this contract.

D. Limited access to transport materials and equipment into facility is available. Access between floors to be provided through stairway, elevator, and doorways.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Work Restrictions

01 14 12 - 2

Interruption of Service

01 14 30 - 1

SECTION 01 14 30

INTERRUPTION OF SERVICE

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include cost in prices offered in the Price Schedule for items of work for which Interruption of Service is required.

1.02 REFERENCE STANDARDS

A. National Fire Protection Association (NFPA):

1. NFPA 101-2015 Life Safety Code

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 14 30-1, Interruption of Service Request:

1. Area where work will be done by number or other description.

2. Outline procedures for accomplishing work including:

a. Specific safety precautions to be taken.

b. Type and location of barricades.

c. Warning signs.

d. Protective grounds and devices to be used.

3. Commencement time of work.

4. Duration of work.

5. Description of equipment to be used.

6. Point of isolation, list panel name and circuit number.

7. Devices to be affected.

1.04 PROJECT CONDITIONS

A. Pumping plant shall remain in operation during construction.

B. During construction activities while fire alarm system is deactivated, Contractor shall operate a continuous fire watch per NFPA 101.

C. Coordinate and schedule Interruption of Service with COR:

Interruption of Service 01 14 30 - 2

1. Coordinate work with Government operations.

2. No specific Interruption of Service Request shall be considered unless:

a. COR has reasonable assurances that the work can be completed as stated.

b. Be prepared to perform work on date and during period of time requested for specific Interruption of Service.

3. Allowable time and available Interruption of Service periods will govern requests, work scheduling, onsite delivery of materials, and required drawings and data submittals.

D. When work cannot be performed during an approved Interruption of Service period, notify COR that Interruption of Service is not required.

E. Show construction Interruptions of Service in construction schedule.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Submittals

01 33 00 - 1

SECTION 01 33 00

SUBMITTALS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 DEFINITIONS

A. Days: Calendar days.

B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.

1.03 REFERENCE STANDARDS

A. American Society of Mechanical Engineers (ASME):

1. ASME Y14.1-12 Decimal Inch Drawing Sheet Size and Format

B. National Institute of Building Sciences (NIBS):

1. NIBS NCS-14 United States National CAD Standards, Version 6

1.04 SUBMITTAL REQUIREMENTS

A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.

B. General:

1. Prepare in English.

2. Label with contract number and title and RSN.

3. Measurement Units: US Customary Units.

C. Drawings:

1. Minimum Identification in Title Block:

a. Contract number and title.

b. Contractor’s or supplier’s title and drawing number.

c. Date.

01 33 00 - 2

2. Reserve 3 by 3-inch space next to title block for review stamps.

3. Print Size: D size (22 inches by 34 inches).

4. Draw to scale using computer drafting or drafting equipment, unless otherwise specified:

a. Computer drafted drawings:

1) In accordance with NIBS NCS.

2) Electronic file format: Compatible with AutoCAD, Version 2013 or later.

3) Compile using “eTransmit” utility in AutoCAD.

b. Drawing prepared with drafting equipment, when allowed: Lettering shall be neat.

5. Drawings Designated as “Government Format” in Specifications:

a. Computer drafted.

b. Government will provide electronic AutoCAD format template.

c. Title block and sheet format:

1) As shown on standard drawing 40-D-7102.

2) Government will supply template.

3) Government will supply specific title block information to be used.

6. Final Drawings:

a. Computer drafted.

b. Government will supply electronic AutoCAD format template.

c. Show as-built changes, including revision dates, made during installation.

Indicate changes by clouding.

7. Electronic Files: On CD or DVD discs.

D. Samples Submittals:

1. Label with complete manufacturer's product and color identification.

2. Include type and quantity of materials specified in the referenced section in each “set” of samples.

3. Samples: Representative of product to be installed.

4. Label each sample, sample kit with contract number and title.

01 33 00 - 3

E. Product Data:

1. Mark manufacturer's data for commercial products or equipment, such as catalog cut sheets.

a. Identify manufacturer's name, type, model, size, and characteristics.

b. Illustrate that product or equipment meets requirements of specifications.

c. Mark items to be furnished in a manner that will photocopy. Note: Yellow highlighter can be used with color copies.

d. Strike through items that do not apply.

F. Certifications:

1. Certifications by a registered professional: Signed and sealed by registered professional.

2. Manufacturer’s certifications: Signed by authorized representative of manufacturer.

1.05 SUBMITTALS PROCEDURES

A. Submit only checked submittals. Submittals without evidence of Contractor's approval will be returned for resubmission.

B. Submit complete sets of required materials for each RSN as specified in “Submittals Required” column in Table 01 33 00A - List of Submittals. A complete set includes all listed items for RSNs with multiple parts.

C. Submit sets specified in “Sets to be sent:” columns in Table 01 33 00A - List of Submittals.

1. Electronic Submittals:

a. In Portable Document Format (.pdf).

b. Include RSN transmittal letter.

c. Do not include Personally Identifiable Information (PII) in electronic submittals.

d. Submittal method (size based):

1) Government can receive e-mails up to 10 MB. Receipt of e-mails exceeding 10 MB (extra-large) may be possible. E-mailing of extra-large electronic submittals may occur only after size limit for transmittal of extra-large e-mail has been verified.

2) Electronic media for submittals too large to e-mail: CD or DVD.

D. Include the following information in transmittal letters:

1. Contract Number and Title:

Submittals 01 33 00 - 4

2. RSN for each attached submittal.

3. Responsible code.

4. Number of sets for each RSN.

5. Identify submittal as initial or resubmittal.

E. Resubmittal of Submittals Not Approved:

1. Mark changes such that they are readily identifiable and show revision date.

2. Describe reasons for significant changes in transmittal letter.

3. Resubmit returned submittals within 7 days after receiving comments, unless otherwise directed.

4. Requirements for initial submittals apply to resubmittals.

F. Submit each RSN under a separate transmittal letter. Multiple RSNs submitted under a single letter will be returned for resubmittal.

1.06 REVIEW OF SUBMITTALS

A. Time Required:

1. Submittal review will require 21 days for review of each submittal or resubmittal, unless otherwise specified.

2. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received and extends through return mailing postmark date.

B. Time in Excess of Specified:

1. CO may extend contract completion date to allow additional time for completing work affected by excess review time.

a. Time extension will be to extent that excess review time caused delay to contract completion date.

b. Time extension will not exceed time used in excess of specified number of days for review of submittals or resubmittals.

c. Concurrent days of excess review time resulting from review of 2 or more separate submittals or resubmittals will be counted only once in extending contract completion date.

2. No time extension will be allowed if Contractor fails to make complete action submittals in sequence and within time periods specified.

3. Adjustment for delay will be made only to extent that:

a. Approval was required under contract,

b. Requests for approval were properly and timely submitted and were approved.

01 33 00 - 5

4. Adjustment will be subject to terms of paragraphs (b) and (c) of the clause at FAR 52.242-14, Suspension of Work; however, no such delay shall be deemed to be a “suspension order” as the term is used in that clause.

C. Submittal Response:

1. Response letter will indicate whether submittal is approved, approved subject to identified changes, or not approved.

a. Revise and resubmit submittals not approved.

b. Do not change designs without approval of CO after drawings, documentation, and technical data have been approved.

1.07 TRANSMITTAL

A. Addresses for codes receiving paper copy submittals listed in Table 01 33 00A - List of Submittals:

1. CO: Bureau of Reclamation, Attention GP-5000, P.O. Box 36900, Billings, MT 59107-6900. Physical address: 2021 4th Avenue North, Billings, MT 59101.

2. COR: Bureau of Reclamation, Attention DK-4100, P.O. Box 1017, Bismarck, ND 58502. Physical address: 304 E. Broadway Avenue, Bismarck, ND 5850.

E-mail address for electronic submittals listed in Table 01 33 00A - List of Submittals: sjacobson@usbr.gov.

3. Submit electronic submittals that are too large for e-mail along with paper copy.

B. Submittals required by specifications, but not listed in Table 01 33 00A - List of Submittals:

1. Submit in accordance with this section.

2. Submit to COR unless otherwise specified.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Submittals 01 33 00 - 6

Table 01 33 00A - List of Submittals ** CO indicates Contracting Officer, COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required Due date or delivery time

Respon-sible code

Sets to be sent: **

CO COR

1 Schedules for Construction Contracts (52.236-15)

Practicable Schedule:

Blackline Prints

Within 7 days after work commences on the contract or another period of time as determined by the CO

CO 1 paper 2 paper

2 Schedules for Construction Contracts (52.236-15)

Annotated Schedule Showing Actual Progress:

Blackline Prints

As directed by the

CO

CO 1 2 paper

3 Schedules for Construction Contracts (52.236-15)

Supplementary Schedule Or Schedules:

Blackline Prints

As deemed necessary by the CO

CO 1 2 paper

4 Performance and Payment Bonds - Construction 52.228-15

Performance and Payment Bonds

Within 10 calendar days after award

CO 1 paper 0

5 Insurance-Work on a Government Installation 1452.228-70

1) Written certification that the required insurance has been obtained

2) Current certification of insurance for each subcontractor

Before commencing onsite work

CO 1 paper

1 paper

6 Liability Insurance 1452.228-70

Acceptable Certificate of Liability Insurance

Prior to commencement of work under the contract

CO 1 paper 0

7 Equal Opportunity 52.222-26

Information required by Executive Order

112246 (SF-100)

Within 30 days following award

CO 1 paper 0

8 Reporting Executive Compensation and First Tier Subcontract Awards 52.204-10

Certification that executive compensation and subcontract awards were reported

Within 10 days of each report being submitted

CO 1 paper 0

9 Release of Claims 1452.204-70

Release of Claims (DI-137) against the Government

After completion of the work and prior to final payment

CO 1 paper 0

Submittals 01 33 00 - 7

Table 01 33 00A - List of Submittals ** CO indicates Contracting Officer, COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required Due date or delivery time

Respon-sible code

Sets to be sent: **

CO COR

10 Labor Standards Data 52.222-11

1) List of subcontractors

2) Statement and acknowledgement Form (SF-1413) for each subcontract

Within 14 days after award of contract

COR 1 paper

1 paper

1 paper + 1 electronic

1 paper + 1 electronic

11 Payrolls and Basic Records 52.222-08

Copies of all payrolls Weekly for each week of contract performance

COR 1 paper 2 paper

12 Site Security

WBR 1452.237-80

List of contractor and subcontractor employees

At least 10 days prior to arriving at worksite

COR 0 2 paper

13 Site Security

WBR 1452.237-80

List of vehicles and equipment to be brought onsite

At least 10 days prior to arriving at worksite

COR 0 2 paper

01 14 10-1 Use of Site Land Use and Land/Landscape Rehabilitation Plan

At least 28 days before starting onsite work

COR 0 1 paper + 1 electronic

01 14 30-1 Interruption of Service Interruption of Service Request

At least 10 days before interruption

COR 0 1 paper + 1 electronic

01 35 10-1 Safety Data Sheets Complete LHM and

SDS

At least 14 days before delivery

COR 0 1 paper + 1 electronic

01 35 10-2 Safety Data Sheets Updated LHM and

SDS

At least 14 days before delivery

COR 0 1 paper + 1 electronic

01 35 20-1 Safety and Health Safety Program Submitted and accepted before commencing onsite work. See section 3 of RSHS

COR 0 1 paper + 1 electronic

01 35 20-2 Safety and Health Monthly Accident Summary Report

Monthly COR 0 1 paper + 1 electronic

01 35 20-3 Safety and Health Respirator User Documentation

Prior to starting onsite work

COR 0 1 paper + 1 electronic

01 35 20-4 Safety and Health Crane Operation Certificates

At least 28 days before starting onsite work

COR 0 1 paper + 1 electronic

01 35 20-5 Safety and Health Other Training Certificates

At least 28 days before starting onsite work

COR 0 1 paper + 1 electronic

01 35 30-1 Contractor’s Onsite Safety Personnel

Qualifications At least 28 days before starting onsite work

COR 0 1 paper + 1 electronic

Submittals 01 33 00 - 8

Table 01 33 00A - List of Submittals ** CO indicates Contracting Officer, COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required Due date or delivery time

Respon-sible code

Sets to be sent: **

CO COR

01 35 30-2 Contractor’s Onsite Safety Personnel

CIH Inspection Reports

Within 7 days of inspection

COR 0 1 paper + 1 electronic

01 35 30-3 Contractor’s Onsite Safety Personnel

Safety Inspection Reports

Weekly COR 0 1 paper + 1 electronic

01 46 00-1 Quality Procedures Quality Control Plan At least 28 days before starting onsite work

COR 0 1 paper + 1 electronic

01 56 10-1 Protection of Existing Installations

Plan for Protecting Existing Installations

At least 28 days before starting onsite work

COR 0 1 paper + 1 electronic

01 57 35-1 Oil Transfer and Spill Prevention

Oil Transfer and Spill Prevention Plan

At least 28 days before starting onsite work

COR 0 1 paper + 1 electronic

01 74 00-1 Cleaning and Waste Management

Waste Production and Disposal Plan

At least 28 days before starting onsite work

COR 0 1 paper + 1 electronic

01 74 00-2 Cleaning and Waste Management

Waste Production and Disposal Records

Within 7 days of waste disposal

COR 0 1 paper + 1 electronic

01 78 30-1 Project Record Documents

Final As-built Drawings

Within 14 days of completion of work

COR 0 2 paper + 1 electronic

02 41 07-1 Removal and Disposal of Existing Features

Removal and Disposal of Existing Features Plan

At least 28 days before beginning onsite work

COR 0 1 paper + 1 electronic

02 41 19-1 Selective Electrical Demolition

Removal Plan and Procedures

At least 28 days before beginning onsite work

COR 0 1 paper + 1 electronic

02 80 10-1 General Requirements for Hazardous Materials

Resumes and Qualifications

At least 28 days before starting onsite work

COR 0 1 paper + 1 electronic

02 80 10-2 General Requirements for Hazardous Materials

Worker Protection Plan

Submitted and accepted before commencing onsite work. See section 3 of RSHS

COR 0 1 paper + 1 electronic

02 80 10-3 General Requirements for Hazardous Materials

Exposure Certifications

At least 28 days before starting onsite work

COR 0 1 paper + 1 electronic

02 80 10-4 General Requirements for Hazardous Materials

Pre-construction Test Results

Within 2 days of completing test

COR 0 1 paper + 1 electronic

02 80 10-5 General Requirements for Hazardous Materials

Working Level Test Results

Within 2 days of completing test

01 33 00 - 9

Table 01 33 00A - List of Submittals ** CO indicates Contracting Officer, COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required Due date or delivery time

Respon-sible code

Sets to be sent: **

CO COR

02 80 10-6 General Requirements for Hazardous Materials

Post-construction Test Results

Within 2 days of completing test

COR 0 1 paper + 1 electronic

02 80 10-7 General Requirements for Hazardous Materials

Air Clearance Test Results

Within 2 days of completing test

COR 0 1 paper + 1 electronic

02 82 20-1 Removal and Disposal of Asbestos Containing Materials

Asbestos Contractor’s History

At least 28 days before beginning onsite work

COR 0 1 paper + 1 electronic

02 82 20-2 Removal and Disposal of Asbestos Containing Materials

Certificates, Qualifications, and Resumes

At least 28 days before beginning onsite work

COR 0 1 paper + 1 electronic

02 82 20-3 Removal and Disposal of Asbestos Containing Materials

Asbestos Hazard Abatement Plan

At least 28 days before beginning onsite work

COR 0 1 paper + 1 electronic

02 82 20-4 Removal and Disposal of Asbestos Containing Materials

Notice of Asbestos Abatement

Within 7 days of filing with State agency.

COR 0 1 paper + 1 electronic

02 82 20-5 Removal and Disposal of Asbestos Containing Materials

Certificate of Disposal

Within 10 days of receiving from Disposal Facility.

COR 0 1 paper + 1 electronic

02 83 35-1 Removal and Disposal of Coatings and Equipment with Coatings Containing Regulated Metals

Qualifications At least 28 days before beginning removal and disposal of coatings and equipment with coatings

COR 0 1 paper + 1 electronic

02 83 35-2 Removal and Disposal of Coatings and Equipment with Coatings Containing Regulated Metals

Removed Coatings Debris Abatement Plan

At least 28 days before beginning removal and disposal of coatings and equipment with coatings

COR 0 1 paper + 1 electronic

02 83 35-3 Removal and Disposal of Coatings and Equipment with Coatings Containing Regulated Metals

Waste Characterization, Handling, and Disposal Plan

At least 28 days before beginning removal and disposal of coatings and equipment with coatings

COR 0 1 paper + 1 electronic

02 83 35-4 Removal and Disposal of Coatings and Equipment with Coatings Containing Regulated Metals

Certificates and Reports

Within 2 days of completing test results

COR 0 1 paper + 1 electronic

02 87 20-1 Removal and Disposal of Used Oil

Qualifications At least 28 days before beginning removal and disposal of used oil

01 33 00 - 10

Table 01 33 00A - List of Submittals ** CO indicates Contracting Officer, COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required Due date or delivery time

Respon-sible code

Sets to be sent: **

CO COR

02 87 20-2 Removal and Disposal of Used Oil

Used Oil Characterization, Handling, and Disposal Plan

At least 28 days before beginning removal and disposal of used oil

COR 0 1 paper + 1 electronic

02 87 20-3 Removal and Disposal of Used Oil

Characterization Report

Within 7 days of completing test results

COR 0 1 paper + 1 electronic

02 87 20-4 Removal and Disposal of Used Oil

Shipping Manifest Within 7 days of receiving from Disposal Facility

COR 0 1 paper + 1 electronic

02 87 20-5 Removal and Disposal of Used Oil

Disposal Certificates Within 7 days of receiving from Disposal Facility

COR 0 1 paper + 1 electronic

03 62 20-1 Nonshrink Grout For Equipment and Metalwork

Approval Data At least 28 days before beginning onsite work

COR 0 1 paper + 1 electronic

03 62 20-2 Nonshrink Grout For Equipment and Metalwork

Instructions At least 28 days before beginning onsite work

COR 0 1 paper + 1

05 50 00-1 Metal Fabrications

Approval Drawings and Product Data (Government Format)

At least 56 days before beginning onsite work

COR 0 1 paper + 1 electronic

05 50 00-2 Metal Fabrications Final Approval Drawings and Product Data (Government Format)

At least 28 days before beginning onsite work

COR 0 1 paper + 1 electronic

05 52 20-1 Fall Restraint Cable System

Approval Drawings and Data

At least 28 days before beginning onsite work

COR 0 1 paper + 1 electronic

05 52 20-2 Fall Restraint Cable System

Instructions At least 28 days before beginning onsite work

COR 0 1 paper + 1 electronic

05 52 20-3 Fall Restraint Cable System

Operation and Maintenance Manual

At least 28 days before beginning onsite work

COR 0 1 paper + 1 electronic

09 96 20-1 Coatings Approval Data At least 28 days before beginning application

COR 0 1 paper + 1 electronic

09 96 20-2 Coatings Final Approval Data At least 28 days before beginning application

COR 0 1 paper + 1 electronic

09 96 20-3 Coatings Paint Chip Samples At least 28 days before beginning application

COR 0 3

01 33 00 - 11

Table 01 33 00A - List of Submittals ** CO indicates Contracting Officer, COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required Due date or delivery time

Respon-sible code

Sets to be sent: **

CO COR

09 96 20-4 Coatings Qualifications At least 28 days before beginning application

COR 0 1 paper + 1 electronic

09 96 20-5 Coatings Contractor Quality Testing Report

Daily COR 0 1 paper + 1 electronic

26 05 19-1 Low-Voltage Power Conductors and Cables

Product Data At least 42 days before beginning installation

COR 0 1 paper + 1 electronic

26 05 19-2 Low-Voltage Power Conductors and Cables

Field Test Reports Within 7 days of completion of tests

COR 0 1 paper + 1 electronic

26 05 33-1 Raceways and Boxes for Electrical Systems

Product Data At least 42 days before beginning installation

COR 0 1 paper + 1 electronic

26 27 26-1 Wiring Devices Approval Data At least 42 days before beginning installation

COR 0 1 paper + 1 electronic

26 51 19-1 LED Interior Lighting Approval Data At least 42 days before beginning installation

COR 0 1 paper + 1 electronic

28 46 10-1 Detection and Initiation Approval Data At least 42 days before beginning installation

COR 0 1 paper + 1

28 46 10-2 Detection and Initiation

Test Plan and Notification

At least 28 days before testing

COR 0 1 paper + 1

28 46 10-3 Detection and Initiation

Test Reports Within 7 days of completion of tests

COR 0 1 paper + 1 electronic

35 21 23-1 Hydraulic Piping Modifications

Hydraulic Piping Modifications Approval Drawings and Data

At least 28 days before fabrication or procurement

COR 0 1 paper + 1 electronic

35 21 23-2 Hydraulic Piping Modifications

Hydraulic Piping Modifications Final Data

Within 14 days after completing installation

COR 0 1 paper + 1

01 33 00 - 12

Safety Data Sheets 01 35 10 - 1

SECT…

This is the start of the file's text. The full file is on GovTribe.

Other files for this federal contract opportunity

Other files attached to DK-SNAKE CREEK PUMPING PLANT STRUCTURAL SAFETY MODIFICATION, newest first.
File Type Posted
R17PS01153_Amend_2.pdf PDF
Amendment No. 1 .pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file