12_Attach_J-7_Subk___Worksheet.pdf

PDF 71 KB Posted

Attached to
Station Service Unit Transformer Replacements at Blue Mesa Federal contract opportunity
Solicitation number
R16PS01494
Issued by
Department of the Interior Bureau of Reclamation

About this file

Attach J-7 Subk Worksheet

View the file

Other files for this federal contract opportunity

Other files attached to Station Service Unit Transformer Replacements at Blue Mesa, newest first.
File Type Posted
12_SF_30_Amend_2_Station_Serv_Transformer_11.8.pdf PDF
12_Attach_J-1_SOW_Amendment_2.pdf PDF
Site_Visit_Attendance_List_StationServ_Transformer.pdf PDF
12_Attach_J-2_Drawings_Amendment_2.pdf PDF
12_SF_30_Amend_1_Station_Serv_Transformer_10.25.pdf PDF
12_Attach_J-5_Performance_Bond.pdf PDF
12_Attach_J-6_Payment_Bond.pdf PDF
12_Attach_J-2_Drawings.pdf PDF
12_Attach_J-1_SOW.pdf PDF
12_Clauses_Station_Servive_Transform.pdf PDF
12_SF_1442_R16PS01494_Solicitation_w_Clauses.pdf PDF
12_Attach_J-4_Bid_Bond.pdf PDF
12_Attach_J-3_Wage_Determination.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior Subcontractors Worksheet Bureau of Reclamation

Station Service Unit Transformer Replacements Solicitation No. R16PS01494

Subcontractors Worksheet

Attachment J-7

Blue Mesa Power Plant Colorado River Storage Project, Colorado

Z:\Hays\Station Service Transformer Replacement BM\Solicitation\12_Attach J‐5 Subk % Worksheet.docx

DIAPR 2011‐06 3/17/2011

U.S. Department of the Interior FAR Clauses 52.219-14, Limitations of Subcontracting

Subcontracting Percentage Worksheet for Non-Commercial Negotiated Acquisitions Requiring Cost Proposals

Note to Offeror: Complete one form for each subcontractor which is included in your Technical and Cost Proposal. This form is for small businesses only who are required to meet the goals setforth under FAR Clause 52.219-14, Limitations of Subcontracting.

PRIME CONTRACTOR: ____________________ SOURCE: ________________

SUBCONTRACTOR: _______________________ SOURCE: ________________

PRIME CONTRACTOR SUBCONTRACTOR

DIRECT LABOR $ $

FRINGE BENEFITS* $ $

SUB TOTAL (A) $ (B) $

LABOR G&A**@______% $ $

TOTAL LABOR COSTS (C) $ (D) $

To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).

Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).

Calculate the subcontractor’s LABOR G&A by multiplying the subcontractor’s G&A rate by the subcontractor’s SUBTOTAL in figure (B).

Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at

(C) and (D) respectively.

Next, using the formula below, calculate the subcontracting labor percentage.

(D)

(C) + (D)

SUBCONTRACTING LABOR COST PERCENTAGE = __________________%

* The firm must demonstrate that their labor overhead is allowable in accordance with FAR 31.205- 6(m).

Failure to do so will cause the entire overhead to be eliminated from the calculations.

** G&A denotes General and Administrative Costs

*** You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor’s costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor’s costs.

File details come from the government source that posted it. Updated .