About this file
Attach J-7 Subk Worksheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12_SF_30_Amend_2_Station_Serv_Transformer_11.8.pdf | ||
| 12_Attach_J-1_SOW_Amendment_2.pdf | ||
| Site_Visit_Attendance_List_StationServ_Transformer.pdf | ||
| 12_Attach_J-2_Drawings_Amendment_2.pdf | ||
| 12_SF_30_Amend_1_Station_Serv_Transformer_10.25.pdf | ||
| 12_Attach_J-5_Performance_Bond.pdf | ||
| 12_Attach_J-6_Payment_Bond.pdf | ||
| 12_Attach_J-2_Drawings.pdf | ||
| 12_Attach_J-1_SOW.pdf | ||
| 12_Clauses_Station_Servive_Transform.pdf | ||
| 12_SF_1442_R16PS01494_Solicitation_w_Clauses.pdf | ||
| 12_Attach_J-4_Bid_Bond.pdf | ||
| 12_Attach_J-3_Wage_Determination.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of the Interior Subcontractors Worksheet Bureau of Reclamation
Station Service Unit Transformer Replacements Solicitation No. R16PS01494
Subcontractors Worksheet
Attachment J-7
Blue Mesa Power Plant Colorado River Storage Project, Colorado
Z:\Hays\Station Service Transformer Replacement BM\Solicitation\12_Attach J‐5 Subk % Worksheet.docx
DIAPR 2011‐06 3/17/2011
U.S. Department of the Interior FAR Clauses 52.219-14, Limitations of Subcontracting
Subcontracting Percentage Worksheet for Non-Commercial Negotiated Acquisitions Requiring Cost Proposals
Note to Offeror: Complete one form for each subcontractor which is included in your Technical and Cost Proposal. This form is for small businesses only who are required to meet the goals setforth under FAR Clause 52.219-14, Limitations of Subcontracting.
PRIME CONTRACTOR: ____________________ SOURCE: ________________
SUBCONTRACTOR: _______________________ SOURCE: ________________
PRIME CONTRACTOR SUBCONTRACTOR
DIRECT LABOR $ $
FRINGE BENEFITS* $ $
SUB TOTAL (A) $ (B) $
LABOR G&A**@______% $ $
TOTAL LABOR COSTS (C) $ (D) $
To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).
Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).
Calculate the subcontractor’s LABOR G&A by multiplying the subcontractor’s G&A rate by the subcontractor’s SUBTOTAL in figure (B).
Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at
(C) and (D) respectively.
Next, using the formula below, calculate the subcontracting labor percentage.
(D)
(C) + (D)
SUBCONTRACTING LABOR COST PERCENTAGE = __________________%
* The firm must demonstrate that their labor overhead is allowable in accordance with FAR 31.205- 6(m).
Failure to do so will cause the entire overhead to be eliminated from the calculations.
** G&A denotes General and Administrative Costs
*** You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor’s costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor’s costs.
File details come from the government source that posted it. Updated .