Amendment_No._0001_Package.pdf
PDF 227 KB Posted
- Attached to
- 242 Project - Pipeline Material for the Yuma Area Office Federal contract opportunity
- Solicitation number
- R16PS00836
About this file
Amendment No. 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0003.pdf | ||
| Amendment_0002_Package.pdf | ||
| IFB_R16PS00838_Package_FINAL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
R16PS00836
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Yuma AZ 85364
R34
7301 Calle Agua Salada Yuma Area Office Lower Colorado Region Bureau of Reclamation
07/07/2016000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/07/2016
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
INVITATION FOR BIDS
Title: 242 Project -Pipeline Material for the Yuma Area Office
Purpose of Amendment: This amendment is to make (1) Revision to the Solicitation; (2)
Revise the Specifications; 3) address questions received; and (4) extend the date of receipt of bids.
Receipt of Bids: The date for receipt of bids is hereby extended from July 21, 2016 to
July 26, 2016, at 17:00 p.m (E.T.). The place for receipt of bids remains the Bureau of
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Meagan R. Fyffe
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
R16PS00836/000001
Reclamation, Yuma Area Office, 7301 Calle Agua Salada, Yuma, AZ 85364.
Acknowledgement: See block 11 above regarding how to acknowledge this amendment. The acknowledgement must be received at the place designated for receipt of bids, see Block 9 of the Solicitation/Contract/Order for Commercial Items. (Standard Form 1449).
Bid Modification: See block 11 above if you have submitted your bid and now desire to modify it or withdraw it.
Description of Modification:
Paragraph B.5 - Bid Price Breakdown is revised to make changes to the requirements, Line Item 40 is revised to change the quantity; Line Item 50 is revised to add additional information to the description; and Line Items 60 - 90 are added to the Bid Price Breakdown for additional fittings.
Header of Attachment 1 (Specifications) Document No. is Corrected from R16PS00834 to R16PS00836 Part 5 - Execution of the Specifications is revised.
Instructions:
Remove page B-3 and B-4 of Solicitation and replace with revised page(s) B-3 and B-4
Remove Attachment 1 (Specifications) Pages 1- 5 and Replace with Revised Attachment 1
(Specifications) Pages 1 -5.
Changes are marked with a Dark Horizontal Black Line.
Period of Performance: 09/01/2016 to 05/31/2017
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Part B – Continuation of Blocks from SF-1449 Amendment No. 0001
Solicitation
R16PS00836
Document Title:
242 Project - Pipeline Material for Groundwater Conveyance
B- 3 price. Rounding up or down is not permitted. If a price entered in the "Amount" column has been rounded, the Contracting Officer will correct such amount, pursuant to the bid preparation provision(s) in Section L for the purposes of determining the apparent low bidder, and any such corrections will appear on the contract award document.
Price Bid Breakdown
19.
Item No.
20. Schedule of Supplies/Services
21. Estimated Quantity
22. Unit 23. Unit Price 24. Amount
10 48" DR 17 HDPE Pipe per attached specifications
Mfg:
65,879 LF
20 42" DR 26 HDPE Pipe per attached specifications
Mfg:
24,373 LF
30 16" DR 17 HDPE Pipe per attached specifications
Mfg:
10,000 LF
40 48” x 48” HDPE Tee (DR 15.5) with 3 flange adapters and 316L SS backer rings
Mfg:
3 EA
50 McElroy Mega MC Poly Horse, 220V – 240V, 50/60 Hz, 3PH, Model 4834001 or equal
1 EA
60 42” x 42” HDPE Equal Tee (DR
21) with 3 flange adapters and 316L SS backer rings
2 EA
70 42” HDPE Flange adapters (DR
21) with 316L SS backer rings
2 EA
80 48” x 48” x 12” Tee (DR 15.5) with 1 12” flange adapter and 316L SS backer rings
1 EA
Total
Part B – Continuation of Blocks from SF-1449 Amendment No. 0001
Solicitation
R16PS00836
Document Title:
242 Project - Pipeline Material for Groundwater Conveyance
B- 4
This Page Intentionally Left Blank
ATTACHMENT 1 –
Specifications Amendment No. 0001
Document No.R16PS00836
Document Title
Pipeline Materials - Yuma Area Office Groundwater Conveyances
Specifications Pipeline Materials - Yuma Area Office Groundwater Conveyance Supplies
PART 1 – GENERAL INFORMATION
A. Background
The Bureau of Reclamation (Reclamation) is responsible for mitigating high groundwater in the Yuma area. High groundwater levels can adversely impact farming and one of the Yuma Area Office’s missions is to operate four well fields consisting of 100 high-production wells. The groundwater program ensures that the water table is kept at a level that is low enough to safely support agricultural production. Pumped groundwater is returned to the Colorado River and included in water deliveries to Mexico, thereby preserving a like amount of water in Lake Mead. Currently about 20 percent of water deliveries to Mexico are groundwater pumped from the Yuma area. Additionally, some of Reclamation’s conveyances are unlined and many conveyances cross roadways.
The purpose of this requisition is to obtain basic pipeline materials required to improve conveyance structures, to create or replace culverts and siphons at roadway crossings, and to replace earthen canals with pipelines. These activities are intended to conserve Colorado River water by reducing releases from upstream reservoirs.
PART 2 - OBJECTIVE
Under the existing water treaty of 1944 between the U.S. Government and the Republic of Mexico the United States is required to deliver 1.5 million acre-feet of water annually to Mexico. Most of this water is delivered at Morelos Dam at the terminus of the Colorado River. Minute 242 of the Treaty stipulates that approximately 140,000 acre-feet of Mexico’s annual apportionment is to be delivered to Mexico at the land boundary near San Luis, Mexico. Yuma area groundwater operations are critical to meeting these delivery goals and to the overall water delivery mission of the organization. The practice of blending Colorado River water and local groundwater allows for the retention of precious resources in upstream reservoirs but requires significant maintenance of aged groundwater infrastructure.
Recognizing the need conserve water in the Colorado River system due to the current and historic drought conditions, the Yuma Area office is purchasing conveyance pipe to upgrade aged infrastructure and to replace earthen canals with underground pipelines. The purchase of materials in this PR will allow for increased efficiency of groundwater evacuation and conveyance and will contribute significantly to water conservation goals.
PART 3 – REQUIREMENT
A. Materials
High Density Polyethylene (HDPE) and Polyvinyl Chloride (PVC) Pressure Pipe Shall meet the following:
1.01 REFERENCE STANDARDS
A. ASTM International (ASTM)
1. ASTM D 3350-12 Polyethylene Plastics Pipe and Fittings Materials
2. ASTM D 3350-12 Standard Specification for Polyethylene Plastic Pipe and Fittings Material – Cell Classification for PE4710 material: 445474C
3. ASTM F714-13 Standard Specification for Polyethylene (PE) Plastic Pipe (DR- PR) Based on Outside Diameter
Amendment No. 0001
Document No.R16PS00836
Document Title
Pipeline Materials - Yuma Area Office Groundwater Conveyances
4. ASTM D 3261-12 Standard Specification for Butt Heat Fusion PE Plastic Fittings for Polyethylene Plastic Pipe and Tubing
B. American Water Works Association (AWWA)
1. AWWA C906-07 Polyethylene (PE) Pressure Pipe and Fittings, 4 in. (100mm)
Through 63 in. (1,575 mm), For Water Distribution and Transmission
2. AWWA C906-15 Polyethylene (PE) Pressure Pipe and Fittings, 4 in. through 65 in., for Waterworks
3. AWWA C228-14 Stainless Steel Pipe Flange Joints for Water Service – Sizes 2” – 72”
PART 2 PRODUCTS
2.01 PIPE
A. HDPE Pressure Pipe: AWWA C 906, except;
1. PE material:
a. Standard PE code designation: PE 4710, ASTM F714.
b. Minimum cell Classification, ASTM D3350: PE 445574C.
2. The HDPE pipe dimension ratios (DR) are based on AWWA Iron Pipe Sizing (IPS) sizes for diameters.
3. Each production lot of pipe shall be tested for melt index, density, percent carbon, dimensions and ring tensile strength.
B. HDPE Pipe Fittings: AWWA C 906, except;
PE material:
Standard PE code designation: PE 4710, ASTM F714.
Minimum cell Classification, ASTM D3350: PE 445574C.
The HDPE pipe dimension ratios (DR) are based on AWWA Iron Pipe Sizing (IPS) sizes for diameters.
Each production lot of pipe fittings shall be tested for melt index, density, percent carbon, dimensions, and ring tensile strength.
Stainless Steel for backer rings and blind flanges shall be 316L
Fitting supplier shall submit shop drawings for all required fittings for review and approval prior to fabrication of any fitting
Supplier of the pipe fittings shall have a minimum of 5 years of previous experience in the fabrication of HDPE pipe fittings of similar diameter and DR.
Amendment No. 0001
Document No.R16PS00836
Document Title
Pipeline Materials - Yuma Area Office Groundwater Conveyances
2.02 Pipe Handling System
1. Provide 20”-48” pipe-handling system to match HDPE with wall thickness specified by DR rating, in accordance to manufacturer’s weight limit on system. Must include all appurtenances to complete loading and feeding operations including but not limited to all required master inserts and inserts needed for 48” and 42” OD pipe with pins and pipe stand.
Part 4 CONTRACTOR RESPONSIBILITIES
The Contractor shall exercise management and operational control and retain full responsibility for delivery and quality of the materials set forth in the Statement of Work.
1. The Contractor shall be responsible for submitting certification that the material provided for this project meets or exceeds the requirements as established under the materials section of this document.
2. The Contractor is responsible for adhering to all applicable rules, regulations, and laws relating to safety and health, including environmental quality control (i.e., dust control, hazardous materials, etc.). This applies to all aspects of the Contractor’s operations.
The Contractor shall not require any employee to work in surroundings or working conditions that are unsanitary, hazardous, or dangerous to health and safety. The Contractor shall furnish or require personal safety apparel and equipment needed for the specified work and as required by the Department of Labor and Health Regulations (OSHA) as published in 29 CFR and in compliance with the Bureau of Reclamation’s “Reclamation Safety and Health Standards”.
The Contractor shall comply with Reclamation’s “Reclamation Safety and Health Standards” and OSHA’s safety regulations. Such responsibilities shall apply to the Contractor’s operations as well as any subcontractor operations. The Contractor shall immediately correct any safety or health violations.
3. The Contractor shall comply with all Federal, State, and local laws when hauling materials to the delivery site. The hauling of materials over public highways, roads, or bridges shall be in compliance with applicable local regulations and shall be such as to minimize interference with or congestion of local traffic. The Contractor shall provide all necessary precautions for the safety of the public.
4. During the performance of work, the Contractor shall comply with applicable Federal, State, and local laws and regulations, with applicable requirements from the “Reclamation Safety and Health Standards” and as outlined in this item regarding the prevention, control, and abatement of dust pollution. Should a conflict exist in the requirements for dust abatement, the most stringent requirement shall apply.
The Contractor shall provide all the labor, equipment, and materials required to prevent dust nuisance or damage to persons, property, or activities including but not limited to recreational activities, traffic, and similar conditions.
5. The Contractor shall clean up and dispose of all waste materials and rubbish. The waste materials and rubbish shall be disposed of in accordance with applicable Federal, State, and local laws and regulations and in accordance with applicable requirements of the “Reclamation Safety and Health Standards”. Should there be a conflict in the requirements
Amendment No. 0001
Document No.R16PS00836
Document Title
Pipeline Materials - Yuma Area Office Groundwater Conveyances for cleanup and disposal of waste materials, the most stringent requirement shall apply. The Government will inspect the delivery site for adherence to required cleanup regulations.
Materials or wastes defined as hazardous by 40 CFR 261.3 and Federal Standard 313, as amended; or by other Federal, State, and local laws and regulations and used by the Contractor shall be disposed of in accordance with the applicable Federal, State, and local laws and regulations. Waste materials known or found to be hazardous shall be disposed of in an approved treatment or disposal facility. Hazardous wastes shall be recycled whenever possible. A copy of all hazardous waste manifests shall be submitted to the Contracting Officer for record purposes.
6. Testing: The contractor shall perform the following testing on HDPE pipe:
1. General: AWWA C906 testing of HDPE pipe.
a. Completed and documented by qualified personnel.
b. Government reserves right to observe testing while in process and to receive testing documentation.
c. Government reserves right to inspect materials both during and after manufacture.
d. Testing reports shall have unique identifiers with shipping bills to verify that pieces shipped belong to same as those tested.
2. Test in accordance with AWWA C906 and/or ASTM F714.
a. Perform 1 butt fusion in accordance with ASTM F2620 and PPI Technical Report TR-33 on each run of pipe.
1) Test using Tensile Impact Test in accordance with ASTM F2634 prior to shipping pipe.
b. Joints exhibiting yield point lower than unfused pipe or that fails in a brittle mode is considered unacceptable.
c. Unacceptable test result, Government may reject pipe manufactured in same run and from same batch of material feedstock represented by unacceptable test. Manufacturer may, at own expense, supply additional testing to COR.
d. Acceptable test results do not:
1) Mean that pipe from pipe run or material feedstock batch will be acceptable.
2) Relieve pipe manufacturer or supplier from liability for defects in material or workmanship of pipe discovered during installation or warrantee period.
3. HDPE pipe out-of-roundness tolerances shall not exceed maximum allowances in ASTM D2513, Table 2.a. HDPE pipe ovality: plus or minus 4 percent at pipe manufacturing facility.
PART 5 - EXECUTION
All materials ordered under this requirement shall be delivered to:
Bureau of Reclamation - Yuma Area Office Attn: COR/Water Systems Engineering Group Manager 7301 Calle Agua Salada Yuma, AZ 85364
Amendment No. 0001
Document No.R16PS00836
Document Title
Pipeline Materials - Yuma Area Office Groundwater Conveyances
Specific frequencies and locations of deliveries may vary, but will only be within a 40 mile radius and will be determined at time of award.
Support and store pipe above ground surface.
The contractor shall be responsible to repair or replace any damaged materials upon inspection by the CO/COR at the time of delivery, if delivered by the contractor.
Initiation of pipe manufacturing needs to be scheduled to have pipe delivery beginning no later than November 2016 (can adjusted depending on actual contract award date).
Delivery of the specified pipe fittings needs to coincide with the initial deliveries of the line pipe.
PART 6 - DELIVERABLES
The Contractor shall furnish all materials as specified and perform all work required for furnishing submittals to the government, in accordance with this paragraph, Table 1A (List of Submittals) and the requirements in the provisions, clauses, and paragraphs of this Statement of Work.
The Contractor shall send all submittals to the applicable addresses listed below.
Contracting Officer’s Representative Contracting Officer Water Systems Eng. Group Mgr. Yuma Area Office, Attn: LC-10401 Yuma Area Office, Attn: YAO-2200 7301 Calle Agua Salada 7301 Calle Agua Salada Yuma AZ 85364 Yuma AZ 85364
Submittal Table - Table 1A - List of Submittals
Clause or Section Title Submittals Required
No. of sets to be sent to:*
Due Date/Delivery time **CO COR
1. Delivery Schedule 1 1 30 days prior delivery.
2. Certifications
(SOW, Part 3 Paragraph A)
Manufacturers’ certifications that pipeline materials meet specified requirements
1 4
Not less than 15 days prior to delivery of pipeline materials.
*CO indicates Contracting Officer and COR indicates Contracting Officer’s Representative.
**Submittals sent to CO shall be sent electronically.
PART 7 - MEASUREMENT AND PAYMENT
A. Measurement
1. Measurement and verification of quantities ordered/delivered shall be conducted at the time of delivery or pickup.
B. Payment
1. Payment for furnishing and delivering materials shall be made at the unit price, per unit specified in the bid schedule, for the specified materials.
THIS PAGE LEFT BLANK INTENTIONALLY
Invitation of Bids
R16PS00836
Amendment No. 0001
Questions and Answers
1. Question: Is it ok to quote 55 foot lengths for the HDPE Pipe.
Answer: Yes, 55 foot lengths for the HDPE Pipe is acceptable to the Government.
2. Question: When are the 48” tees and McElroy Equipment need to be delivered.
Answer: The items shall be delivered with the first load of pipe. Note that the Price Bid
Breakdown has been revised to add an additional line items. Page B‐3 is revised.
3. Question: The bid says period of performance 09/01/2016 to 05/30/2017, so do they need all 5 tees on 9/1/2016 or do we have longer to get produced and shipped same with the McElroy
Mega Mc Poly Horse.
Answer: Please refer to Question 2 above.
4. Question: Period of Performance: It is listed as 9/01/2016 thru 05/31/2017. Do you anticipate this project being awarded to the low responsive bidder prior to September 1st.
Answer: It is estimated to be awarded by September 1, but if award is not made by September
1, the performance period will be adjusted. The performance period is for 9 months after award.
5. Question: Page 5 of the pipe specifications state that the pipe is to be wrapped in an adequately fastened opaque covering. This is typically a requirement for PVC pipe, not HDPE pipe which is already UV resistant. Will this still remain a requirement for the HDPE pipe?
Answer: The requirement for the pipe to be wrapped and fastened is not required for the
HDPE pipe. Specifications have been revised.
6. Question: FAR 52.219‐8 and FAR 52.219‐9; Large Business subcontracting opportunities – if we are classified as Large Business and are buying materials from a pipe manufacturing partner for
“resale”, does this eliminate the need to provide a subcontracting plan? If not, should we list the manufacturers in the subcontract plan? To save money for the government, we would like to eliminate the need to subcontract but want to make sure we fully understand your project requirements.
Answer: The subcontracting plan is only required if there are subcontracting opportunities for the socio economics categories identified in C.3(b)(17). Refer to page C‐7 and C‐8.
7. If no subcontracting opportunities exist, what is the proper way to notify you?
Answer: Notification to the Contracting Officer via email before bid opening day is required.
8. On item number 40, are the 48X48 HDPE tee (DR 15.5) supposed to be fully pressure rated for DR15.5 or made out of DR15.5?
Answer: Tee needs to be made out of DR15.5.
9. Which MegaMc Pipe stands are you requesting?
Answer: Bid Price Breakdown has been revised.
Invitation of Bids
R16PS00836
Amendment No. 0001
10. Do the backing rings on the 48” Tee’s (line item 40) can they be imported or do they have to be domestic?
Answer: There is no specific or preference requirement.