Amendment_No_0003.pdf

PDF 3 MB Posted

Attached to
EC-FI PENSTOCK INTERIOR COATING REPAIR Federal contract opportunity
Solicitation number
R16PS00781
Issued by
Department of the Interior Bureau of Reclamation

About this file

Project Title Flatiron Penstock Coating Repairs. See attachments for changes incorporated by this amendment. Note Receipt of Proposals The hour and date for receipt of proposals is hereby extended to 3 00 PM on June 23 2016. No further extension will be granted.

View the file

Other files for this federal contract opportunity

Other files attached to EC-FI PENSTOCK INTERIOR COATING REPAIR, newest first.
File Type Posted
Amendment_No_0002.pdf PDF
Sol_R16PS00781_Amd_000001_(1).pdf PDF
R16PS00781_(7).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

R16PS00781

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Billings MT 59107

R60

PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation

06/10/2016000003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/04/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project Title: Flatiron Penstock Coating Repairs

See attachments for changes incorporated by this amendment

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Gerri Voto-Braun

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0003 Solicitation No. R16PS00781

Description of Changes:

1. Table of Contents – Remove Table of Contents in its entirety and substitute therefor the attached revised Table of Contents.

2. In Section C – Specifications, remove Section 01 35 22 - First Aid and Medical Services in its entirety.

3. In Section C – Specifications, remove Section 51 09 96 – Penstock Inspection Reports in its entirety and substitute therefor the attached revised Section 51 09 96.

4. In Section C - Specifications, insert the attached new Section 51 09 97 - Photographs

Receipt of Proposals: The hour and date for receipt of proposals is hereby extended to 3:00 PM on June 23, 2016. No further extension will be granted

The Pre-Proposal Site Visit Sign-in Sheet is attached to this amendment and is provided for informational purposes only.

The final contractor questions from prospective contractors and their respective answers are attached to this amendment and are provided for informational purposes only.

Flatiron Penstock Coating Repairs Flatiron Power and Pumping Plant Colorado-Big Thompson Project, Colorado Amendment No. 0003

Table of Contents - 1

TABLE OF CONTENTS

PART 1 – THE SCHEDULE

SECTION A – Solicitation, Offer, and Award Form (SF 1442)

SECTION B – Supplies or Services and Prices

SECTION C – Specification/Drawings/Maps

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 14 10 Use of Site 01 14 22 Coordination of Work with Other Contractors 01 14 30 Interruption of Service 01 33 00 Submittals 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety and Health Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 56 10 Protection of Existing Installations 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 60 00 Product Requirements 01 74 00 Cleaning and Waste Management

DIVISION 09 - COATINGS

09 96 20 Coatings

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 04 10 Removal of Water from Penstocks

DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS

51 00 00 Information Available to Offerors 51 09 96 Penstock Inspection Reports 51 09 97 Photographs

DIVISION 52 - DRAWINGS

52 00 00 Drawings

SECTION D – Not Used

Colorado-Big Thompson Project, Colorado Amendment No. 0003

Table of Contents - 2

SECTION E – Inspection and Acceptance E.1 Material and Workmanship E.2 Inspection of Construction E.3 Warranty of Construction

SECTION F – Deliveries or Performance F.1 Commencement, Prosecution, and Completion of Work F.2 Variation in Quantity

F.3 Suspension of Work

SECTION G – Contract Administration Data G.1 Authorities and Delegations

G.2 Electronic Invoicing and Payment Requirements

SECTION H – Special Contract Requirements

H.1 Site Security

PART II – CONTRACT CLAUSES

SECTION I – Contract Clauses I.1 Clauses By Reference I.2 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements I.3 Commercial and Government Entity Code Maintenance

I.4 Order of Precedence –Uniform Contract Format I.5 Minimum Wages Under Executive Order 13658 I.6 Estimate of Percentage of Recovered Material I.7 Buy American Act – Construction Materials I.8 Bid Guarantee I.9 Additional Bond Security I.10 Performance and Payment Bonds - Construction I.11 Payments Under Fixed-Price Construction Contracts I.12 Prompt Payment for Construction Contracts I.13 Differing Site Conditions

I.14 Accident Prevention I.15 Schedules for Construction Contracts

I.16 Specifications and Drawings for Construction I.17 Changes I.18 Authorized Deviations in Clauses I.19 Restriction on Endorsements I.20 Release of Claims I.21 Examination of Records By The Department of Interior I.22 Liability Insurance I.23 Prohibition on Release of Information – Bureau of Reclamation I.24 Asbestos – Free Warranty

Colorado-Big Thompson Project, Colorado Amendment No. 0003

Table of Contents - 3

I.25 Safety and Health I.26 Protecting Federal Employees and the Public from Exposure to Tabacco Smoke in the Federal Workplace I.27 Certification of Representatives for Corporate Sureties I.28 Equipment Ownership and Operating Expense I.29 Payment for Mobilization and Preparatory Work I.30 Claims Accounting I.31 Other Contracts I.32 Preservation of Cultural Resources I.33 Security Requirements I.34 Modification Proposals

PART III – DOCUMENTS, EXHIBITS, AND OTHER

SECTION J – List of Documents, Exhibits, and Other Attachments

1- Wage Determination 2- Standard Form 24 – Bid Bond 3- Company Experience Reference List 4- Past Performance Questionaire

PART IV – REPRESENTATIONS AND INSTRUCTIONS

SECTION K – Representations, Certifications and Other Statements of Offerors K.1 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements K.2 Annual Representations and Certifications

SECTION L – Instructions, Conditions and Notices to Bidders L.1 System for Award Management L.2 Commercial and Government Entity Code Reporting

L.3 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR PART 101-29 L.4 Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisition

Streamlining and Standardization Information system (ASSIST) L.5 Submission of Offers in the English Language L.6 Submission of Offers in U.S. Currency L.7 Instructions to Offorors L.8 Type of Contract L.9 Construction Wage Rate Requirments L.10 Notice of Requirement for Affirmative Action to Ensure Equal Employment

Opportunity for Construction L.11 Site Visit (Construction) L.12 Preparation of Proposals - Construction

L.13 Authorized Deviations in Provisions L.14 Use and Disclosure of Proposal Information

Colorado-Big Thompson Project, Colorado Amendment No. 0003

Table of Contents - 4

L.15 Service of Protest L.16 Notice of Intent to Acquire Metric Products and Services L.17 Source Evaluation and Selection Procedures L.18 General Proposal Instructions L.19 Technical Proposal Instructions L.20 Pricing Proposal Instructions L.21 Instruction for Mobilization and Preparatory Work Schedule Line item L.22 Notice of Proposed Partnering L.23 Authorized Workers Notice to Potential

SECTION M – Evaluation Factors for Award M.1 Evaluation Factors for Award M.2 Notice of World Trade Organization Government Procurement Agreement Evaluations

Colorado-Big Thompson Project, Colorado Amendment No. 003

Penstock Inspection Reports Revised 51 09 96 - 1

SECTION 51 09 96

PENSTOCK INSPECTION REPORTS

PART 1 GENERAL

1.01 TRIP REPORT INFORMATION

A. Tables 51 09 96A - Unit 1 Penstock and 51 09 96B - Unit 2 Penstock list the damaged coating areas observed during two separate visits.

Table 51 09 96 A- Unit 1 Penstock

Location

Actual Size of Defect

Details, clock position references are facing downstream.

Expansion joint 2-3 between sta.

91+89.05 and 92+36.51, Sheet 4 (Drawing 245-D-6202)

3 sq. ft.

6 o’clock, expansion joint is backwards

40 ft. D.S. from expansion joint 2 sta. 92+36.51, Sheet 4 (Drawing 245-D-6202)

1 sq. ft.

6 o’clock small quarter-sized defect

3 Expansion joint 3-4 sta. 97+00.04, Sheet 5 (Drawing 245-D-6203) 3 sq. ft. 6-8 o’clock tiny spots

4 Expansion joint 6-7 sta. 107+35.61, Sheet 7 (Drawing 245-D-6205) 2 sq. ft. 6 o’clock

5 Expansion joint 7-8 sta. 112+55.38, Sheet 8 (Drawing 245-D-6206) 2 sq. ft. 6 o’clock

6 Block 8 sta. 115+41.33, Sheet 9 (Drawing 245-D-6207) 2 sq. ft. 8 o’clock, 1st set of rivets*

7 Block 8 sta. 116+56.58, Sheet 9 (Drawing 245-D-6207) 3 sq. ft. 6-8 o’clock, 3rd set of rivets

8 Block 8 sta. 117+72.90, Sheet 9 (Drawing 245-D-6207) 7 sq. ft. 3+6+9 o’clock 5th set of rivets

9 Block 8 sta. 118+20.40, Sheet 9 (Drawing 245-D-6207) 3 sq. ft. 3+8+9 o’clock on rivets, 6th set of rivets

10 Block 8 sta. 118+78.56, Sheet 9 (Drawing 245-D-6207) 1 sq. ft. 4 o’clock, 7th set of rivets

11 Block 8 sta. 119+36.72, Sheet 9 (Drawing 245-D-6207) 6 sq. ft. 3-7 o’clock on rivets, 8th set of rivets

12 Block 8 sta. 119+94.88, Sheet 9 (Drawing 245-D-6207) 4 sq. ft. 3+5-7+9 o’clock on rivets, 9th set of rivets

13 Block 9 sta. 120+54.1, Sheet 10 (Drawing 245-D-6208) 1 sq. ft. 6 o’clock, 1st set of rivets

Colorado-Big Thompson Project, Colorado Amendment No. 003

Revised 51 09 96 - 2

Expansion joint 9-10 sta.

121+73.31, Sheet 10 (Drawing 245- D-6208)

2 sq. ft.

6 o’clock

15 Block 10 sta. 123+92.50, Sheet 10 (Drawing 245-D-6208) 4 sq. ft. 6 o’clock, 2nd set of rivets on a previous repair

16 Block 10 sta. 124+42.32, Sheet 10 (Drawing 245-D-6208) 2 sq ft 3+6 o’clock, blisters, 3rd set of rivets

17 Block 11 sta. 125+81.19, Sheet 11 (Drawing 245-D-6209) 4 sq. ft. 4+6+8 o’clock, blisters + corrosion, 1st set of rivets

18 Block 11 sta. 126+99.46, Sheet 11 (Drawing 245-D-6209) 1 sq. ft. 6 o’clock, small crack, 3rd set of rivets

19 Block 11 sta. 127+58.89, Sheet 11 (Drawing 245-D-6209) 3 sq. ft. 3+6 o’clock, 4th set of rivets

Expansion joint 11-12 sta.

128+18.33 – 128+66.86, Sheet 11 (Drawing 245-D-6209)

6 sq. ft.

4-7 o’clock

21 Block 11 sta. 128+66.86, Sheet 11 (Drawing 245-D-6209) 4 sq. ft. 2-4 o’clock, 6th set of rivets

22 Block 11 sta. 129+85.73, Sheet 11 (Drawing 245-D-6209) 4 sq. ft. 6-9 o’clock, 7th set of rivets

23 Block 11 sta. 129+85.73, Sheet 11 (Drawing 245-D-6209) 6 sq. ft. 3-7 o’clock, 8th set of rivets

24 Block 11 sta. 130+45.16, Sheet 11 (Drawing 245-D-6209) 3 sq. ft. 6-7 o’clock, 9th set of rivets

25 Block 12 sta. 131+63.58, Sheet 12 (Drawing 245-D-6210) 2 sq. ft. 3+6 o’clock, 2nd set of rivets

26 Block 12 sta. 132+22.69, Sheet 12 (Drawing 245-D-6210) 4 sq. ft. 5-6+8 o’clock, 3rd set of rivets

27* Block 12 sta. 132+81.81, Sheet 12 (Drawing 245-D-6210) 36 sq. ft. 2 to 10 o’clock, 4th set of rivets, need to redo rivets

28 Block 12 sta. 133+40.92, Sheet 12 (Drawing 245-D-6210) 2 sq. ft. 6 o’clock, 5th set of rivets

Expansion joint 12-13, Sheet 12 (Drawing 245-D-6210) 133+40.92 - 133+89.20, Sheet 12 (Drawing 245-D-6210)

2 sq. ft.

6 o’clock

30 Block 12 sta. 133+89.20, Sheet 12 (Drawing 245-D-6210) 1 sq. ft. 6 o’clock, 6th set of rivets

31 Block 12 sta. 134+48.32, Sheet 12 (Drawing 245-D-6210) 8 sq. ft. 4-6+10-9 o’clock, 7th set of rivets

32 Block 12 sta. 135+07.43, Sheet 12 (Drawing 245-D-6210) 2 sq. ft. 6+8 o’clock, 8th set of rivets

33 Block 13 sta. 136+26.40, Sheet 13 (Drawing 245-D-6211) 3 sq. ft. 6+9 o’clock, 1st set of rivets

34 Block 13 sta. 136+85.55, Sheet 13 (Drawing 245-D-6211) 2 sq. ft. 3+6 o’clock, 2nd set of rivets

Colorado-Big Thompson Project, Colorado Amendment No. 003

Revised 51 09 96 - 3

35 Block 13 sta. 137+45.17, Sheet 13 (Drawing 245-D-6211) 1 sq. ft. 3 o’clock, 3rd set of rivets

Expansion joint 13-14 138+64.42- 139+13.12, Sheet 13 (Drawing 245- D-6211)

4 sq. ft.

4-7 o’clock

37* Block 13 sta. 139+13.12, Sheet 13

(Drawing 245-D-6211)

18 sq. ft.

3-9 o’clock, blisters 6th set of rivets

38 Block 13 sta. 139+72.74, Sheet 13 (Drawing 245-D-6211) 1 sq. ft. 6 o’clock, 7th set of rivets

39 Block 13 sta. 140+32.37, Sheet 13 (Drawing 245-D-6211) 2 sq. ft. 3 o’clock, 8th set of rivets

Block 14 4th sleeve coupling ~ 140 ft downstream from block 14, Sheet 14 (Drawing 245-D-6212)

1 sq. ft.

6 o’clock chunk missing

Block 14 5th sleeve coupling ~ 180 ft downstream from block 14 , Sheet 14 (Drawing 245-D-6212)

6 sq. ft.

5+7 o’clock 9 inch long cracks, 12 o’clock missing coating

Block 14 6th sleeve coupling ~ 220 ft downstream from block 14, Sheet 14 (Drawing 245-D-6212)

3 sq. ft.

12 o’clock, missing coating

* Items 27 and 37 require abrasive blast cleaning. Refer to Tabulation 1.

Table 51 09 96 B- Unit 2 Penstock

Location Size of Defect

Details, clock position references are facing downstream.

1 Block 8, sta. 117+14.74, Sheet 9 (Drawing 245-D-6207) 1 sq. ft. 5+9 o’clock on rivets, 4th set of rivets

2 Block 8, sta. 118+20.4 Sheet 9 (Drawing 245-D-6207) 1 sq. ft. 6 o’clock on rivets, 6th set of rivets

3 Block 8, sta. 118+78.56 Sheet 9 (Drawing 245-D-6207) 4 sq. ft. 6 o’clock on rivets, 7th set of rivets

4 Block 10, sta. 124+81.18 Sheet 10 (Drawing 245-D-6208) 2 sq. ft. 3+6 o’clock on rivets, 4th set of rivets

5 Block 12, sta. 131+63.58 1 sq. ft. 6 o’clock on rivets, 2nd set of rivets, small crack in repair material on rivets

6 Block 12, sta. 134+48.32, Sheet 12 (Drawing 2145-D-6210 1 sq. ft. 6 o’clock on rivets, 7th set of rivets, small crack in repair material on rivets

7 Block 14 1st coupling, Sheet 14 (Drawing 245-D-6212) 36 lf 3/4" Chamfer of both steel pipe ends

8 Block 14 1st coupling, Sheet 14 (Drawing 245-D-6212) 36 sq ft Spot repair joint

Colorado-Big Thompson Project, Colorado Amendment No. 003

Revised 51 09 96 - 4

9 Block 14 2nd coupling, Sheet 14 (Drawing 245-D-6212) 36 lf 3/4" Chamfer of both steel pipe ends

10 Block 14 2nd coupling, Sheet 14 (Drawing 245-D-6212) 36 sq ft Spot repair joint

11 Block 14 3rd coupling, Sheet 14 (Drawing 245-D-6212) 36 lf 3/4" Chamfer of both steel pipe ends

12 Block 14 3rd coupling, Sheet 14 (Drawing 245-D-6212) 36 sq ft Spot repair joint

13 Block 14 4th coupling, Sheet 14 (Drawing 245-D-6212) 36 lf 3/4" Chamfer of both steel pipe ends

14 Block 14 4th coupling, Sheet 14 (Drawing 245-D-6212) 36 sq ft Spot repair joint

15 Block 14 5th coupling, Sheet 14 (Drawing 245-D-6212) 36 lf 3/4" Chamfer of both steel pipe ends

16 Block 14 5th coupling, Sheet 14 (Drawing 245-D-6212) 800 sq ft Delaminated section complete removal and recoat in zone, includes joints 5 and 6.

17 Block 14 6th coupling, Sheet 14 (Drawing 245-D-6212) 36 lf 3/4" Chamfer of both steel pipe ends

18 Block 14 7th coupling, Sheet 14 (Drawing 245-D-6212) 36 lf 3/4" Chamfer of both steel pipe ends

19 Block 14 7th coupling, Sheet 14 (Drawing 245-D-6212) 800 sq ft Delaminated section complete removal and recoat in zone, includes joints 7 and 8.

20 Block 14 8th coupling, Sheet 14 (Drawing 245-D-6212) 36 lf 3/4" Chamfer of both steel pipe ends

21 Butterfly valve flange, Sheet 14 (Drawing 245-D-6212 19 sq. ft. Spot repair, flanged joint

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

END OF SECTION

Colorado-Big Thompson Project, Colorado Amendment No. 003

Photographs

New 51 09 97 - 1

SECTION 51 09 97

PHOTOGRAPHS

PART 1 GENERAL

1.01 PHOTOGRAPHS

A. Photographs showing some areas to be recoated are provided. These photographs give general information of work site conditions and recoating locations.

B. The Government assumes no responsibility for deductions, interpretations, or conclusions made by the Contractor based on information made available by the Government, in accordance with the clause at FAR 52.236-3 “Site Investigations and Conditions Affecting the Work.”

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

New 51 09 97 - 2

Flatiron Penstock Unit 1

Photo 1. Flatiron Penstock Unit 1 inspection April 2015 typical damage to an expansion joint.

New 51 09 97 - 3

Photo 2. Flatiron Penstock Unit 1 inspection April 2015 corrosion at rivet set between the two pipe sections.

New 51 09 97 - 4

Photo 3. Flatiron Penstock Unit 1 inspection April 2015 blister on rivet set.

New 51 09 97 - 5

Photo 3. Flatiron Penstock Unit 1 inspection April 2015 crack in polyurethane liner at edge of penstock pipe section of riveted construction.

New 51 09 97 - 6

Photo 4. Flatiron Penstock Unit 1 inspection April 2015 polyurethane cracked around a rivet.

New 51 09 97 - 7

Photo 5. Flatiron Penstock Unit 1 inspection April 2015 polyurethane damage and corrosion at rivet set between two pipe sections.

New 51 09 97 - 8

Flatiron Penstock Unit 2

Photo 7. Flatiron Penstock Unit 2 inspection in March 2015, sleeve coupling joint #4 downstream from Block 14. Coating was cracked full circumference.

New 51 09 97 - 9

Photo 8. Flatiron Penstock Unit 2 inspection in March 2015, 5th sleeve coupling downstream of Block 14. Delamination of polyurethane lining.

New 51 09 97 - 10

Photo 9. Flatiron Penstock Unit 2 inspection in March 2015 7th sleeve coupling downstream of Block 14. Delamination of polyurethane lining.

New 51 09 97 - 11

Photo 10. Repair to prevent further delamination of the polyurethane damaged areas, the following repair procedures were used. The polyurethane lining was cut and peeled off to expose white metal blast profile. The polyurethane lining was easily removed with chisels and crowbars. The polyurethane lining was feathered using a battery-operated grinder with a flap wheel sanding disc.

New 51 09 97 - 12

Photo 11. The repaired surfaces were wiped with a solvent (xylene) rag. The edges were sealed with Denso Protal 7125.

New 51 09 97 - 13

Photo 12. Flatiron Penstock Unit 2 inspection April 2016 typical condition of the sealed edge of the polyurethane delaminated sections.

END OF SECTION

New 51 09 97 - 14

This page intentionally left blank.

Pre-Proposal Site Visit Sign-in Sheet

Request for Proposal

Date: May 26, 2016 Time: 9:00 a.m. MDT

Solicitation Title: Flatiron Penstock Coating Repairs Name Company Phone Email Anthony Wallace Hartman Walsh Painting

Company

(314) 374-1777 awallace@hartmanwalsh.com

Paul Cartier TMI Coating (651) 452-6100 pcartier@tmicoatings.com

Charles Catlett Purcell Painting and Coatings

(206) 450-5071 charlesc@purcellpainting.com

Steve Davis Coblaco Services (303) 690-7148 steve@coblaco.com

Tim McAdoo Coblaco Services (303) 690-7148 tim@coblaco.com

Shane Stapley The Gateway Company (801) 532-2500 mailto:awallace@hartmanwalsh.com

Amendment 003 Questions and Answers

1. Will the BOR be providing new gaskets for the hatches that will need to be removed for access?

Reclamation will not provide new gaskets for the hatches that will need to be removed for access. The gaskets will require replacement by the contractor. Reclamation uses Garlock Style 9200 reinforced rubber gaskets.

2. Will the BOR be removing and replacing all of the bolts needed for access? If not can you address the specifications on the bolts. I know that some will break when removing, I am sure there is a torque setting that needs to be followed when replacing them. How will this be verified and by whom?

Contractor will be responsible for removing and replacing all of the bolts needed for access including replacement of broken bolts. Contractor will be required to thoroughly clean and mechanically chase or dress all reused threads.

For estimating purposes, refer to the attached drawings for bolt information. Since the drawings do not specify material properties of the bolts, the Government assumes them to be roughly equivalent to Grade 2 bolts.

Contractor will be required to reinstall the bolts and torque them to original specifications which will be verified by the Government’s Onsite Representative. The Government will provide torque values at the time of installation.

3. Section 1.04 Qualifications C Independent Coating Inspector and in section M it refers to them and Certified Industrial Hygienists as Key Personnel. Are they to be treated as a subcontractors, and if so are they required to submit the Past Performance Questionnaire or should we just include them in our technical proposal and submit copies of their resumes like we would for our employees.

Yes this procurement does in fact require both an Independent Coatings Inspector and a Certified Industrial Hygienist. Any individual you propose to occupy a key position, such as the CIH or the Independent Coatings Inspector, shall have a resume that is included in your technical proposal.

It would be desirable that Past Performance Questionnaires are submitted for these subcontractors as well since we are evaluating the prime and proposed subcontractors as a whole, but failure to submit them will not result in an unacceptable technical rating.

This Page Intentionally Left Blank

3 Table of Contents.pdf
DIVISION 09 - COATINGS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS
DIVISION 52 - DRAWINGS
51 09 96 - Penstock Inspection Reports .pdf
SECTION 51 09 96 PENSTOCK INSPECTION REPORTS
PART 2 PRODUCTS
PART 3 EXECUTION
END OF SECTION

40-D-3850 ShtNo: 60

File details come from the government source that posted it. Updated .