Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040187882

Bureau of Reclamation

Great Plains Region

Regional Office PO Box 36900

R60

Billings MT 59107

Michael Birkland

103/23/2015

R15PS00575

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Project Title: Road Maintenance, Belle Fourche Reservoir, South Dakota

Location of Work: Bureau of Reclamation's Belle Fourche Reservoir, South Dakota

Scope of Work: Watering, scarifying, blading, and compacting approximately 16 miles of Belle Fourche Reservoir roads and mowing approximately 31 miles of roadside

Magnitude of Project: The range of this project is $25,000 to $100,000

This is 100% set-aside for small business. The North American Industry

Classification System (NAICS)code is 237310. The Small Business Size Standard for

NAICS 237310 is $33.5M. Electronic submission of Quotes is allowed and can be faxed to 406-247-7798 or emailed to mbirkland@usbr.gov. Hand Carried Offers and express mail offers will be received at the office of the Bureau of Reclamation, Great

Plains Regional Office, Attention Michael Birkland GP5000, 2021 4th Ave North, Room

507, 5th Floor, Billings Montana 59101.

TAX PAYER IDENTIFICATION NUMBER (TIN) __________________________________

DATA UNIVERSAL NUMBER SYSTEM (DUNS) ___________________________________

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 180 calendar days and complete it within ________________ ________________ calendar days after receiving

Paragraph F.1

04/16/2015

NSN 7540-01-155-3212

x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Michael L. Birkland

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

R15PS00575

Suggested COR: CCOLLIN4

Delivery: 09/02/2015

Delivery Location Code: 0009910085

Bureau of Reclamation-GP-DKAO

Belle Fourche Reservoir

Arpan Road and Highway 212

Belle Fourche SD 57717 US

FOB: Destination

Period of Performance: 05/01/2015 to 09/02/2015

00010 Belle Fourche Recreation Road Bladings

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

U.S. Department of the Interior Bureau of Reclamation March 2015

Request for Quotation (RFQ) Solicitation No. R15PS00575

ROAD MAINTENANCE

BELLE FOURCHE DAM & RESERVOIR

BELLE FOURCHE PROJECT – SOUTH DAKOTA

THIS PAGE INTENTIONALLY LEFT BLANK

Belle Fourche Reservoir Road Maintenance Solicitation Number R15PS00575

FOREWARD

BELLE FOURCHE RESERVOIR

BELLE FOURCHE UNIT – SOUTH DAKOTA

FOREWORD

The work consists of road maintenance (watering, scarifying, blading, shaping, compacting, cleaning and mowing) on roads owned by the Bureau of Reclamation around the Belle Fourche Reservoir. Approximately 16 miles of road and one parking area will require maintenance under this contract.

The location of the work is at the Belle Fourche Reservoir located 8.5 miles northeast of Belle Fourche, South Dakota in Butte County. Maintenance shall be performed on the roads and parking area shown in Table 01 11 00A. The location of the Roads and Jeremiason Fishing Access Parking to be worked on under this contract is provided in Appendix A on the map titled “Belle Fourche Reservoir Road Maintenance Butte County, South Dakota”.

PRINCIPAL COMPONENTS OF WORK

Watering, scarifying, blading and compacting approximately 16 miles of Belle Fourche Reservoir roads.

Mowing approximately 31 miles of roadside shoulders.

Spreading, watering, blading and compacting limestone road gravel on approximately 1 mile of newly constructed Bird Island View Rd. Gravel is to be spread evenly 6 inches deep across 24 feet of road base.

Contractor will be responsible to repair or restore any damage caused by their work to the surrounding property to the satisfaction of the Contracting Officer and/or COR.

The work will be quoted under 4 schedules. The first date of completion is set at May 21, 2015, the second date of completion is set at July 1, 2015, the third date of completion is set at July 31, 2015, and the last date of completion shall be September 2, 2015. All contract submittals and invoices shall be provided to Reclamation completing the work by September 16, 2015.

TELEPHONE INQUIRIES REGARDING THIS SOLICITATION TO:

Contractual Matters:

Contracting Officer Michael Birkland Attention GP-5000 Billings, Montana Telephone: (406) 247-7646

FOREWARD

PRE-QUOTE SITE VISIT: AN ORGANIZED SITE VISIT WILL BE HELD ON

TUESDAY MARCH 31, 2015 AT 10:00 AM. PROSPECTIVE QUOTERS

ANTICIPATING TO ATTEND THE WALK-THRU SHALL MEET AT THE INLET

CANAL’S JEREMIASON FISHING ACCESS PARKING OFF OF FISHERMAN’S

ROAD LOCATED ON THE WEST SIDE OF BELLE FOURCHE RESERVOIR.

PROSPECTIVE QUOTERS ARE STRONGLY ENCOURAGED TO ATTEND THE

PRE-QUOTE MEETING AND VISIT THE SITE TO GAIN FIRST-HAND

KNOWLEDGE OF THE WORK REQUIREMENTS AND SITE CONDITIONS.

FAILURE OF THE PROSPECTIVE QUOTERS TO INSPECT THE SITE WILL NOT

RELIEVE THE QUOTER FROM THE RESPONSIBILITY TO PROPERLY ESTIMATE

THE DIFFICULTY OR COST OF SUCCESSFULLY PERFORMING THE WORK IN

ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT. QUESTIONS

MAY BE ADDRESSED BY CALLING GEORGE FINNEGAN AT 605-394-9757

EXTENSION 3002. CONTRACTORS INTERESTED IN THE PRE-QUOTE SITE VISIT

SHALL MAKE ARRANGEMENTS BY CONTACTING GEORGE FINNEGAN OF THE

RAPID CITY FIELD OFFICE AT (605) 394-9757, Ext. 3002.

FOR DATE WHEN OFFERS ARE TO BE SUBMITTED, SEE "SOLICITATION,

OFFER, AND AWARD," STANDARD FORM 1442, BLOCK 11. OFFERS SHALL BE

MAILED TO THE ADDRESS SHOWN IN BLOCK 8 OF THE FORM.

FOR INFORMATION REGARDING BUREAU OF RECLAMATION'S PUBLICATION

"RECLAMATION SAFETY AND HEALTH STANDARDS" (2013 EDITION) WHICH IS

APPLICABLE TO WORK UNDER THIS CONTRACT, SEE CLAUSE AT "WBR

1452.223-81 SAFETY AND HEALTH."

ORAL EXPLANATIONS OR INSTRUCTIONS GIVEN BEFORE THE AWARD OF

THE CONTRACT WILL NOT BE BINDING.

EFFECTIVE JULY 29, 2012, ANY CONTRACTOR INTERESTED IN DOING

BUSINESS WITH THE FEDERAL GOVERNMENT MUST REGISTER IN THE

SYSTEM FOR AWARD MANAGEMENT (SAM) DATABASE PRIOR TO AWARD OF

A CONTRACT OR AGREEMENT. SAM IS A FEDERAL GOVERNMENT OWNED

AND OPERATED FREE WEBSITE THAT CONSOLIDATES THE CENTRAL

CONTRACTOR REGISTRATION (CCR), THE ONLINE REPRESENTATIONS AND

CERTIFICATIONS APPLICATION (ORCA), AND THE EXCLUDED PARTIES LIST

SYSTEM (EPLS). THE VENDOR'S DUNS & BRADSTREET NUMBER AND BANKING

INFORMATION ARE REQUIRED FOR REGISTRATION. CONTRACTORS MAY

OBTAIN INFORMATION ON REGISTRATION AND ANNUAL CONFIRMATION

REQUIREMENTS VIA THE SAM WEBSITE ACCESSED THROUGH

HTTPS://WWW.SAM.GOV/PORTAL/PUBLIC/SAM/ OR BY CONTACTING THE

FEDERAL SERVICE DESK AT 1-866-606-8220.

Table of Contents - 1

TABLE OF CONTENTS

PART 1 – THE SCHEDULE

SECTION A – Solicitation, Offer, and Award Form (SF 1442)

SECTION B – Offer Schedule

SECTION C – Specification/Drawings/Maps

DIVISION 01 – GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 14 10 Use of Site 01 33 00 Submittals 01 35 10 Material Safety Data Sheets 01 35 20 Safety and Health 01 55 20 Traffic Control 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 74 10 Cleaning

DIVISION 31 – EARTHWORK

31 02 10 Water for Dust Abatement 31 23 40 Roadway Embankments

APPENDIX A

Belle Fourche Reservoir Road Maintenance Map

SECTION D – Not Used

SECTION E – Inspection and Acceptance E.1 Material and Workmanship E.2 Inspection of Construction E.3 Warranty of Construction

SECTION F – Deliveries or Performance F.1 Commencement, Prosecution, and Completion of Work F.2 Variation in Estimated Quantity F.3 Suspension of Work

SECTION G – Contract Administration Data G.1 Authorities and Delegations

G.2 Identification of Correspondence G.3 Government Administration Personnel – Reclamation G.4 Contractor’s Administration Personnel – Reclamation G.5 Post Award Conference

Table of Contents - 2

G.6 Electronic Invoicing and Payment Requirements

SECTION H – Special Contract Requirements

H.1 Non-Discrimination Notice to U.S. Department of the Interior Contractors, Subcontractors, and Lessors

H.2 Authorized Workers H.3 Site Security

PART II – CONTRACT CLAUSES

SECTION I – Contract Clauses I.1 Clauses By Reference I.2 Restriction on Endorsements

I.3 Release of Claims I.4 Liability Insurance I.5 Limitations on Subcontracting I.6 Encouraging Contractor Policy to Ban Text Messaging While Driving I.7 Buy American Act – Construction Materials I.8 Alternative Payment Protections I.9 Irrevocable Letter of Credit I.10 Payments Under Fixed-Price Construction Contracts I.11 Prompt Payment for Construction Contracts I.12 Other contracts I.13 Schedules for Construction Contracts I.14 Changes and Changed Conditions I.15 Default (Fixed-Price Construction) I.16 Authorized Deviations in Clauses I.17 Authorities and Delegations I.18 Prohibition on Release of Information I.19 Asbestos-Free Warranty I.20 Safety and Health I.21 Protecting Federal Employees and the Public from Exposure to Tabacco Smoke in the Federal Workplace I.22 Certification of Representatives for Corporate Sureties I.23 Equipment Ownership and Operating Expense I.24 Payment for Mobilization and Preparatory Work I.25 Preservation of Cultural Resources I.26 Security Requirements

Table of Contents - 3

PART III – DOCUMENTS, EXHIBITS, AND OTHER

SECTION J – List of Documents, Exhibits, and Other Attachments

1- Wage Determination 2- Past Jobs Reference List 3- Standard Form 25A – Payment Bond

PART IV – REPRESENTATIONS AND INSTRUCTIONS

SECTION K – Representations, Certifications and Other Statements of Offerors K.1 Annual Representations and Certifications K.2 Preparation of Proposals--Construction

SECTION L – Instructions, Conditions and Notices to Bidders L.1 Use and Disclosure of Proposal Information – Department of the Interior L.2 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR PART 101-29 L.3 Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisition

Streamlining and Standardization Information system (ASSIST) L.4 Submission of Offers in the English Language L.5 Submission of Offers in U.S. Currency L.6 Type of Contract L.7 Construction Wage Rate Requirement –Secondary Site of Work L.8 Notice of Requirement for Affirmative Action to Ensure Equal Employment

Opportunity for construction L.9 Service of Protest L.10 Site Visit

L.11 Authorized Deviations in Provisions L.12 Notice of Intent to Acquire Metric Products and Services L.13 Instruction for Mobilization and Preparatory Work Schedule Line Item

SECTION M – Evaluation Factors for Award M.1 Basis for Award M.1 Notice of World Trade Organization Government Procurement Agreement Evaluations

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040187882

Bureau of Reclamation

Great Plains Region

Regional Office PO Box 36900

R60

Billings MT 59107

Michael Birkland

103/23/2015

R15PS00575

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Project Title: Road Maintenance, Belle Fourche Reservoir, South Dakota

Location of Work: Bureau of Reclamation's Belle Fourche Reservoir, South Dakota

Scope of Work: Watering, scarifying, blading, and compacting approximately 16 miles of Belle Fourche Reservoir roads and mowing approximately 31 miles of roadside

Magnitude of Project: The range of this project is $25,000 to $100,000

This is 100% set-aside for small business. The North American Industry

Classification System (NAICS)code is 237310. The Small Business Size Standard for

NAICS 237310 is $33.5M. Electronic submission of Quotes is allowed and can be faxed to 406-247-7798 or emailed to mbirkland@usbr.gov. Hand Carried Offers and express mail offers will be received at the office of the Bureau of Reclamation, Great

Plains Regional Office, Attention Michael Birkland GP5000, 2021 4th Ave North, Room

507, 5th Floor, Billings Montana 59101.

TAX PAYER IDENTIFICATION NUMBER (TIN) __________________________________

DATA UNIVERSAL NUMBER SYSTEM (DUNS) ___________________________________

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 See Sec F.calendar days and complete it within _____________________________ calendar days after receiving

Paragraph F.1

04/16/2015

NSN 7540-01-155-3212

x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Michael L. Birkland

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

Bid Schedule

SECTION B –SCHEDULE

BELLE FOURCHE RESERVOIR

BELLE FOURCHE UNIT – SOUTH DAKOTA

B.1 QUOTATION SCHEDULE

A. Offers will be considered for award on the following schedule(s), but no offer will be considered for award on only a part of the schedule(s). All offers are subject to the terms and conditions of this solicitation.

B. The quantities in the schedule are estimated quantities for comparison of offers only, and except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns.

C. See the contract clause at WBR 1452.232-81 Alt II, Payment for Mobilization and Preparatory Work, for CLIN 1.

SCHEDULE A – Completion Date May 21, 2015

CLIN* Section Work or Materials Quantity and Unit

Unit Price

Amount

1 WBR

1452.23

2-81

Mobilization and Preparatory Work

For the lump sum of $

2 31 23 40 Water, Scarify, Blade and Compact Road Embankment – Susie Peak Road

4.30 MI $ $

3) 31 23 40 Water, Scarify, Blade and Compact Road Embankment – Gaden’s Point Camp Loop Roads

3.22 MI $ $

4) 31 23 40 Water, Scarify, Blade and Compact Road Embankment – Golf Course Point Road

1.17 MI $ $

5) 31 23 40 Water, Scarify, Blade and Compact Road Embankment – Owl Creek Road – Partial

3.50 MI $ $

SCHEDULE A – Completion Date May 21, 2015

CLIN* Section Work or Materials Quantity and Unit

Unit Price

Amount

6) 31 23 40 Water, Scarify, Blade and Compact Road Embankment – South Inlet Canal Road

0.38 MI $ $

7) 31 23 40 Water, Scarify, Blade and Compact Road Embankment – North Inlet Canal Road

0.46 MI $ $

8) 31 23 40 Water, Scarify, Blade and Compact Jeremiason Fishing Access Parking

1.25 AC $ $

9) 31 23 40 Mowing Road Borrow Ditches

26.06 MI $ $

*CLIN – Contract Line Item Number

TOTAL FOR SCHEDULE A $_________________

SCHEDULE B – Completion Date July 1, 2015

Unit

Unit Price

Amount

10) WBR

1452.23

2-81

Mobilization and Preparatory Work

For the lump sum of $

11) 31 23 40 Water, Scarify, Blade and Compact Road Embankment – Susie Peak Road

4.30 MI $ $

12) 31 23 40 Water, Scarify, Blade and Compact Road Embankment – Gaden’s Point Camp Loop Roads

3.22 MI $ $

13) 31 23 40 Water, Scarify, Blade and Compact Road Embankment – Golf Course Point Road

1.17 MI $ $

14) 31 23 40 Water, Scarify, Blade and Compact Road Embankment – Owl Creek Road – Partial

3.50 MI $ $

15) 31 23 40 Water, Scarify, Blade and Compact Road Embankment – South Inlet Canal Road

0.38 MI $ $

16) 31 23 40 Water, Scarify, Blade and Compact Road Embankment – North Inlet Canal Road

0.46 MI $ $

TOTAL FOR SCHEDULE B $_________________

SCHEDULE C – Completion Date July 31, 2015

Unit

Unit Price

Amount

17) 31 23 40 Spread, Water, Blade and Compact Road Gravel – Bird Island View Road

1.00 MI $ $

....................................................................... TOTAL FOR SCHEDULE C $_________________

SCHEDULE D – Completion Date September 2, 2015

Unit

Unit Price

Amount

18) WBR

1452.23

2-81

Mobilization and Preparatory Work

For the lump sum of $

19) 31 23 40 Water, Scarify, Blade and Compact Road Embankment – Susie Peak Road

4.30 MI $ $

20) 31 23 40 Water, Scarify, Blade and Compact Road Embankment – Middle Point Road

1.60 MI $ $

21) 31 23 40 Water, Scarify, Blade and Compact Road Embankment – Gaden’s Point Camp Loop Roads

3.22 MI $ $

22) 31 23 40 Water, Scarify, Blade and Compact Road Embankment – Golf Course Point Road

1.17 MI $ $

SCHEDULE D – Completion Date September 2, 2015

Unit

Unit Price

Amount

23) 31 23 40 Water, Scarify, Blade and Compact Road Embankment – Bird Island View Road

1.00 MI $ $

24) 31 23 40 Water, Scarify, Blade and Compact Road Embankment – Owl Creek Road – Partial

3.50 MI $ $

25) 31 23 40 Water, Scarify, Blade and Compact Road Embankment – South Inlet Canal Road

0.38 MI $ $

26) 31 23 40 Water, Scarify, Blade and Compact Road Embankment – North Inlet Canal Road

0.46 MI $ $

27) 31 23 40 Water, Scarify, Blade and Compact Jeremiason Fishing Access Parking

1.25 AC $ $

28) 31 23 40 Water, Scarify, Blade and Compact Tequila Beach Access Parking

1.25 AC $ $

28) 31 23 40 Mowing Road Borrow Ditches

31.26 MI $ $

TOTAL FOR SCHEDULE D $_________________

Road Maintenance Belle Fourche Reservoir Solicitation No. R15PS00575

Summary of Work 01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 LOCATION

The location of the work is at the Belle Fourche Reservoir located 8.5 miles northeast of Belle Fourche, South Dakota in Butte County. The Bureau of Reclamation has approximately 38 miles of road around Belle Fourche Reservoir. Maintenance shall be performed on the roads and parking areas shown in Table 01 11 00A. The location of the Roads and Jeremiason Fishing Access Parking to be worked on under this contract is provided in Appendix A on the map titled “Belle Fourche Reservoir Road Maintenance Butte County, South Dakota”.

Table 01 11 00A - Belle Fourche Reservoir Roads and Parking to be Maintained

Road ID NAME Surface

Type Width (Feet) Access

Length

(Miles)

Est. Gravel Surfacing

Depth

101 South Inlet Canal Road Aggregate 16 Open To The

Public 0.38 4 inches

102 North Inlet Canal Road Aggregate 16 Open To The

Public 0.46 4 inches

Jeremiason Fishing Access Parking Aggregate

1.25 Acres

Open To The Public 1.25 Acres 3 inches

200 Susie Peak Road Aggregate 24 Open To The Public

4.10 6 inches

200 Susie Peak Road Aggregate 16 Open To The Public 0.20 6 inches

201 Middle Point Road Aggregate 24 Open To The Public 1.60 6 inches

203 Gaden's Point Camp Loop Road Aggregate 16 Open To The

Public 1.08 3 inches

204 Gaden's Point Camp Loop Road Aggregate 16 Open To The

Public 0.90 3 inches

205 Gaden's Point Camp Loop Road Aggregate 16 Open To The

Public 0.26 3 inches

01 11 00 - 2

Road ID NAME Surface

Type Width (Feet) Access

Length

(Miles)

Est. Gravel Surfacing

Depth

206 Gaden's Point Camp Loop Road Aggregate 16 Open To The

Public 0.26 3 inches

207 Gaden's Point Camp Loop Road Aggregate 16 Open To The

Public 0.72 3 inches

500 Golf Course Point Road Aggregate 16 Open To The

Public 1.17 2 inches

501 Bird Island View Road - Partial Aggregate 24 Open to the

Public 1.00 6 inches

600 Owl Creek Road – Partial Aggregate 24 Open To The

Public 0.50 3 inches

600 Owl Creek Road - Partial Aggregate 16 Open To The

Public 3.00 3 inches

01 11 00 - 3

1.02 PRINCIPAL COMPONENTS OF WORK

A. Watering, scarifying and blading approximately 16 miles of Belle Fourche Reservoir roads. The roads and parking areas designated for maintenance in this contract are listed in Table 01 11 00A and shown in Appendix A on the map titled “Belle Fourche Reservoir Road Maintenance Butte County, South Dakota”. Typical sections for the roads are provided as Exhibit A in Appendix A.

B. Mowing approximately 31 miles of roadside shoulders.

C. Spreading, watering, blading and compacting limestone road gravel on approximately 1 mile of newly constructed Bird Island View Rd. Gravel is to be spread evenly 6 inches deep across 24 feet of road base.

D. Onsite work is to commence three weeks before each of the scheduled completion dates specified in the bid schedule. In the event of severe or wet weather, the Contracting Officer and/or COR will have authority to suspend work until such time that, in their opinion work may resume, in order to minimize damage or rutting of the travel routes.

E. Contractor will be responsible to repair or restore any damage caused by their work to the surrounding property to the satisfaction of the Contracting Officer and/or COR.

Contractor’s work that causes damage to adjacent roads such as the paved portion of Fisherman Road or adjacent county roads will be the responsibility of the Contractor to repair or restore any damage.

1.03 SPECIFICATIONS REQUIREMENTS

A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 52.

B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.

C. Where specifications are written in streamlined form, the words “shall be” are included by inference where a colon (:) is used within the sentence or phrase.

1.04 DEFINITIONS

A. When the specifications use a word or term defined in the Federal Acquisition Regulations (FAR), the definition of the word or term shall be in accordance with FAR sections in effect at the time the solicitation was issued.

B. Quality Assurance: Inspection and tests performed by Government to ensure compliance with the terms of the contract.

C. Quality Control: Activities performed by Contractor to ensure work conforms to contract requirements.

01 11 00 - 4

D. Contractor Quality Testing: Specified tests to be performed by the Contractor.

1. The Government may use the test results for Quality Assurance.

2. The Contractor may use the test results as part of Contractor quality control.

a. The Government anticipates that these tests will be part of the Contractor’s quality control program; however the tests do not relieve the Contractor of providing adequate quality control measures in accordance with the clause at FAR 52.246-12, Inspection of Construction.

1.05 ACRONYMS

A. The following acronyms apply to specifications Divisions 1 through 52:

1. CO: Contracting Officer

2. COR: Contracting Officer’s Representative

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

END OF SECTION

Use of Site 01 14 10 - 1

SECTION 01 14 10

USE OF SITE

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the schedule for other items of work.

1.02 PROJECT CONDITIONS

A. Government land available for Contractor use as a staging area for contractor will be permitted as approved by the Contractor Officer.

B. When private land is used for construction facilities, or other construction purposes, make necessary arrangements associated with use of private land.

C. Location, construction, operation, maintenance, and removal of construction facilities on Government land will be subject to approval of the COR.

D. Do not interfere with work of other contractors or the Government in vicinity, or with reservations made by the Government for use of such land.

E. Housing for construction personnel will not be permitted on Government land, except housing for guards or watchmen as may be approved by the COR.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 CLEANING

A. Construction equipment: Before bringing on site, clean construction equipment to remove dirt, vegetation, and other organic material to prevent introduction of noxious weeds, and invasive plant and animal species.

Use of Site 01 14 10 - 2

3.02 RESTORATION

A. Restore temporary construction roads to original contours and make impassable to vehicular traffic when no longer required.

B. After completion of work, scarify and blade Government land used for construction purposes and not required for completed installation so that surfaces blend with natural terrain and are in a condition that will facilitate natural revegetation, provide proper drainage, and prevent erosion.

Submittals 01 33 00 - 1

SECTION 01 33 00

SUBMITTALS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the schedule for other items of work requiring submittals.

1.02 DEFINITIONS

A. Days: Calendar days.

B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.

C. Submittal Types, as listed in Table 01 33 00A – List of Submittals:

1. A – Approval:

a. Government will approve, conditionally approved subject to identified changes, or disapprove these submittals.

b. Approval submittals are considered to be “shop drawings” within the terms of the clause at FAR 52.236-21, Specifications and Drawings for Construction.

2. I – Informational:

a. The Government will acknowledge receipt of these submittals.

b. The Government may reject an Informational submittal when the submittal does not comply with the contract. The Contractor shall correct mistakes or deficiencies in rejected Informational submittals and resubmit.

c. Informational submittals are considered to be “shop drawings” within the terms of the clause at FAR 52.236-21, Specifications and Drawings for Construction, except that approval by the Government is not required.

1.03 SUBMITTAL REQUIREMENTS

A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.

01 33 00 - 2

B. General:

1. Prepare in English.

2. Label with contract number and title, and RSN.

3. Measurement units: US Customary Units.

C. Certifications:

1. Sign and seal submittals by registered professional.

2. Manufacturer’s certifications: Signed by authorized representative of manufacturer.

1.04 SUBMITTALS PROCEDURES

A. Submit only checked submittals. Submittals without evidence of Contractor's approval will be returned for resubmission.

B. Submit complete sets of required materials for each RSN as specified in “Submittals Required” column in Table 01 33 00A - List of Submittals. A complete set includes all listed items for RSNs with multiple parts.

C. Submit number of sets specified in “No. of sets to be sent to:” columns in Table 01 33 00A - List of Submittals.

D. Include the following information in transmittal letters:

1. Contract number and title.

2. RSN for each attached submittal.

3. Responsible code.

4. Number of sets for each RSN.

5. Identify submittal as initial or resubmittal.

E. More than one RSN may be submitted under a transmittal letter, provided the responsible code is the same.

F. All submittals shall be submitted for approval in accordance with Table 01 33 00A – List of Submittals.

G. Test results for Acceptance Testing submittals should be submitted no later than 3 calendar days after the test was performed. If the test(s) fail, then the results should be submitted within 4 hours.

01 33 00 - 3

1.05 REVIEW OF SUBMITTALS

A. Time Required:

1. Submittal review will require 14 days for review of each submittal or re-submittal, unless otherwise specified.

2. Time required for review of each submittal or re-submittal begins when complete sets of materials required for a particular RSN are received and extends through return mailing postmark date.

B. Time in Excess of Specified:

1. The CO may extend the contract completion date to allow additional time for completing work affected by excess review time.

a. The time extension will be to the extent that excess review time caused delay to the contract completion date.

b. The time extension will not exceed the time used in excess of the specified number of days for review of submittals or re-submittals.

c. Concurrent days of excess review time resulting from review of two or more separate submittals or re-submittals will be counted only once in extending the contract completion date.

2. No time extension will be allowed if the Contractor fails to make complete approval submittals in sequence and within time periods specified.

3. Adjustment for delay will be made only to the extent that:

a. Approval was required under the contract, and

b. Requests for approval were properly and timely submitted and were approved.

Adjustment will be subject to terms of paragraphs (b) and (c) of the clause at FAR 52.242-14, Suspension of Work, however, no such delay shall be deemed to be a “suspension order” as the term is used in that clause.

C. Return of Submittals:

1. One set of submittals required for approval will be returned either approved, approved subject to identified changes, or not approved.

01 33 00 - 4

2. Submittals not approved:

a. Revise and resubmit for approval.

b. Show changes and revisions with revision date.

c. Describe reasons for significant changes in transmittal letter.

d. Resubmit returned submittals within 14 days after receiving the comments, unless otherwise specified.

e. Requirements for initial submittals apply to re-submittals.

3. Do not change designs without approval of the CO after approval drawings, documentation, and technical data have been approved.

4. The Government will acknowledge Informational submittals.

a. Informational submittals will not be returned when they comply with the specifications.

b. Informational submittals that do not comply with the specifications may be returned for re-submittal or additional information may be requested.

1.06 TRANSMITTAL

A. Addresses for codes listed in Table 01 33 00A - List of Submittals:

1. Contracting Officer, Bureau of Reclamation, Attention: GP-5000 (M. Birkland), PO Box 36900, Billings, MT 59107.

2. Contracting Officer’s Representative, Bureau of Reclamation, Attention:

DK-4000 (George Finnegan), 515 9th Street, Room 101, Rapid City, SD 57701.

B. Send a copy of each transmittal letter to offices listed above which are not sent the submittal.

C. Submittals required by the specifications, but not listed in Table 01 33 00A - List of Submittals:

1. Submit in accordance with this section.

2. Submit to Contracting Officer’s Representative, Bureau of Reclamation, Attention: DK-4000 (George Finnegan), 515 9th Street, Room 101, Rapid City, SD 57701, unless otherwise specified.

01 33 00 - 5

PART 2 PRODUCTS

01 33 00 - 6

Table 01 33 00A. - List of Submittals

* Submittal types: A – Approval, I – Information

** CO indicates Contracting Officer and COR indicates Construction Officer’s Representative.

RSN Clause or Section Title

Submittals required Due date or Delivery Time Ty pe

Respo nsible Code

No. of sets to be sent to: **

CO COR

1 Insurance-Work on a Government Installation (52.228-5)

1) Written certification that the required insurance has been obtained

2) Current certification of insurance for each subcontractor

1) Before issue of notice to proceed

2) Prior to Contractors commencing onsite work

A CO 1 0

2 Liability Insurance (1452.228-70)

Acceptable Certificate of Liability Insurance

Prior to commencement of work under the contract

A CO 1 0

3 Equal Opportunity (52.222-26)

Information required by Executive Order

112246 (SF-100)

Within 30 Calendar days following contract Award

I CO 1 0

4 Release of Claims (1452.204-70)

Release Claims (DI-137) against the United States

After Completion of the work and prior to final payment.

A CO 1 1

5 Payments 52.232-33

Payment Information After award but no later than 20 days before an invoice is submitted. Changes shall be furnished 30 days before effective date of change.

I CO 1 0

6 Site Security

GP-7

List of Employees

List of Vehicles and Equipment

Atleast 10 days prior to arriving on site.

A COR 0 1

7 Payroll Records (52.222-08)

Payroll Records for Prime Contractor, Subcontractors and all Employees

Weekly for each week of contractor performance

A COR 1 1

8 Labor Standards (52.222-11)

1) List of Subcontractors

2) Statement and Acknowledgement form for each subcontractor

1) List of all contractor and subcontractors employees working onsite

2) Within 14 days after award of any subcontract

A COR 1 1

01 33 00 - 7

9 Schedules for Construction Contracts (52.236-15)

Baseline schedule: Within 5 days before work commences on the contract

A COR 1 1

Blackline prints

10 Schedules for Construction Contracts (52.236-15)

Updated schedule or schedules:

As deemed necessary by the

CO/COR.

A COR 1 1

Blackline prints

01 35 10-1 Material Safety Data Sheets

Complete LHM and

MSDS

At least 21 days before jobsite delivery of hazardous material

I COR 0 1

01 35 10-2 Material Safety Data Sheets

Updated LHM and

MSDS

At least 21 days before jobsite delivery of hazardous material not previously listed

I COR 0 1

01 35 20-1 Safety and Health (WBR 1452.223-81)

Safety program, including CPR and First Aid Certifications

Submitted and accepted before commencing onsite work. See section 3 of RSHS.

A COR 0 1

01 35 20-2 Safety and Health (WBR 1452.223-81)

Monthly accident summary report

First day of each month. See paragraph 3.8 of RSHS.

I COR 0 1

01 55 20-1 Traffic Control Traffic Control Plan At least 15 days before affecting public traffic

A COR 0 1

01 74 10-1 Cleaning Waste Production and Disposal Records

Within 5 days Upon Completion of Site Clean Up and Disposal of All Waste Materials

A COR 0 1

01 74 10-2 Cleaning Hazardous Wastes Manifest

Within 5 days of discovery of Hazardous Waste

I COR 0 1

01 74 10-3 Cleaning Test Results on Unknown Wastes

Within 5 days of Hazardous Waste Manifest

I COR 0 1

Material Safety Data Sheets 01 35 10 - 1

SECTION 01 35 10

MATERIAL SAFETY DATA SHEETS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the schedule for other items of work.

1.02 DEFINITIONS

A. LHM: List of Hazardous Materials

B. MSDS: Material Safety Data Sheet.

1.03 APPLICATION

A. For the purposes of this contract, the definition of “materials delivered under this contract” in the clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data - Alternate 1, includes materials delivered to the Government and all materials expected to be used during contract performance at the jobsite.

1.04 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 35 10-1, Complete LHM and MSDS:

1. Comply with paragraph (e) of clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data - Alternate 1.

C. RSN 01 35 10-2, Updated LHM and MSDS:

1. Comply with paragraph (e) of clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data - Alternate 1.

1.05 DELIVERY

A. Do not deliver hazardous materials to jobsite which are not included on the original or previously updated LHM and MSDS before receipt of updated LHM and MSDS by the Contracting Officer’s Representative.

Material Safety Data Sheets 01 35 10 - 2

PART 2 PRODUCTS

Safety and Health 01 35 20 - 1

SECTION 01 35 20

SAFETY AND HEALTH

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the schedule for other items of work.

1.02 REFERENCE STANDARDS

A. Safety and Health Standards

1. Bureau of Reclamation (USBR)

a. RSHS-2009 Reclamation Safety and Health Standards

1) Available on the Internet at:

http://www.usbr.gov/ssle/safety/RSHS/rshs.html.

2) Hard copies available from:

The Government Printing Office Superintendent of Documents North Capitol and H St. N. W.

MS-SSMC - Room 566 Washington, D.C. 20401 Phone: (202) 512-1800 (Stock item GPO-024-003-00190-2)

3) The October 2009 revision of the RSHS supersedes previous versions. For construction and other contracts that require a safety clause, the RSHS version that was in effect when the contract was signed would govern, unless there is a mutual agreement by the contracting parties to adopt this revised version. If there is a significant change that would affect the work being performed for a specific project, a modification may be explored with the contractor.

2. OSHA General Industry and Construction Standards

a. Available at www.osha.gov

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

1. RSN 01 35 20-1, Safety and Health Plan:

a. Written safety program in accordance with Section 3 and Appendix B of

USBR RSHS.

http://www.osha.gov/

01 35 20 - 2

1) The Contractor shall provide a site specific written Safety Plan that is acceptable to Reclamation as listed on Table 01 33 00A. The program shall be consistent with the outline and content of the Reclamation Safety and Health Standard (RSHS), 2009 revision, Section 3 and Appendix B and include the program materials required by the Occupation Safety and Health standards (OSHA) for the work conducted. Due to the nature of the work the Written Plan shall include as a minimum; Hazard Communication, Personal Protective Equipment, Hearing Conservation and machinery. All equipment used on this contract must meet requirements as per appendices F, G, H of RSHS.

2) The written plan shall contain detailed information on the training, safe work practices, personal protective equipment and engineering controls to be used onsite to control hazard.

3) The Contractor shall be responsible for insuring that Subcontractors comply with the requirements set forth in this specification, the regulatory standards and the industry standards incorporated by reference in the RSHS OSHA standards. Where there is conflict between the standards, the more stringent or restrictive shall be utilized.

4) Medical Facilities Plan:

a) Describe facilities for providing medical attention for injured or disabled employees.

b) Employee’s qualifications to render CPR and First Aid.

Arrange for dependable ambulance service in accordance with USBR RSHS paragraph 5.4.

5) Resume of Contractor’s Onsite Safety Representative:

a) They must be capable of identifying existing and predictable hazards in the surround or working conditions which are unsanitary, hazardous or dangerous to employees, inspectors and the public. They must be qualified by possession of a recognized degree, certification, and/or professional standing, or by extensive knowledge, training and experience has successfully demonstrated the ability to solve or resolve work related safety and health problems. They must communicate effectively safety plans and activities with the Contract Officer’s Representative. Should the Contractor’s safety effort be considered inadequate, the Contracting Officer has the option to require the Contractor to employ a qualified Safety Professional.

01 35 20 - 3

2. RSN 0135 20-2, Monthly Accident Report:

a. Form 7-2218 or other acceptable form in accordance with paragraph 3.7 and 3.8 of USBR RSHS.

1.04 PROJECT CONDITIONS

A. Comply with RSHS.

B. Do not begin work on site until health and safety plans and certificates have been submitted, approved and implemented on site.

C. Provide and maintain a work environment and procedures that will:

1. Safeguard the public and Government's personnel exposed to Contractor operations and activities.

2. Avoid interruptions of site operations and delays in project completion dates.

3. Control costs in contract performance.

D. Do not require persons employed in performance of this contract, including subcontracts, to work under conditions which are unsanitary, hazardous, or dangerous to the employee’s health or safety.

E. Provide appropriate safety barricades and signs.

F. Maintain accurate record of and report to the CO the following occurrences during performance of this contract:

1. Death.

2. Occupational disease.

3. Traumatic injury to employees or the public.

4. Property damage in excess of $2,500.

G. Contractor must comply specifically with all of the requirements contained in USBR RSHS section 3-Contractor Requirements.

H. The Contractor shall be responsible for insuring that subcontractors comply with the requirements set forth in this specification and all regulatory standards.

01 35 20 - 4

This page was left blank intentionally.

Traffic Control 01 55 20 - 1

SECTION 01 55 20

TRAFFIC CONTROL

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost: Include in prices offered in the schedule for other items of work.

1.02 REFERENCE STANDARDS

A. Federal Highway Administration, Department of Transportation

1. MUTCD, Part 6 Part 6, Temporary Traffic Control, MUTCD 2000, Manual on Uniform Traffic Control Devices, 2003 Edition, with Revision No. 1, July 21, 2004 (http://mutcd.fhwa.dot.gov/)

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 55 20-1, Traffic control plan.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 TRAFFIC CONTROL

A. Meet requirements of MUTCD, Part 6.

B. The contractor will be not be allowed to close the roads designated for repair to the public during the road reconstruction project.

C. Access will be maintained for government personnel as needed.

D. Provide cones, delineators, concrete safety barriers, barricades, flasher lights, danger signals, signs, and other temporary traffic control devices as required to protect work and public safety.

E. Provide flaggers and guards as required to prevent accidents and damage or injury to passing traffic.

Traffic Control 01 55 20 - 2

F. Do not begin work along public or private roads until proper traffic control devices for warning, channeling, and protecting motorists are in place in accordance with approved traffic control plan.

G. Remove traffic control devices when no longer needed.

Environmental Controls 01 57 20 - 1

SECTION 01 57 20

ENVIRONMENTAL CONTROLS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in the prices offered in the schedule for other items of work, except as specified.

2. Costs for damages and work stoppage are the Contractor's responsibility.

1.02 REFERENCE STANDARDS

A. Bureau of Reclamation (USBR)

1. RSHS-2009 Reclamation Safety and Health Standards

1.03 REGULATORY REQUIREMENTS

A. Comply with Federal, State, and local laws and regulations.

B. Comply with RSHS.

C. Conform to most stringent requirement in cases of conflict between specifications, regulatory requirements, and RSHS.

D. Contractor shall be responsible for damages resulting from dust originating from Contractor operations in accordance with clause at FAR 52.236-7, Permits and Responsibilities.

E. The CO may stop any construction activity in violation of Federal, State, or local laws and additional expenses resulting from work stoppage will be responsibility of Contractor.

1.04 DUST CONTROL

A. Provide dust control and abatement during performance of work.

B. Prevent, control, and abate dust pollution on rights-of-way provided by Government or elsewhere during performance of work.

C. Provide labor, equipment, and materials, and use efficient methods wherever and whenever required to prevent dust nuisance or damage to persons, property, or activities, including, but not limited to, crops, orchards, cultivated fields, wildlife habitats, Environmental Controls 01 57 20 - 2 dwellings and residences, agricultural activities, recreational activities, traffic, and similar conditions.

1.05 AIR POLLUTION CONTROL

A. Use reasonably available methods and devices to prevent, control, and otherwise minimize atmospheric emissions or discharges of air contaminants.

B. Do not operate equipment and vehicles that show excessive exhaust gas emissions until corrective repairs or adjustments reduce such emissions to acceptable levels.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Water Pollution Control 01 57 30 - 1

SECTION 01 57 30

WATER POLLUTION CONTROL

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the schedule for other items of work.

1.02…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .