Sol_R15PS00208.pdf

PDF 5 MB Posted

Attached to
UNIT CIRCUIT BREAKERS AND DISCONNECT SWITCHES REPLACEMENT FOR HOOVER DAM Federal contract opportunity
Solicitation number
R15PS00208
Issued by
Department of the Interior Bureau of Reclamation

About this file

R15PS00208

View the file

Other files for this federal contract opportunity

Other files attached to UNIT CIRCUIT BREAKERS AND DISCONNECT SWITCHES REPLACEMENT FOR HOOVER DAM, newest first.
File Type Posted
R15PS00208_Amend_0003_Site_Visit_Sign-In_Sheets.pdf PDF
Sol_R15PS00208_Amd_000003.pdf PDF
Sol_R15PS00208_Amd_000002.pdf PDF
Sol_R15PS00208_Amd_000001.pdf PDF
PSN_Unit_Circuit_Breakers.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

Bureau of Reclamation

Lower Colorado Region

Regional Office 500 Fir Street

R30

Boulder City NV 89005

Patrick Jacobs 702-293-8451

1x 02/05/2015

R15PS00208

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Solicitation No. R15PS00208 -- Unit Circuit Breakers and Disconnect Switches

Replacement for Hoover Dam Power Plant

Reference Block 8 for mailing address: Contractor's offer will be received by the

Bureau of Reclamation, Lower Colorado Regional Office, Attention: Patrick Jacobs, LC-10304, P.O. Box 61470, Boulder City, NV 89006. Express mailed offer(s) should be sent to: Bureau of Reclamation, Lower Colorado Regional Office, Attention: Patrick

Jacobs, LC-10304, 500 Fir Street, Boulder City, NV 89005. Hand-carried offer(s) should be delivered to the Bureau of Reclamation, Lower Colorado Regional Office, Annex Building, Nevada Highway and Park Street, Boulder City, Nevada.

Offeror must complete Block 17 of this Standard Form 1442 or leave the number of calendar days blank (do not insert "zero").

See solicitation Section L.10 1452.215-81, General Proposal Instructions--Bureau of

Reclamation, which specifies the number of copies of each proposal volume to be furnished with the offeror's proposal.

Estimated Price Rage of the Project: More than $10,000,000.00.

Continued ...

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

15 1460 calendar days and complete it within ________________ ________________ calendar days after receiving

Sections F.2 and F.3

03/05/2015

NSN 7540-01-155-3212

x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Meagan R. Fyffe

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

R15PS00208

FOB: Destination

00010 Unit Circuit Breakers and Disconnect Switches 1 AU

Replacement for Hoover Dam Power Plant

(Contract Price Schedule CLINS 00010 through

00100)

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Solicitation No. R15PS00208 Contract No.

Total Small Business Set-Aside

Unit Circuit Breakers and Disconnect Switches Replacement for Hoover Dam Power Plant

U.S. Department of the Interior Bureau of Reclamation Lower Colorado Region Boulder City, Nevada 2015

This page left intentionally bank

Foreward Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect Switches Replacement i

UNIT CIRCUIT BREAKERS AND DISCONNECT SWITCHES REPLACEMENT

Hoover Dam Powerplant Nevada/Arizona

FOREWARD

Work is located at the Hoover Dam Power Plant approximately 30 miles northeast of Las Vegas, Nevada.

Principal work includes; remove nine (9) old 16.5-kV Unit Circuit Breakers and nine (9) old pairs of Disconnect Switches, furnish and install nine (9) new 25.3-kV Generator-Service Circuit Breakers, nine

(9) new pairs of Disconnect Switches, one (1) new Current Transformer per phase on each side of the Unit Circuit Breakers, modify existing Isolated-Phase Bus, and furnish and install new Isolated-Phase Bus to connect new Unit Circuit Breakers to existing Isolated-Phase Bus.

This acquisition is being procured under Federal Acquisition Regulations (FAR), Part 15, Contracting by Negotiations. See provisions in Section L that include General, Technical, and Pricing Proposal Instructions and in Section M for the evaluation factors for award.

OFFER SUBMISSION: Offers are due on MARCH 5, 2015 by 12:00 PM PACIFIC TIME. (See Standard Form 1442). The Government does not contemplate extending the due date for receipts of offers.

SITE VISIT: A site visit will be held on FEBRUARY 23, 2015 at 9:00 AM PACIFIC TIME. All prospective offerors are strongly encouraged to attend the pre-bid site to examine access to the work, the location of the work, and the existing equipment arrangements (See Section L.7, FAR 52.236-27, Site Visit – Construction). All attendees should meet at the flagpole across the street from the Hoover Dam Visitors Center. Prospective offerors desiring to attend the site visit should contact Patrick Jacobs, Lower Colorado Regional Office, Boulder City, NV, at pjacobs@usbr.gov or (702) 293-8451.

DRAWINGS: Copies of the drawings referenced in Section J, List of Documents, Exhibits, and Other Attachments, will not be posted electronically. Interested offerors may request copies of the drawings, which are available on CD Media, by contacting Patrick Jacobs at pjacobs@usbr.gov. The CD will be sent by overnight mail.

QUESTIONS: All questions pertaining to this solicitation shall be sent via email only to Patrick Jacobs at pjacobs@usbr.gov by FEBRUARY 25, 2015 by 12:00 PM PACIFIC TIME.

NOTE TO OFFERORS: The Government anticipates making award without discussions and will not seek clarifications or hold discussions. The award decision may be based on the offeror’s initial proposal.

Offerors are encouraged to submit proposals using recycled paper and doubled sided copying to minimize waste and to utilize products that are made with post-consumer recycled content, recyclable, bio-based, and/or energy efficient products.

For information regarding Bureau of Reclamation’s publication; “Reclamation Safety and Health Standards” (2009 Edition), which is applicable to work under this contract, see clause at “1452.223-81, Safety and Health (RSHS).” The Contractor may download the electronic version of the RSHS Manual at no charge from the Bureau of Reclamation’s website at http://www.usbr.gov/ssle/safety/RSHS/rshs.html.

Based upon law, Executive Order, or internal policy, the Department of the Interior prohibits discrimination in the workplace, including sexual harassment, based on race, color, national origin, sex, religion, disability, age, or sexual orientation. The Department urges its contractors, subcontractors, and lessors to develop and enforce comprehensive anti-discrimination policies for their places of work.

mailto:pjacobs@usbr.gov http://www.usbr.gov/ssle/safety/RSHS/rshs.html

Foreward Document No.

Document Title Unit Circuit Breaker and Disconnect Switches ii

This page left intentionally bank

Table of Contents Document No.

Document Title Unit Circuit Breaker and Disconnect Switches i

TABLE OF CONTENTS

FOREWARD

TABLE OF CONTENTS i

SECTION A – Solicitation Offer and Award A-1

SECTION B – Continuation of Section B – Services and Prices B-1 B.1 The Requirements - Negotiation B-1 B.2 The Schedule B-2

SECTION C – Descriptions and Specifications C-1 C.1 Statement of Work/Specifications/Work Statement C-1

SECTION D – Packaging and Marking D-1

SECTION E – Inspection and Acceptance E-1 E.1 Clauses Incorporated By Reference E-1

SECTION F – Deliveries or Performance F-1 F.1 Clauses Incorporated By Reference F-1 F.2 Performance Periods F-1

SECTION G – Contract Administration Data G-1 G.1 Authorities and Delegations G-1 G.2 Postaward Conference – Bureau of Reclamation G-1 G.3 Government Administration Personnel G-2 G.4 Contractor’s Administration Personnel G-2 G.5 Electronic Invoicing and Payment Requirements – Invoice Processing Platform G-2

SECTION H – Special Contract Requirements H-1 H.1 Contractor Performance Assessment Reporting System H-1 H.2 Authorized Workers Notice to Potential Bureau of Reclamation Contractors H-2

SECTION I – Contract Clauses I-1

I.1 Clauses Incorporated By Reference I-1 I.2 Buy American – Construction Materials Under Trade Agreements I-3 I.3 Authorized Deviations in Clauses I-8 I.4 Restriction on Endorsements – Department of the Interior I-8 I.5 Release of Claims – Department of the Interior I-8 I.6 Examination of Records by the Department of the Interior I-9 I.7 Safety and Health – Bureau of Reclamation I-9 I.8 Liability Insurance – Department of the Interior I-9 I.9 Limitation of Funds (Fixed-Price Contract) – Bureau of Reclamation I-10 I.10 Payment for Mobilization and Preparatory Work – Bureau of Reclamation I-12 I.11 Security Requirements – Bureau of Reclamation I-13 I.12 Safety Data Submittal Requirements – Bureau of Reclamation I-22

Table of Contents Document No.

Document Title Unit Circuit Breaker and Disconnect Switches ii

SECTION J – List of Documents, Exhibits and Other Attachments J-1

J.1 Applicability of Documents J-1 J.2 J.3

List of Contract Documents List of Drawings

J-1 J-1

SECTION K – Representations, Certifications and Other Statements of Offerors K-1 K.1 Solicitation Provisions Incorporated by Reference K-1 K.2 Annual Representations and Certifications K-1 K.3 Certification Regarding Responsibility Matters K-5 K.4 Information Regarding Responsibility Matters K-6

SECTION L – Instructions, Conditions and Notices to Bidders L-1

L.1 Solicitation Provisions Incorporated by Reference L-1 L.2 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or

Pricing Data – Alternate IV L-1

L.3 Type of Contract L-1 L.4 Construction Wage Rate Requirements – Secondary Site of the Work L-1 L.5

Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction

L-2

L.6 Notice of Buy American Requirement—Construction Materials Under Trade Agreement L-3 L.7 Site Visit (Construction) - Alternate I L-4 L.8 Authorized Deviations In Provisions L-4 L.9 Use and Disclosure of Proposal Information--Department of the Interior L-4 L.10 General Proposal Instructions -- Bureau of Reclamation L-6 L.11 Technical Proposal Instructions -- Bureau of Reclamation L-8 L.12 Pricing Proposal Instructions – Bureau of Reclamation L-11 L.13 Service of Protest – Department of Interior L-12 L.14 Instruction for Mobilization and Preparatory Work L-13

SECTION M – Evaluation Factors for Award M-1 M.1 Provisions By Reference M-1 M.2 Evaluation Factors for Award M-1

Section A Solicitation, Offer and Award

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect Switches Replacement

A-1

SECTION A – SOLICITATION, OFFER, AND AWARD

(SF 1442 Insert Form Here)

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

Bureau of Reclamation

Lower Colorado Region

Regional Office 500 Fir Street

R30

Boulder City NV 89005

Patrick Jacobs 702-293-8451

1x 02/05/2015

R15PS00208

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Solicitation No. R15PS00208 -- Unit Circuit Breakers and Disconnect Switches

Replacement for Hoover Dam Power Plant

Reference Block 8 for mailing address: Contractor's offer will be received by the

Bureau of Reclamation, Lower Colorado Regional Office, Attention: Patrick Jacobs, LC-10304, P.O. Box 61470, Boulder City, NV 89006. Express mailed offer(s) should be sent to: Bureau of Reclamation, Lower Colorado Regional Office, Attention: Patrick

Jacobs, LC-10304, 500 Fir Street, Boulder City, NV 89005. Hand-carried offer(s) should be delivered to the Bureau of Reclamation, Lower Colorado Regional Office, Annex Building, Nevada Highway and Park Street, Boulder City, Nevada.

Offeror must complete Block 17 of this Standard Form 1442 or leave the number of calendar days blank (do not insert "zero").

See solicitation Section L.10 1452.215-81, General Proposal Instructions--Bureau of

Reclamation, which specifies the number of copies of each proposal volume to be furnished with the offeror's proposal.

Estimated Price Rage of the Project: More than $10,000,000.00.

Continued ...

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

15 1460 calendar days and complete it within ________________ ________________ calendar days after receiving

Sections F.2 and F.3

03/05/2015

NSN 7540-01-155-3212

x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Meagan R. Fyffe

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

R15PS00208

FOB: Destination

00010 Unit Circuit Breakers and Disconnect Switches 1 AU

Replacement for Hoover Dam Power Plant

(Contract Price Schedule CLINS 00010 through

00100)

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Section A Solicitation, Offer and Award

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect

A-2

This page left intentionally blank

Section B Continuation of Section B – Services and Prices

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect

B-1

SECTION B – CONTINUATION OF SECTION B – SERVICES AND PRICES

B.1 THE REQUIREMENTS – NEGOTIATION

(a) The Contractor shall furnish the items identified in this Section, in accordance with the terms, conditions, and specifications contained in the contract.

(b) Offerors are cautioned to carefully review the proposal submission requirements contained in Section L. Failure to comply with these requirements may result in an offer being determined technically unacceptable.

(c) Offers will be considered for award on the schedule in Paragraph B.2, but no offer will be considered for award for only a part of the schedules or a part of any single schedule. Offers for only a part of the schedules or parts of a single schedule may be determined technically unacceptable.

(d) Offers will be considered on any single schedule or any combination of schedules; however, no offers will be considered for only a part of a single schedule.

(e) Offerors shall complete the schedule(s) in Section B and furnish any additional information required in Section B, as applicable.

(f) Offerors proposing to submit equal product(s), pursuant to the Brand Name or Equal clause of the solicitation are required to furnish descriptive literature which will demonstrate that the equal product offered meets all salient characteristics contained in the specifications. See the Section L provision Additional Offer Submission Requirements.

(g) The Section I clause entitled "Payment for Mobilization and Preparatory Work" applies to Schedule item(s) for Mobilization and Preparatory Work. Also, see the Section L provision entitled “Instruction for Mobilization and Preparatory Work Schedule Line Item.”

(h) IMPORTANT NOTE: The requirement for submission of a bid guarantee and performance and payment bonds is only applicable to offers in excess of $100,000.00.

Section B Continuation of Section B – Services and Prices

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect

B-2

B.2

THE SCHEDULE

CLIN Supplies or Services Quantity Unit Unit Price Price

00010 Mobilization and Preparatory Work

1 Lump Sum

00020 Bonds 1 Lump Sum

00030 Electrical Drawings and Data

9 Each

00040 Removal of Existing Equipment

9 Each

00050 Isolated-Phase Bus 9 Each

00060 Medium-Voltage Circuit Breakers

9 Each

00070 Disconnecting Switches and Current Transformers Set

9 Each

00080 Rolling Doors and Vault Modifications

9 Each

00090 Cable Sheets Information 9 Each

00100 Old Breaker Salvage Credit

9 Each

Total Proposed Price: _________________________

Section C Descriptions and Specifications

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect

C-1

SECTION C – DESCRIPTIONS AND SPECIFICATIONS

C.1 STATEMENT OF WORK / SPECIFICATIONS / WORK STATEMENT

The Contractor shall furnish the necessary personnel, materials, equipment, services, and facilities (except as otherwise specified) to perform the requirement specified in the Statement of Work / Specifications / Work Statement contained in Attachment No. 1 of this solicitation/contract.

Section C Descriptions and Specifications

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect

C-2

Section D Packaging and Marking

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect Switches

D-1

SECTION D – PACKAGING AND MARKING

(There are no clauses in this section)

Section D Packaging and Marking

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect Switches

D-2

Section E Inspection and Acceptance

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect

E-1

SECTION E - INSPECTION AND ACCEPTANCE

E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following addresses:

Federal Acquisition Regulations (FAR) Clauses - https://www.acquisition.gov/far/

Clause Title Date 52.246-12 Inspection of Construction AUG 1996 https://www.acquisition.gov/far/

Section E Inspection and Acceptance

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect

E-2

Section F Deliveries or Performance

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect

F-1

SECTION F -- DELIVERIES OR PERFORMANCE

F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following addresses:

Federal Acquisition Regulations (FAR) Clauses - https://www.acquisition.gov/far/ Reclamation Acquisition Regulations (RAR) Clauses - http://www.usbr.gov/mso/aamd/resources.html

In addition, the clauses can be identified as follows:

FAR – by the number prefix 52 (e.g. 52.252-01)

Clause Title Date 52.211-10 Commencement, Prosecution, and Completion of Work APR 1984 52.242-14 Suspension of Work APR 1984

F.2 PERFORMANCE PERIODS

Due to funding limitations and outage schedules, the number of Unit Circuit Breakers which can be installed each year is limited. One (1) notice-to-proceed (NTP) will be issued for the entire contract performance period. The overall contract performance period is estimated from March 30, 2015 to March 30, 2019, commencing upon the issuance of the NTP.

The line items required under this contract are required to be completed in accordance with the following outage schedules (reference Statement of Work, Section C.1.5, Project Schedule Milestones) for installation work.

UNIT

NO.

LOCATION START/END DATES

FOR

INSTALLATION

A1 HOOVER DAM, ARIZONA SIDE JAN-MAR FY-2016

A2 HOOVER DAM, ARIZONA SIDE JAN-MAR FY-2016

N1 HOOVER DAM, NEVADA SIDE JAN-MAR FY-2017

N2 HOOVER DAM, NEVADA SIDE JAN-MAR FY-2017

N3 HOOVER DAM, NEVADA SIDE JAN-MAR FY-2017

N4 HOOVER DAM, NEVADA SIDE JAN-MAR FY-2018

N5 HOOVER DAM, NEVADA SIDE JAN-MAR FY-2018

N6 HOOVER DAM, NEVADA SIDE JAN-MAR FY-2019

N8 HOOVER DAM, NEVADA SIDE JAN-MAR FY-2019

https://www.acquisition.gov/far/ http://www.usbr.gov/mso/aamd/resources.html

Section F Deliveries or Performance

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect

F-2

The overall contract performance period of this contract consists of the following time periods:

(1) The performance period for the first two Unit Circuit Breakers will be for 3 months (90 calendar days).

(2) The performance period for the next three Unit Circuit Breakers will be for 3 months (90

(3) The performance period for the next two Unit Circuit Breakers will be 3 months (90

(4) The performance period for the last two Unit Circuit Breakers will be for 3 months (90

Section G Contract Administration Data

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect

G-1

SECTION G -- CONTRACT ADMINISTRATION DATA

G.1 1452.201-70 AUTHORITIES AND DELEGATIONS SEPT 2011

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.

The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.

Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph

(d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

G.2 1452.242-80 POSTAWARD CONFERENCE – BUREAU OF RECLAMATION JUL 1993

(a) Prior to the Contractor starting work, a postaward conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The Contractor's Project Manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.

Administration Data

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect

G-2

(b) The conference will be held at the Bureau of Reclamation, Lower Colorado Regional Office, Annex Building, Boulder City, Nevada.

(c) The Contracting Officer and the Contractor will agree to the date and time of the conference after award of the contract. In event of a conflict in schedules, the Contracting Officer shall establish the date for the conference.

(d) The Contractor shall include any associated costs for attendance at the conference in its offer.

G.3 GOVERNMENT ADMINISTRATION PERSONNEL

The contracting office representative responsible for overall administration of this contract is:

Meagan R. Fyffe, Contracting Officer (LC-10300) Bureau of Reclamation P.O. Box 61470 Boulder City, NV 89006-1470 Phone No.: 702-293-8552 Facsimile No.: 702-293-8499 E-mail: mfyffe@usbr.gov

G.4 CONTRACTOR’S ADMINISTRATION PERSONNEL

The designated Contractor Official who will be in charge of overall administration of this contract is:

Name: ________________________________________________________ Title: _________________________________________________________ Address: ______________________________________________________ City/State/Zip: __________________________________________________ Telephone No.: _________________________________________________ Facsimile No.: __________________________________________________ Company Cell No.:_______________________________________________ Company Email Address: __________________________________________

G.5 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS—INVOICE APR 2013

PROCESSING PLATFORM

Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Internet Payment Platform System (IPP).

“Payment requests” means any request for contract financing payment or invoicing payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions-Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: (1) Invoice (Construction); 2) Monthly Certificate of Labor Conformance; 3) Subcontractor/Supplier Payment Summary; and 4) Any additional documentation to substantiate each progress payment request and as required by the Contracting Officer’s Representative or Contracting Officer. The forms will be provided during the post award conference. The Government will prepare a Contract Summary (Construction Voucher).

mailto:mfyffe@usbr.gov https://www.ipp.gov/

Administration Data

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect

G-3

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3-5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

mailto:ippgroup@bos.frb.org

Administration Data

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect

G-4

Section H Special Contract Requirements

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect Switches

H-1

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM

(a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.

(b) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.

(c) DOI will utilize the Primary and Alternate Points of Contact shown in System for Award Management (SAM) as the past performance contacts for your company that will be notified to complete the performance evaluation on behalf of your firm. If you have not yet designated Past Performance Points of Contact in SAM, we recommend that you do so, and request that you furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm’s past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.

(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov.

The CPARS User Manual, registration for On Line Training for Contractor Representatives, and a practice application may be found at this site.

(e) Within 60 days after the end of the performance period(s) specified in paragraph (a), the Contracting Officer will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official’s narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, blocks 1 – 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating “No comment” in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: “The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment.” Your response is due within 30 calendar days after receipt of the CPAR.

(f) The following guidelines apply concerning your use of the past performance evaluation:

(1) Protect the evaluation as “source selection information.” After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.

https://www.cpars.gov/ https://www.cpars.gov/

Requirements

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect Switches

H-2

(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.

(g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30-day review period.

(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

H.2 AUTHORIZED WORKERS NOTICE TO POTENTIAL BUREAU OF RECLAMATION

CONTRACTORS

(a) Definitions.

IRCA - Immigration Reform and Control Act of 1986 INA - Immigration and Nationality Act INS - Immigration and Naturalization Service SSA - Social Security Administration INS SAVE Program - The INS Systematic Alien Verification for Entitlements Program ESA - Employment Standards Administration (Department of Labor)

(b) Authority. Immigration Reform and Control Act of 1986 (8 USC 1101 as amended) and the Immigration and Nationality Act, Section 274A.

(c) Who is Covered. INA includes provisions addressing employment eligibility, employment verification, and nondiscrimination. These provisions apply to all employers, including government contractors.

(d) Basic Provisions/Requirements. Under IRCA, employers may hire only persons who may legally work in the U.S., i.e., citizens and nationals of the U.S. and aliens authorized to work in the U.S. The employer must verify the identity and employment eligibility of anyone to be hired, which includes completing the Employment Eligibility Verification Form (I-9). Employers must keep each I-9 on file for at least three years, or one year after employment ends, whichever is longer. Detailed guidance on the I-9 is available at the INS web site: http://www.uscis.gov/i-9-central

(e) Employment Verification Pilot Programs. The INS and the SSA are conducting the following programs that provide employers a way to confirm the employment eligibility of their newly hired employees. Any employer located in a pilot state may volunteer to participate in a pilot program. If employers are not located in a pilot state, they would verify employment eligibility by following the procedures currently in place, i.e., by completing Form I-9.

(1) The Basic Pilot is a joint pilot being conducted by the INS and SSA in the States of California, Florida, Illinois, Nebraska, New York, and Texas. This pilot involves verification checks of the SSA and INS databases of all newly hired employees, regardless of citizenship. To receive information on the Basic Pilot program please call the INS SAVE Program toll free at 1-888-464-4218, or fax your request for information to (202) 514-9981, or write to USINS, SAVE Program, 425 I Street, NW, ULLICO Building 4th Floor, Washington, DC 20536. You may also contact the Social Security Administration by calling (410) 966-1940, or writing to Social Security Administration, Office of Program Benefits Policy, 6401 Security Blvd., 760 Altmeyer, Baltimore, MD 21235.

http://www.uscis.gov/i-9-central

Requirements

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect Switches

H-3

(2) The INS is conducting the Citizen Attestation Pilot in the States of Arizona, Maryland, Massachusetts, Michigan, and Virginia. The Citizen Attestation Pilot permits participating employers to electronically verify the employment eligibility of newly hired alien employees by using a personal computer with a modem. To receive information on the Citizen Attestation Pilot program please call the INS SAVE Program toll free at 1-888-464-4218, or fax your request for information to (202) 514-9981. Employers may also write to US/INS, SAVE Program, 425 I Street, NW, ULLICO-4th Floor, Washington, DC 20536.

(3) The INS and the SSA are conducting the Machine-Readable Document Pilot in the State of Iowa. The Machine-Readable Document Pilot is identical to the Basic Pilot in all respects, except for the geographic scope of the pilot and for one additional feature. If an employee presents an Iowa's driver's license or identification card containing a machine-readable SSN, the employer will make an inquiry through the confirmation system by using the machine-readable feature. To receive information on the Machine- Readable Document Pilot program please call the INS SAVE Program toll free at 1-888-464-4218, or fax your request for information to (202) 514-9981. You may also write to US/INS, SAVE Program, 425 I Street, NW, ULLICO-4th Floor, Washington, DC 20536.

(f) Employee Rights. The INA protects U.S. citizens and aliens authorized to accept employment in the U.S. from discrimination in hiring or discharge on the basis of national origin and citizenship status.

(g) Compliance Assistance. More detailed information, including copies of explanatory brochures and regulatory and interpretative materials, may be obtained from local offices of the Department of Labor's Employment Standards Division, Wage and Hour Division, and the Office of Federal Contract Compliance Programs.

(h) Penalties/Sanctions. Employers who fail to complete and/or retain the I-9 forms are subject to penalties. The INS enforces the INA requirements on verification of employment eligibility. The Justice Department enforces the anti-discrimination provisions. As part of their ongoing enforcement efforts, the ESA's Wage and Hour Division and Office of Federal Contract Compliance Programs conduct inspections of the I-9 forms. They report their findings to the INS and to the Department of Justice when they find cases of disparate treatment or unauthorized employment. A debarring official may debar a contractor, based on a determination by the Attorney General of the United States, or designee, that the contractor is not in compliance with the INA. The Attorney General's determination is not reviewable in the debarment proceedings.

Requirements

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect Switches

H-4

Section I Contract Clauses

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect Switches

I-1

SECTION I – CONTRACT CLAUSES

I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following addresses:

Federal Acquisition Regulations (FAR) Clauses - https://www.acquisition.gov/far/ Department of the Interior Acquisition Regulations (DIAR) Clauses -http://www.doi.gov/pam/programs/acquisition/pamareg.cfm Reclamation Acquisition Regulations (RAR) Clauses - http://www.usbr.gov/mso/aamd/resources.html

In addition, the clauses can be identified as follows:

FAR – by the number prefix 52 (e.g. 52.252-01) DIAR – by the number prefix 1452 and number suffix of -70 (e.g. 1452.204-70) RAR – by the number prefix 1452 and number suffix of -80 (e.g. 1452.201-80)

Clause Title Date 52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper

Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal Transactions OCT 2010 52.203-13 Contractor Code of Business Ethics and Conduct APR 2010 52.203-14 Display of Hotline Poster(s) DEC 2007 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform

Employees of Whistleblower Rights

APR 2014

52.204-2 Security Requirements - Alternate II (April 1984) AUG 1996 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper MAY 2011 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards JUL 2013 52-204-13 System for Award Management Maintenance JUL 2013 52.209-6 Protecting the Government's Interest When Subcontracting With

Contractors Debarred, Suspended, or Proposed for Debarment

AUG 2013

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

JUL 2013

52.210-1 Market Research APR 2011 52.215-2 Audit and Records--Negotiation OCT 2010 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than

Certified Cost or Pricing Data--Modifications

OCT 2010

52.219-6 Notice of Total Small Business Set-Aside NOV 2011 52.219-8 Utilization of Small Business Concerns MAY 2014 52.219-14 Limitations on Subcontracting NOV 2011 52.219-28 Post-Award Small Business Program Representation JUL 2013 52.222-3 Convict Labor JUN 2003 https://www.acquisition.gov/far/ http://www.doi.gov/pam/programs/acquisition/pamareg.cfm http://www.usbr.gov/mso/aamd/resources.html

Document No.

R15PS00208

Document Title Unit Circuit Breaker and Disconnect Switches

I-2

52.222-4 Contract Work Hours and Safety Standards—Overtime Compensation MAY 2014 52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination—Debarment MAY 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related

Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition of Segregated Facilities FEB 1999 52.222-26 Equal Opportunity MAR 2007 52.222-27 Affirmative Action Compliance Requirements for Construction FEB 1999 52.222-35 Equal Opportunity for Veterans JUL 2014 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans JUL 2014 52.222-40 Notification of Employee Rights Under the National Labor Relations Act DEC 2010 52.222-50 Combating Trafficking in Persons FEB 2009 52.222-54 Employment Eligibility Verification AUG 2013 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2014 52.223-3 Hazardous Material Identification and Material Safety Data –

Alternate I (July 1995)

JAN 1997

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug Free Workplace MAY 2001 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving AUG 2011 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copy Infringement DEC 2007 52.227-4 Patent Indemnity—Construction Contracts DEC 2007 52.228-1 Bid Guarantee SEPT 1996 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance—Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets JAN 2012 52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014 52.228-14 Irrevocable Letter of Credit MAY 2014 52.228-15 Performance and Payment Bonds—Construction OCT 2010 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-23…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .