R15PS00018_-_Amendment_2.pdf
PDF 5 MB Posted
- Attached to
- BULL TROUT STATUS AND CHARACTERISTICS BASELINE DATA COMPILATION Federal contract opportunity
- Solicitation number
- R15PS00018
About this file
R15PS00018 - Amendment 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_R15PS00018_Amd_000002.pdf | ||
| R15PS00018_-_Amendment_1.pdf | ||
| Sol_R15PS00018.pdf | ||
| R15PS00018_-_Bull_Trout_Attachments.pdf | ||
| R15PS00018_-_Bull_Trout_Section_A_and_B.pdf | ||
| R15PS00018_-_Bull_Trout_Data_Analysis_RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
R15PS00018
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Billings MT 59107 Billings MT 59107
R60
PO Box 36900 PO Box 36900 Regional Office Regional Office Great Plains Region Great Plains Region Bureau of Reclamation Bureau of Reclamation
01/02/2015000002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/05/2014
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project Title: BULL TROUT STATUS AND CHARACTERISTICS BASELINE DATA COMPILATION, MILK RIVER
PROJECT, ST. MARY RIVER, MONTANA
See Page 2 of 194 for changes incorporated by this amendment.
Period of Performance: 02/01/2015 to 03/31/2016
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Christine K Mundt
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation Number R15PS00018 Amendment No. 0001
Pg 2 of 194
Description of Changes - This amendment incorporates the following changes to the solicitation:
1. Remove the Table of Contents in its entirety and substitute therefore the attached revised Table of Contents.
2. Remove Section C, Performance Work Statement, in its entirety and substitute therefore the attached revised pages C – 3 through C – 20.
3. Remove Section I, Purchase Order Clauses, in its entirety and substitute therefore the attached revised pages I – 1 through I – 12.
4. Remove Section J, List of Documents, Exhibits, and Other Attachments, in its entirety and substitute therefore the attached revised pages J – 1 through J – 2.
5. In Section J, List of Documents, Exhibits, and Other Attachments, remove Attachment Number 1, Service Contract Act Wage Determination (Revision Number 14), in its entirety and substitute therefore the attached revised Service Contract Act Wage Determination (Revision Number 15).
6. In Section J, List of Documents, Exhibits, and Other Attachments, add the new Attachment Number 3, Large-Scale, Seasonal Movements of Radiotagged, Adult Bull Trout in the St. Mary River Drainage, Montana and Alberta (Accepted for publication 22 September 2005).
7. In Section J, List of Documents, Exhibits, and Other Attachments, add the new Attachment Number 4, Identification and Characterization of Migratory and Nonmigratory Bull Trout Populations in the St. Mary River Drainage, Montana (Transactions of the American Fisheries Society 134:841–852, 2005)
8. In Section J, List of Documents, Exhibits, and Other Attachments, add the new Attachment Number 5, Fish Entrainment At the Saint Mary Diversion, Montana With a Review of the Impacts of Project Operations on Bull Trout and other Native Fishes (April 2011)
9. In Section J, List of Documents, Exhibits, and Other Attachments, add the new Attachment Number 6, Genetic Analysis of Bull Trout in the St. Mary River System (September 16, 2011)
10. In Section J, List of Documents, Exhibits, and Other Attachments, add the new Attachment Number 7, Bull Trout (Salvelinus confluentus) Investigations in the St. Mary River Drainage, Montana (May 2013)
Solicitation Number R15PS00018 Amendment No. 0001
Pg 3 of 194
11. In Section J, List of Documents, Exhibits, and Other Attachments, add the new Attachment Number 8, Genetic Analysis of Bull Trout in the St. Mary River System, MT (April 16, 2014)
12. Remove Section K, Representations, Certifications, and Other Statements of Offerors, in its entirety and substitute therefore the attached revised pages K – 1 through K –14.
13. This amendment provides the Questions and Answers received in response to the solicitation as of January 1, 2015.
For convenience, essential changes on the revised solicitation pages are indicated by a vertical line in the margin where lines or paragraphs changed from the previous version. However, all portions of the revised solicitation pages shall apply whether changes thereon have or have not been indicated.
Acknowledgement - See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of offers (See Block 9 of the Standard Form 1449 - Solicitation/Contract/Order for Commercial Items).
Question Response Date - All contractual and technical questions must be submitted by email to cmundt@usbr.gov. Offerors shall submit questions no later than 7 calendar days prior to the date designated for quote response.
Quotation Response Date - This hour and date for receipt of quotations has been extended to 5:00 pm (local time) on January 12, 2015.
Third Party – If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.
mailto:cmundt@usbr.gov
Document No.
R15PS00018
Document Title Bull Trout Status and Baseline Characteristics Data Compilation
This Page Intentionally Left Blank
TOC - 1
TABLE OF CONTENTS
PART I – THE SCHEDULE
SECTION A – REQUEST FOR QUOTATION
Standard Form 1449 ........................................................................................... Separate Download
SECTION B – SUPPLIES OR SERVICES AND PRICES / COSTS
Standard Form 1449 ........................................................................................... Separate Download
SECTION C – PERFORMANCE WORK STATEMENT
Performance Work Statement .................................................................................................... C - 1 Quality Assurance Surveillance Plan ............................................................................. Appendix A
SECTION D – NOT USED
SECTION E – NOT USED
SECTION F – NOT USED
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 DOI Electronic Invoicing Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) ................................................................................ G - 1 G.2 Postaward Conference--Bureau of Reclamation ........................................................... G - 1 G.3 Government Administration Personnel ......................................................................... G - 2 G.4 Contractor's Administration Personnel .......................................................................... G - 2
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1 Site Security .................................................................................................................. H - 1
PART II – PURCHASE ORDER CLAUSES
SECTION I – PURCHASE ORDER CLAUSES
I.1 Clauses Incorporated by Reference ................................................................................ I - 1 I.2 Contract Terms and Conditions Required to Implement Statues or Executive Orders -- Commercial Items ....................................................................................................... I - 1 I.3 Establishing A Minimum Wage For Contractors (Deviation) ....................................... I - 7 I.4 Protecting Federal Employees and the Public from Exposure to Tobacco Smoke in the Federal Workplace -- Bureau of Reclamation ...................................................... I - 8 I.5 Security Requirements -- Bureau of Reclamation .......................................................... I - 8 I.6 Reserved ....................................................................................................................... I - 12
PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER
ATTACHMENTS
TOC - 2
SECTION J – LIST OF ATTACHMENTS
1 - Service Contract Act Wage Determination 2 - Company Experience Reference List 3 - Large-Scale, Seasonal Movements of Radiotagged, Adult Bull Trout in the St. Mary River Drainage, Montana and Alberta (Accepted for publication 22 September 2005) 4 - Identification and Characterization of Migratory and Nonmigratory Bull Trout Populations in the St. Mary River Drainage, Montana (Transactions of the American Fisheries Society 134:841–852, 2005) 5 - Fish Entrainment At the Saint Mary Diversion, Montana With a Review of the Impacts of Project Operations on Bull Trout and other Native Fishes (April 2011) 6 - Genetic Analysis of Bull Trout in the St. Mary River System (September 16, 2011) 7 - Bull Trout (Salvelinus confluentus) Investigations in the St. Mary River Drainage, Montana (May 2013) 8 - Genetic Analysis of Bull Trout in the St. Mary River System, MT (April 16, 2014)
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K – REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF
OFFERORS OR RESPONDENTS
K.1 Commercial and Government Entity Code Reporting .................................................. K - 1 K.2 Incorporation by Reference of Representations and Certifications ............................... K - 2 K.3 Offeror Representations and Certifications - Commercial Items .................................. K - 2
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR
RESPONDENTS
L.1 System for Award Management .................................................................................... L - 1 L.2 Instructions to Offerors -- Commercial Items ............................................................... L - 2 L.3 Use and Disclosure of Proposal Information -- Department of the Interior .................. L - 5 L.4 Notice of Intent to Acquire Metric Products and Services -- Bureau of Reclamation .............................................................................................................. L - 7 L.5 Authorized Workers Notice to Potential Bureau of Reclamation Contractors .............. L - 8
SECTION M – EVALUATION FACTORS FOR AWARD
M.1 Evaluation—Commercial Items ................................................................................... M - 1 M.2 Notice of World Trade Organization Government Procurement Agreement Evaluations--Bureau of Reclamation ........................................................................... M - 2
C - 1
PERFORMANCE WORK STATEMENT (PWS)
BULL TROUT STATUS AND CHARACTERISTICS BASELINE DATA COMPILATION,
MILK RIVER PROJECT, ST. MARY RIVER, MONTANA
1. C-1 - GENERAL
1.1. BACKGROUND.
Currently, Reclamation is progressing toward the modification or replacement of several key structures and possible operation changes of the Milk River Project. The project provides for storage of water from Swift Current Creek, a tributary of the St. Mary River, in Lake Sherburne behind Lake Sherburne Dam and diversion of St. Mary River water through a 29-mile canal discharging into the North Fork Milk River. All water supply and distribution works have been constructed, and are operated and maintained by Reclamation with reimbursement provided from the Milk River Joint Board of Control and the Milk River Irrigation Districts.
The Milk River Project is an early 1900s irrigation project with project components as far west as Sherburne Dam, which is on the eastern boundary of Glacier National Park. The easternmost project features are near the confluence with the Missouri River. This project relates to the St.
Mary Unit of the Milk River Project. The St. Mary Unit consists of Sherburne Dam and the associated impoundment, the Swiftcurrent Dike, and the St. Mary Diversion Dam and headworks.
Sherburne Dam is operated to store irrigation water, the reservoir is opened as needed to accommodate diversions at the downstream St. Mary Diversion and to comply with International Treaty. Following the irrigation season, Sherburne Dam is closed and water is not released into Swiftcurrent Creek through the winter months. When water is being delivered, water flows from Sherburne Dam into Swiftcurrent Creek. Below the union with Boulder Creek, a water control dike was built to redirect the flows of Swiftcurrent Creek and Boulder Creek into the Lower St.
Mary Lake. Water flows through the lake and exits into the St. Mary River. The St. Mary Diversion Dam is operated to deliver water into the St. Mary Canal. During periods of water delivery the unscreened headworks receive water checked by the St. Mary Diversion Dam through the closure of gates. This results in fish entrainment into the canal, and the dam serves as a migratory barrier to bull trout. During the non irrigation season the gates on the diversion are open and bull trout passage is provided. The gates of the headworks are closed during the non-irrigation season minimizing entrainment.
The distinct population segment (DPS) of bull trout, Salvelinus confluentus, in the St. Mary River drainage, east of the Continental Divide in Northern Montana, was “listed” as a threatened “species,” under the U.S. Endangered Species Act, in 1999. Since 1997, Reclamation has been funding studies conducted by U.S. Fish and Wildlife Service, Montana Fish and Wildlife Conservation Office (Service) to monitor the status and population characteristics of the bull trout in the St. Mary River drainage.
Prior to implementing Milk River Project changes, the “baseline” characteristics of the bull trout population of the drainage need to be described in detail using those data collected during the previous years of investigations. Successful completion of the work will require the contractor to collaborate closely with Reclamation and Service personnel.
C - 2
1.2. GENERAL SCOPE OF WORK.
The objective of this purchase order effort is to provide Reclamation with a detailed, statistically valid description of baseline characteristic for the bull trout population in the St. Mary River basin. The contractor shall compile, analyze, and describe all data collected between 1997 and 2013 under Reclamation-funded studies and relate these to existing operations.
The final document shall describe the assumed characteristics of bull trout in the DPS at the time of listing, compare those assumed characteristics to those for the bull trout population revealed by the past 18 years of investigation and data collection, describe planned modifications to the physical nature or operational characteristics of the Milk River Project structures, and describe their importance to the bull trout population. The contractor is not expected to make any modification to the physical nature or the operations of the Milk River Project. Analysis of the bull trout data in conjunction with flow data may lead to the identification of trends in bull trout linked to Bureau of Reclamation facilities of the St. Mary Unit. If negative trends exist, management recommendations would be appropriate to consider. Positive trends should be identified as well.
Except as specified in Section C-3, the contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and incidental services necessary to satisfactorily perform data analysis services as defined in Section C-5.
The contractor shall perform in accordance with the standards defined in Section C-5 of this Performance Work Statement (PWS). The contractor shall utilize a variety of work methods that may include but are not limited to review of existing related databases, reports, maps, and location drawings, project management, research of public records, meeting coordination, report writing, and other related activities. Any onsite field work is excluded from the scope of this purchase order. Additionally, there is no requirement for engineering certification, ESA regulatory compliance, or NEPA permits as a part of this requirement. The contractor shall specify their proposed work methods in their general work plan as addressed in Section 4.2 of this PWS.
1.3. CONTRACTOR PERSONNEL.
1.3.1. Administration Personnel. The contractor shall designate a representative in accordance with the clause at GP-3 included in Section G. The contractor’s representative shall have the authority to act for the contractor on all matters relating to daily operation of the resultant purchase order. The contractor’s representative shall be able to read, write, speak, and understand the English language.
1.3.2. Employee Qualifications. The contractor’s key personnel must have prior experience and training for work that is similar in scope and complexity to this project. If key personnel become unavailable during the period of performance of the purchase order, the contractor shall provide individuals with equal or great qualifications.
C - 3
1.4. SAFETY AND HEALTH REQUIREMENT.
The contractor understands and agrees that they are solely responsible for occupational safety and health compliance and the safety and health of its employees and subcontractors. The contractor agrees to adhere to all applicable Federal, State and Local laws, regulations, and standards relating to occupational safety and health, including, but not limited to Occupational Safety and Health Administration (OSHA) regulations 29 CFR §1926, relevant safety and health-related standards from the American National Standards Institute (ANSI) and the National Fire Protection Association (NFPA), collectively (Safety Codes).
1.5. SECURITY OR ACCESS REQUIREMENT.
The contractor shall comply with the security requirements of Clause GP-7 incorporated in Section H and Reclamation Clause WBR 1452.237-80 incorporated in Section I. As such at least 10 days prior to conducting any site visit and/or coordination meetings, the contractor shall submit a list of all contractor and subcontractor employees that will be onsite. This list must include a legible photocopy of each employee’s driver’s license.
Additionally, the contractor shall submit a list of all contractor vehicles and equipment that the contractor will bring to the worksite. For each vehicle, the list shall include the year, make, model, color, license plate number, and state of issuance. This list must be updated if employees, vehicles, or equipment changes. This requirement applies for any contractor work performed under this purchase order at Reclamation facilities.
The contractor will not have unsupervised access to restricted areas during the performance of this purchase order. As such, Reclamation has determined that Personal Identity Verification (PIV) is not applicable to this requirement.
During any national emergency, the contractor and employees may be subject to additional screening for security purposes by Governmental agencies charged with the security of the nation. The contractor shall not employ any person that does not meet national security standards.
1.6. CONTRACTOR QUALITY CONTROL.
Contractor’s Quality Control Plan. The contractor and not the Government is responsible for the management and quality control actions necessary to meet the quality standards set forth by the purchase order. As such, the contractor shall establish and maintain a Quality Control Plan (QCP) to ensure they achieve the requirements of the purchase order. At a minimum, the contractor’s QCP shall address the following items:
• Methods – The methods for identifying and preventing deficiencies in the quality and timeliness of services performed before the level of performance becomes unacceptable.
• Performance Inspections - The inspection system that covers all the services listed in the Performance Requirements Summary Table (PRST). The inspection system must specify the task activities to be inspected on a scheduled or unscheduled basis, how frequently inspections will be accomplished, and the title(s) of the individual(s) who will perform the inspections.
C - 4
• Records - Written or electronic database records of all inspections conducted by the contractor and any necessary corrective actions taken. The records shall be made available to the Contracting Officer (CO), as requested, during the term of the purchase order.
1.6.1. Government Review of QCP. The contractor shall develop and submit the QCP to the
Government for review and acceptance within 20 calendar days after post award conference.
If the Government finds the contractor's plan to be adequate, the Government will accept the plan. The contractor then uses their QCP to guide and document the implementation of the required management and quality control actions to achieve the specified results.
If the Government finds the contractor's plan to be inadequate as submitted, the Government will identify the deficiencies to the contractor in writing. The contractor shall correct all identified deficiencies and submit a revised contractor QCP.
1.7. GOVERNMENT’S QUALITY ASSURANCE SURVEILLANCE PLAN.
FAR Part 37.6 requires Reclamation to develop quality assurance surveillance plans (QASP) when acquiring services. A QASP has been developed for the services required under this PWS.
The primary intent of this plan is to provide the Government’s Contracting Officer’s Representative (COR) a basis for evaluating the contractor’s performance under the purchase order. The QASP is not a part of the purchase order nor is it intended to duplicate the contractor’s QCP. An informational copy of the QASP is included in Appendix A of this PWS.
The copy is provided to support the contractor’s efforts in developing a QCP and to provide the contractor an opportunity to recommend improvements to Reclamation’s method of monitoring the contractor’s performance. The QASP is to be a living document that the Government should revise or modify as circumstances warrant.
1.7.1. Quality Assurance Evaluator (QAE). After purchase order award and prior to any field work, the CO will designate the COR in writing to act as the authorized representative, who assists in the Government’s technical monitoring and administration under the purchase order.
The COR is not authorized to make any commitments, or to authorize any changes on the Government’s behalf.
If any doubt exists as to the extent of the authority of the QAE, the contractor shall contact the CO for guidance before taking action on the matter.
1.8. PERIOD OF PERFORMANCE & HOURS OF OPERATION.
1.8.1. Period of Performance. The term of the purchase order shall be from February 1, 2015 through March 31, 2016.
1.8.2. Normal Hours of Operation. The contractor shall perform any required site visits at Reclamation facilities between the hours of 7:00 a.m. and 4:00 p.m. There are no specific schedule limitations on work performed at contractor facilities.
C - 5
1.8.3. Recognized Holidays. The contractor is not required to provide services on recognized Federal holidays established by Federal law (5 U.S.C. 6103). The contractor can find a schedule of the 2015 recognized holidays at the following website: http://www.opm.gov/policy-data-oversight/snow-dismissal-procedures/federal-holidays/#url=2015.
1.9. DOCUMENTATION AND RECORDS.
All documentation, records, and schedules as described in this PWS that are the responsibility of the contractor, are the property of the Government. The contractor shall turn over such documentation to the Government upon completion or termination of the purchase order. All records are subject to the Freedom of Information and Privacy Acts. As such, the Government will handle any requests for release of any records accordingly.
http://www.opm.gov/policy-data-oversight/snow-dismissal-procedures/federal-holidays/#url=2015 http://www.opm.gov/policy-data-oversight/snow-dismissal-procedures/federal-holidays/#url=2015
C - 6
2. C-2 - DEFINITIONS.
2.1. As Directed, As Required, As Permitted, Approval, Acceptance. Terms that indicate that direction, requirement, permission, approval, or acceptance by the Contracting Officer are intended unless stated otherwise.
2.2. Contracting Officer (CO). A duly appointed person with the authority to enter into, administer, or terminate contracts, and to make findings and determinations on behalf of the United States Government. This is the only individual authorized to change the purchase order or any of the requirements stated herein.
2.3. Contractor. The individual, partnership, company, or corporation responsible for the duties and responsibilities under the purchase order. The term also covers requirements for any subcontractor. The contractor is ultimately responsible for ensuring that all subcontractors comply with the terms and conditions of the purchase order.
2.4. Defective Service. A unit of service that contains one or more defects, or non-conformance with specified requirements.
2.5. Deficiency. A shortcoming in the quality or state of services performed.
2.6. Documentation Review. Under this method, Reclamation audits documentation supplied to and produced by the contractor.
2.7. Emergency / Special Event(s). Any unforeseen circumstance or combination of circumstances that requires immediate attention.
2.8. Existing Operations. The actual operations of Sherburne Dam and the Saint Mary Diversion Facilities as they relate to flows in Swiftcurrent Creek and the St. Mary River and impacts to basin wide bull trout distribution during the period of data collection from 1997 to present.
2.9. Inspection. The critical examination of a facility, system, or procedure to discover and remedy discrepancies and inefficiencies.
2.10. Performance Requirements Summary Table (PRST). An outline of purchase order requirements that identifies the key service outputs the Government will inspect and the related performance standards and method(s) of performance assessment and surveillance.
2.11. Performance Requirements. Tasks the contractor performs.
2.12. Performance Standard. The desired results, expressed by the Government, expected from performance of purchase order services, to satisfy the requirement.
C - 7
2.13. Periodic Surveillance. Under this method, Reclamation assumes receipt of acceptable performance based on acceptable monitoring results of a given percentage or number of scheduled assessments. The Government plans these assessments at specific intervals or dates (i.e. the Government conducts assessments with predictability).
2.14. Purchase Order Discrepancy Report. A formal letter produced by the CO upon receipt of a Quality Assurance Surveillance Checklist that documents the contractor is providing defective services. The letter will indicate if the Government will affect the price computation system in accordance with the Performance Requirements Summary Table and the Inspection of Services Clause in the purchase order.
2.15. Quality Assurance Evaluator (QAE). A Government person designated by the Contracting Officer, with authority to act within the scope of the delegated authority, limited to the technical monitoring and administration of the contractor’s performance.
2.16. Quality Assurance Surveillance Plan (QASP). An organized, written, “living” document outlining the Government’s methodology for monitoring contractor performance.
2.17. Quality Assurance. Those actions taken by the Government to assure services meet the requirements established in the Performance Work Statement (PWS).
2.18. Quality Control Plan (QCP). An organized, written document outlining the contractor’s methodology for ensuring contractor performance.
2.19. Quality Control. Those actions taken by a contractor to ensure that contractor performance meets the requirements of the purchase order.
2.20. Statistically Valid Description. The standards should be like those applied in scientific studies in general. Specifically, the conclusions drawn by the analyst should be supported by the analyses (statistical and other, in the sense of obvious conclusions) of the available data. Some data will be strong, others may be weak. The validity of the baseline population characteristics described by the analyst will depend on the strength of the data, the analysis techniques employed, and the reasoned conclusions drawn from the results.
C - 8
3. C-3 GOVERNMENT-FURNISHED REQUIREMENTS
3.1. GENERAL.
The Government shall provide, without cost, the facilities, equipment, materials, and information listed below. The contractor shall be liable for any loss or damage to Government property while in their possession, and shall be responsible for any damage to Government buildings or equipment occurring because of purchase order performance. The contractor shall understand that in the performance of the purchase order, the contractor is an independent contractor and not an agent or employee of the United States.
The contractor will not use Government-furnished materials for use outside of the job requirements of this purchase order. The Government will not permit unauthorized use of Government-furnished materials. During the post award conference meeting, the contractor shall agree to and sign a non-disclosure agreement pertaining to all government provided information prior to receipt of such property.
3.2. SITE VISIT.
The Government strongly urges offerors to inspect the materials referenced in Section 3.3 and to satisfy themselves regarding all conditions that may affect the cost of performance. An organized site visit will not be held prior to award.
All contractual and technical questions must be submitted by mail or email no later than 7 days prior to the response due date for quotations. Contractors may email their questions to cmundt@usbr.gov or may mail their questions to Bureau of Reclamation, Great Plains Region, Regional Office, GP-5000 (CMUNDT), 2021 4th Avenue, North, Billings, MT 59101.
The contractor shall conduct site visits and face-to-face visits at the following facilities during the execution of the purchase order:
• U.S. Fish and Wildlife Service Office, located at 4052 Bridger Canyon Road, Bozeman, MT 59715.
• Reclamation’s Montana Area Office, located in Suite 501, 2900 4th Avenue North, Billings, MT.
3.3. GOVERNMENT-FURNISHED PROPERTY AND MATERIALS.
Due to the sensitivity of the data within Reclamations existing datasets, Reclamation cannot allow interested vendors to view the datasets prior to award. It is in the interest of the Government to provide summaries of each data set to promote a good understanding of the project and to ensure Reclamation receives accurate quotations. In addition to the summary information provided below, Reclamation has incorporated supporting documents in Section J.
The contractor shall coordinate with the CO and the designated QAE the receipt of government-furnished property and materials. Additionally, the contractor shall provide adequate advance notice to acquire government-furnished property and materials to the designated QAE. The contractor is responsible for all costs as applicable and related to making the following property available for use, such as payment of all transportation, installation, or rehabilitation costs.
mailto:cmundt@usbr.gov
C - 9
Reclamation’s Montana Area Office shall provide the following property and materials required for data analysis services. All data is in excel format. Only the related reports and data descriptions (methodologies) are in Word format:
Availability
Purpose/Description of the Data Collection
Number of Year of Data
Brief Description of the Labels for
Each Data Field in a Database
Number of lines of Data in each Database
Format
Post-Award Electrofishing 17 Species Length Weight
Age/Maturity Date
Location Reach length
10,500 Microsoft Excel and Microsoft
Word
Post Award Entrainment 5 Species Length Weight
Age/Maturity Date
200 Microsoft Excel and Microsoft
Word
Post Award Flow Data 18 USGS Gage Data
Daily Stream Flows 3 sites
- Sherburne
- St. Mary at
Babb
- St. Mary
Canal
Tabular web based data
Post Award Genetic Sampling 10 Species Length Weight
Age/Maturity Date
Location
500 Microsoft Excel and Microsoft
Word
Post Award Redd Surveys 18 Count Location
36 Microsoft Excel and Microsoft
Word Post-Award Tagging
(Includes PIT tags (only) described by year and location (stream). No GIS information was collected.)
18 Species Length Weight
Age/Maturity Date
Location Reach Length
3,900 Microsoft Excel and Microsoft
Word
C - 10
Post-Award Trapping 4 Species Length Weight
Age/Maturity Date
Location Reach length
700 Microsoft Excel and Microsoft
Word
3.4. POST AWARD CONFERENCE.
In accordance with Reclamation Clause WBR 1452.242-80, incorporated under Section G, the Government will hold a post award conference within 20 calendar days after award of the purchase order. The purpose of the post award conference will be to review the purchase order, the work to be performed, and established safety requirements and procedures.
C - 11
4. C-4 - CONTRACTOR-FURNISHED REQUIREMENTS
4.1. GENERAL.
Except for those items or services specifically stated to be Government furnished in Section C-3, the contractor shall furnish everything (equipment, materials, supplies, incidentals, etc.) required to perform the tasks identified in this PWS.
4.2. GENERAL WORK PLAN.
The contractor shall provide a written work plan that addresses the general sequence, duration, and means and methods of activities along with their quote. The General Work Plan shall be an orderly, specific, and complete document. The contractor shall present it in a manner that allows it to “stand alone” without the need to reference other documents. It should describe the capability of the contractor’s organization to complete this project and demonstrate a thorough understanding of the PWS. At a minimum, the written work plan shall address the following:
• Technical Approach Proposed to Accomplish the PWS - The contractor’s methods, procedures, and equipment:
• Contain detailed explanations of proposed methods to be used in order to complete the major task in the PWS. Repeating the PWS without elaborating on the specific tasks to be performed is unacceptable.
• Contain a specific statement of any problems anticipated in performing or accomplishing the work and methods or techniques that are proposed to solve the problems.
• Contractor’s Anticipated Schedule for completing the work.
• Contain a Gantt Chart or similar work schedule chart or graph showing the general sequencing of the work, and significant milestones.
• Quality Control Inspection Records – Means and methods and examples of reports, checklists, forms, etc. that the contractor will use to show how the contractor will document that work is completed properly.
4.3. COMPANY EXPERIENCE.
Company experience is an objective criterion that determines whether the contractor has or has not performed similar work. Therefore, the contractor shall furnish a list (no more than five) of Federal, State, local government or commercial projects similar in scope, complexity, and magnitude to the work required under this solicitation that the contractor has completed within the last three years. These projects must clearly demonstrate the contractor’s successful ability to accomplish projects in a timely and satisfactory manner. In particular, the contractor shall provide career and project experience that demonstrates they possess the knowledge, skills and abilities pertinent to the following:
• Compiling, analyzing, and interpreting large, complex data sets consisting of biological data and data for the physical environment (e.g., stream flows, water and air temperatures, climatic conditions);
• Applying advanced statistical and computational methods, including the writing of computer code unique to the requirements of item 1;
C - 12
• Comprehensively understanding the biology and ecology of bull trout;
• Comprehensively understanding the U.S. Endangered Species Act and its requirements;
• Understanding the water-supply and delivery systems commonly used in the intermountain west, including the key characteristics of the Milk River Project; and
• Preparing and writing comprehensive, concise reports and manuscripts in a timely manner.
If an offeror intends to utilize subcontractors to perform any of the major components of work, all of the above information must be provided for each proposed subcontractor. The “Company Experience Reference List” included in Section J of this RFQ is supplied as a recommended template for this information. At a minimum, the contractor must provide the following information for each project:
• Name and location of project.
• Description of work.
• Note whether or not offeror was the prime contractor and what portion of the work was performed by the offeror and what portion was performed by subcontractors.
• Original completion time and date, and actual dates and duration for each project
(including modifications).
• Initial contract amount and final contract amount (including modifications).
• Name, address and phone number of CO/owner/COR/point of contact who may verify information for this project.
• Any problems encountered in performance of the work and corrective actions taken.
The greater the extent to which the offeror can demonstrate successful completion of projects similar in size and complexity to that required under this solicitation, the more favorably the quotation will be rated. The Government will not evaluate references with incorrect or missing phone numbers and contact names, which may potentially result in a less favorable rating of the contractor’s offer.
C - 13
5. C-5 - SPECIFIC TASKS, SERVICES AND PERFORMANCE REQUIRED
5.1. GENERAL.
The contractor shall provide experienced and qualified personnel to perform the services to include, but not limited to the tasks identified below. The purchase order must recognize that the timely and accurate performance of these services is a vital and mandatory requirement of the purchase order. Throughout the life of the purchase order, the contractor is encouraged to seek and incorporate innovative ways of performing these services in the most economic and efficient manner.
The work described in this PWS is not the continuation of existing work. The Service will continue to complete the bull trout data collection and provide annual reports to Reclamation. A copy of the most recent annual report is included in Section J of this RFQ.
5.2. TASK NO. 1 - COMPILE BASELINE CHARACTERISTICS REPORT AND CATALOG
DATABASES.
5.2.1. Description. Produce a detailed, statistically valid description of baseline characteristic for the bull trout population in the St. Mary River basin. Compile, analyze, and describe all data collected between 1997 and 2013 under Reclamation-funded studies. These data include annual electrofishing results, results from the operation of fish traps, results from tag-recapture studies (PIT tags) and the movements of radio-tagged bull trout, data from the netting of fish at the headgate of the St. Mary Canal, and data from annual surveys of bull trout redds.
The contractor shall closely examine and analyze data for statistical trends and associations within, between, and among data sets. The biological data will be related to seasonal stream-discharge and climate data available in the drainage. All statistical associations will be described in a manner that will allow comparison with similar data collected in the future. An assessment of the management and scientific values of the various data sets will be provided, as will recommendations for the modification or improvement of future data collections.
5.2.2. Specific Subtasks Required. The contractor shall coordinate status meetings at the 6-month and 11-month time frames to discuss work progress. The contractor shall be responsible for preparing draft and final agendas and meeting notes subject to Reclamation review and approval.
The contractor shall meet with Reclamation staff in person or by phone conference aside from the status meeting as required by Reclamation.
The contractor shall prepare and submit final reports in both electronic and hard copy formats, with data and reports catalogued on disk or jump drive in Microsoft Word and Microsoft Excel formats.
C - 14
5.2.3. Performance Standard. The contractor shall provide to Reclamation the required documentation associated above with each subtask on time and with no major deficiencies.
Reclamation will review the documentation for accuracy, format, and timeliness to determine performance.
5.3. SPECIAL REQUIREMENTS.
The contractor shall fully cooperate with the Reclamation employees to adapt scheduling and performing the work under this purchase order.
5.3.1. Required Format For Hard Copy Documents. The contractor shall comply with the following constraints when providing the progress reports and final report:
• Be logically assembled, practical, legible, clear, concise, coherent; and indexed (cross-indexed, where appropriate); and
• Contain appropriately numbered pages of each volume or part.
• Separation of volumes
5.3.2. Required Format for Electronic Copy Documents. Reclamation expects reports to be in
Microsoft Word format. Data storage and analysis programs used are at the discretion of the contractor and should be addressed in their General Work Plan. As such, the contractor shall comply with the following constraints when providing electronic documents:
• Spreadsheets of data in txt format
• Portable for data files
• Documents in Microsoft Word
5.4. METHOD(S) OF MONITORING PERFORMANCE.
Reclamation may use a variety of surveillance methods to evaluate the contractor’s performance.
Types of surveillance methods, which are defined in Section C-2 of this PWS, include, but are not limited to, the following:
• Documentation Review
• Periodic Surveillance
5.5. GOVERNMENT REMEDIES.
Reclamation will make payments associated with significant milestones as identified in the Contractor’s general work plan (e.g. Progress report provided to Reclamation at end of month 6;
Draft of final report submitted to Reclamation for review at end of month 11 and Final report provided at end of month 14.) The Government will make full payment after the performance of required services and Reclamation has accepted the services to be fully compliant. As it pertains to the required services, “fully compliant" is where there has been no willful departure from the terms of the purchase order and there has been no omission of essential work. The contractor has honestly and faithfully performed the work required and the only variance consists of infrequent minor omissions or deficiencies.
All work shall be subject to inspection, approval, and acceptance by the Government. The Government will compare the contractor's performance to industry standards and will not exclude common sense considerations as applied by the CO and the QAE. The Contracting Officer will follow the requirements of FAR Clauses 52.212-04 for the contractor’s failure to correct
C - 15 nonconforming services. The Government will consider work incomplete when any one of the following conditions exits:
• The contractor did not perform any or all of the interim-progress tasks successfully and timely; or
• The final report is not in strict accordance with the performance standards and procedures.
The QAE will document acceptable and unacceptable purchase order performance. When the QAE considers the contractor's performance to be unsatisfactory, the QAE will report the information to the CO. The CO may require the contractor to explain, in writing, the cause of the poor performance, any corrective actions the contractor has already taken to obtain an acceptable level, and any future corrective actions the contractor will utilize to prevent unacceptable performance.
The contractor’s administration personnel may be required to meet with the QAE, as determined necessary, to discuss the contractor’s performance, to include actual or potential problems. All parties shall make a mutual good faith effort to resolve any issues. All parties to the discussion shall review and sign written minutes of the meeting. Should the contractor not concur with the minutes, the contractor shall state any areas of non-concurrence in writing to the CO within 7 business days of receipt of the minutes. Whenever the CO issues a Purchase Order Discrepancy Report, the QAE will hold a meeting if the contractor requests such a meeting.
If the performance of any required service is unsatisfactory, and poor performance is clearly the fault of the contractor, the Government may reduce the purchase order price to reflect the reduced value of defective services, provided that the Government gives the contractor a written Purchase Order Discrepancy Report prior to executing such payment deductions.
The mentioned deductions will in no way affect the Government’s right under the “Default” clause of the purchase order.
5.6. PERFORMANCE REQUIREMENTS SUMMARY TABLE.
The following Performance Requirements Summary Table (PRST) summarizes the tasks, performance standards, methods of monitoring performance, and disincentives under the purchase order.
PURCHASE ORDER PERFORMANCE REQUIREMENT SUMMARY TABLE
Task Description
Performance Standard Acceptable Quality Level
Method of Monitoring Disincentives
See 5.2
Progress report provided to Reclamation at end of month 6.
Draft of final report submitted to Reclamation for review at end of month 11.
Final report provided at end of month 14.
Documentation Review
Periodic Surveillance
Rework at contractor’s expense
C - 16
6. C-6 - SUBMITTALS
6.1. REQUIRED SUBMITTALS.
The contractor shall comply with all applicable Federal Acquisitions Regulations (FAR) and Reclamation Directives and Standards (D&S) project management regulations and guidelines.
For convenience, essential submittals from the contractor are listed below to ensure quality and safe work under the purchase order. However, all submittals, reporting requirements, and compliance portions of the purchase order clauses shall apply whether they have or have not been indicated below.
RSN
Clause Or Section Title Submittals Required Due date or delivery time
No. of sets to be sent to:
CO QAE
1 Site Security
GP-7
(1) List of all contactor and subcontractor employees performing work under this purchase order with supporting documentation
Within 10 calendar days after the post award conference
1 1
(2) List of all vehicles and equipment to be brought onsite with supporting documentation
Within 10 calendar days after the post award conference
1 1
3 Section C-1.6 Contractor’s quality control plan
Within 10 calendar days after the post award conference
1 1
Reporting Requirements 52.204-10
Reporting Executive Compensation and First- Tier Subcontract Awards at http://www.fsrs.gov
By the end of the month following the month of award of a subcontract with a value of $25,000 or more.
1 0
5 Section C-5.2 Progress Report 6-Months After Award 0 1
6 Section C-5.2 Draft of Final Report 11-Months After Award 0 1
7 Section C-5.2 Final Report 14-Months After Award 1 1
6.2. SUBMITTAL REVIEW.
6.2.1. Time Required For Submittal Review. Submittal review will require 14 days for review of each submittal or re-submittal, unless otherwise specified. Time required for review of each submittal or re-submittal begins when the Government receives the complete sets of materials required for a particular RSN and extends through the return mailing postmark date.
http://www.fsrs.gov/
C - 17
6.2.2. Reviewer Addresses. Submittals shall be provided to the following addresses/individuals:
• Contracting Officer (CO): Bureau of Reclamation - GP-5000; Attn: Christine Mundt; 2021 4th Avenue North; Billings, MT 59101
• Quality Assurance Evaluator (QAE): Bureau of Reclamation, Montana Area Office; Attn:
Justin Kucera; P.O. Box 30137; Billings, MT 59107-0137
C - 18
APPENDIX A
BUREAU OF RECLAMATION’S
QUALITY ASSURANCE SURVEILLANCE PLAN
BULL TROUT STATUS AND CHARACTERISTICS BASELINE DATA COMPILATION,
MILK RIVER PROJECT, ST. MARY RIVER, MONTANA
Purpose The Government has developed this Quality Assurance Surveillance Plan (QASP) to implement a quality surveillance strategy for bull trout status and baseline characteristics data compilation purchase order.