This document is a Quality Assurance Surveillance Plan (QASP) for Contract Number 36C24624Q0729 related to a Veeder Root Upgrade project at the Hampton Veterans Affairs Medical Center in Hampton, VA.
The QASP outlines the government's plan for monitoring the contractor's performance under this contract. It defines the performance standards, acceptable quality levels, and methods for surveillance such as direct observation and user surveys. The contractor will be evaluated based on adherence to the Performance Work Statement requirements, meeting wait time and turnaround time metrics, and providing monthly reports. Positive performance will be incentivized through favorable evaluations, while unacceptable performance may result in a Contract Discrepancy Report and the need for a corrective action plan. The Contracting Officer and Program Point of Contact are responsible for overseeing and documenting the contractor's performance under this QASP.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Tank 3 Picture 3.jpg | JPG image | |
| Tank 2 Picture 4.jpg | JPG image | |
| Tank 2 Picture 2.jpg | JPG image | |
| Tank 2 Picture 3.jpg | JPG image | |
| 36C24625Q0134 0001.docx | DOCX document | |
| Tank 3 Picture 1.jpg | JPG image | |
| Tank 1 Picture 1.jpg | JPG image | |
| Amendment Response to Vendor Questions.pdf | ||
| Tank 3 Picture 2.jpg | JPG image | |
| Tank 2 Picture 5.jpg | JPG image | |
| Tank 2 Picture 1.jpg | JPG image | |
| 36C24625Q0134_1.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
RF # 36C24624Q0729
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
The contractor shall be evaluated in accordance with the following QASP.
For: Hampton Veterans Affairs Medical Center (VAMC), Hampton, VA
Contract Number: 36C24624Q0729
Contract Description: Veeder Root Upgrade
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
1. What shall be monitored.
1. How monitoring shall take place.
1. Who shall conduct the monitoring.
1. How monitoring efforts and results shall be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Harold L. McQuillia, Jr. – 757-315-3430 Harold.McQuillia@va.gov Assigned CS: Kristine Woodbury – 757-722-9961 x11229 Kristine.Woodbury@va.gov
b. Program Point of Contact (POC) - The POC is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The POC shall keep a quality assurance file. The POC is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned POC: Daniel Apahidean – 757-722-9961 x2152 Daniel.Apahidean@va.gov
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
Program Manager – TBD
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements are listed below. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
| ID |
| Performance Objective |
| Performance Standard |
| AQL |
| Method of Surveillance |
| Incentives / Disincentives |
The Contractor shall adhere to all requirements in accordance with (IAW)Performance Work Statement (PWS) section B 3.
The Contractor shall successfully provide the required service throughout the period of performance
95%
CO/COR periodic surveillance
Incentives: Favorable contactor performance evaluation.
Disincentive: Unfavorable contractor performance evaluation.
A Contract Discrepancy Report (CDR) may be issued on the first instance of failure to provide the acceptable level
The Contractor shall adhere to wait time and TAT requirement in Paragraph B.3, 7
The Contractor shall successfully meet the required time constraint throughout the period of performance
95%
CO/COR observation and audit
Incentives: Favorable contactor performance evaluation.
A Contract Discrepancy Report (CDR) may be issued on the first instance of failure to provide the acceptable level
| 3 |
| The Contractor shall provide monthly reports in accordance with Paragraph B.3, r. |
| The Contractor shall compliance throughout the period of performance |
| 98% |
| CO/POC |
Monthly review of reports Incentives: Favorable contactor performance evaluation.
A Contract Discrepancy Report (CDR) may be issued on the first substantiated instance of failure to provide the acceptable level
5. INCENTIVES/DISINCENTIVES
The Government shall use favorable contractor performance evaluations as incentives. The Government shall report unfavorable contractor performance as disincentives. Disincentives shall include documentation of any performance issues. If repetitive or consistent the government shall take further corrective action or begin termination procedures.
Incentives/disincentives shall be based on exceeding, meeting, or not meeting performance standards.
6. PROCEDURES/METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. Direct Observation. (Can be performed periodically or through 100% surveillance.)
b. Complaints. Any complaint data is reviewed by the CO/COR – any validated complaints against a contractor will be further investigated.
c. User Survey. (Combines elements of validated user complaints and random sampling. Random survey is conducted to solicit user satisfaction. May also generate inspections and sampling.)
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
Positive outcome: No more than 1 incident of not meeting the performance standard during the period of performance.
Neutral outcome: No more than 3 incidents of not meeting the performance standard during the period of performance
Negative outcome: More than 3 incidents of not meeting the performance standard during the period of performance.
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the COR shall inform the Contracting Officer (CO). This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR and the CO shall document the discussion and place it in their respective file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the CO. The CO will in turn review and submit to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CDR in writing. The CDR shall specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR shall also state how long after receipt the contractor has to present this corrective action plan to the CO and COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor monthly to assess performance and shall provide a written assessment.
Contractor Program Manager
Program Point of Contact (POC)