QALI_22-50017.pdf

PDF 889 KB Posted

Attached to
B-2 TLX Kits, FA821322R3003 Federal contract opportunity
Solicitation number
FA821322R3003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document contains a government file and related federal contract opportunity. The government file outlines quality assurance inspection requirements for four part numbers being procured under Contract No. 22-50017 to support the B-2 Weapon System. Inspections include explosive weight verification, leak testing, x-ray/n-ray film evaluation, lot acceptance testing (LAT) unit selection and testing witnessing, ammunition data card review, preparation for shipment verification, and additional requirements as deemed necessary by the Defense Contract Management Agency (DCMA).

The related federal contract opportunity is solicitation number FA821322R3003 to procure critical safety items from sole source contractor Universal Propulsion Company (CAGE: 17610). The solicitation seeks four kits containing all explosive lines required for a B-2 aircraft time change (CLIN 0001, quantity four) as well as detonating cord assemblies in varying lengths (CLIN 0002 quantity three, CLIN 0003 quantity five, CLIN 0004 quantity five). The procuring agency is the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base to support the B-2 Weapon System.

View the file

Other files for this federal contract opportunity

Other files attached to B-2 TLX Kits, FA821322R3003, newest first.
File Type Posted
05 Amendment 0002 Solicitation_FA821322R3003_08312022.pdf PDF
01 Amended Solicitation_FA821322R3003.pdf PDF
RESHIP.pdf PDF
EDLs 22-50017.pdf PDF
CADPAD Item Marking Instruction - Ver 1.5 - 20190501.pdf PDF
Bid Sets.doc DOC document
EDLs_22-50017.pdf PDF
807s_22-50017.pdf PDF
CDRLs_22-50017.pdf PDF
SPI F012548612.pdf PDF
SPI F014615481.pdf PDF
Solicitation FA821322R3003.pdf PDF
JA_Redacted.pdf PDF
SPI F014548835.pdf PDF
Item Descriptions_22-50017.pdf PDF
AIR SPEC_22-50017.pdf PDF
ADC SOW Jan 2018.doc DOC document
ES7034 (Attachment 5).doc DOC document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name

CAGE code

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor, at a minimum, shall allow DCMA to inspect the following points:

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend per comment section.

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.

Notify - N: By phone or email prior to action.

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer Signature

Rev Date: 5 May 2019

Sheet1

Text46: 14 June 2021
2021-06-14T11:26:50-0600
ROCHOLL.NOAH.SCOTT.1549493501
undefined_9: N
Text32: 9. Additional Requirements
undefined_8: M
Text31: 8. Shippers (DD250, Reports)
undefined_7: M
Text30: 7. AMMO Data Card Review
undefined_6: V
Text29: 6. Preparation for Shipment
undefined_5: W
Text28: 5. LAT
undefined_4: V
Text27: 4. LAT Sample Selection
undefined_3: V
Text26: 3. X-Ray/N-Ray
undefined_2: V
Text25: 2. Leak Test
undefined: V
Text36: 1. Explosive Weight

2. Verify gross leak and fine leak check are performed.

3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer

Text24: 1.Inspection
Part Number: 52170-067, 52171-097, 52171-095, 200210068-10
DODIC: WA80, WA89, WA87, JL04
Text20:
Text19:
Part Number Line 2:
Contract No: 22-50017
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: B-2

File details come from the government source that posted it. Updated .