About this file
This document contains a government file and related federal contract opportunity. The government file outlines quality assurance inspection requirements for four part numbers being procured under Contract No. 22-50017 to support the B-2 Weapon System. Inspections include explosive weight verification, leak testing, x-ray/n-ray film evaluation, lot acceptance testing (LAT) unit selection and testing witnessing, ammunition data card review, preparation for shipment verification, and additional requirements as deemed necessary by the Defense Contract Management Agency (DCMA).
The related federal contract opportunity is solicitation number FA821322R3003 to procure critical safety items from sole source contractor Universal Propulsion Company (CAGE: 17610). The solicitation seeks four kits containing all explosive lines required for a B-2 aircraft time change (CLIN 0001, quantity four) as well as detonating cord assemblies in varying lengths (CLIN 0002 quantity three, CLIN 0003 quantity five, CLIN 0004 quantity five). The procuring agency is the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base to support the B-2 Weapon System.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 05 Amendment 0002 Solicitation_FA821322R3003_08312022.pdf | ||
| 01 Amended Solicitation_FA821322R3003.pdf | ||
| RESHIP.pdf | ||
| EDLs 22-50017.pdf | ||
| CADPAD Item Marking Instruction - Ver 1.5 - 20190501.pdf | ||
| Bid Sets.doc | DOC document | |
| EDLs_22-50017.pdf | ||
| 807s_22-50017.pdf | ||
| CDRLs_22-50017.pdf | ||
| SPI F012548612.pdf | ||
| SPI F014615481.pdf | ||
| Solicitation FA821322R3003.pdf | ||
| JA_Redacted.pdf | ||
| SPI F014548835.pdf | ||
| Item Descriptions_22-50017.pdf | ||
| AIR SPEC_22-50017.pdf | ||
| ADC SOW Jan 2018.doc | DOC document | |
| ES7034 (Attachment 5).doc | DOC document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name
CAGE code
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor, at a minimum, shall allow DCMA to inspect the following points:
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend per comment section.
Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.
Notify - N: By phone or email prior to action.
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer Signature
Rev Date: 5 May 2019
Sheet1
| Text46: 14 June 2021 | |
| 2021-06-14T11:26:50-0600 | |
| ROCHOLL.NOAH.SCOTT.1549493501 |
| undefined_9: N |
| Text32: 9. Additional Requirements |
| undefined_8: M |
| Text31: 8. Shippers (DD250, Reports) |
| undefined_7: M |
| Text30: 7. AMMO Data Card Review |
| undefined_6: V |
| Text29: 6. Preparation for Shipment |
| undefined_5: W |
| Text28: 5. LAT |
| undefined_4: V |
| Text27: 4. LAT Sample Selection |
| undefined_3: V |
| Text26: 3. X-Ray/N-Ray |
| undefined_2: V |
| Text25: 2. Leak Test |
| undefined: V |
| Text36: 1. Explosive Weight |
2. Verify gross leak and fine leak check are performed.
3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.
4. Randomly select LAT units per latest government approved ATP.
5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.
6. Ensure Paperwork is correct.
7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.
8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer
| Text24: 1.Inspection |
| Part Number: 52170-067, 52171-097, 52171-095, 200210068-10 |
| DODIC: WA80, WA89, WA87, JL04 |
| Text20: |
| Text19: |
| Part Number Line 2: |
| Contract No: 22-50017 |
| Date Contract Awarded: |
| Final Delivery Date FDD: |
| Program Name: B-2 |