PWS-Serv M23-014 Repair Dynapower Control Unit (Service) under PWS.pdf
PDF 274 KB Posted
- Attached to
- Repair and Upgrade Dynapower Control Unit (rectifier) Federal contract opportunity
- Solicitation number
- FA812624Q0004
About this file
This performance work statement outlines repair services for a Dynapower control unit. The contractor shall provide all labor, tools, equipment, parts, quality control, transportation and manuals necessary to perform a one-time repair on the control unit, including replacing an interface board and wiring. The repair must be completed within five business days of receiving authorization from the contracting officer and required parts. The contractor must certify that any parts used are new and that the equipment is cleaned and purged before and after repair. The contractor must also comply with environmental, safety, and hazardous material handling requirements and provide training certificates for personnel. The related solicitation seeks repair and upgrade of the Dynapower control unit rectifier for the Department of the Air Force Materiel Command Air Force Sustainment Center.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Serv M23-014 Repair Dynapower Control Unit (Service) under PWS (1).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
REPAIR
ON THE
DYNAPOWER CONTROL UNIT
PREPARED BY:
OC-ALC/OBCA
TINKER AFB 73145
August 30, 2023
Section One
1.0 Scope: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform the Repair on the Dynapower Control Unit for the Oklahoma City–Air Logistics Complex (OC-ALC). The equipment is listed in Appendix A.
1.1 The Contractor shall be responsible for ensuring all services, parts and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS.
1.2 Requested Services: Contractor shall provide a One-Time Repair on the Dynapower Control Unit to include new interface board and wiring.
1.3 Authorizations for Repair Actions: Only the Contracting Officer (CO) can authorize repair actions.
The GPOC will coordinate any repair actions with the Government Subject Matter Expert (SME) and the CO in order to obtain the approval to proceed. The Contractor shall ensure all repair actions have the documented CO approval, in writing, before initiating any repair or ordering parts. The Contractor shall demonstrate to the Government SME that the repairs have been completed.
1.3.1 Once the authorization for repair action has been received from the CO, the Contractor shall order any required parts within two (2) business days and notify the GPOC, in writing, of the estimated arrival date of the parts. Upon the receipt of the parts, the Contractor shall perform the repair within five (5) business days. The GPOC will verify the receipt of the parts with the Contractor to ensure the repair is performed in a timely manner.
1.4 Parts and Materials: The Contractor shall provide and use only new parts and material in performance of this PWS unless otherwise authorized by the CO. Long lead items greater than five (5) business days must be identified and provide sufficient documentation supporting the delay.
1.5 Service Report: Immediately upon completion of the maintenance support services and before leaving the OC-ALC, the Contractor shall provide a written Service Report to the Government SME. When necessary the Government SME will forward the service report to the GPOC within two (2) business days of receipt. The Contractor shall provide, by fax or email, the final service report within five (5) business days to the GPOC. As a minimum, the final service report shall contain the following information:
• name of the company
• requested service date
• contract number
• equipment ID#
• description of services provided
• additional services recommended (if any)
• printed name and signature of technician who performed the services (electronic signatures are acceptable)
• printed name and signature of on-site Government SME or GPOC (electronic signatures are acceptable)
• start and completion dates
• complete breakdown of the labor cost (hours and rate)
• materials and parts used
• details of any other charges
• printed name and signature stating only new parts and materials were used (electronic signatures are acceptable)
• written verification statement that a performance check to verify operational condition was performed and that the equipment is in working order. (electronic signatures are acceptable)
1.6 Continuation of Essential Department of Defense (DoD) Contractor Services During Crisis: This requirement has been determined not to be essential and does not require continued support during a crisis as defined in DFARS 252.237-7023.
1.7 Contractor Personnel: The Contractor shall provide the name of the Contract Manager (CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be designated to the CO and GPOC, in writing, within ten (10) business days after the contract award date. The Contractor shall provide telephone numbers and email addresses where the CM and alternates may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-ALC on Tinker Air Force Base (AFB). The Contractor shall provide a CM who can read, write, speak, and understand English fluently.
1.8 Environmental Certification: The Government will ensure the part or equipment is clean, drained and purged before it is transferred to the Contractor for repair. The Government will provide written certification of such to the Contractor prior to shipment or pick up of the part or equipment. Certification will be by official correspondence with a statement which specifies the part or equipment is certified to be clean, drained and purged. In addition, as a minimum, said certification will contain description of the part or equipment, make, model, serial number, and OC number (if applicable). This certification will be provided to the GPOC three (3) business days prior to the pick-up or shipment of the part or equipment.
The GPOC will, in turn, provide it to the Contractor within two (2) business days prior to the pick-up or shipment of the part or equipment.
1.8.1 The Contractor shall ensure and provide written certification that the repaired part or equipment is cleaned to remove all hazardous contaminants, dirt, shavings, oil, or grease, and drained and purged to remove all fluids, oils and liquids before returning to Tinker AFB. Certification shall be by official correspondence with a statement which specifies the part or equipment is certified to be clean, drained and purged. In addition, as a minimum, said certification shall contain description of part or equipment, make, model, serial number, and OC number (if applicable). This certification shall be provided to the GPOC two (2) business days prior to the return of the part or equipment.
1.9 Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.
1.9.1 Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force Manual (AFMAN) 32-7002, “Environmental Compliance and Pollution Prevention”, Tinker AFB procedures per Tinker Air Force Base Hazardous Waste Management Plan (TAFB HWMP), and Complex procedures per Oklahoma City Air Logistics Complex (OC-ALC) Supplement to AFMAN 32-7002, “Environmental Compliance and Pollution Prevention” and OC-ALCI 32-101 “Air Quality Record Keeping Procedure”.
Publications are available digitally on e-Publishing website at www.e-publishing.af.mil for downloading or ordering.”
1.10 Hazardous Material (HAZMAT): If no HAZMAT will be brought on base or used in performance on this contract, the contractor shall certify “No HAZMAT will be brought on base” or “No HAZMAT Usage” by official correspondence. This certification shall be provided to the COR within ten
(10) days after award. Upon COR receipt of the certification, the requirements of this section no longer http://www.e-publishing.af.mil/ apply. Appropriate penalties for the contractor shall be assessed if found in violation of above certification.
1.10.1 The Contractor shall not store chemicals or hazardous material (HAZMAT) on Tinker AFB. Contractors shall be compliant with HAZMAT management procedures per Oklahoma City Air Logistics Complex (OC-ALC) Supplement to AFMAN 32-7002, “Environmental Compliance and Pollution Prevention”. The Contractor shall maintain a log of all HAZMAT that is used on base. This usage log shall be provided to the COR monthly, the last business day of each month, or when the required work is completed. The COR will forward the records to the Unit Environmental Coordinator (UEC) no later than the fourth (4th) day of the following month or the first (1st) subsequent business day.
1.11 Safety Data Sheet (SDS) and Labeling: Upon COR receipt of the “No HAZMAT Usage” certification, the requirements of this section no longer apply.
1.11.1 The Contractor shall not transport, ship or use any chemical, material or substance used in the performance of this PWS on Tinker AFB before written approval is provided by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The Contractor shall submit to the COR, ten
(10) calendar days after contract award date all Safety Data Sheets (SDSs). The Contractor shall receive approval from the COR prior to shipping any chemical, material or substance to Tinker AFB. A copy of the manufacturer SDS shall accompany the shipment. Contractor shall comply with the effective dates for SDS requirements IAW the Occupational Safety and Health Administrations (OSHA) Hazardous Communication Standard, Title 29, Code of Federal Regulation (CFR) Part 1910.1200. The Contractor shall ensure containers of hazardous chemicals are labeled with the following information, prior to shipping to Tinker AFB IAW OSHA Hazardous Communication Standard, Title 29, CFR Part 1910.1200 (2012): product identifier; signal word; hazard statement(s); precautionary statement(s); pictogram(s); and name, address and telephone number of the chemical manufacturer, importer, or other responsible party.
The COR will forward all SDS submittals to 72 ABW/CEIE for approval. A current manufacturer SDS shall be submitted to the COR if the Contractor changes manufacturer or vendor for any chemicals that were prior approved. The Contractor shall maintain copies of manufacturer SDSs for all chemicals and SDSs shall be readily accessible at all times by Contractor personnel as well as government employees.
1.12 Hazardous Waste: If no HAZWASTE will be generated during performance of this contract, the contractor shall certify “NO Hazardous Waste Generation” by official correspondence. This certification shall be provided to the COR within ten (10) days after award. Upon COR receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply. Appropriate penalties for the contractor shall be assessed if found in violation of above certification.
1.12.1 The Contractor shall dispose of contaminated solid waste, spent or processed chemical solutions, used rags and hazardous waste in government furnished waste containers located in the shop or area the work is being performed. The Contractor shall notify the COR if the required waste containers are not available on site.
1.13 Discharges: Any discharges into Tinker’s industrial waste treatment plant (IWTP) or sanitary sewer shall be approved and done IAW Tinker Industrial Waste Water Discharge Permit as instructed by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). Notice of intent documentation shall be provided to the COR within ten (10) days after award. The COR will submit the required notice of intent documentation to the UEC for 72 ABW/CEIE approval. The Contractor shall not discharge into IWTP and sanitary sewer prior to approval issued by 72 ABW/CEIE. The Contractor shall maintain records of written approval issued by 72 ABW/CEIE for discharges into IWTP and sanitary sewer.
1.14 Off-Site Discharges: For discharges outside of Tinker AFB, the Contractor shall ensure waste water discharges, that may contain pollutants resulting from any contracted service, go to a state or federal permitted treatment facility such as a municipal Publicly Owned Treatment Works (POTW). The Contractor shall provide official correspondence ten (10) calendar days after contract award date to the COR from the POTW that states the POTW is permitted for all pollutants that the Contractor may discharge during the contracted service.
1.15 Spills: Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB 911. The Contractor shall immediately report all environmental violations to the COR and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows:
1.15.1 One (1) copy to CO, two (2) copies to the COR, a copy for UEC and one (1) copy for record. The format of the report shall be left up to the Contractor, but the report shall contain the following information:
1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and rate of discharge 6.) Any damages or injuries involved 7.) Extent of area impacted 8.) Potential hazards 9.) Actions taken 10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.)
and whether 911 was called and which agencies responded.
1.16 Environmental Training: Upon COR receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply.
1.16.1 Contractor personnel performing duties in the service of this PWS shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable State Laws and regulations; DoD, Air Force and local requirements. This training can be obtained through creditable training institutions or companies. All training shall be approved by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm; http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 and http://www.lion.com/Storing-Hazardous-Waste-for-LQGs at the Contractor’s expense. Prior to obtaining training, the Contractor shall provide the name of the training institution or company and course description to the COR for approval within ten (10) calendar days after contract award date. Once written approval is received from the COR, the Contractor shall provide the environmental training certificates for employees performing duties in the service of this PWS to the COR, within thirty (30) calendar days after contract award date. In addition to the required environmental training, Contractors shall be compliant with Tinker AFB procedures per TAFB HWMP, “Hazardous Waste Management”.”
1.17 Forms, Technical Orders (T.O.), AFI, Air Force Material Command Instructions (AFMCI), and Publications: The Contractor shall obtain the forms and publications expressly required to perform the http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 http://www.lion.com/Storing-Hazardous-Waste-for-LQGs work in this contract via the internet at www.e-publishing.af.mil. In the event a form or publication is not available online, the GPOC will provide the form, instruction, or publication to the Contractor upon the Contractor’s written request (e-mail is acceptable). In the event, laws, regulations, T.O.’s, AFI’s, or AFMCI’s change during the term of this contract, the Contractor shall be required to comply as the changes come into effect. Contractors delivering or handling official United States Air Force (USAF) records shall comply with the applicable records management regulations in AFI 33-322, Chapter 3, in its entirety.
1.18 Foreign Nationals: The Contractor shall notify the GPOC before sending a Foreign National representative to perform services. Special rules apply for foreign nationals visiting a US Government facility.
1.19 Safety and Health off Government Installations: While performing work under this contract the Contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. During the execution of the contract, the Contractor shall notify the CO, GPOC, and Government Contract Administrator (CA) within one (1) business day of any damage to Government property in which the dollar value exceeds $500,000.00 and within two (2) work days, for any damage to Government property less than $500,000.00.
Mishap notifications shall contain, as a minimum, the following information:
• Contract, Contract Number, Name and Title of Person(s) Reporting
• Date, Time and exact location of accident/incident
• Brief Narrative of accident/incident (Events leading to accident/incident)
• Cause of accident/incident, if known
• Estimated cost of accident/incident (material and labor to repair/replace)
• Nomenclature of equipment and personnel involved in accident/incident
• Corrective actions (taken or proposed)
• Other pertinent information
If requested by the designated CO, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.
1.20 Combating Trafficking in Persons: IAW DFARS PGI 222.17, the COR shall pursue, as appropriate, the following methods of monitoring the Contractor’s performance regarding trafficking in persons such that non-compliances with FAR clause 52.222-50 are brought to the immediate attention of the Contracting Officer:
a. Keep the lines of communication open with the Contractor. At the Post-Award conference, remind the Contractor of his contractual responsibilities to notify the government if the Contractor receives notification of any alleged violations to this policy or if actions have been taken against the Contractor employees, subcontractor’s or subcontractor employees pursuant to the clause.
b. When appropriate, encourage Contractor to complete Human Trafficking Awareness Training.
c. Encourage the Contractor to take steps to investigate and eliminate slavery and human trafficking in their supply chains and to publish information for consumer awareness.
d. Periodically access the Department of State’s Trafficking in Person (TIP) website for updates and to view the latest reports. http://www.state.gov/g/tip
1.21 Commanders Safety Intent: The safety of everyone on Tinker AFB is our top priority. All Individuals must accept personal responsibility for safety and seek opportunities for improving the safety http://www.e-publishing.af.mil/ http://www.state.gov/g/tip of our work environment. Everyone working on Tinker AFB is challenged to find, fix (if able) and report all hazards and near-misses. It is our shared duty to take every reasonable step and precaution to prevent accidents and preserve the health/safety of each contractor and government employee.
1.22F Speak Up for Safety: Safety surety is an integral part of our overall goal of establishing a world class safety and health program. Our “Speak Out for Safety” initiative ensures a partnership with contractors and government employees to further enhance safety to ensure we are looking out for all our partners and empowers all employees to actively participate in each other’s safety.
A safe workplace is everyone's business. As part of the contract team, military, civilian and contractor personnel are empowered to Speak Out for Safety (S.O.S.) when they observe an unsafe act.
Events that present imminent danger to personnel or catastrophic damage to property we
Section Two
RESERVED
Section Three
Government Furnished Property (GFP) And Services
3.1. Government Furnished Property (GFP).
3.1.1. Government Property Repair/Maintenance (or Similar Requirement) On-Base.
Note: Same as Government Property Incidental to Government Installation or Site.
Not Applicable
3.1.2. GFP - Repair/Maintenance Off-Base.
The Contractor shall ensure all GFP is secured at the close of each workday. The Government retains title to all GFP, until the Government properly disposes of the GFP as authorized by law or regulation. This GFP shall not be used for the performance of any other contract. The applicable Government Property contract clauses will be cited in the solicitation/contract. The GFP is identified in Attachment #2.
NOTE: When the GFP or Components (Parts) of the GFP are required to be shipped off-base, the Government Surveillance COR or GPOC will be responsible for providing a Monthly Off-Base Repair/Maintenance Log to the Government Contracting Officer and Property Administrator identifying the following information:
• Contract #
• Attachment # _ Line Item #
• GFP or GFP Component (Part) Name/Description, NSN, CAGE, Part #, Model #, Serial #, Quantity, as applicable
• Shipment Date and Document #
• Return Shipment Date and Document #
• Receipt Date
3.1.2.1. GFP Shipment to Contractor’s Facility. In accordance with PWS Section One.
3.1.2.2. GFP Return Shipment to Government. In accordance with PWS Section One.
3.1.2.3. Loss of Government Property. In accordance with the Government Property contract clauses.
3.1.2.4. GFP Identification Labels. When applicable, the Contractor shall clearly label (without damaging) GFP to distinguish it from Contractor Furnished Property IAW with the contract terms and conditions and this PWS.
3.2. Government Furnished Services (GFS).
Not Applicable
3.3. Government Property Incidental to the Government Installation or Site.
Note: Formerly termed Shared Property of the Government.
Not Applicable
3.4. Intangible Government Property.
Not Applicable
3.5. Contractor Acquired Property (CAP), Time & Material (T&M), Labor Hour (LH), Cost, or Travel Contract Line Item Numbers (CLINS).
Not Applicable