PWS.pdf

PDF 215 KB Posted

Attached to
CD Band Antenna Federal contract opportunity
Solicitation number
FA8251-23-R-0016
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This performance work statement outlines requirements for the remanufacture and repair of C/D Band Antennas used in F-16 aircraft. Key details include:

  • The contractor will remanufacture C/D Band Antennas through major overhaul, including complete disassembly, reworking or replacing parts to restore functionality. Reusable components will be used from other antennas.

  • Testing will ensure items meet all performance requirements and specifications before acceptance. The contractor must perform acceptance testing and address any deficiencies. Warranty and quality issues processes are defined.

  • Packaging, handling, and transportation requirements are specified. The contractor must report any damages or shortages upon receipt. Security and shipping documentation standards are provided.

  • Specific work requirements cover disassembly, cleaning, corrosion treatment, maintenance, inspection, reassembly, testing, marking, and counterfeit prevention plans. The contractor must meet all material, workmanship, and documentation standards.

View the file

Other files for this federal contract opportunity

Other files attached to CD Band Antenna, newest first.
File Type Posted
FA825123R0016_0004.pdf PDF
FA825123R0016_0003.pdf PDF
FA825123R0016_0002.pdf PDF
FA825123R0016_0001.pdf PDF
FA825123R0016.pdf PDF
DRILS.pdf PDF
Packaging.pdf PDF
SOW.pdf PDF
WageDeterminations.pdf PDF
GFPFA825123R0016.pdf PDF
ITMDESC_9283.pdf PDF
CDRLs.pdf PDF
QASP.pdf PDF
IUID_9283.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(Rev: 7 Dec 2018) 10 May 2022 PWS 2652-01-146-9283WF 1/12

DEPARTMENT OF THE AIR FORCE

OGDEN AIR LOGISTICS CENTER, HILL AFB, UTAH 84056-5820

PERFORMANCE WORK SPECIFICATION (PWS)

PR NO: FD20202200453 DATE: 10 May 2022

1.0 Contract Type: IDIQ

1.1 SCOPE OF WORK: The Performance Work Specification (PWS) establishes the requirement to test andremanufacture the following F-16 items: C/D Band Antenna to serviceable “A” condition. This remanufacturingconsists of major overhaul including complete or substantial tear-down into component parts. This tear-downincludes reworking or replacing most parts in the C/D Band Antenna items. Reusable disassembled C/D BandAntenna components SHALL be used as replacement components for restoring functionality of other C/D BandAntenna items.

These reusable components are not required to maintain the end item identification. The C/DBand Antenna item parts SHALL be reassembled so as to furnish a totally rebuilt item. This SHALL include replacingall old solder joints in the Radio Frequency section to preclude early failure. The remanufacturing processesused by the contractor SHALL bring service life back to the reconditioned C/D Band Antenna that would resemblethe originally manufactured item. The C/D Band Antennas are restored to a nearly new condition (but notnecessarily cosmetically new) in a facility owned and/or operated by the contractor.

2.0 REF. DOCUMENTS:

AFMCMAN 21-149 Contract Depot Maintenance (CDM) Program DoDI 4140.1 Supply Chain Material Management Policy (Replacing DoD Directive 4140.1 Dec 2011) DoDI 4140.67DoD Counterfeit Prevention Policy (Apr 26 2013) DoD 4160.28-M Vol 1. Publication, Defense Demilitarization: Program Administration (Incorporated and cancelled DoD 4160.21-M-1 June 2011) DoD 4100.39-M Federal Logistics Information System (FLIS Manual) DLM 4000.25.1 Military Standard Requisitioning and Issue Procedures (MILSTRIP) replacing DoD 4000.25-1-M Jun 2012 DLM 4000.25-2 Military Standard Transaction Reporting and Accountability Procedures (MILSTRAP) replacing DoD 4000.25-2-M Jun 2012 CAV AF Manual Commercial Asset Visibility Air Force (Version 8.01 or higher) MIL-HDBK-344 Environmental Stress Screening of Electronic Equipment MIL-I-46058C Insulating Compound, Electrical MIL-HDBK-454 Requirements for Electronic Equipment MIL-STD-130 Identification Marking of U.S. Military Property AS12500 Corrosion Prevention and Deterioration Control of Electronic Components and Assemblies ESD-TR20.20 ESD Association Technical Report for the Protection of Electrostatic Discharge Susceptible Items – Handbook for the Development of an Electrostatic Discharge Control Program for the Protection of Electronic Parts, Assemblies, and Equipment MIL-STD-1568D Materials and Processes for Corrosion Prevention and Control in Aerospace Weapons Systems NAS 847 Cap and Plug, Protective, Dust and Moisture Seal ANSI/ESD-S20.20-2014 The Development of an Electrostatic Discharge Control Program for – Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices),ESD Association Standard for

(Rev: 7 Dec 2018) 10 May 2022 PWS 2652-01-146-9283WF 2/12

T.O. 00-5-1 AF Technical Order System T.O. 00-5-2 AF Technical Order Distribution System T.O. 1-1-689 Avionics Cleaning/Corrosion Manual T.O. 1-1-691 Aircraft Weapon System Cleaning and Corrosion Control T.O. 33B-1-1 Non-Destructive Inspection Methods T.O. 00-20-2 Maintenance Data Documentation T.O. 00-25-260 Asset Marking and Tracking Item Unique Identification (IUID) Marking Procedures

Applicable Non-Government Publications 16ZE221 Critical Item Development Spec (H/G) for C/D Band Antenna 16VE221 C/D Band Antenna Specification Control Drawing (H/G) 27130 L3 Randtron C/D Band Antenna Specification Control Drawing (H/G)

Technical orders/manuals, technical directives and other applicable publications required to accomplish the work effort, but not in possession of the contractor, SHALL be acquired as authorized and directed by the CO. Commercial publications can be substituted for technical orders and military standards if the contractor can substantiate to the engineering control authority that such publications will accomplish the same purpose.

NOTE: Primary source for military specifications and standards is:

DLA DOCUMENT SERVICES/QUICK SEARCH ASSIST

700 Robbins Ave Bldg. 4, Sec D.

Philadelphia, PA 1911-5094

DSN: 442-6396

COMM: (215) 697-6396

WEB: http://quicksearch.dla.mil/

3.0 SERVICE DELIVERY SUMMARY (SDS):

DCMA/ACO Quality Assurance Representative (QAR) is ultimately responsible for inspecting and accepting the reparable assets In Accordance With (IAW) Federal Acquisition Regulation (FAR) Inspection Clause 52.246-4 & 52.245-1

Performance Objective PWS Para Performance Threshold Surveillance

Return the assets to a serviceable condition.

4.1 Successful completion of

repair on all items not determined to be beyond economical repair.

DCMA QAR/DCMA ACO

Delivery of repaired asset made IAW contract delivery schedule.

7.5 No more than one item

delivered after the schedule date.

DCMA QAR/ACO/PCO

(Rev: 7 Dec 2018) 10 May 2022 PWS 2652-01-146-9283WF 3/12

Asset determined to be Beyond Economical Repair

(BER)

6.0 No contested BERs allowed. DCMA QAR/DCMA

ACO/PCO/ 416 SCMS

Quality Deficiency Report

(QDR)

4.5 No contested QDRs

allowed.

DCMA QAR/DCMA

ACO/PCO/ 416 SCMS

Reporting in Commercial Asset Visibility Air Force

(CAVAF)

5.5, 10.1, 10.2

Condition Code changes SHALL be noted no later than 1 business day after change has taken place.

100% (or as detailed in) DCMA risk Management Plan Accuracy rate for material handling and Data Item Display. 100% of the overhauled assets require workmanship inspections through the maintenance process as required in DID, or CAVAF.

PCO/CAV AF POC

Maintenance Data Collection Record (MDCR): Item failures and component consumption data SHALL be documented and reported

10.4

Reporting SHALL take place according to contract schedule

416 SCMS

Acceptance Test Plan

(ATP)

4.1, 8.4.2 100% assets must meet form-fit-function-interface.

FAR Inspection clause 52.246-4

DCMA QAR

Test Requirements 4.4, 8.4.2 100% of the time this item must pass performance acceptance testing per previously approved ATP.

ENG/ES/DCMA QAR

Warranty 4.5, 7.6 Item functions properly within warranty period.

ENG/ES/PM/DCMA

Preservation of markings/ Item Unique Item Identifier (IUID) marking

8.5 All parts to be marked with

IUID label per drawing.

IUID information for all parts uploaded to IUID database. DCMA has IUID inspection responsibility.

DCMA QAR

Counterfeit Prevention Plan

8.7, 10.5 Report submitted per B001 PCO/ACO

(Rev: 7 Dec 2018) 10 May 2022 PWS 2652-01-146-9283WF 4/12

The contractor will perform Environmental Stress Screening (ESS), when applicable.

Must maintain 100% accuracy in reporting all required discrepancy report documentation.

Government Inspection

4.0 WORK PERFORMANCE REQUIREMENTS:

4.1 TECHNICAL OR PERFORMANCE REQUIREMENTS: Unit will meet all performance requirements of a new item. All repaired/retrofitted items will be configured and perform IAW the latest requirements of the Specification Control Drawing and Acceptance Test Plan listed in Para. 2.0.

4.2 OBSOLETE COMPONENTS will be identified to the ACO/PCO after the Test and Evaluation and before the repair price is negotiated/defined (for multi-step Contracts).

4.3 FOREIGN DISCLOSURE RESTRICTIONS: Foreign Disclosure Restrictions IAW

AFMCMAN 21-149, and AFMCI 20-102 Do Apply

4.4 TEST REQUIREMENTS: The Contractor SHALL perform an acceptance test and checkout of each completed end-item to assure serviceability and full functionality prior to presentation to the Government. This testing will be performed IAW existing approved test plan or IAW developed test plans approved by the Government.

4.5 QUALITY DEFICIENCY REPORTING: Any asset that fails to function within Government- Contractor mutually agreed warranty period after date of repair, and the Government suspects failure is due to quality of workmanship, level of overhaul, or quality of replacement parts used by the contracted repair source, the asset SHALL be returned to the repair source for correction.

This repair SHALL be accomplished at no additional cost to the government if deemed by 416 SCMS to be the fault of the contractor and will be delivered back to the government under the terms of the original contract. The contractor may dispute Air Force determination of responsibility through the ACO to the PCO with DCMA providing evidence that the failure was not the fault of the contractor. This measure will be accomplished by customer reported deficiencies in the form of product quality deficiency or material deficiency reports according to T.O. 00-35D-54 titled USAF Deficiency Reporting Investigation and Resolution.

5.0 PACKAGING, HANDLING, SECURITY AND TRANSPORTATION:

5.1 RECEIVING INSPECTION: Contractor SHALL notify the ACO/PCO along with the Quality Assurance Representative (QAR) of all damages and shortages, or discrepancies (i.e. items not packaged in accordance with applicable Special Packaging Instructions (SPI)) discovered upon receipt of any item(s). All issues must be reported back to the originating organization for disposition. If items are damaged in transit or assets are found to be misidentified during the inspection process, the ACO/PCO will request disposition instruction from the 416 SCMS. The 416 SCMS will verify if additional assets are available to resubmit to the contractor. If no assets are available, ACO/PCO will address the required changes. The ACO or QAR SHALL initiate a Supply Discrepancy Report (SDR). Access to WebSDR can be found at https://www.daas.dla.mil/sar/warning.asp.

(Rev: 7 Dec 2018) 10 May 2022 PWS 2652-01-146-9283WF 5/12

5.2 SECURITY REQUIREMENTS:

5.2.1 DD Form 254: DoD Contract Security Classification Specification, is REQUIRED at a sercret level because of the classified data generated by the F-16’s C/D Band Antenna.

5.2.2 Destructive Notice: For classified documents, follow the procedures in DoD 5220.22- M, National Industrial Security Program (NISPOM), Section 11 and DoD5200.1-R, Information Security Program Regulation. For unclassified, limited documents, destroy by any method that SHALL prevent disclosure of contents or reconstruction of the document.

5.3 REUSABLE CONTAINERS: Contractor SHALL handle and store reusable containers and materials used for packing and packaging in a manner, which SHALL assure that they are retained in a serviceable condition for reuse. If the contractor questions the serviceability/condition of the reusable containers, notify the ACO for repair/replacement instructions.

5.4 HANDLING: All items SHALL be handled and packaged in accordance with applicable

Special Packaging Instructions (SPI).

5.4.1 Care SHALL be exercised to prevent damage to Government Furnished Property/Equipment while in the contractor’s possession.

5.4.2 All Government Furnished Property SHALL be stored in a secure area to provide protection against damage, pilferage, or loss. Storage areas SHALL provide protection against all adverse environmental conditions.

5.5 SHIPPING DOCUMENT REQUIREMENT: A DD Form 1348 SHALL be prepared and attached to any item or items that have been repaired and are ready to be shipped without exception. Under no circumstances SHALL a DD Form 250 or DD Form 1149 ever be sent with a shipment and/or used as a shipping document. If CAV AF is used by the contractor for repair data reporting, the DD Form 1348 generated as a part of the shipping transaction SHALL be printed and used. NOTE: The DD Form 1348 must be printed when prompted in CAV AF.

The DD Form 1348 cannot be printed after that point. If CAV AF reporting is not fully completed or used by the contractor for any reason, a manual DD Form 1348 SHALL be prepared and SHALL be annotated with the following statement: “Contract Repair;

Receiving activities process as D6M receipt, __ Condition Stock.” (Enter appropriate condition code). When a manual DD Form 1348 is used, a copy must be sent to the Procuring Contracting Officer (PCO) with a statement indicating that the DD Form 1348 is to be sent to the CAV AF POC for the contract. Contractor is required to comply with all CAVAF requirements identified in the CDRLs and attachments to the contract. Additionally, upon completion of the repair, the contractor is required to print the DD1348-1 (in triplicate) from CAVAF. One copy is to be placed inside the box with the returnable repair asset, one outside the box and one copy will be electronically uploaded to WAWF as part of the Receiving Report

(DD250).

6.0 CONDEMNATION:

It SHALL be considered uneconomical to accomplish repair on an end item when the total cost for parts, material, and labor exceeds 75 percent of the stock list price of a new item. Parts obsolescence may also be a condition for BER. Authorization to accomplish repair, condemnation, or disposition SHALL be obtained through the ACO/PCO from the 416 SCMS for

(Rev: 7 Dec 2018) 10 May 2022 PWS 2652-01-146-9283WF 6/12 end items determined to be uneconomical to return to a serviceable condition. If BER is approved the contract delivery schedule will be adjusted accordingly to relieve contractor delivery schedule on item.

7.0 GENERAL:

7.1 RELIABILITY AND MAINTAINABILITY (R&M): Additional R&M is not required;

however, existing R&M performance SHALL not be degraded during this work effort.

7.2 ENVIRONMENTAL IMPACT (EI) REQUIREMENTS: No special EI requirements have been identified.

7.3 ROUTINE, MISSION IMPAIRED CAPABILITY AWAITING PARTS (MICAP), SURGE,

and ESSENTIAL DoD CONTRACTOR SERVICES: The Contractor SHALL be responsible for returning serviceable assets in the time set forth in this contract. In the event that the Government requires an asset for coverage of a MICAP requirement, the Contractor agrees to enter into negotiations with the Government to expedite delivery of the needed asset(s).

7.4 ELECTROSTATIC DISCHARGE CONTROL: The contractor SHALL implement or maintain an Electrostatic Discharge (ESD) control program in accordance with ANSI/ESD-S20.20-2014, paragraphs 5.1, 5.4, 5.5, 5.6, 5.7, 5.8.2, 5.10, 5.11, 5.12, and 5.13 and with T.O. 00-25-234, Section VII for all electronics ESD sensitive end items/components.

7.5 DISPOSITION: Repaired parts SHALL be shipped to the destination specified in the contract.

Disposition of any misidentified items SHALL be as stated in paragraph 5.1. Delivery SHALL be according to the delivery schedule in the contract. Early and partial shipments are acceptable.

7.6 WARRANTY: The contractor SHALL warranty their work IAW industry standards. The contractor SHALL provide the terms of their warranty in their bid or proposal prior to contract award. Any rework that is done under warranty SHALL be at no addition cost to the Government.

7.7 TRIAGE CONCEPT IS AUTHORIZED: Cross utilization of components are authorized following coordination with DCMA COR.

7.8 SAFETY AND HEALTH: While performing work under this contract the contractor SHALL comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor SHALL notify the Contracting Officer (CO), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two workdays, for any damage to government property less than $500,000.00 during the execution of the contract.

Mishap notifications SHALL contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

(Rev: 7 Dec 2018) 10 May 2022 PWS 2652-01-146-9283WF 7/12

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information

If requested by the designated CO, the contractor SHALL immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

8.0 SPECIFIC WORK REQUIREMENTS:

8.1 DISASSEMBLY: The Contractor SHALL disassemble each item only to the extent necessary to accomplish inspection, testing, fault isolation, and maintenance.

8.2 CLEANING: The end item SHALL be cleaned thoroughly prior to and after disassembly and maintain cleanliness during this maintenance effort. IAW MIL- HDBK-454 and T.O. 1-1-1.

8.3 CORROSION CONTROL AND TREATMENT: Accomplish corrosion control and treatment as required, using methods and materials IAW MIL-STD-1568, section 4 and T.O. 1-1-2 as applicable, and specification drawings.

8.4 MAINTENANCE: The contractor SHALL perform the required maintenance, inspection, reassembly of the reworked end item and components and calibration, if applicable, IAW T.O. 00-25-234.

8.4.1 The contractor SHALL perform an acceptance test and checkout of each completed end item to assure serviceability prior to presentation to the government.

8.4.2 Upon satisfactory completion of final test, the contractor SHALL cover and seal all ports, vents and electrical connection/plugs with suitable caps to prevent entry of foreign matter or damage during handling and shipment. Cap or seal all open flexible or rigid lines, hoses, and fittings at all times when not in use.

8.5 MARKING:

8.5.1 Preservation of Markings: The Contractor SHALL ensure nameplates and product markings are correct and accurate upon repair completion. The Contractor SHALL replace damaged markings, identification, and decals IAW drawings or equivalent best commercial practice. The assemblies, subassemblies, and parts that constitute this repair SHALL be marked for identification in accordance with existing style and format.

8.5.2 If not already marked, Item Unique Item Identifier (IUID) marking SHALL be accomplished according to MIL-STD-130 and MIL-STD-129 latest versions and per DFARS Clause 252.211.7003. All marking SHALL be placed in accordance with the technical data for the part.

(Rev: 7 Dec 2018) 10 May 2022 PWS 2652-01-146-9283WF 8/12

8.5.2.1 Specification requirements for IUID marking will be contained in the applicable Air Force/OEM Technical Order, Specific Work Requirements appendix, approved engineering drawing, or a Government provided Engineering order as applicable. The government will provide IUID marking specifications.

8.5.2.2 In the event the government cannot provide or it is not feasible for the contractor to provide IUID marking specifications a determination and findings will be accomplished IAW DFARS 211.274-2 Policy for unique item identification.

8.5.2.3 IUID markings currently in place on items undergoing repair SHALL be protected from damage or removal during repair. Ensure 2-D matrix IUID markings are readable per TO 00-25-260. Should IUID marking be rendered unreadable during repair, the contractor SHALL notify the PCO/ACO for determination.

8.5.2.4 Prior to government acceptance, the contractor SHALL submit the required and applicable contingent data to the IUID Registry per the data submission procedures at http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html.

DCMA has IUID inspection responsibility.

8.5.2.5 Enter logistical data into database

8.6 REFINISHING: Refinish only to the extent necessary to assure adequate protection of all surfaces IAW Technical Data.

8.7 COUNTERFEIT PREVENTION PLAN (CPP): Contractors that supply electronic parts or systems that contain electronic parts SHALL establish policies and procedures to avoid, detect, mitigate and dispose of counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures SHALL be documented in a CPP for submission and approval in accordance with CDRL B001 (DI- MISC-81832/T) and accomplished for all specified contract items. DI-MISC-81832/T is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI- MISC-81832/T also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE 5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition SHALL also apply.

8.7.1 At a minimum, the CPP SHALL address:

(Rev: 7 Dec 2018) 10 May 2022 PWS 2652-01-146-9283WF 9/12

8.7.1.1 Applicability: The Contractor SHALL identify all Business locations and programs to which the CPP applies. The CPP SHALL address materials, hardware, electronic parts, and procured assemblies.

8.7.1.2 Definitions: The Contractor SHALL utilize definitions per AS 5553 to ensure consistency. Any contractor-derived definitions must be included in an appropriate CPP appendix or annex. (Ref. AS5553, paragraph 3, 3.1, 3.2, 3.3, appendix H)

8.7.1.3 Parts Availability and Use of Parts Brokers: The Contractor SHALL not procure materials, systems, assemblies, subassemblies or parts from parts Brokers when available from Original Manufacturers (OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP. (Ref. AS5553, paragraph 4.1.1, 4.1.2.e., appendix A)

8.7.1.4 Procurement Policies: The Contractor SHALL provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor SHALL identify the appropriate office(s), business units, functional organizations, and programs, who SHALL have responsibility for development, maintenance and implementation of the CPP. The CPP SHALL identify the specific roles and responsibility for each. (Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D)

8.7.1.5 Risk Assessment: The contract SHALL address the risk of using unknown sources and or unauthorized suppliers in the CPP. Application or technical risk assessments SHALL establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments SHALL establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor SHALL conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The contractor SHALL identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material and functional requirements. As a minimum, analysis SHALL be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The contractor SHALL require completion of a trade study, documented within the CPP, that SHALL facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref.

AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D)

(Rev: 7 Dec 2018) 10 May 2022 PWS 2652-01-146-9283WF 10/12

8.7.1.6 Detection and Avoidance Responsibilities: The Contractor SHALL establish processes for the review and approval of contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes SHALL be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124 Stat.

4311; 10 U.S.C. 2302 note). The Contractor SHALL flow down such requirements and processes to their subcontractors per ODASD Memo titled “Overarching DoD Counterfeit Prevention Guidance”, dated 16 March 2012. (Ref. AS5553, paragraph 4.1.4, 4.1.5, appendix E)

8.7.1.7 Testing and Verification: The Contractor SHALL establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential.

These processes apply to prime contracts, and to subcontracts or suppliers below the prime contracts. The Contractor SHALL provide a list of acceptable test facilities if the subcontractor or supplier does not have the capability to perform required testing. Submittal of Certificates of Compliance indicating the parts are not counterfeit SHALL be acceptable for verification of testing. (Ref. AS5553, paragraph 4.1.4, appendix E)

8.7.1.8 Configuration Identification and Traceability: The Contractor SHALL identify and control the configurations of all systems, assemblies, subassemblies and parts, and enable mechanisms to provide traceability of parts. The Contractor SHALL report to the Government when control of the configurations of all systems, assemblies, subassemblies and parts, and mechanisms to provide traceability of parts are not possible. The Contractor SHALL identify the specific systems, assemblies, subassemblies and parts beyond the Contractors’ control. The Contractor SHALL be responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and SHALL be responsible for the rework or corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts. The cost of counterfeit electronic parts and suspect counterfeit electronic parts and the cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs under Department contracts , unless: a) the contractor has established a counterfeit avoidance/detection system approved by the DoD,

b) the counterfeit parts were procured from a DoD-accredited trusted supplier or provided as government property, and c) the contractor has provide timely notification to the government. (Ref. AS5553, paragraph 4.1.6, appendix F)

(Rev: 7 Dec 2018) 10 May 2022 PWS 2652-01-146-9283WF 11/12

8.7.1.9 Counterfeit Notification and Reporting: The Contractor SHALL report in writing to the Procuring Activity within 30 days of determining any end item, component, part, or material contained in supplies purchased by the Department of Defense, or purchased by a contractor or subcontractor for delivery to, or on behalf of, the Department, contains counterfeit electronic parts or suspect counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of Special Investigations (AFOSI).

The Procuring Contracting Officer (PCO) SHALL coordinate reporting to the appropriate Program Management/Item Management, System Engineering Management, the AFMC Discrepant Materiel Reporting Program (DMRP) Office in 406 SCMS/GULAB, and the AFOSI.

Additionally, the Contractor SHALL within the same 30 day period ensure all suspected or confirmed counterfeit items are entered into the Government-Industry Data Exchange Program (GIDEP) system, which will serve as the DoD central reporting repository. (Ref. AS5553, paragraph 4.1.7, appendix G)

8.7.1.10 Counterfeit Prevention Training: The Contractor SHALL provide appropriate training and SHALL require all personnel working procurement within their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said training. The Contractor SHALL determine the appropriate training required. Training may be developed in-house or may be other Industry accepted training. The CPP SHALL describe and list the training provided by the contractor to their personnel.

9.0 DISCREPANCIES:

In case of conflict between this document and any referenced document, contact ACO & PCO for resolution of discrepancy.

10.0 DATA:

10.1 CAV AF: Contractor SHALL provide the status of maintenance production, asset management, and condemnations IAW Contract Data Requirements List (CDRL) Exhibit A001 (DI-MGMT-81838) Contractor is required to comply with all CAVAF requirements identified in the CDRLs and attachments to the contract. Additionally, upon completion of the repair, the contractor is required to print the DD1348-1 (in triplicate) from CAVAF. One copy is to be placed inside the box with the returnable repair asset, one outside the box and one copy will be electronically uploaded to WAWF as part of the Receiving Report (DD250).

10.2 Contract Depot Maintenance (CDM) Monthly Production Report: The contractor SHALL report monthly by contract delievery order on all applicable categories, totals and on hand balances, providing all listed DID requirements for each repair location, including sub-contractor facilities, if applicable, for the contracts maintenance occurrence actions during the reporting period IAW CDRL A002 (DI-PSSS-81995A/T)

(Rev: 7 Dec 2018) 10 May 2022 PWS 2652-01-146-9283WF 12/12

10.3 Government Property (GP) Inventory Report: The Contractor SHALL provide an Annual Government Property Physical Inventory Report IAW CDRL A003 (DI-

MGMT-80441D)

10.4 Maintenance Data Collection Reporting: Serial number tracking by the contractor is REQUIRED for all received assets. The contractor SHALL document all maintenance actions involving maintenance with the disassembly, cleaning, inspection, maintenance and replacement of repaired end-items. The contractor SHALL load Maintenance Data to the Defense Repair Information Logistics System (DRILS) (IAW CDRL A004) (DI-

MISC-82003/T).

10.5 Counterfeit Prevention Plan: The contractor SHALL provide a Counterfeit Prevention Plan (CPP) per CDRL B001 (DI-MISC-81832/T), including items from section 4 of

SAE AS5553.

PREPARED BY: Carlos Chacon 448 SCMW/416 SCMS

File details come from the government source that posted it. Updated .