This performance work statement outlines repair services for an SF6 tank assembly. The contractor will perform testing, teardown, and evaluation of the asset and identify any components requiring repair or replacement. Minor repair is defined as work that does not require total disassembly, while major repair involves extensive disassembly. The contractor must meet all technical and performance requirements and obtain approval for any design changes. Additional requirements include quality deficiency reporting, packaging and shipping, and condemnation if repair costs exceed 75% of the asset's value. The contractor shall report repair status and data in Commercial Asset Visibility Air Force and complete a counterfeit prevention plan, engineering change proposals, and manpower reporting as required.

View the file

Other files for this federal contract opportunity

Other files attached to Repairs Services for the TPS-75 program., newest first.
File Type Posted
CDRL.pdf PDF
SQSR.pdf PDF
EO.pdf PDF
FA825022R0003.pdf PDF
CAV_AF.pdf PDF
ITMDESC_REPORT.pdf PDF
GFPFA825022R0003_1.pdf PDF
PKGRQMT_REPORT.pdf PDF
SOW.pdf PDF
TRNSPDATA_REPORT.pdf PDF
UIIEC_REPORT.pdf PDF
RDL_REPORT.pdf PDF
SPI.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10 Mar 2022 PWS 1/9

DEPARTMENT OF THE AIR FORCE

OGDEN AIR LOGISTICS CENTER, HILL AFB, UTAH 84056-5820

PERFORMANCE WORK SPECIFICATION (PWS)

PR NO: FD2020-22-00647 DATE: 10 March 2022

1.0 SCOPE OF WORK: (3- Step) For the end item the contractor shall furnish all facilities, parts, materials, equipment and services, required to inspect and, if necessary, restore to serviceable condition. Services to be performed will not be essential in a crisis situation. Work consists of one of four efforts: Test, teardown, and evaluation (TT&E) only; TT&E and Minor Repair; TT&E and

Moderate Repair; TT&E and Major Rebuild.

1.1 TEST, TEARDOWN, AND EVALUATION: The contractor shall perform visual, mechanical and electrical testing of the end item, reusable or replacement component parts, and materials according to the schedule in the contract to determine the condition of the end item. Upon completion of this task, all of the components of the end item requiring repair or replacement will be identified by part number, NSN (if applicable), nomenclature, and location in the assembly. This information will be reported in writing to the Procurement Contracting Officer

(PCO)/ Defense Contract Management Agency (DCMA) Administrative Contracting Officer

(ACO) and, if necessary, a category of repair will be negotiated. The price of repair for the end item will be firm-fixed based on this negotiated repair level. If no further repair is required, the asset must be returned in serviceable like new condition.

1.2 MINOR REPAIR: (FFP) Minor repair is defined as repair that does not require total disassembly of the end item or replacement of major subcomponents. A minor repair candidate typically requires external adjustments or rework in order to meet all of the electrical specifications in accordance with the Technical Order Test Procedure and mechanical dimensions in accordance with the outline drawing. It would include repair or replacement of damaged or missing minor external parts as required. Test each end item IAW the specifications for P/N’s as listed in the contract schedule. If minor repair is initiated and it is found that, in order to return the end item to serviceable condition that the level of repair must increase to a major repair, the DCMA Government representative (ACO/PCO or QAR) will be notified and give the notice to proceed to the major repair category.

1.3 MAJOR REPAIR: (FFP) Major repair is defined as an end item that is beyond the minor repair category to the extent that the end item is to be disassembled or reconstituted. This could be due to extensive mechanical damage, extensive disassembly to access or replace subcomponents and/or replacement of major subcomponents. A major repair will also include replacement of any missing parts. Assets sent out for repairs will most likely be missing parts.

Parts that may be missing include, but is not limited to: the SF6 Tank Shell, Inductors, and

Connectors. Please consider the likelihood of these missing parts, and others, when reviewing the contract. As with minor repair, the end item will be tested IAW the specifications and

Technical Order test procedures to verify correct Form, Fit, Function and Interface of the P/N’s listed in the contract schedule.

Below listed item(s) will be shipped to contractor to repair:

Item Description NSN Part Number

10 Mar 2022 PWS 2/9

5840-01-481-7460 SF6 Tank Assembly 1366840

This PWS establishes the minimum work requirements to return the end item(s) to a serviceable but like new condition.

ESD: YES

2.0 WORK PERFORMANCE REQUIREMENTS:

2.1 TECHNICAL OR PERFORMANCE REQUIREMENTS: Unit will meet all performance requirements of a new item. All repaired/retrofitted items will be configured and perform IAW the latest requirements of the Specification Control Drawing and Acceptance Test Plan listed in the Repair Data List (RDL).

2.2 SUBCOMPONENT CHANGE OR REDESIGN: The contractor will identify any proposed/necessary changes to subcomponents, values, part/manufacture substitutions or redesign of subsystems to the 415 SCMS ESA after the Test and Evaluation. If the contractor proposes any internal changes to this item, the contractor shall submit an ECO to the 415 SCMS for review and approval by the designated engineering authority. Submission of ECO(s) does not imply approval. The ECO shall include a coversheet with appropriate CUI, distribution statement, and contract identification information and be accompanied with complete technical documentation, unlimited data rights and shall be submitted to the government for approval.

Contract Data Requirements List D001 DI-SESS-80639E.

2.3 FOREIGN DISCLOSURE RESTRICTIONS: This item contains critical technology and is export controlled. Distribution authorized to DoD and U.S. DoD Contractors only (Critical

Technology).

2.4 TEST REQUIREMENTS: The Contractor shall perform an acceptance test and checkout of each completed end-item to assure serviceability and full functionality prior to presentation to the Government. This testing will be performed IAW existing approved test plan or IAW developed test plans approved by the Government.

2.5 QUALITY DEFICIENCY REPORTING: Any asset that fails to function within one year after date of repair, and the Government suspects failure is due to quality of workmanship, level of overhaul, or quality of replacement parts used by the contracted repair source, the asset shall be returned to the repair source for correction. This repair shall be accomplished at no additional cost to the government if deemed by 415 SCMS to be the fault of the contractor and will be delivered back to the government under the terms of the original contract. The contractor may dispute Air Force determination of responsibility through the ACO to the PCO with DCMA providing evidence that the failure was not the fault of the contractor. This measure will be accomplished by customer reported deficiencies in the form of product quality deficiency or material deficiency reports according to T.O. 00-35D-54 titled USAF Deficiency Reporting

Investigation and Resolution.

3.0 PACKAGING, HANDLING, SECURITY AND TRANSPORTATION:

3.1 RECEIVING INSPECTION: Contractor shall notify the ACO/PCO along with the Quality

Assurance Representative (QAR) of all damages and shortages, or discrepancies (i.e. items not

10 Mar 2022 PWS 3/9 packaged in accordance with applicable Special Packaging Instructions (SPI)) discovered upon receipt of any item(s). All issues must be reported back to the originating organization for disposition. If items are damaged in transit or assets are found to be misidentified during the inspection process, the ACO/PCO will request disposition instruction from the 415 SCMS. The

415 SCMS will verify if additional assets are available to resubmit to the contractor. If no assets are available, ACO/PCO will address the required changes. The ACO or QAR shall initiate a

Supply Discrepancy Report (SDR). Access to WebSDR can be found at https://www.daas.dla.mil/sar/warning.asp.

3.2 SECURITY REQUIREMENTS: N/A

3.3 REUSABLE CONTAINERS: Contractor shall handle and store reusable containers and materials used for packing and packaging in a manner, which shall assure that they are retained in a serviceable condition for reuse. If the contractor questions the serviceability/condition of the reusable containers, notify the ACO for repair/replacement instructions.

3.4 HANDLING: All items shall be handled and packaged in accordance with applicable Special

Packaging Instructions (SPI).

3.4.1 Care shall be exercised to prevent damage to Government Furnished

Property/Equipment while in the contractor’s possession.

3.4.2 All Government Furnished Property shall be stored in a secure area to provide protection against damage, pilferage, or loss. Storage areas shall provide protection against all adverse environmental conditions.

3.5 SHIPPING DOCUMENT REQUIREMENT: Contractor is required to comply with all CAV AF requirements identified in the CDRLs (para 8.1) and attachments to the contract. Additionally, upon completion of the repair, the contractor is required to print four copies of the DD1348-1A from CAVAF. One copy is to be placed inside the box with the returnable repair asset, one outside the box, provide one copy to DCMA and one copy will be electronically uploaded to

WAWF as part of the Receiving Report (DD250). It is recommended a copy be retained for the contractor’s records. Under no circumstances shall a DD Form 250 or DD Form 1149 ever be sent with a shipment and/or used as a shipping document. NOTE: The DD Form 1348 must be printed when prompted in CAV AF. The DD Form 1348 cannot be printed after that point.

In the event CAV AF system is inoperable or is on a scheduled downtime:

1. The DD Form 1348-1A shall be manually completed and generated (printed) by contractor, using the AFPUBS website: https://www.esd.whs.mil/directives/forms/

2. When CAV AF is again operational, the contractor shall resume with transactional reporting actions in a timely and accurate manner, including completing a DD Form 1348-1A (printing not required if manual DD1348-1A PDF file utilized) and the shipment process in CAV AF.

4.0 CONDEMNATION: It shall be considered uneconomical to accomplish repair on an end item when the total cost for parts, material, and labor exceeds 75 percent of the stock list price of a new item. Parts obsolescence may also be a condition for BER. Authorization to accomplish repair, condemnation, or disposition shall be obtained through the ACO/PCO from the 415 SCMS for end items determined to be uneconomical to return to a serviceable condition. If BER is approved the contract delivery schedule will be adjusted accordingly to relieve contractor delivery schedule on item.

https://www.esd.whs.mil/directives/forms/

10 Mar 2022 PWS 4/9

5.0 GENERAL:

5.1 RELIABILITY AND MAINTAINABILITY (R&M): Additional R&M is not required;

however, existing R&M performance shall not be degraded during this work effort.

5.2 ENVIRONMENTAL IMPACT (EI) REQUIREMENTS: The SF6 Tank Assembly will likely contain Sulfur Hexafluoride (SF6). Take appropriate Industry Standard precautions when working on the SF6 Tank Assembly.

5.3 ROUTINE, MISSION IMPAIRED CAPABILITY AWAITING PARTS (MICAP), SURGE,

and ESSENTIAL DoD CONTRACTOR SERVICES: The Contractor shall be responsible for returning serviceable assets in the time set forth in this contract. In the event that the

Government requires an asset for coverage of a MICAP requirement, the Contractor agrees to enter into negotiations with the Government to expedite delivery of the needed asset(s).

5.4 ELECTROSTATIC DISCHARGE CONTROL: The contractor shall implement or maintain an

Electrostatic Discharge (ESD) control program in accordance with MIL-PRF-87893, MIL-STD-

1686, paragraphs 5.1, 5.4, 5.5, 5.6, 5.7, 5.8.2, 5.10, 5.11, 5.12, and 5.13 and with T.O. 00-25-

234, Section VII for all electronics ESD sensitive end items/components.

5.5 DISPOSITION: Repaired parts shall be shipped to the destination specified in the contract.

Disposition of any misidentified items shall be as stated in paragraph 3.1. Delivery shall be according to the delivery schedule in the contract. Early and partial shipments are acceptable.

5.6 TRIAGE CONCEPT IS AUTHORIZED: Cross utilization of components are authorized following coordination with DCMA COR.

5.7 SAFETY AND HEALTH: While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the Contracting Officer (CO), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two workdays, for any damage to government property less than $500,000.00 during the execution of the contract.

Mishap notifications shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information

If requested by the designated CO, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

10 Mar 2022 PWS 5/9

6.0 SPECIFIC WORK REQUIREMENTS:

6.1 DISASSEMBLY: The Contractor shall disassemble each item only to the extent necessary to accomplish inspection, testing, fault isolation, and maintenance.

6.2 CLEANING: The end item shall be cleaned thoroughly prior to and after disassembly and maintain cleanliness during this maintenance effort. IAW MIL-HDBK-454 and T.O. 1-1-1.

6.3 CORROSION CONTROL AND TREATMENT: Accomplish corrosion control and treatment as required, using methods and materials IAW MIL-STD-1568, section 4 and T.O. 1-1-2 as applicable, and specification drawings.

6.4 MAINTENANCE: The contractor shall perform the required maintenance, inspection, reassembly of the reworked end item and components and calibration, if applicable, IAW T.O.

00-25-234.

6.4.1 The contractor shall perform an acceptance test and checkout of each completed end item to assure serviceability prior to presentation to the government.

6.4.2 Upon satisfactory completion of final test, the contractor shall cover and seal all ports, vents and electrical connection/plugs with suitable caps to prevent entry of foreign matter or damage during handling and shipment. Cap or seal all open flexible or rigid lines, hoses, and fittings at all times when not in use.

6.5 MARKING:

6.5.1 Preservation of Markings: The Contractor shall ensure nameplates and product markings are correct and accurate upon repair completion. The Contractor shall replace damaged markings, identification, and decals IAW drawings or equivalent best commercial practice. The assemblies, subassemblies, and parts that constitute this repair shall be marked for identification in accordance with existing style and format.

6.5.2 If not already marked, Item Unique Item Identifier (IUID) marking shall be accomplished according to MIL-STD-130 and MIL-STD-129 latest versions and per

DFARS Clause 252.211.7003. All marking shall be placed in accordance with the technical data for the part.

6.5.2.1 Specification requirements for IUID marking will be contained in the applicable

Air Force/OEM Technical Order, Specific Work Requirements appendix, approved engineering drawing, or a Government provided Engineering order as applicable.

The government will provide IUID marking specifications.

6.5.2.2 In the event the government cannot provide or it is not feasible for the contractor to provide IUID marking specifications a determination and findings will be accomplished IAW DFARS 211.274-2 Policy for unique item identification.

6.5.2.3 IUID markings currently in place on items undergoing repair shall be protected from damage or removal during repair. Ensure 2-D matrix IUID markings are readable per TO 00-25-260. Should IUID marking be rendered unreadable during repair, the contractor shall notify the PCO/ACO for determination.

10 Mar 2022 PWS 6/9

6.5.2.4 Prior to government acceptance, the contractor shall submit the required and applicable contingent data to the IUID Registry per the data submission procedures at http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html.

DCMA has IUID inspection responsibility.

6.5.2.5 Enter logistical data into database

6.6 REFINISHING: Refinish only to the extent necessary to assure adequate protection of all surfaces IAW Technical Data.

6.7 COUNTERFEIT PREVENTION PLAN (CPP): Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and dispose of counterfeit electronic parts to prevent such parts from entering the

USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with CDRL C001 (DI-MISC-81832) and accomplished for all specified contract items. DI-MISC-81832 is applicable to Parts, Material and Processes

Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD.

The requirements established by DI-MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted

SAE 5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply.

6.7.1 At a minimum, the CPP shall address:

6.7.1.1 Applicability. The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies.

6.7.1.2 Definitions. The Contractor shall utilize definitions per AS 5553 to ensure consistency. Any contractor-derived definitions must be included in an appropriate CPP appendix or annex. (Ref. AS5553, Section 3)

6.7.1.3 Parts Availability and Use of Parts Brokers. The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts Brokers when available from Original Manufacturers (OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP. (Ref.

AS5553, Section 3.1)

6.7.1.4 Procurement Policies. The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The

Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, who shall have responsibility for development, maintenance and implementation of the CPP. The CPP shall identify the specific roles and responsibility for each. (Ref. AS5553, Section 3.1.3, 3.1.4)

10 Mar 2022 PWS 7/9

6.7.1.5 Risk Assessment. The contract shall address the risk of using unknown sources and or unauthorized suppliers in the CPP. Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the

Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The contractor shall require completion of a trade study, documented within the CPP, that shall facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref. AS5553, Section 3)

6.7.1.6 Detection and Avoidance Responsibilities. The Contractor shall establish processes for the review and approval of contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton National

Defense Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124 Stat.

4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their subcontractors per ODASD Memo titled “Overarching DoD

Counterfeit Prevention Guidance”, dated 16 March 2012. (Ref. AS5553, Section 3)

6.7.1.7 Testing and Verification. The Contractor shall establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential. These processes apply to prime contracts, and to subcontracts or suppliers below the prime contracts. The

Contractor shall provide a list of acceptable test facilities if the subcontractor or supplier does not have the capability to perform required testing. Submittal of

Certificates of Compliance indicating the parts are not counterfeit shall be acceptable for verification of testing. (Ref. AS5553, Section 3.1.5)

6.7.1.8 Configuration Identification and Traceability. The Contractor shall identify and control the configurations of all systems, assemblies, subassemblies and parts, and enable mechanisms to provide traceability of parts. The Contractor shall report to the Government when control of the configurations of all systems, assemblies, subassemblies and parts, and mechanisms to provide traceability of parts are not possible. The Contractor shall identify the specific systems, assemblies, subassemblies and parts beyond the Contractors’ control. The Contractor shall be responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and shall be responsible for the rework or corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts. The cost of counterfeit electronic parts and suspect counterfeit electronic parts and the cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs under Department contracts , unless: a) the

10 Mar 2022 PWS 8/9 contractor has established a counterfeit avoidance/detection system approved by the DoD, b) the counterfeit parts were procured from a DoD-accredited trusted supplier or provided as government property, and c) the contractor has provide timely notification to the government. (Ref. AS5553, Section 3.1.7)

6.7.1.9 Counterfeit Notification and Reporting. The Contractor shall report in writing to the Procuring Activity within 30 days of determining any end item, component, part, or material contained in supplies purchased by the Department of Defense, or purchased by a contractor or subcontractor for delivery to, or on behalf of, the

Department, contains counterfeit electronic parts or suspect counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of

Special Investigations (AFOSI). The Procuring Contracting Officer (PCO) shall coordinate reporting to the appropriate Program Management/Item Management, System Engineering Management, the AFMC Discrepant Materiel Reporting

Program (DMRP) Office in 406 SCMS/GULAB, and the AFOSI. Additionally, the Contractor shall within the same 30 day period ensure all suspected or confirmed counterfeit items are entered into the Government-Industry Data

Exchange Program (GIDEP) system, which will serve as the DoD central reporting repository. (Ref. AS5553, Section 3.1.8)

6.7.1.10 Counterfeit Prevention Training. The Contractor shall provide appropriate training and shall require all personnel working procurement within their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said training. The Contractor shall determine the appropriate training required. Training may be developed in-house or may be other Industry accepted training. The CPP shall describe and list the training provided by the contractor to their personnel. (Ref. AS5553, Section 3.1.1)

7.0 DISCREPANCIES: In case of conflict between this document and any referenced document, contact ACO & PCO for resolution of discrepancy.

8.0 DATA DELIVERABLES:

8.1 CAV AF: Contractor shall provide the status of maintenance production, asset management, and condemnations IAW Contract Data Requirements List (CDRL) Exhibit

A001 (DI-MGMT-81838/T), A002 (DI-PSSS-81995/T), A003 (DI-MGMT-80441 C/T)

and all requirements of this PWS. Contractor shall be ready to report in CAVAF before receipt of assets. Contractor shall complete on time all required CAVAF production/repair data reporting as required in paragraph 3.5 of this PWS.

8.2 REPAIRED ITEM INSPECTION REPORT: All item failures and component consumption data shall be documented and reported to OO-ALC 415 SCMS IAW with the

Repairable Item Inspection Report, CDRL B001 (DI-PSSS-80386A).

8.3 COUNTERFEIT PREVENTION PLAN: The contractor shall provide a Counterfeit

Prevention Plan (CPP) per CDRL C001 (DI-MISC-81832), including the identified items of SAE AS5553 per section 6.7.

10 Mar 2022 PWS 9/9

8.4 ENGINEERING CHANGE PROPOSAL: The contractor shall provide an Engineering

Change Proposal for any proposed subcomponent substitutions per CDRL Exhibit D001

(DI- SESS-80639E) (see paragraph 2.2).

8.5 CONTRACTOR MANPOWER REPORTING: The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the SF6 Tank Assembly via a secure data collection site.

The contractor is required to completely fill in all required data fields at http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30

September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.

8.5.1 Reporting Period: Contractors are required to input data by 31 October of each year.

8.5.2 Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

8.5.3 User Manuals: Data for Air Force service requirements must be input at the Air

Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.

9.0 SERVICE DELIVERY SUMMARY (SDS):

Performance Objective PWS Para Performance Threshold Surveillance

Reporting in Commercial

Asset Visibility Air Force

(CAVAF)

DD250/Material/Inspection

Reporting and Receiving reports.

3.5, 8.1 Condition Code changes

Must be noted no later than

24 Hrs. after change has taken place. 100% (or as detailed in) DCMA risk

Management Plan Accuracy rate for material handling and reporting in DD250 or

CAVAF.

PCO/CAV AF POC

Item failures and component consumption data shall be documented and reported

8.2

Reporting shall take place no later than 7 days after repair.

415 SCMS

Counterfeit Prevention Plan 6.7, 8.3 Reporting shall take place no later than 30 days after contract award.

415 SCMS

PREPARED BY: William E Powell 448 SCMW/415 SCMS http://www.ecmra.mil/ http://www.ecmra.mil/