PWS.pdf
PDF 153 KB Posted
- Attached to
- REPAIR SERVICES LENS, OPTICAL INSTRU Federal contract opportunity
- Solicitation number
- FA8250-22-Q-0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| TRNSPDATA_REPORT.pdf | ||
| CA_AF.pdf | ||
| CDRLS.pdf | ||
| ITMDESC_REPORT.pdf | ||
| SOW.pdf | ||
| SQSR.pdf | ||
| PKGRQMT_REPORT.pdf | ||
| FA825022Q0004.pdf | ||
| RDL_REPORT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12 Jan 2022 PWS 6650-01-056-0979 1/6
DEPARTMENT OF THE AIR FORCE
OGDEN AIR LOGISTICS CENTER, HILL AFB, UTAH 84056-5820
PERFORMANCE WORK SPECIFICATION (PWS)
PR NO: FD20202200439 DATE: 12 January 2022
1.0 Contract Type One step
1.1 SCOPE OF WORK: (FFP) For the following end item(s), the contractor shall furnish all facilities, parts, materials, data, equipment and services, required to dissemble, (the process of breaking down item(s) into component parts that will be reworked, refurbished, altered, and/or replaced), inspect, repair as necessary (providing manufacturing processes that are similar to the original manufacturing process to totally rebuild items), reassemble, align and functionally test each item(s), returning the item(s) to a serviceable condition. Services to be performed will not be essential in a crisis situation.
The objective of this effort is refurbishment of SOON mirror assembly of the AN/FMQ-7
System. The work is generally described as removing the existing reflective coating if required, resurfacing and recoating the mirror assemblies in accordance with the specifications contained in the engineering drawing. The required drawings containing the specifications are identified as 7361222. It will be beyond economical repair
(BER) if there is a chip or crack near the center of the lens that is unrepairable.
Below listed item(s) will be shipped to contractor to repair:
Item Description NSN Part Number
Lens, Optical Instrument 6650-01-056-0979 7361222
This PWS establishes the minimum work requirements to return the end item(s) to a serviceable but like new condition.
ESD: NO
2.0 WORK PERFORMANCE REQUIREMENTS:
2.1 TECHNICAL OR PERFORMANCE REQUIREMENTS: Unit will meet all performance requirements of a new item. All repaired/retrofitted items will be configured and perform IAW the latest requirements of the Specification Control Drawing and Acceptance Test Plan listed in the Repair Data List (RDL).
2.2 SUBCOMPONENT CHANGE OR REDESIGN: The contractor will identify any proposed/necessary changes to subcomponents, values, part/manufacture substitutions or redesign of subsystems to the 415 SCMS ESA after the Test and Evaluation. If the contractor proposes any internal changes to this item, the contractor shall submit an ECO to the 415 SCMS for review and approval by the designated engineering authority. Submission of ECO(s) does not imply approval. The ECO shall include a coversheet with appropriate CUI, distribution statement, and contract identification information and be accompanied with complete technical documentation, unlimited data rights and shall be submitted to the government for approval.
Contract Data Requirements List D001 DI-SESS-80639E.
12 Jan 2022 PWS 6650-01-056-0979 2/6
2.3 FOREIGN DISCLOSURE RESTRICTIONS: This item contains critical technology and is export controlled. Distribution authorized to DoD and U.S. DoD Contractors only (Critical
Technology).
2.4 TEST REQUIREMENTS: The Contractor shall perform an acceptance test and checkout of each completed end-item to assure serviceability and full functionality prior to presentation to the Government. This testing will be performed IAW existing approved test plan or IAW developed test plans approved by the Government.
2.5 QUALITY DEFICIENCY REPORTING: Any asset that fails to function within one year after date of repair, and the Government suspects failure is due to quality of workmanship, level of overhaul, or quality of replacement parts used by the contracted repair source, the asset shall be returned to the repair source for correction. This repair shall be accomplished at no additional cost to the government if deemed by 415 SCMS to be the fault of the contractor and will be delivered back to the government under the terms of the original contract. The contractor may dispute Air Force determination of responsibility through the ACO to the PCO with DCMA providing evidence that the failure was not the fault of the contractor. This measure will be accomplished by customer reported deficiencies in the form of product quality deficiency or material deficiency reports according to T.O. 00-35D-54 titled USAF Deficiency Reporting
Investigation and Resolution.
3.0 PACKAGING, HANDLING, SECURITY AND TRANSPORTATION:
3.1 RECEIVING INSPECTION: Contractor shall notify the ACO/PCO along with the Quality
Assurance Representative (QAR) of all damages and shortages, or discrepancies (i.e. items not packaged in accordance with applicable Special Packaging Instructions (SPI)) discovered upon receipt of any item(s). All issues must be reported back to the originating organization for disposition. If items are damaged in transit or assets are found to be misidentified during the inspection process, the ACO/PCO will request disposition instruction from the 415 SCMS. The
415 SCMS will verify if additional assets are available to resubmit to the contractor. If no assets are available, ACO/PCO will address the required changes. The ACO or QAR shall initiate a
Supply Discrepancy Report (SDR). Access to WebSDR can be found at https://www.daas.dla.mil/sar/warning.asp.
3.2 SECURITY REQUIREMENTS: N/A
3.3 REUSABLE CONTAINERS: Contractor shall handle and store reusable containers and materials used for packing and packaging in a manner, which shall assure that they are retained in a serviceable condition for reuse. If the contractor questions the serviceability/condition of the reusable containers, notify the ACO for repair/replacement instructions.
3.4 HANDLING: All items shall be handled and packaged in accordance with applicable Special
Packaging Instructions (SPI).
3.4.1 Care shall be exercised to prevent damage to Government Furnished
Property/Equipment while in the contractor’s possession.
12 Jan 2022 PWS 6650-01-056-0979 3/6
3.4.2 All Government Furnished Property shall be stored in a secure area to provide protection against damage, pilferage, or loss. Storage areas shall provide protection against all adverse environmental conditions.
3.5 SHIPPING DOCUMENT REQUIREMENT: Contractor is required to comply with all
CAV AF requirements identified in the CDRLs (para 8.1) and attachments to the contract. Additionally, upon completion of the repair, the contractor is required to print four copies of the DD1348-1A from CAVAF. One copy is to be placed inside the box with the returnable repair asset, one outside the box, provide one copy to DCMA and one copy will be electronically uploaded to WAWF as part of the Receiving Report
(DD250). It is recommended a copy be retained for the contractor’s records. Under no circumstances shall a DD Form 250 or DD Form 1149 ever be sent with a shipment and/or used as a shipping document. NOTE: The DD Form 1348 must be printed when prompted in CAV AF. The DD Form 1348 cannot be printed after that point.
In the event CAV AF system is inoperable or is on a scheduled downtime:
1. The DD Form 1348-1A shall be manually completed and generated (printed) by contractor, using the AFPUBS website: https://www.esd.whs.mil/directives/forms/
2. When CAV AF is again operational, the contractor shall resume with transactional reporting actions in a timely and accurate manner, including completing a DD Form
1348-1A (printing not required if manual DD1348-1A PDF file utilized) and the shipment process in CAV AF.
4.0 CONDEMNATION: It shall be considered uneconomical to accomplish repair on an end item when the total cost for parts, material, and labor exceeds 75 percent of the stock list price of a new item. Parts obsolescence may also be a condition for BER. Authorization to accomplish repair, condemnation, or disposition shall be obtained through the ACO/PCO from the 415 SCMS for end items determined to be uneconomical to return to a serviceable condition. If BER is approved the contract delivery schedule will be adjusted accordingly to relieve contractor delivery schedule on item.
5.0 GENERAL:
5.1 RELIABILITY AND MAINTAINABILITY (R&M): Additional R&M is not required;
however, existing R&M performance shall not be degraded during this work effort.
5.2 ENVIRONMENTAL IMPACT (EI) REQUIREMENTS: N/A
5.3 ROUTINE, MISSION IMPAIRED CAPABILITY AWAITING PARTS (MICAP), SURGE,
and ESSENTIAL DoD CONTRACTOR SERVICES: The Contractor shall be responsible for returning serviceable assets in the time set forth in this contract. In the event that the
Government requires an asset for coverage of a MICAP requirement, the Contractor agrees to enter into negotiations with the Government to expedite delivery of the needed asset(s).
5.4 ELECTROSTATIC DISCHARGE CONTROL: N/A
https://www.esd.whs.mil/directives/forms/
12 Jan 2022 PWS 6650-01-056-0979 4/6
5.5 DISPOSITION: Repaired parts shall be shipped to the destination specified in the contract.
Disposition of any misidentified items shall be as stated in paragraph 3.1. Delivery shall be according to the delivery schedule in the contract. Early and partial shipments are acceptable.
5.6 TRIAGE CONCEPT IS AUTHORIZED: Cross utilization of components are authorized following coordination with DCMA COR.
5.7 SAFETY AND HEALTH: While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the Contracting Officer (CO), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two workdays, for any damage to government property less than $500,000.00 during the execution of the contract.
Mishap notifications shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
If requested by the designated CO, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.
6.0 SPECIFIC WORK REQUIREMENTS:
6.1 DISASSEMBLY: The Contractor shall disassemble each item only to the extent necessary to accomplish inspection, testing, fault isolation, and maintenance.
6.2 CLEANING: The end item shall be cleaned thoroughly prior to and after disassembly and maintain cleanliness during this maintenance effort. IAW MIL-HDBK-454 and
T.O. 1-1-1.
6.3 CORROSION CONTROL AND TREATMENT: Accomplish corrosion control and treatment as required, using methods and materials IAW MIL-STD-1568, section 4 and
T.O. 1-1-2 as applicable, and specification drawings.
6.4 MAINTENANCE: The contractor shall perform the required maintenance, inspection, reassembly of the reworked end item and components and calibration, if applicable, IAW T.O. 00-25-234.
6.4.1 The contractor shall perform an acceptance test and checkout of each completed end item to assure serviceability prior to presentation to the government.
12 Jan 2022 PWS 6650-01-056-0979 5/6
6.4.2 Upon satisfactory completion of final test, the contractor shall cover and seal all ports, vents and electrical connection/plugs with suitable caps to prevent entry of foreign matter or damage during handling and shipment. Cap or seal all open flexible or rigid lines, hoses, and fittings at all times when not in use.
6.5 MARKING: This part does not require IUID
6.6 REFINISHING: Refinish only to the extent necessary to assure adequate protection of all surfaces IAW Technical Data.
6.7 COUNTERFEIT PREVENTION PLAN (CPP): This part contains no electrical components and CPP is not required.
7.0 DISCREPANCIES: In case of conflict between this document and any referenced document, contact ACO & PCO for resolution of discrepancy.
8.0 DATA DELIVERABLES:
8.1 CAV AF: Contractor shall provide the status of maintenance production, asset management, and condemnations IAW Contract Data Requirements List (CDRL)
Exhibit A001 (DI-MGMT-81838/T), A002 (DI-PSSS-81995/T), A003 (DI-
MGMT-80441 C/T) and all requirements of this PWS. Contractor shall be ready to report in CAVAF before receipt of assets. Contractor shall complete on time all required CAVAF production/repair data reporting as required in paragraph 3.5 of this PWS.
8.2 REPAIRED ITEM INSPECTION REPORT: All item failures and component consumption data shall be documented and reported to OO-ALC 415 SCMS IAW with the Repairable Item Inspection Report, CDRL B001 (DI-PSSS-80386A).
8.3 ENGINEERING CHANGE PROPOSAL: The contractor shall provide an
Engineering Change Order for any proposed subcomponent substitutions per
CDRL Exhibit D001 (DI- SESS-80639E) (see paragraph 2.2).
9.0 SERVICE DELIVERY SUMMARY (SDS):
Performance Objective PWS Para Performance Threshold Surveillance
Reporting in Commercial
Asset Visibility Air Force
(CAVAF)
DD250/Material/Inspection
Reporting and Receiving reports.
3.5, 8.1 Condition Code changes
Must be noted no later than
24 Hrs. after change has taken place. 100% (or as detailed in) DCMA risk
Management Plan Accuracy rate for material handling and reporting in DD250 or
CAVAF.
PCO/CAV AF POC
12 Jan 2022 PWS 6650-01-056-0979 6/6
Performance Objective PWS Para Performance Threshold Surveillance
Item failures and component consumption data shall be documented and reported
8.2
Reporting shall take place no later than 7 days after repair.
415 SCMS
PREPARED BY: Jackson Andrasko 448 SCMW/415 SCMS
File details come from the government source that posted it. Updated .