PWS.pdf
PDF 253 KB Posted
- Attached to
- TH-1H Flight Instrument Federal contract opportunity
- Solicitation number
- FA8524-21-R-0008
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| F8524-21-R-0008final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR: FD2060-22-00024 PWS REVISION: 0 1
Distribution Statement: A
Performance Work Statement for
TH-1H Flight Instruments
Purchase Request: FD2060-22-00024
4 June 2021
Distribution Statement A:
DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited.
PR: FD2060-22-00024 PWS REVISION: 0 2
1.0 Description of Services
1.1 Objective(s): This Performance Work Statement (PWS) describes the services required to overhaul TH-1H flight instruments. These services include functional testing, inspection and repair actions required to ensure the below items are in serviceable condition.
National Stock Number (NSN) Part Number (PN) Noun 5895-01-566-6242 100433-300 Control, Direction Finder 5895-01-566-7709 100858-300 Control, Receiver Transmitter 5825-01-566-7710 100892-200 Control, Transponder
The Contractor shall fault isolate, repair and test unserviceable assets. The Contractor shall track and resolve items affected by Product Quality Deficiency Reports (PQDR), perform depot level repair, functional testing, inspection, and packaging. A repair is successful if the item is in a serviceable condition and efficiently serves its intended purpose. The period of performance shall consist of a basic one-year period after contract award plus four one-year ordering periods.
The contract type is a Firm-Fixed Price Requirements type for all ordering periods. Repairs shall be completed within 30 days after induction. The Contractor shall respond to the Production Management Specialist (PMS) within one business day of the request with the estimated delivery date of a critical item. The Contractor shall report production using the Commercial Asset Visibility Air Force (CAVAF) system by maintaining current inputs. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report daily or as actions occur. The Contractor shall have no more than two valid PQDR per contract year.
1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the United States Air Force (USAF) by having assets available to support the TH-1H helicopter.
1.3 Background: These flight instruments are installed on the USAF TH-1H helicopter. There are no other USAF applications. The flight instruments are commercial items and not military unique. The Original Equipment Manufacturer is Executive Instruments, Incorporated.
2.0 Services Summary
Performance Objective PWS Reference
Performance Threshold
Quality of repair 4.3.9 There shall be no more than two PQDRs and/or QDRs per contract year.
Delivery of repair 4.3.6.4 Repaired assets shall be delivered in accordance with the schedule defined by the contract/order.
There shall be no more than two late delivery(ies) per contract year. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date and negotiate a revised delivery date. The late asset shall be delivered by the revised delivery date acceptable to the Government.
PR: FD2060-22-00024 PWS REVISION: 0 3
CAV-AF reporting 4.3.3 The Contractor shall report production in CAV-AF.
The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report as actions occur.
Quality of CDRL deliverable
4.2.1 There shall be no more than one rejection of any
deliverable. There shall be no more than one total rejection(s) of deliverables per contract year. The Government will reject a deliverable if one or more technical errors or one more minor errors are found within the deliverable. The rejected deliverable shall be corrected and resubmitted within three business days of notification of Government rejection.
Receipt of CDRL deliverable
4.2.2 There shall be no more than one late submission(s)
of deliverables per contract year. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.
Request for assistance 4.3.6.1 The Contractor shall initially respond to a request for assistance within eight business hours. Follow-up assistance, if required, shall be provided by the suspense date acceptable to the Government.
Adherence to Contractor Quality Program Plan
5.8 100% compliance with the QMS is required.
3.0 Government Property
3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in accordance with the Federal Acquisition Regulation (FAR) and as specified in the contract/order.
3.2 Government Property to be Provided: Government furnished property to be provided includes:
National Stock Number (NSN) Part Number (PN) Noun 5895-01-566-6242 100433-300 Control, Direction Finder 5895-01-566-7709 100858-300 Control, Receiver Transmitter 5825-01-566-7710 100892-200 Control, Transponder
3.3 Reporting of Government Property: The Contractor shall create and maintain records of all Government property accountable to the contract/order. The Contractor shall record receipt and return of Government-Furnished Property (GFP) in the Item Unique Identification (IUID) Registry.
3.4 Loss of Government Property
3.4.1 Definition of Loss of Government Property: “Loss of Government property” means unintended loss of or damage to Government property including property that cannot be found
PR: FD2060-22-00024 PWS REVISION: 0 4
after a reasonable search, loss due to inadequate storage, loss due to lack of security, theft, damage requiring repair to restore the item to usable condition, or damage that renders the property useless for its intended purpose or Beyond Economical Repair (BER). Loss of Government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing. Unless otherwise stated in the contract/order, loss of Government property does not include normal and reasonable inventory adjustments, i.e., losses of low priority consumable material, such as common hardware, as agreed to by the Contractor and the Government Property Administrator.
3.4.2 Reporting Loss of Government Property: The Contractor shall report loss of Government property using Defense Contract Management Agency (DCMA) / Access To eTools.
3.5 Return or Retention of Government Property: All property provided by the Government remains the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the Procuring Contracting Officer (PCO) directs the Contractor to retain the property for continued use under a successor contract. All Government property shall be returned to the Government in the condition provided unless approved in advance by the PCO. All material generated under the contract/order becomes the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the PCO directs the Contractor to retain the material for continued use under a successor contract.
4.0 Technical Requirements
4.1 Period and Place of Performance
4.1.1 Contract/Order Period of Performance: The period of performance for the contract/order will extend 12 months after the last ordering period. The contract is a one-year basic ordering period plus four one-year ordering periods.
4.1.2 Place of Performance: These services will be performed at the Contractor’s facility.
4.2 Contract Data Requirements List(s) (CDRL)
Document Identifier
DID Title PWS Reference(s)
A001 DI-MGMT-81838 Commercial Asset Visibility Air Force (CAVAF) / Contract Furnished Material End Item Report
4.3.3
A002 DI-MGMT-80441D Government Property Inventory Report 4.4 A003 DI-PSSS-81995 Contract Depot Maintenance Production Report 4.5 A004 DI-QCIC-81722 Quality Program Plan 5.8
4.2.1 Quality of CDRL Deliverable: There shall be no more than one rejection of any deliverable. There shall be no more than one total rejection(s) of deliverables per contract year.
The Government will reject a deliverable if one or more technical errors or one or more minor errors are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with
PR: FD2060-22-00024 PWS REVISION: 0 5
the CDRL, PWS or contract. A minor error is exemplified by a typographical error, a grammatical error, etc. The rejected deliverable shall be corrected and resubmitted within three business days of notification of Government rejection.
4.2.2 Receipt of CDRL Deliverable: CDRL deliverables shall be submitted via Wide Area Work Flow (WAWF) and submitted directly to the MFT member identified on the CDRL. There shall be no more than one late submission(s) of deliverables per contract year. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.
4.3 Repair
4.3.1 Item Unique Identification is required for all items to be delivered to the Department of Defense (DoD) that meet the criteria established by the FAR. No IUID marking is required since the units are below the regulatory threshold.
4.3.2 Packaging: The Contractor shall package and mark material in accordance with the contract/order Air Force Materiel Command (AFMC) Form 158, Packaging Requirements, and applicable Government regulations.
4.3.2.1 The Contractor shall package and mark end items and components in accordance with the contract (basic or order, as applicable) Air Force Materiel Command (AFMC) Form 158, Packaging Requirements; MIL-STD-129R, Department of Defense Standard Practice / Military Marking for Shipment and Storage; MIL-STD-130N, Department of Defense Standard Practice / Identification Marking of U.S. Military Property; and MIL-STD-2073-1E, Standard Practice for Military Packaging. The Contractor shall package and mark material in accordance with other applicable Government regulations including, but not limited to, those regarding security, safety and environmental concerns.
4.3.2.2 The Contractor shall package and mark material for movement, shipment, receipt and storage in a manner that ensures the protection and preservation of the material for shipment to and storage at the destination. The Contractor shall package electronic parts susceptible to electrostatic discharge damage in accordance with MIL-STD-1686C, Department of Defense Standard Practice / Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices), and MIL-HDBK-263B, Military Handbook / Electrostatic Discharge Control Handbook for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices).
4.3.2.3 In accordance with MIL-STD-2073-1E, Standard Practice for Military Packaging, shipping containers received, which meet the requirements of the AFMC Form 158 and are suitable for return shipment of serviceable assets, shall be reclaimed and stored for reutilization.
Unsuitable shipping containers shall be disposed of and replaced with new containers that meet the requirements of the AFMC Form 158.
PR: FD2060-22-00024 PWS REVISION: 0 6
4.3.3 Commercial Asset Visibility-Air Force (CAVAF): The Contractor is required to comply with all CAVAF requirements identified in the CDRLs and attachments to the contract, and shall report production in CAVAF. Additionally, upon completion of the repair, the contractor is required to print the DD1348-1 (in triplicate) from CAVAF. One copy is to be placed inside the box with the returnable repair asset, one outside the box and one copy will be electronically uploaded to WAWF as part of the Receiving Report (DD250). The Contractor shall provide data on the actions conducted for each unit and report as actions occur. [CDRL A001, DI-MGMT- 81838, Commercial Asset Visibility Air Force (CAVAF) / Contract Furnished Material End Item Report]
4.3.3.1 Reference CAVAF Reporting Requirements attached to the solicitation for detailed instructions.
4.3.3.2 The Contractor shall direct CAVAF questions to the CAVAF office, email available upon request.
4.3.3.3 The Contractor shall report delivery of asset for repair within three days of receipt.
4.3.4 The Contractor shall establish and maintain a counterfeit electronic part detection and avoidance system to mitigate the risk of counterfeit electronic parts being installed in end items or otherwise entering the USAF/DoD inventory
4.3.5 The Contractor shall induct units for repair within three days of receipt or a funded order, whichever is later.
4.3.6 Turn-Around Time (TAT) is measured from the Contractor’s receipt of the item and funded delivery order, whichever is latest, to the time the asset is shipped back to the Government. TAT for repairs shall be 30 days. Notification shall be provided to the government when long-lead time parts are required. The Contractor shall notify the Government via email if an asset identified as NSN 5895-01-566-7709, PN 100858-300 requires component repair performed off-site. In the event there is a need for long-lead time parts, the contractor shall notify the government PCO within 10 days of induction. Joint Chief of Staff Surge backorders and Mission Incapable Aircraft Parts (MICAP) requirements will take precedence over the routine schedule and shall be expedited to 20 days.
4.3.6.1 The Contractor shall respond to the Production Management Specialist (PMS) within eight business hours of the request with the estimated delivery date of a critical item. In the event that a repairable item is required by the Government on an emergency basis to fill MICAP/Surge backorders, the Government PMS or Program Manager (PM) will notify the Contractor in writing via E-mail as soon as the need is identified. Follow-up assistance, if required, shall be provided by a suspense date acceptable to the Government.
4.3.6.2 Repairs performed under this work specification include all actions necessary to return the items to a serviceable condition. A repair is considered successful and an item serviceable when the end item operates and efficiently serves its intended operational purpose in accordance with its system specification, and technical data package as tested through an acceptance test
PR: FD2060-22-00024 PWS REVISION: 0 7
procedure. All repairs shall be complete before returning the item to the Government. The Contractor ISO 9001:2008 approved repair processes will ensure that all repaired or overhauled hardware meets the same performance standards as the original units to ensure that form, fit, function, and interchangeability are maintained for the length of the contract.
4.3.6.3 The Contractor shall provide, for the length of the contract, all necessary labor, materials, facilities and equipment required to analyze, troubleshoot, repair, overhaul and test the assemblies and parts that are maintained or repaired or overhauled under this contract. These services also include alignment, adjustment, calibration, testing, movement, storage and reporting status related services to the repair and return of items to the users. Each item will be repaired at the Contractor or subcontractor facility.
4.3.6.4 There shall be no more than two late deliveries per contract year. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date within three (3) working days of not meeting the delivery date and negotiate a revised delivery date. The late asset shall be delivered by the revised delivery date acceptable to the Government.
4.3.7 The Contractor shall remain responsible for any actions associated with their subcontractors. When assets are repaired at subcontractor facilities, the Contractor shall maintain asset visibility and tracking.
4.3.8 The Contractor shall notify the Government in writing (Email) upon receipt of items that are misidentified, misdirected, received incomplete, or missing components/subassemblies. For items received incomplete or missing components/subassemblies, the Government shall provide disposition to include a replacement for the missing item.
4.3.9 The Contractor shall ensure that best practices are implemented to maintain as a minimum, ISO 9001:2008, or equivalent, quality control standards. The Contractor shall maintain a system to ensure each item is inspected, repaired, and tested in accordance with the engineering data currently being used or developed and approved under this contract. There shall be no more than two validated Product Quality Deficiency Report (PQDR) per contract year.
4.3.10 Beyond Economical Repair (BER)
4.3.10.1 An end item shall be considered a BER candidate if the cost to repair the asset exceeds 100% of the unit’s repair cost.
4.3.10.2 An end item shall be considered a BER candidate if there is permanent loss of functionality to key components.
4.3.10.3 The Contractor shall submit BER requests via email to the Government PCO within five days of induction. The Contractor shall document the damage including description and photographs.
4.3.10.4 The Government IPT will then make the final determination and provide disposition instruction to the PCO.
PR: FD2060-22-00024 PWS REVISION: 0 8
4.3.10.5 The Contractor shall not charge the full repair cost, but only the firm fixed price costs associated with incoming test and inspection.
4.3.11 Condemnation
4.3.11.1 An end item shall be considered a Condemnation candidate if the unit inducted exhibits one of the following conditions.
4.3.11.2 Physical damage that affects greater than 75 percent of the material within the end item (i.e., crushed).
4.3.11.3 Burn damage that affects greater than 80 percent of the internal electrical components and connections of the end item.
4.3.11.3 Condemnation authority shall not be requested due to unavailability of replacement parts or parts obsolescence.
4.3.11.4 The Contractor shall submit a condemnation request within five days of induction. The package shall include at a minimum a description of the asset detailing the extent of damage and photographs clearly portraying the extent of damage to the end item and/or effects of overheating. One photograph shall be of the entire end item showing the part number and serial number.
4.3.11.5 The Government IPT will confirm the condemnation request and issue disposition instructions.
4.3.11.6 Condemned items shall be disposed of and demilitarized in accordance with DoD Publication 4160.21-M-1 “Defense Demilitarization Manual.”
4.3.11.7 The Government will be authorize Contractor to retain a condemned item(s) for cannibalization and reuse. The Contractor shall request that authorization at the time of the condemnation authority request. The Government will authorize the Contractor to retain all condemned items for use in cannibalization down to the Shop Replaceable Unit (SRU) level for use in the repair process. Removing parts, components, or subassemblies to aid in the repair of other units, shall not be reason for condemnation. Parts, components, or subassemblies used to aid in the repair of other units shall be replaced as they become available.
4.3.11.8 The Contractor shall not charge the full repair cost, but only the firm fixed price costs associated with incoming test and inspection.
4.3.12 Cross Cannibalization
4.3.12.1 The Contractor is authorized cross cannibalization to facilitate repair with Government authorization.
PR: FD2060-22-00024 PWS REVISION: 0 9
4.3.12.2 The Contractor shall request cross cannibalization authorization from the Government IPT via email including which part(s) the Contractor proposes to cross cannibalize.
4.3.12.3 The Contractor shall replace the cross cannibalized part(s) so as not to create an incomplete unit.
4.3.13 The Contractor shall perform a final acceptance testing to verify repair or overhaul actions have returned the unit to serviceable condition. The Contractor shall conducted Final Acceptance Testing using Contractor prepared Acceptance Test Procedure (ATP). All items repaired or overhauled shall pass a Contractor approved functional test prior to shipment. All repaired or overhauled end items shall be final inspected by the Contractor’s Quality Assurance Department.
The Contractor shall submit serviceable units to Defense Contract Management Agency (DCMA) for Acceptance at Origin on a Material Inspection and Receiving Report (through Wide Area Work Flow).
4.3.14 Any work performed above the negotiated repair price prior to notification to, and approval by, the Government will not be considered reimbursable.
4.3.15 A No Fault Found (NFF) is defined as when the Contractor is unable to duplicate the failure of a specific unit. The Contractor shall notify the Procuring Contracting Officer (PCO) as the method for reporting this to the Government. The Contractor shall not charge the full repair cost, but only the firm fixed price costs associated with incoming test and inspection
4.3.16 Shipping: The Contractor shall ship repaired assets within five business days by fastest, traceable means after DCMA acceptance.
4.4 The Contractor shall conduct a 100% physical inventory once per contract year of all GFP.
The report shall be in Contractor’s format but compatible with .xls or .xlsx format. The report shall include any Contractor held or subcontractor inventories where GFP has been provided by the government for a Contractor’s or subcontractor’s repair performance. Once an annual physical inventory has been accomplished, the contractor shall provide their internal property management control records in accordance with FAR Part 52.245-1(f)(1)(iv), Physical Inventory.
The specific report requirements are listed in CDRL A002, DI-MGMT-80441D, Government Property Inventory Report (CDRL A002, Government Property Inventory Report, DI-MGMT- 80441D).
4.5 The Contractor shall submit a Depot Maintenance Production Report on the 10th calendar day after the end of each reporting period in accordance with the CDRL. The Contractor shall report on maintenance production figures, status and accountability of assets at the contractor facility. The specific requirements are listed in CDRL A003, DI-PSSS-81995. (CDRL A003, DI-PSSS-81995, Contract Depot Maintenance Production Report)
5.0 General Information
PR: FD2060-22-00024 PWS REVISION: 0 10
5.1 Continuation of Mission-Essential Services During a Crisis: The Functional Commander or civilian equivalent has determined these services are not mission-essential and will not continue in the event of a crisis.
5.2 Security Requirements
5.2.1 Security Regulations: The Contractor shall ensure personnel, information, system, property, facility security requirements are met. The Contractor shall comply with Government security regulations including, but not limited to, Department of Defense (DoD) 5200.2-R, Personnel Security Program; DoD Directive (DoDD) 5205.02E, DoD Operations Security (OPSEC) Program; DoD Manual 5205.02-M, and DoD Operations Security (OPSEC) Program Manual.
5.2.2 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with DoDD 5205.02E and DoD Manual 5205.02-M to protect United States (U.S.)
Government interests. The Contractor shall ensure Contractor personnel who perform work on a Government facility comply with the OPSEC procedures of the facility.
5.2.3 Communications Security (COMSEC): The Contractor shall use only secure communications methods and/or equipment to Controlled Unclassified Information (CUI).
5.2.4 Security Clearance: It is not expected contractor/subcontractor personnel will require security clearances for proper accomplishment of contract/order requirements.
Contractor/subcontractor personnel shall not be authorized access to classified information and/or Controlled Unclassified Information (CUI) and classified items or be permitted to work on classified projects and/or programs without an appropriate security clearance and a need-to-know.
5.2.5 Security Incident or Violation: The Contractor shall immediately notify the Government Security Office of any potential or actual security incident or violation.
5.2.6 Access to Government System(s): The Government will provide contractor/subcontractor personnel access to system(s) necessary to perform tasks under the contract/order. The Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified or classified Government Automated Information System (AIS) have the respective background check or security investigation conducted. At a minimum, the Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified AIS have a National Agency Check with Inquiries (NACI) conducted. Upon completion/termination of the contract/order or transfer/termination of contractor/subcontractor personnel, the Contractor shall ensure the system account(s) are closed.
5.3 Environmental Management System (EMS): Contractor/subcontractor personnel who perform work on any Government facility shall comply with the EMS requirements established by the facility. Contractor/subcontractor personnel may be required to complete EMS training prior to beginning work.
PR: FD2060-22-00024 PWS REVISION: 0 11
5.4 Agency Affirmative Procurement Programs: This acquisition does not require the purchase of Environmental Protection Agency (EPA)-designated products or United States Department of Agriculture (USDA)-designated products; therefore, the requirement does not apply.
5.5 Safety Requirements
5.5.1 Contractor Compliance: The Contractor shall comply with Government Safety and Health regulations including, Public Law 91-596 as amended by Public Law 101-552 [Occupational Safety and Health Act of 1970 (OSHA)] and DoDD 4715.1E, Environment, Safety, and Occupational Health (ESOH).
5.5.2 Safety and Health Plan/Program: The Contractor shall establish and maintain a safety program in accordance with the contract/order, applicable Government regulations and the Safety and Health Plan.
5.5.3 Mishap Notification/Investigation: The Contractor shall report mishaps including damage to DoD property; occupational illness to DoD military or civilian personnel; injury to on- or off-duty DoD military personnel; injury to on-duty DoD civilian personnel; and damage to public or private property or injury or illness to non-DoD personnel caused by Government operations.
The Contractor shall ensure the Safety Office and the PCO are notified of mishaps. The Contractor shall contact the MFT (COR, if available, or another MFT member) by telephone within four business hours. The Contractor shall cooperate with Government safety investigations.
5.6 Inspection of Services: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.
5.7 Invoicing/Payment and Receipt/Acceptance: The Contractor shall submit/process payment requests and receipt/acceptance documents via WAWF.
5.8 Quality Program Plan: The Contractor shall ensure the quality of services through a quality and/or inspection system. The Contractor shall submit a Quality Program Plan (QPP) addressing detection of quality program problems and defects, identification of root causes for quality related problems/defects, correction of root causes related to detected problems/defects, and follow-up to ensure quality related problems/defects do not recur. The plan shall include the schedule of quality assurance/control inspections planned by the Contractor. 100% compliance with the QPP is required. [CDRL A004, DI-QCIC-81722, Quality Program Plan]
PR: FD2060-22-00024 PWS REVISION: 0 12
6.0 Appendices
6.1 Appendix A, Reference(s)
Publication Title of Publication
Date of Publication Sections(s) that Apply
FAR and supplements
Federal Acquisition Regulation https://www.acquisition.gov
Sections applicable to contract and PWS
DoDD 4715.1E
Environment, Safety, and Occupational Health (ESOH)
March 19, 2005 Entire
Public Law 91-596 as amended by Public Law 101-552
Occupational Safety and Health Act of
December 29, 1970 as amended through January 1, 2004
Entire
DoD Publication 4160.21- M-1
Defense Demilitarization Manual
18 August 1997 Entire
MIL-STD-
129R
Department of Defense / Standard Practice / Military Marking for Shipment and Storage
15 December 2002 Change 1 - 15 January 2004, Change 2 - 10 February 2004, Change 3 - 29 October 2004, Change 4 - 19 September 2007 http://www.acq.osd.mil/log/sci/ait/MIL-STD- 129PCH4.pdf
Entire
MIL-STD-
130N
Department of Defense / Standard Practice / Identification Marking of U.S. Military Property
17 December 2007 Change 1 – 16 November 2012 http://www.acq.osd.mil/dpap/pdi/uid/docs/MIL- Std130N_Ch1.pdf
Entire
MIL-STD-
2073-1E
Department of Defense / Standard Practice for Military Packaging
15 December 1999, Notice 1, 10 May 2002 https://www.acquisition.gov/ http://www.acq.osd.mil/log/sci/ait/MIL-STD-129PCH4.pdf http://www.acq.osd.mil/log/sci/ait/MIL-STD-129PCH4.pdf http://www.acq.osd.mil/dpap/pdi/uid/docs/MIL-Std130N_Ch1.pdf http://www.acq.osd.mil/dpap/pdi/uid/docs/MIL-Std130N_Ch1.pdf
PR: FD2060-22-00024 PWS REVISION: 0 13
MIL-
HDBK
263-B
Electrostatic Discharge Control Handbook for Protection of Electrical Equipment and Electronic Parts, Assemblies and Equipment
Jan 2007 (July 94) Entire
MIL-STD-
1686C
Department of Defense Standard Practice / Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)
25 Oct 1995
DoDD 5205.02E
DoD Operations Security
(OPSEC)
Program
June 20, 2012 Entire
DoD Manual 5205.02-M
DoD Operations Security
(OPSEC)
Program Manual
November 3, 2008 Entire
Department of Defense (DoD) 5200.2-R, Personnel Security Program
Department of Defense (DoD) 5200.2-R, Personnel Security Program
Department of Defense (DoD) 5200.2-R, Personnel Security Program
Department of Defense (DoD) 5200.2-R, Personnel Security Program
File details come from the government source that posted it. Updated .