PWS Agilent Test Stations.pdf
PDF 301 KB Posted
- Attached to
- AGILENT 3070 TEST STATIONS ON-SITE SUPPORT Federal contract opportunity
- Solicitation number
- FA857125Q0011
About this file
This document is a Performance Work Statement (PWS) for providing on-site support services for eight (8) Agilent 3070 Series I, II, and III Automatic Test Stations located at Robins AFB, GA. The contractor shall provide all labor, transportation, tools, equipment, materials and services to perform unscheduled repair, calibration, and technical support of the test stations. The contractor must respond within 24 hours for unscheduled support and provide a diagnostic or repair solution within 24 hours via telephone. If on-site support is required, the contractor must arrive within 3 days. Downtime for a station shall not exceed 5 work days, and no repair shall take more than 30 days. Calibrations must be performed every 180 days. The period of performance is 12 months with four 12-month option periods. The requirement is a small business set-aside for the Department of the Air Force Materiel Command Air Force Sustainment Center.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CDRL A003 Contractors Safety Plan signed.pdf | ||
| CDRL A002- CALIBRATION CERTIFICATE signed.pdf | ||
| Solicitation - FA857125Q0011.pdf | ||
| Appendix C.pdf | ||
| CDRL A004 Accident Incident Report signed.pdf | ||
| CDRL A001- STATUS REPORT signed.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
AGILENT 3070 SERIES I, II, & 3 AUTOMATIC TEST STATIONS (ATS)
21 Aug 2024
1.0 DESCRIPTION OF SERVICES. The contractor shall provide all labor, transportation, tools, travel, equipment, materials and services to provide on-site support for eight (8) Agilent 3070 Series I, II & 3 Test Stations as listed in Section 5, Attachment A. On-site support services include unscheduled repair, calibration, and technical support of the Agilent 3070 testers located in buildings 640 and 645 at Robins AFB, GA. Technical support includes on-site and telephone service calls. Service support of the Agilent 3070 test stations is mission critical for supportability of the Line Replaceable Units (LRU) and Shop Replaceable Units (SRU) to maintain serviceability of aerospace equipment.
1.2 The contractor shall respond within 24 hours for unscheduled technical support and unscheduled maintenance service calls. A diagnostic or repair solution shall be provided within 24 hours via telephone.
1.3 Over and Above Work. If the diagnostic or repair solution cannot be accomplished via telephone, the contractor shall arrive on site within 3 days after the completion of the service call. Once on station, the contractor shall perform diagnostics and provide an estimated date of completion to the Government POC. Upon discovery of the need for over and above work, the Contractor shall prepare and furnish to the Government a work request. Upon request the Contractor shall promptly submit to the Contracting Officer, a proposal for the over and above work. The Government and Contractor will then negotiate a settlement for the over and above work. Contract modifications will be executed to definitize all over and above work. Downtime shall not exceed 5 workdays after the contractor’s on-site response. If the contractor determines that unscheduled repairs will extend beyond 5 workdays, the contractor shall provide an exchange serviceable item within 3 working days. If the unscheduled repair is not complete in 5 working days a Status Report will be electronically provided weekly to the Government POCs listed in paragraph 4.1 until the repair is complete. No repair shall take more than a total of 30 days. (CDRL A/B/C/D/E001, DI-MGMT-80368A, Status Report).
1.4 The contractor shall contact the government POC no later than three (3) working days before arrival at Robins AFB to arrange date and time for calibration service visit.
1.5 Any replacement parts shall be furnished by the contractor and shall be identical to or equivalent to the original configuration of the part being replaced. If possible, the contractor shall repair the equipment identified in Attachment A on site. In the event an item cannot be repaired on site, the contractor shall obtain POC approval before removing the item. Items shall not be removed from Robins AF Base to an off-site repair center without a signed hand receipt, AF Form 1297.
1.6 The contractor shall ensure the Agilent 3070 Test Stations calibrations are per Technical Manual Air Force Metrology and Calibration Program, TO 00-20-14 (paragraphs 4.5.1.3 and 4.5.1.4) dated 30 November 2023. Calibrations for each test station will be completed at 180-day intervals. Within 3 working days of completion, the contractor shall provide an electronic certificate of calibration to the Government POCs (listed in paragraph 4.1) for each individual test station attesting that calibration requirements have been met. The contactor shall demonstrate the current state of accuracy and performance of the Agilent 307X Test Stations. After completion of a successful calibration, each test station shall display a calibration decal indicating the date and next due date for calibration. (CDRL A/B/C/D/E002, DI-QCIC-80798B, Calibration Certificate)
2.0 SERVICES SUMMARY (SS)
Performance Objectives
PWS
Para. Performance Threshold
Perform unscheduled repair/ support of test stations
1.2, 1.3, 1.4
Respond within 24 hours for unscheduled technical support and repair service calls; if on-site support is required, arrive on site within 3 days of completion of service call.
Station Down Time 1.3 Downtime for a station shall not exceed 5 work days per station for on-site support. No repair shall take more than 30 days. Provide exchange units as required.
Perform and Maintain Equipment Calibration
1.6 Completed at 180-day intervals.
3.0 GOVERNMENT FURNISHED PROPERTY (GFP). None – there is no GFP attachment for this acquisition.
4.0 GENERAL INFORMATION.
4.1 Government Representatives. The following individuals will serve as the Primary and Alternate Government Representatives as the points of contact through which all contractor-provided services will be requested and accomplished for EMXG. Government Representatives will not supervise the Contractor, and they are not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The following individuals will serve as Government Representatives for EMXG.
Primary Government Representative Alternate Government Representative Name: Timi Fagbamiye Name: Yanellie Gonzalez-Santiago Unit: 402 EMXG/MXDEAC Unit: 402 EMXG/MXDEAC Phone: (478) 926-5446 Phone: (312) 468-5400 Email:
oluwatimilehin.fagbamiye@us.af.mil
Email: yanellie.gonzalez-santiago@us.af.mil
4.2 Period of Performance. The period of performance shall be 12 months for the basic period, and four, 12-month options for a total period of 60 months.
4.3 Contractor Program Manager. The Contractor shall provide a Program Manager who shall be the single point of contact between the Contractor and the Government. The name and phone number of the Contractor’s Program Manager shall be provided in writing to the Contracting Officer, Government Representatives, and COR no later than five (5) calendar days after contract award date.
4.4 Place of Performance and Hours of Work. On-site contract services shall be performed at the Warner Robins Air Logistic Complex. The work will take place in buildings 640 and 645 at Robins Air Force Base, GA. The Contractor’s work hours (shifts) shall normally be from 6:00 am to 2:30 pm (EST), Monday through Friday. The Government may adjust the Contractor’s work hours based on workload requirements, with the flexibility to start work earlier, work odd shifts, and/or work weekends. The Government will provide the Contractor the required work hours (schedule) for contractor personnel, and will provide a 48-hour notice prior to changing any work hours.
4.5 Recognized Holidays. Unless otherwise required by the Government, the Contractor shall not have access to Government facilities to work or telework on all federal holidays or during facility closings as authorized by the Government. If the holiday falls on Saturday, it is observed on Friday.
If the holiday falls on a Sunday, it is observed on Monday.
4.6 Security Requirements.
4.6.1 Government Security Regulations. The Contractor shall ensure personnel, information, system, facility, and international security requirements are met in accordance with 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), Air Force Instruction (AFI) 31-101, Integrated Defense.
4.6.2 Communications Security (COMSEC). The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified and/or sensitive, but unclassified, information in accordance with 2 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM).
4.6.3 Visitors Only – No Badging ID. The Air Force has mandated all visitors consent to a check of their criminal history prior to being allowed access to installations. The check will be conducted at the Visitor Control Center (VCC) off Watson Boulevard, Robins AFB, GA.
Visitors requiring unescorted access will need their driver’s license or state-issued ID along with insurance and registration if driving on base. The pass issued by the Visitor Control Center authorizes unescorted entry to Robins AFB for the bearer only. For visitors, a short term pass is up to 60 days. Any time greater than 60 days requires a secondary form of ID (Social security card, birth certificate or passport).
4.6.4 Operations Security (OPSEC). The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with DoDD 5205.02E “DoD Operations Security”, DoD Manual 5205.02-M and AFI 10-701 “Operations Security” to protect United States (U.S. Government interest. The Contractor shall ensure compliance with OPSEC requirements including procedures to protect classified and/or sensitive, but unclassified, Government projects and/or programs. The Contractor shall ensure Contractor personnel who perform work at Robins AFB or another Government facility comply with the OPSEC procedures of the facility.
4.6.5 Security Incident or Violation. The Contractor shall immediately notify the Government Security Office of any potential or actual security incidents or violations including potential or actual unauthorized disclosure or compromise of classified and/or sensitive, but unclassified, information.
4.6.6 Supply Chain Risk Management. The Contractor shall implement risk management procedures to ensure that system, equipment, components, software, maintenance equipment, and supplies do not incorporate counterfeit parts, malicious code, or other elements that would allow adversaries to gain access to data and critical program information and disrupt operations.
Contractor risk management procedures shall comply with:
Air Force Pamphlet (AFPAM) 63-113, Program Protection Planning for Life Cycle
Management, SAE Aerospace Standard AS5553C, Counterfeit Electrical, Electronic, and
Electromechanical (EEE) Parts; Avoidance, Detection, Mitigation and Disposition, National Institute of Standards and Technology (NIST) Special Publication 800-53 Rev
5, Security and Privacy Controls for Information Systems and Organizations.
4.7 Contractor Identification. Contractor personnel shall wear visible identification designating them as contractors at all times while on Robins Air Force Base.
4.8 Contractor Vehicle Entry. The Contractor shall contact the Robins Air Force Base Visitor's Center to and comply with local procedures for obtaining credentials and vehicle entry.
Information may be obtained by calling the following phone number: Commercial 478-222- 1972.
4.9 Agency Affirmative Procurement Program. In accordance with FAR 23.404(b)(1), 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program] and/or United States Department of Agriculture (USDA)-designated products included in the bio based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.
4.9.1 In accordance with FAR 23.404(a)(3)(iii), the Contractor shall provide estimates and verification of recovered material for EPA-designated CPG products and certification for both http://www.biopreferred.gov/
EPA-designated CPG products and USDA-designated bio based products. In accordance with the Robins Air Force Base, Georgia / Affirmative Procurement Program (formerly Green Procurement Program (GPP)) Plan, the Contractor shall provide estimates and certifications to the Government for completion of the applicable attachment(s) to be included in the Purchase Request (PR) package.
4.10 Other Government Furnished Equipment and Services. None.
4.11 Environmental Management System (EMS). Environmental Management Systems (EMS) Awareness Training: All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force-provided initial EMS Awareness Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB.
Notification of training completion shall be sent to the Robins AFB Contracting Officer (CO) to be maintained in the contract file for tracking purposes. Failure to provide documentation of EMS Training may result in termination of the contract.
4.11.1 EMS training is provided by Environmental Management. Request for Robins EMS Awareness training through email at 78ceg.cev.FrontOfc@us.af.mil. Contractors have two options to satisfy the mandatory EMS Awareness Training requirement. (Front Desk: 478-926- 8178.)
4.11.2 Option 1: Contractors can register for an account through The Environmental Awareness Course Hub (TEACH), the Air Force training database: https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f Search for Course ID: EMS110UHHZ00293 Directions:
1. Hover your mouse over the Courses and Transcripts tab.
2. Click on Transcripts
3. Click into the TEACH Course Completion Log by clicking the orange Continue or Begin button.
4. When you are on the transcript, click on the blue “Search for Course” button.
5. When the pop up appears enter the course name or course number and press search.
6. Once you find the course you want to add, click on the +Select button to add the course to your transcript.
(Note: TEACH may not supported by Internet Explorer; recommend using Chrome.)
4.11.3 Option 2: Contractor requests a copy of the Robins EMS Awareness Training PowerPoint Presentation from Environmental Management. The request should be sent to the Environment Management Workflow Box at the following email address, 78ceg.cev.FrontOfc@us.af.mil.
Once the presentation is received, the contractor is responsible for ensuring that all his/her employees view the training.
mailto:78ceg.cev.FrontOfc@us.af.mil https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f mailto:78ceg.cev.FrontOfc@us.af.mil
4.12 ISO 50001 – Energy Management System. Due to the WR-ALC being ISO 500001 certified, all contractors are subject to the Energy Management System (EnMS) requirements and shall abide by certification guidelines whenever applicable.
4.12.1. EnMS Training. All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force provided initial EnMS Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB.
4.12.1.1. EnMS training is provided by the Energy Assurance Office. The Contractor shall request the training by sending an email to 402MXSG.MXDEA.EnergyAssurance@us.af.mil.
4.12.2. Notification of training completion shall be sent to the Energy Assurance Office (402MXSG.MXDEA.EnergyAssurance@us.af.mil) and the CSMO POC to be maintained for tracking purposes. Failure to provide documentation of EnMS Training prior to beginning work may result in termination of the contract.
4.13 Contractor Safety Program. (See Appendix C, Part II, Para 7) The Contractor shall establish and maintain an acceptable safety program in accordance with their accepted Safety and Health Plan. The Air Force is part of the OSHA Voluntary Protection Program (VPP). All shall familiarize themselves with the requirements of VPP. Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html. Additionally, the Contractor is responsible for the safety and health of all subcontractor employees. No more than two Class C mishaps per contract year and Zero Class A or B mishaps will be tolerated. All changes to the plan must also be submitted in writing and approved by the Government.
4.13.1 Safety and Health Plan: Within 10 calendar days after contract award, the contractor shall email a copy of their company Safety Plan that is required to ensure compliance with the Occupational Safety and Health Act (OSHA) (Public Law 91-596) to 402mxw.se.wf@us.af.mil.
The Safety Plan will be provided to the Safety Office for review. The Safety Office will provide acceptance or non-acceptance within 5 working days of receipt to the government point-of-contact who will notify the CO. (CDRL A003, DI-SAFT-82080/T NOT 1, Contractor's Safety Plan).
4.13.2 The Contractor Safety Plan shall address in detail the items listed in the Contract Appendix C, Part II through Part IV as applicable. For task specific procedures identified in the Contract Appendix C, the contractor’s internal procedures for those tasks must be identifiable within the submitted Safety Plan or shall be provided in an amendment or addendum to the company’s Safety Plan. If task specific procedures identified in the Contract Appendix C, are not submitted with the contractor’s Safety Plan, the submitted Safety Plan will be returned as NOT ACCEPTED. The contractor will have 5 working days to resubmit the Safety Plan, amendment or addendum to address or correct issues identified for non-acceptance. The Safety Office will provide acceptance or non-acceptance of the resubmission within 5 workings days of receipt to the government POC who will notify the CO.
mailto:402MXSG.MXDEA.EnergyAssurance@us.af.mil mailto:402MXSG.MXDEA.EnergyAssurance@us.af.mil http://www.osha.gov/dcsp/vpp/index.html mailto:402mxw.se.wf@us.af.mil
4.14 Mishap Notification. (See Appendix C, Part II, Para 5) The Contractor shall notify the Robins AFB Safety Office telephonically at (478) 327-4862 during duty hours and (478) 926- 3567 after hours, within four (4) hour after initial notification of all mishaps or incidents for damage to DoD property (material plus labor) entrusted by this contract and employee injuries as a result of the contract operation. A follow-up (written or e-mail) of this mishap/incident notification shall be sent within three calendar days to the Government Representative, the Procurement Contracting Officer (PCO), Contract Surveillance Management Office (CSMO) Representative (with a copy to program manager), who will forward it to the Safety Office. The information that is not available at the time of the initial notification shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Impound Authority Name and Phone Number (as applicable)
g. Nomenclature of equipment and personnel involved in accident/incident
h. Corrective actions (taken or proposed)
i. Other pertinent information
(CDRL A/B/C/D/E004, DI-SAFT-81563 NOT 2, Accident/Incident Report)
4.15 Essential Services During Crisis. The Services Acquisition Lead (SAL) has determined, by placing in writing their decision, that this requirement is not Mission Essential (M-E) in accordance with DFARS 237.76, Continuation of Essential Contractor Services.
4.16 Inspection of Services/Inspection of Supply: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.
4.17 Invoice/Payment and Receipt/Acceptance: In accordance with DFARS clause 252.232-7003, Electronic submission of Payment Requests and Receiving Reports, the Contractor shall submit/process payment requests (invoices, Receiving Reports or combos) and receipt/acceptance documents via Procurement Integrated Enterprise Environment (PIEE) through module Wide Area Workflow (WAWF). Access at the following site:
https://piee.eb.mil/
5.0 APPENDICES
5.1 Appendix A, References and Attachments
Name of Publication
Sections that Apply
Date of Publication Title of Publication
DAFI 63-138 Entirety 2 Jan 2024 Acquisition of Services https://piee.eb.mil/
Name of Publication
Sections that Apply
Date of Publication Title of Publication
Attachment 1 Entirety July 2024 Target Equipment List
TO 00-20-14 Para. 4.5.1.3, 4.5.1.4
November 30, Technical Manual Air Force Metrology and Calibration Program
ATTACHMENT 1: Target Equipment List
Agilent 3070 Test Equipment1 Listing & Location
Item Serial Number P/N Series Flight
1 US34240041 E4026A 32 567 EMXS/MXDPB
2 SG01040236 E9900B 3 567 EMXS/MXDPB
3 US34240046 E4026A 32 567 EMXS/MXDPC
4 SG01040399 E9900B 3 567 EMXS/MXDPC
5 2844A00292 E4025A I 567 EMXS/MXDPC
6 2844A00295 E4025A I 567 EMXS/MXDPC
7 US38240103 E9900A 3 568 EMXS/MXDPC
8 SG01040318 E9900B 3 568 EMXS/MXDPC
1 Includes station mainframe and modules equipment.
2 Upgraded from Series II
File details come from the government source that posted it. Updated .