PURCHASE DESCRIPTION M290 Accessories.docx
DOCX document 29 KB Posted
- Attached to
- EOS M290 ACCESSORIES Federal contract opportunity
- Solicitation number
- FA822723QEOSM
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 10626 SSJ.pdf | ||
| Solicitation EOS M290 Accessories.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PURCHASE DESCRIPTION
FOR
EOS M290 ACCESSORIES
January 24, 2023
Taylor Gittins
809 MXSS/MXDTAD
1.0 DESCRIPTION OF REQUIREMENTS
The RAPID Innovation Center at Hill AFB, UT has a need for a EOS M290 accessories. The accessories will be used to improve quality, safety, and output from their new M290 3D printer.
2.0 REQUIRED ACCESSORIES
The following accessories shall be included:
| Part Number |
| Description |
| Quantity |
| 1216-5203 |
| Cone for 20 l stainless steel container (funnel adapter) |
| 3 |
| 300050703 |
| 20 liter Stainless Steel Container w/ Lid |
| 5 |
| 2200-4373 |
| Building platform DirectBase S36 (for steel powder) |
| 10 |
| 2200-4073 |
| HSS recoater blade |
| 5 |
| 200000611 |
| RFS Collection Conatainer Replacement Kit |
| 2 |
| 1216-3001 |
| Electrical lifting trolley |
| 1 |
| 1212-0313 |
| Sieve Frame with earthing 249x224mm |
| 1 |
| 1212-0134 |
| Sleighs |
| 1 |
| 9080-0015 |
| Brush |
| 1 |
| 200001766 |
| Wet Separator MX360 EX (EOS NA Only) |
| 1 |
| 1212-0317 |
| Wet separator earthing Titanium version |
| 1 |
| 200000969 |
| IPCM M pro (200,208,240,480V; 60Hz; UL) |
| 1 |
3.0 WARRANTY
The contractor shall provide:
· One (1) year warranty which warrants all products provided under this contract, under normal use, free from defects in materials and workmanship and that system will perform its design function for a period of no less than one (1) year. Warranty period to start from date of final acceptance. Any defects in materials or workmanship or failure of any product or component to perform its designed function during the warranty period shall be fixed by the contactor at no additional cost to the Government.
4.0 DELIVERY ADDRESS
The contractor shall deliver at the following address:
Physical Address:
| ATTN: Taylor Gittins |
| 5925 Southgate Ave. |
Bldg. 205, Room 2
HILL AFB, UT 84056
Email address for electronic delivery:
taylor.gittins@us.af.mil
File details come from the government source that posted it. Updated .