PSE_Solicitation_Template-RevB.xlsx

XLSX spreadsheet 78 KB Posted

Attached to
C-17 Cable Assembly, Special Purpose, Electrical Federal contract opportunity
Solicitation number
FA852622Q0019
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to C-17 Cable Assembly, Special Purpose, Electrical, newest first.
File Type Posted
Packaging_Form.pdf PDF
FA8526-22-Q-0019 - 19May22.pdf PDF
CDRL_A003_IUID_Marking_Plan_17G550555.pdf PDF
CDRL_A001_A002_17G550555.pdf PDF
Transportaton_Form_30245.pdf PDF
Transportation_Form_30251.pdf PDF
EDL_Rev6.pdf PDF
Use_and_Non-Disclosure_Agreement.docx DOCX document
Mandatory_Shipping_Documents.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR INSTRUCTIONS

Solicitation #-FA8526-XX-P-XXXX
Title-Peculiar Support Equipment XYZ
INSTRUCTIONAL GUIDANCE
Spreadsheet Worksheet TabInstructions for Specific SpreadSheet Worksheet Tab
NOTE: "EXAMPLE-REPLACE W/ PROPOSAL DATA" IN RED
Incorporate into Column A, rows 1-4 the information requested as it relates to your solicitation (information will flow into the other tabs)
Incorporate into Columns A & B the correct Contract Line Items (CLINS) and descriptions of each as located in Schedule B of the solicitation
Add in new lines if more CLINS are required than what is presented in this tab (follow the exact layout as provided)
Total Summary Tab by CLINIncorporate into Columns C-F Labeled "Proposed Sum of Hours by Labor Category/Material (Contractor Use) the applicable labor categories and rates utilized by CLIN (Replace Task Categories as necessary)
Add in additional rows under the related CLIN for additional Task categories needed (ensure formulas are adhered to for calculation purposes)
Incorporate the hours for each labor category identified by CLIN
Incorporate your total dollars for Option CLINs (sample escalation provided)
Ensure your data calculates correctly
NOTE: "EXAMPLE-REPLACE W/ PROPOSAL DATA" IN RED
Incorporate into Columns A & B the correct Contract Line Items (CLINS) and descriptions of each as located in Schedule B of the solicitation
Add in new lines if more CLINS are required than what is presented in this tab (follow the exact layout as provided)
Task Summary by CLINIncorporate into Columns D-U Labeled "Proposed Sum of Hours by Task (Contractor Use) " the applicable tasks utilized by CLIN (Add To or Replace Labor Catagories as necessary)
Add in additional rows under the related CLIN for additional tasks needed in Column C (ensure formulas are adhered to for calculation purposes)
Incorporate the hours for each task identified by CLIN against the labor categories provided (i.e. PM/ENGINEERING/QUALITY)
Ensure your data calculates correctly
NOTE: "EXAMPLE-REPLACE W/ PROPOSAL DATA" IN RED
Incorporate into Columns A & B the correct Contract Line Items (CLINS) and descriptions of each as located in Schedule B of the solicitation
Add in new lines if more CLINS are required than what is presented in this tab (follow the exact layout as provided)
Materials Breakout TemplateIncorporate into Columns C-H Labeled "Material" the applicable material utilized by CLIN (Replace material as necessary)
Add in additional rows under the related CLIN for additional material as needed (ensure formulas are adhered to for calculation purposes)
Incorporate the part number, unit of measure, unit price, and quantity
Add in Shipping Costs as appropriate (Shipping Cost will be respresented as part of the sum of material pulled into the Summary Tab)
Ensure your data calculates appropriately

Total Summary Tab by CLIN

Solicitation #-FA8526-XX-Q-XXXX
Quote # 1234 (Valid for 30 days)
Contractor-ABC Company
Date 2 May 2020
PROPOSED-Sum of Hours by Labor Category/Material (CONTRACTOR USE)Government Technical Review (For Official Use Only)
CLINSDescriptionTaskTotal HoursRatesTotalTotal HoursRationale
BASIC PERIOD
0001First Article/Production-FAT required
0001AAFirst ArticleProject Management$ - 0
Marerials Receiving and Handling$ - 0
Work Card / Traveler Development$ - 0
Task / Machine Setup$ - 0
Machine Operation$ - 0
Sheetmetal-Fabrication$ - 0
Welding$ - 0
Assembley$ - 0
In process inspections$ - 0
Test$ - 0
Paint Unit$ - 0
Packaging / Shipping$ - 0
$ - 0
$ - 0
$ - 0
Total Hrs/Category:0.00$ - 00.00
MATERIAL (SUM FROM MATERIAL TAB)$ - 0
CLIN 0001AA TOTAL$ - 0
0001ABProduction UnitProject Management$ - 0
Marerials Receiving and Handling$ - 0
Work Card / Traveler Development$ - 0
Task / Machine Setup$ - 0
Machine Operation$ - 0
Sheetmetal-Fabrication$ - 0
Welding$ - 0
Assembley$ - 0
In process inspections$ - 0
Test$ - 0
Paint Unit$ - 0
Packaging / Shipping$ - 0
$ - 0
$ - 0
$ - 0
Total Hrs/Category:0.00$ - 00.00
MATERIAL (SUM FROM MATERIAL TAB)$ - 0
CLIN 0001AB TOTAL$ - 0
0002DATA/CDRLs
0002AATest PlanProgram Management$ - 0
Engineering$ - 0
Engineering Support$ - 0
Total Hrs/Category:0.00$ - 00.00
0002AATest ReportProgram Management$ - 0
Engineering$ - 0
Engineering Support$ - 0
Total Hrs/Category:0.00$ - 00.00
BASIC PERIOD TOTAL
Total Proposed Hours0.000.000.00
Total Proposed Labor Cost$ - 0
Total Proposed Material (From Material Tab)$ - 0
Total Price Basic Period$ - 0
OPTION YearsProduction
1001Production$ - 0
escalation1.035
CLIN 1001 TOTAL$ - 0
2001Production$ - 0
escalation1.035
CLIN 2001 TOTAL$ - 0
3001Production$ - 0
escalation1.035
CLIN 3001 TOTAL$ - 0

EXAMPLE

Replace W/ Proposal Data

Task Summary by CLIN

Solicitation #-FA8526-XX-Q-XXXX
Quote # 1234 (Valid for 30 days)
Contractor-ABC Company
Date 2 May 2020
PROPOSED-Sum of Hours by Task (Contractor Use)GOVERNMENT Technical Review (For Official Use Only)
CLINSDescriptionTask

JACKSON, ROBERT A CIV USAF AFMC AFLCMC/WNKE:

Please modify this section to correspond with the Labor Task that are applicable with the requirement.

The tasks on the template are only examples and should be modified.# Hours PM# Hours Engineering# Hours Engineering Tech# Hours Quality Inspector# Hours Welder-I# Hours Welder-II# Hours Welder-III# Hours Machinist-I# Hours Machinist-II# Hours Machinist-III# Hours Fabricator-I# Hours Fabricator-II# Hours Fabricator-III# Hours Assembler-I# Hours Assembler-II# Hours Assembler-III# Hours Test# Hours Packaging & ShippingTotal Hours# Hours PM# Hours Engineering# Hours Engineering Tech# Hours Quality Inspector# Hours Welder-I# Hours Welder-II# Hours Welder-III# Hours Machinist-I# Hours Machinist-II# Hours Machinist-III# Hours Fabricator-I# Hours Fabricator-II# Hours Fabricator-III# Hours Assembler-I# Hours Assembler-II# Hours Assembler-III# Hours Test# Hours Packaging & ShippingTotal HoursRationale
BASIC PERIOD
0001First Article/Production-FAT required
0001AAFirst ArticleProject Management00
Marerials Receiving and Handling00
Work Card / Traveler Development00
Task / Machine Setup00
Machine Operation00
Sheetmetal-Fabrication00
Welding00
Assembley00
In process inspections00
Test00
Paint Unit00
Packaging / Shipping00
00
00
00
Total Hrs/Category:00000000000000000000000000000000000000
0001ABProduction UnitProject Management00
Marerials Receiving and Handling00
Work Card / Traveler Development00
Task / Machine Setup00
Machine Operation00
Sheetmetal-Fabrication00
Welding00
Assembley00
In process inspections00
Test00
Paint Unit00
Packaging / Shipping00
00
00
00
Total Hrs/Category:00000000000000000000000000000000000000
0002DATA/CDRLs
0002AATest PlanProgram Management00
Engineering00
Engineering Tech00
Total Hrs/Category:00000000000000000000000000000000000000
0002AATest ReportProgram Management00
Engineering00
Engineering Tech00
Total Hrs/Category:00000000000000000000000000000000000000

Total Proposed Hours: 0 Total Objective Hours: 0

OPTION YearsProduction
1001ProductionLearning curve Hr Calculator
FA Starting PointLearning Curve
Prod195%
2001ProductionProd290%
Prod385%
Avg ProdERROR:#DIV/0!
3001Production

EXAMPLE

Replace W/ Proposal Data

Materials Breakout Template

Solicitation #-FA8526-XX-Q-XXXX
Quote # 1234 (Valid for 30 days)
Contractor-ABC Company
Date 2 May 2020
MaterialsTechnical Review
Part NumberDescription/TypeUnit of MeasureMinimum Order Quantity
STEVENSON, JULIAN B NH-03 USAF AFMC AFLCMC/WLE: Only list the MOQ if it is greater that what is required for manufactureing. For Example: If you only need 4 of an item, but the distributer won't sell you less than 10. Then you list 10 as the MOQ. Otherwise, do not list an MOQ.Unit CostFA Quantity (CLIN 0001AA)Production Quantity (CLIN 0001AB)Total QuantityFA Material Cost (CLIN 0001AA)Production Material Cost (CLIN 0001AB)Total Extended PriceCommentsRequirement per End ItemTotal Required QuantityAdjusted Total Extended CostRationale

STEVENSON, JULIAN B NH-03 USAF AFMC AFLCMC/WLE: Only list the MOQ if it is greater that what is required for manufactureing. For Example: If you only need 4 of an item, but the distributer won't sell you less than 10. Then you list 10 as the MOQ. Otherwise, do not list an MOQ.

STEVENSON, JULIAN B NH-03 USAF AFMC AFLCMC/WLE: Only list the MOQ if it is greater that what is required for manufactureing. For Example: If you only need 4 of an item, but the distributer won't sell you less than 10. Then you list 10 as the MOQ. Otherwise, do not list an MOQ.0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00

Total Proposed Material Cost : $0.00 $0.00 $0.00 Total Adjusted Material Cost: 0.0

EXAMPLE

Replace W/ Proposal Data

File details come from the government source that posted it. Updated .