Proposal Package Schedule 2023Mar22.pdf

PDF 130 KB Posted

Attached to
HVAC Equipment Replacement, Memphis Federal contract opportunity
Solicitation number
12639523R0014
Issued by
Department of Agriculture Animal and Plant Health Inspection Service Marketing and Regulatory Programs Business Services

About this file

This document provides details on a forthcoming solicitation for HVAC equipment replacement services at the U.S. Department of Agriculture headquarters in Memphis, Tennessee. The solicitation will request proposals to replace chillers, boilers, a plate frame heat exchanger, cooling towers, and air compressors. Offerors must provide multiple equipment selections from manufacturers such as Carrier, Daikin, Trane, and York. Proposals will be evaluated on life cycle cost, including initial cost, energy cost, and maintenance cost over 20 years. Weights will also be assigned for efficiency, lead time, and a combination of factors. Award will be made on the basis of life cycle cost and delivery time. The estimated value of the project is between $500,000 and $1 million. The NAICS code is 238220 and the small business size standard is $16.5 million. Interested parties should monitor the SAM website where the full solicitation and amendments will be posted on or about April 7.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL PACKAGE SCHEDULE - USDA AMS Cotton and Tobacco HQ, Memphis, TN

REFER TO BID FORM FOR INFORMATION REQUIRED UNDER EACH BID PACKAGE 3/22/2023

BID PACKAGE DESIGNATION EQUIPMENT REPLACED CAPACITY EXISTING MODEL NUMBER SELECTION CRITERIA DESCRIPTION OF WORK

1A - 1,2,3 CHILLER(S) - TRANE SCREW, 3-PASS EVAPORATOR, 2-PASS CONDENSER

215 GROSS, 200 NET

TONS

TRANE

RTHB215FLB00EWP000UNN3LF2LF0000

SHORTEST LEAD TIME

REMOVE EXISTING SCREW CHILLER AND INSTALL NEW CHILLER, INCLUDES NEW ISOLATION VALVES AND

ACTUATORS, PIPING MODIFICATION REQUIRED BY PIPING CONFIGURATION

1B- 1,2,3 CHILLER(S) - TRANE SCREW, 3-PASS EVAPORATOR, 2-PASS CONDENSER

215 GROSS, 200 NET

TONS

TRANE

RTHB215FLB00EWP000UNN3LF2LF0000

LOWEST FIRST COST

REMOVE EXISTING SCREW CHILLER AND INSTALL NEW CHILLER, INCLUDES NEW ISOLATION VALVES AND

ACTUATORS, PIPING MODIFICATION REQUIRED BY PIPING CONFIGURATION

1C - 1,2,3 CHILLER(S) - TRANE SCREW, 3-PASS EVAPORATOR, 2-PASS CONDENSER

215 GROSS, 200 NET

TONS

TRANE

RTHB215FLB00EWP000UNN3LF2LF0000

HIGHEST EFFICIENCY

REMOVE EXISTING SCREW CHILLER AND INSTALL NEW CHILLER, INCLUDES NEW ISOLATION VALVES AND

ACTUATORS, PIPING MODIFICATION REQUIRED BY PIPING CONFIGURATION

1D- 1,2,3 CHILLER(S) - TRANE SCREW, 3-PASS EVAPORATOR, 2-PASS CONDENSER

215 GROSS, 200 NET

TONS

TRANE

RTHB215FLB00EWP000UNN3LF2LF0000

BEST COMBINATION

REMOVE EXISTING SCREW CHILLER AND INSTALL NEW CHILLER, INCLUDES NEW ISOLATION VALVES AND

ACTUATORS, PIPING MODIFICATION REQUIRED BY PIPING CONFIGURATION

2 PLATE FRAME HEAT EXCHANGER

240 TONS, 45F LCHWT AT

43F ECWT; 480 GPM

ALFA LAVAL 30101-95949 MIN. 873 SF SURFACE REPLACE EXISTING PLATE-FRAME HEAT EXCHANGER AND VALVES. REUSE PNEUMATIC ACTUATORS

3A-1,2,3 STEAM BOILER - GAS FIRED, FORCED DRAFT

15 PSI, 2821 MBH

OUTPUT

BURNHAM EL-80-G-GP, SN 22604,5,6 LOWEST FIRST COST REPLACE EXISTING LOW PRESSURE STEAM BOILER AND FORCED DRAFT BURNER

3B-1,2,3 STEAM BOILER - GAS FIRED, FORCED DRAFT

15 PSI, 2821 MBH

OUTPUT

BURNHAM EL-80-G-GP, SN 22604,5,6 HIGHEST EFFICIENCY REPLACE EXISTING LOW PRESSURE STEAM BOILER AND FORCED DRAFT BURNER

4A-1,2,3 COOLING TOWER - 9'X9', ON EXISTING SUPPORTS

200 TONS, 600 GPM,

95/85/78F, 20HP

EVAPCO AT8-99B, S/N 942781M, 10-

386892, 942783M ALL STAINLESS REPLACE EXISTING COOLING TOWER WITH UNIT HAVING CHARACTERISTICS AND CAPACITY SCHEDULED

4B-1,2,3 COOLING TOWER - 9'X9', ON EXISTING SUPPORTS

200 TONS, 600 GPM,

95/85/78F, 20HP

EVAPCO AT8-99B

ALL STAINLESS AND

FIBERGLASS

REPLACE EXISTING COOLING TOWER WITH UNIT HAVING CHARACTERISTICS AND CAPACITY SCHEDULED

4C-1,2,3 COOLING TOWER - 9'X9', ON EXISTING SUPPORTS

200 TONS, 600 GPM,

95/85/78F, 20HP

EVAPCO AT8-99B LOWEST FIRST COST REPLACE EXISTING COOLING TOWER WITH UNIT HAVING CHARACTERISTICS AND CAPACITY SCHEDULED

5A-1,2 SOUTH AIR COMPRESSOR, AIR DRYER, ACCESSORIES 40 HP

QUINCY QGD-40 COMPRESSOR WITH

QPNC200 AIR DRYER

QUINCY ONLY REPLACE EXISTING COMPRESSOR, REFRIGERATED AIR DRYER, AND FILTERS AS DETAILED.

5B-1,2 NORTH AIR COMPRESSOR, AIR DRYER, ACCESSORIES 40 HP

QUINCY QGV-40 COMPRESSOR WITH

QPNC200 AIR DRYER

OTHER BRANDS REPLACE EXISTING COMPRESSOR, REFRIGERATED AIR DRYER, AND FILTERS AS DETAILED.

Sheet1

File details come from the government source that posted it. Updated .