Propane SOW 2022.docx
DOCX document 17 KB Posted
- Attached to
- Propane Federal contract opportunity
- Solicitation number
- SP330022Q5048
- Issued by
- Defense Logistics Agency Distribution
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment A00001 Page from SF30.pdf | ||
| CSS SP330022Q5048 Propane.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK:
Propane Services for DLA Distribution Oklahoma City, Tinker AFB, Oklahoma 73145
Period of Performance:
Option Year: 30 September 2022 through 29 September 2023 Base Year 1: 30 September 2023 through 29 September 2024 Base Year 1: 30 September 2024 through 29 September 2025
Type: UN1075, Liquefied Petroleum Gas, 2.1 Cannister Size: 3u – approximately 8 gallons Estimated Yearly consumption: 45,000 – 50,000 gallons Vendor will supply all cages; to include, lockable storage racks and cylinders free of charge.
LPG Cylinders must be of accurate size to be secured in manufactures mount.
LPG Cylinders must contain operational fuel gauge.
Delivery date: Every Monday and Thursday. Holiday delivery will occur the day prior or the day after the holiday.
Vendor may be called to resupply LPG prior to the scheduled time; in these instances a 24 hour maximum response time is required.
Services: Fill cylinders that are empty in rack locations, see below.
Repair/replace tanks that have bad o-rings, valves, or any other defects that may cause the leakage of Liquefied Petroleum Gas (LPG), or integrity of the cylinders.
Supply Markings to meet ANCI/OSHA Compliance.
Identification tags to be supplied by the vendor for inoperable cylinder(s).
Maintenance of LPG cylinders is the responsibility of vendor.
Used cylinders of LPG will be placed in supplied racks with the bottom of the tank facing outside.
Filled cylinders will be placed with valves to the outside.
Delivery Locations:
1. Building 10, Door 16 - 12 bottle rack + 9 bottles = 21 total
2. Building 11, Door - 0 bottle rack (borrow from 10) – 1 bottle = 1 total
3. Building 18, Door 17 – 12 bottle rack + 18 bottles = 30 total
4. Building 412, Door 10 – 8 bottle rack + 5 bottles = 13 total
5. Building 416, Door 19 – 16 bottle rack + 5 bottles = 21 total
6. Building 510, Door 8 – 24 bottle rack + 6 bottles = 30 total
7. Building 506, Door 47 – 48 bottle rack + 29 bottles = 77 total
8. Building 812 (Outside of Locked Gate) – 12 bottle rack + 4 bottle = 16 total (On hold until November 2022) (12 bottle Rack will need to be provided at Location)
9. Building 1022 (Outside of Locked Gate) - 4 bottle rack + 1 bottle = 5 total
10. Building 3001 (Corp), by the fence of Bldg 3117 – 12 bottle rack + 6 bottles = 18 total
11. Building 9001, Door – 4 bottle rack + 1 bottle = 5 total
12. Building 1, Door 64 - 9 bottle rack + 5 bottles = 14 total
Total = 251 bottles in racks, 87 bottles in forklifts located in various buildings = 338 Grand Total.
In case of future expanse the contractor will provide additional racks and cylinders to accommodate the mission. There will be no down time to forklifts during transition period. Vehicles that are currently operating with LPG will have their tanks exchanged by the new vendor, prior to disposition of their old tanks.
The Contractor will be required to supply these racks, tanks, cylinders and bottles. Tanks and cylinders should be made of aluminum.
File details come from the government source that posted it. Updated .