Price Sheet.pdf

PDF 142 KB Posted

Attached to
Spillway Crane Repairs Federal contract opportunity
Solicitation number
20223161030
Issued by
International Boundary and Water Commission U.S.-Mexico

About this file

This solicitation is seeking maintenance and repair services for a 30-ton spillway crane located at the Falcon Power Plant in Falcon Heights, Texas. Services include inspecting and assessing the crane's ropes, cables, chains and fittings; removing and repairing the current gear box; performing a full maintenance including cleaning, lubricating and oiling; and testing and providing a final inspection. If necessary, vendors may also be required to order and install a new gear box, and align and label the rail crane. The solicitation is set aside for small businesses with a deadline of March 2nd, 2022 for quotes to be submitted. Vendors must include technical details on their approach, qualifications, and at least one past performance reference for similar work. A site visit may be scheduled by contacting the point of contact provided.

View the file

Other files for this federal contract opportunity

Other files attached to Spillway Crane Repairs, newest first.
File Type Posted
E Structure Spillway Crane Repairs.pdf PDF
Wage Determinartion 2015-5309 Rev 17 Dated 12-27-2021.txt TXT text file
Crane Electrical Drawings.pdf PDF
G Brakes Spillway Crane Repairs.pdf PDF
H Motor Spillway Crane Repairs.pdf PDF
J General Drawings Spillway Crane Repairs.pdf PDF
Applicable Clauses and Provisions .pdf PDF
D PWS Spillway Crane Repairs.pdf PDF
F Pictures Spillway Crane Repairs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Sheet

Maintenance and Repair 30 TON Spillway Crane IBWC Falcon Power Plant

Contractor Name:

POC: ___________________________________________

DUNS:

Line Item

Description QTY Unit Unit Price Amount

001 MNTREPREB- ROPE, CABLE, CHAIN, AND

FITTINGS - Perform Assessment and Inspection

Work to be performed as outlined in the attached Performance Work Statement.

1 EA $ $

002 MNTREPREB- ROPE, CABLE, CHAIN, AND

FITTINGS - Inspect Rail Crane

Work to be performed as outlined in the attached Performance Work Statement.

1 EA $ $

003 MNTREPREB- ROPE, CABLE, CHAIN, AND

FITTINGS - Remove Old Gear Box for Inspection

Work to be performed as outlined in the attached Performance Work Statement.

1 EA $ $

004 MNTREPREB- ROPE, CABLE, CHAIN, AND

FITTINGS - Repair Current Gear Box

Work to be performed as outlined in the attached Performance Work Statement.

1 EA $ $

005 MNTREPREB- ROPE, CABLE, CHAIN, AND

FITTINGS - Install Current Repair Gear Box

Work to be performed as outlined in the attached Performance Work Statement.

1 EA $ $

006 MNTREPREB- ROPE, CABLE, CHAIN, AND

FITTINGS - Mechanical Gear Parts and Installation

Work to be performed as outlined in the attached Performance Work Statement.

1 EA $ $

007 MNTREPREB- ROPE, CABLE, CHAIN, AND

FITTINGS - Mobile Crane Rental

Work to be performed as outlined in the attached Performance Work Statement.

2 DY $ $

008 MNTREPREB- ROPE, CABLE, CHAIN, AND

FITTINGS - Disposal of Old Materials and Parts

Work to be performed as outlined in the attached Performance Work Statement.

1 LS $ $

009 MNTREPREB- ROPE, CABLE, CHAIN, AND

FITTINGS - Perform Full Maintenance (Clean, Lube, and Oil)

Work to be performed as outlined in the attached Performance Work Statement.

1 LS $ $

010 MNTREPREB- ROPE, CABLE, CHAIN, AND

FITTINGS - Test and Final Inspection of 30T Spillways Crane

Work to be performed as outlined in the attached Performance Work Statement.

1 LS $ $

011 MNTREPREB- ROPE, CABLE, CHAIN, AND

FITTINGS - Miscellaneous Costs

Work to be performed as outlined in the attached Performance Work Statement.

1 EA $ $

012 MNTREPREB- ROPE, CABLE, CHAIN, AND

FITTINGS - Order a New Gearbox (If Necessary)

Work to be performed as outlined in the attached Performance Work Statement.

1 EA $ $

013 MNTREPREB- ROPE, CABLE, CHAIN, AND

FITTINGS - Install a New Gear Box (If Necessary)

Work to be performed as outlined in the attached Performance Work Statement.

1 EA $ $

014 MNTREPREB- ROPE, CABLE, CHAIN, AND

FITTINGS - Align and Label Rail Crane (If Necessary)

Work to be performed as outlined in the attached Performance Work Statement.

1 EA $ $

015 MNTREPREB- ROPE, CABLE, CHAIN, AND

FITTINGS - No Cost

20 DO NOT QUOTE-For Internal Use Only

Grand Total

Signature

Date

File details come from the government source that posted it. Updated .