This pre-solicitation notice provides details for the Phase 2 construction of the Bruneau Fire Station. The project will involve completing construction of a new fire station facility, including the structure and foundation, systems and equipment installation, electrical and plumbing work, connection to septic and utility infrastructure installed in Phase 1. The performance period is from June 2021 to August 2022. The Bureau of Land Management will issue a total small business set-aside solicitation in mid-April seeking a single firm fixed price award. The solicitation will be subject to Davis Bacon Act wage determinations and require compliance with the Buy American Act. The request for proposal will be available electronically at beta.sam.gov for 30 days following issuance. Offerors must be registered in the System for Award Management to be eligible for award.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bruneau Fire Station Phase II
Pre-Solicitation Notice
140L0621R0009
This work is for Phase 2 and will include the construction and utility connections supporting the new Fire
Station and related site improvement elements for Phase 2. Contract will include the construction of a new facility that includes a Fire Station and all site utilities and features needed to support associated facility activities. All work is to incorporate the latest, applicable building codes, NFPA standards and sustainable design measures. Complete construction of the new building, including structure and foundation, layout and installation of systems and equipment, electrical and grounding, water system, plumbing and waste piping, septic system tie-in, HVAC, and other required site elements. Contractor must complete connections to underground utility infrastructure installed in Phase 1. The Phase 2 contract will require full responsibility of these underground utilities and perform all work to make this infrastructure functional including wire and cable, fittings and modifications for existing utility runs and connections. Phase 2 performance period will begin while Phase 1 is underway, resulting in both phases undergoing construction at the same time.
The period of performance for this requirement is June 28, 2021 to August 12, 2022 (410 days).
The BLM expects to issue a Total Small Business Set-Aside competitive solicitation around mid-April .
The BLM anticipates issuing a single firm fixed price award from this solicitation. Davis Bacon Act
(DBA) is applicable and the appropriate DBA Wage Determination(s) will be included in the solicitation.
The NAICS code for this acquisition is 236220, Commercial and Institutional Building Construction. The small business size standard for this NAICS code is $39.5 million. All materials must be in accordance with the Buy American Act.
A request for proposal (RFP) solicitation package will be available electronically at beta.sam.gov and will be available for 30 days. Potential offerors are responsible for monitoring beta.sam.gov for the release of the solicitation package and any solicitation amendments. The government will not provide paper copies or email the solicitation. To be eligible for contract award, offerors must be registered and complete the online Representations and Certifications in the System for Award Management (SAM) data base via website: http://www.sam.gov.