PR 1301025675 - Performance Work Statement (PWS).pdf
PDF 10 MB Posted
- Attached to
- Crane Rental w/operator and Rigging Support Federal contract opportunity
- Solicitation number
- N0016722Q0235
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Crane SAP_Storage Locations.pdf | ||
| N0016722Q0235_Q and A_Amendment 0002.pdf | ||
| N0016722Q0235_Amendment 0001.pdf | ||
| N0016722Q0235_Combined.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
TITLE: Crane Rental and Support
1.0 DESCRIPTION OF SERVICES/INTRODUCTION:
The contractor shall provide crane support for unloading of equipment that is being shipped from Maryland to Memphis. This unloading support is needed at the Memphis site. The contractor shall be responsible for all labor required to unload the equipment from the truck with the crane.
The estimated duration of this work is five days. Working days may not be sequential depending on truck arrival schedule (i.e., no extended gaps are planned, but there may be a small gap of a day or several days in between delivery of one truck and another).
2.0 BACKGROUND:
A crane is needed to support unloading of equipment from trucks. This equipment is being transported from Maryland to the Memphis site. A crane is needed in order to unload pieces of equipment from the trucks and move it to the desired location at the Memphis site.
3.0 OBJECTIVE:
3.1 The contractor shall perform the following services:
All Work to Be Completed Not Later Than 23-Sep-2022
3.1.1 The contractor shall provide crane support services at the Memphis site (address noted below). This shall include operation of the crane and proper use of any required rigging gear. The contractor shall be responsible for all labor required to unload the equipment from each truck with the crane.
3.1.2 A list of the equipment included in this scope of work is noted in Appendix A: Table 2.
3.1.3 Equipment shall not be stacked during unloading unless otherwise specified by the onsite government representative.
3.1.4 Address of Memphis site:
Naval Surface Warfare Center, Carderock Division Detachment Large Cavitation Channel 3001 Harbor Ave.
Memphis, TN 38113
3.1.5 There is crane access located near the final storage location for the equipment. The trucks will deliver the equipment near the final storage location.
3.1.6 The contractor shall provide a quote for (5) days of work and note the daily rate applicable to this service. Working days may not be sequential depending on truck arrival schedule (i.e., no extended gaps are planned, but there may be a small gap of a day or several days between delivery of one truck and another).
3.1.7 Contractor quotes shall follow the structure noted in Table 1 and the accompanying description noted below.
Table 1: Contractor Quote Line Items Line Item Description Quantity Unit Cost Total Cost Line item 1 Equipment line item (detailed description noted below) 5 Cost per day Total cost
Line item 2 Labor line item (detailed description noted below)
5 Cost per day Total cost
Line item 3 Permits, travel, misc. line item (detailed description noted below)
1 Total cost
Equipment line item: Line item 1 shall include equipment costs necessary to complete the scope of work including but not limited to the crane. This line item should note the daily rate for this equipment.
Labor line item: Line item 2 shall include labor costs for all personnel necessary to complete the scope of work. This line item should note the daily rate for these personnel.
Permits, travel, misc. line item: Line item 3 shall include any cost items that aren’t applicable to line item 1 or 2 including but not limited to, permits, travel, and fuel surcharge fees.
3.2 Minimum Specifications. The contractor shall provide the necessary supplies needed to complete work tasks per para. 3.1 above including:
3.2.1 All necessary equipment needed to unload the government equipment noted in Appendix A: Table 2 shall be provided by the contractor including but not limited to a crane and rigging gear. The contractor shall be responsible to determine the appropriate equipment needed based on the equipment list.
4.0 SPECIAL QUALIFICATIONS: Contractor shall have experience with crane and rigging operations.
5.0 GOVERNMENT FURNISHED EQUIPMENT/PROPERTY/INFORMATION: N/A
6.0 DELIVERABLES: N/A
7.0 SECURITY REQUIREMENTS: UNCLASSIFIED, but personnel should be U.S. Citizen or permanent residents capable of passing a background check.
8.0 GOVERNMENT POINTS OF CONTACT
TPOC information will be provided upon contract award.
Appendix A: Equipment information
Table 2 includes the details for all of the equipment that shall be unloaded under this scope of work. Pictures of each piece of equipment is included in Figures A-S.
Table 2: Equipment List
*Item
**Truck
Item Description and Dimensions Approximate Weight (lbs)
2 15 40 K Charge Fin L-10'4" x W-8'6" x H-4'6" 700 4 15 40 K Dummy Charge L-13'5" x W-8' x H-9' 11000 5 4 Air Gun Air Compressor Conex L-12'1" x W-8' x H-8'6" 4000 6 5 Air Gun Conex L-20' x W-8' x H-8'6" 20000 7 4 Air Gun Conex (2) w/roll up door L-21' x W-8' x H-8'6" 8000 8 5 Air Gun Float (Green) (1) L-20' x W-5'6" x H-7'6" 15000 9 6 Air Gun Float (Green) (2) L-20' x W-5'6" x H-7'6" 15000
10 6 Air Gun Float (Green) (3) L-20' x W-5'6" x H-7'6" 15000 11 7 Air Gun Float (Green) (4) L-20' x W-5'6" x H-7'6" 15000 14 8 Small Appleton Winch L-9'6" x W-8'7" x H-7'2" 14000 15 13 Appleton Winch (1) L-12' x W-9'6" x H-8' 41000 16 14 Appleton Winch (2) L-12' x W-9'6" x H-8' 41000 17 8 Appleton Winch FDN L-12'4" x W-7'3" x H-8'5" 4000 18 9 DR.MUDD (1) L-9'8" x W-4'2" x H-4' 12000 19 8 DR.MUDD (2) L-12' x W-5'1" x H-4'4" 15000 21 9 Deep Sea Box Spreader Bar (Large) L-12' x W-8' x H2'10" 4000 22 9 Deep Sea Box Spreader Bar (Small) L-3'6" x W-3'6" x H2'6" 1500 23 10 Inst Recording Conex (1) L-20' x W-8' X H-8' 8000 24 10 Inst Recording Conex (2) L-20' x W-8' X H-8' 8000 25 7 Inst Ship Recording Blivit L-15'8" x W-8'2" x H-9'2" 6000 26 12 Inst Winch Deep Sea L-13'3" x W-8'2" x H-8'7" 40000 28 9 Inst Winch L-12'6" x W-7'3" x H-8' 20000 29 11 Ken's Conex L-20' x W-8' x H-8'6" 35000
*These items are taken from a larger equipment list. All items listed in this table are part of the scope of work for this contract. Any missing numbers such as item 1 for example are intentionally not included in this table and are not part of the scope for this contract.
**Truck numbers refer to an estimated shipping plan involving 12 different trucks numbered 4-15.
This information is only included here to inform the contractor that the SOW includes unloading an estimated 12 trucks.
Figure A: Item 2
Figure B: Item 4
Figure C: Item 5
Figure D: Item 6
Figure E: Item 7
Figure F: Items 8-11
Figure G: Item 14
Figure H: Item 15
Figure I: Item 16
Figure J: Item 17
Figure K: Item 18
Figure L: Item 19
Figure M: Item 21 & 22
Figure N: Item 23
Figure O: Item 24
Figure P: Item 25
Figure Q: Item 26
Figure R: Item 28
Figure S: Item 29
File details come from the government source that posted it. Updated .