ORDER FOR SUPPLIES OR SERVICES
3. ORDER NO. 4. REQUISITION/REFERENCE NO.
PAGE OF PAGES
5. ISSUING OFFICE (Address correspondence to) b. STREET ADDRESS
IMPORTANT: Mark all packages and papers with contract and/or order numbers. 1
1. DATE OF ORDER 2. CONTRACT NO. (If any) 6. SHIP TO:
a. NAME OF CONSIGNEE
c. CITY d. STATE e. ZIP CODE
7. TO:
a. NAME OF CONTRACTOR
f. SHIP VIA
8. TYPE OF ORDER
b. COMPANY NAME
c. STREET ADDRESS
d. CITY e. STATE f. ZIP CODE
9. ACCOUNTING AND APPROPRIATION DATA
a. PURCHASE b. DELIVERY
REFERENCE YOUR:
Please furnish the following on the terms and conditions specified on both sides of this order and on the attached sheet, if any, including delivery as indicated.
Except for billing instructions on the reverse, this delivery order is subject to instructions contained on this side only of this form and is issued subject to the terms and conditions of the above-numbered contract.
10. REQUISITIONING OFFICE
11. BUSINESS CLASSIFICATION (Check appropriate box(es))
a. SMALL b. OTHER THAN SMALL c. DISADVANTAGED d. WOMEN-OWNED
13. PLACE OF
a. INSPECTION b. ACCEPTANCE
14. GOVERNMENT B/L NO. 15. DELIVER TO F.O.B. POINT
ON OR BEFORE (Date)
16. DISCOUNT TERMS
17. SCHEDULE (See reverse for Rejections)
01/25/2021
75H70621P00325 IHS1421255
Aberdeen Area Indian Health Servic
Federal Building
115 Fourth Ave, SE
Aberdeen SD 57401
TEMPERATURE TECHNOLOGY INC 527867
TEMPERATURE TECHNOLOGY, INC. 2
2809 PLANT ST
RAPID CITY SD 577020335
See Schedule
12. F.O.B. POINT
07/26/2021
IHSPINERIDGE
607 Indian Health Road E. Hwy 18
PINE RIDGE SD 57770
Jason Duwenhoegger
605-343-1144
PFISTER MATTHEW JAMES (IHS)
ITEM NO.
(a)
SUPPLIES OR SERVICES
(b)
QUANTITY
ORDERED
(c)
UNIT
(d)
UNIT
PRICE
(e)
AMOUNT
(f)
QUANTITY
ACCEPTED
(g)
X
X
Destination Destination
PINE RIDGE SD 57770
IHS NET 15P
f. SERVICE-DISABLED
VETERAN-OWNED
e. HUBZone
g. WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOSB PROGRAM
h. EDWOSB
Firm Fixed-Price, Non-Personal Service Type, Purchase Order to re-build and/or correct deficiencies of Air Handler 1 (AH-1) located in Dental Area B, Pine Ridge IHS Hospital, Pine Ridge, South Dakota.
Continued ...
19. GROSS SHIPPING WEIGHT18. SHIPPING POINT 20. INVOICE NO.
21. MAIL INVOICE TO:
a. NAME
b. STREET ADDRESS
(or P.O. Box)
c. CITY d. STATE e. ZIP CODE
SEE BILLING
INSTRUCTIONS
ON REVERSE
17(h)
TOTAL
(Cont.
pages)
17(i)
GRAND
TOTAL
$115,907.75
22. UNITED STATES OF
AMERICA BY (Signature)
23. NAME (Typed)
TITLE: CONTRACTING/ORDERING OFFICER
CRAIG J. WELLS
$115,907.75
OPTIONAL FORM 347 (Rev. 2/2012)
Prescribed by GSA/FAR 48 CFR 53.213(f)
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION NOT USABLE
01/26/2021
IHSGREATPLAINS AREA
Great Plains Area IHS
115 4TH AVENUE SE
ABERDEEN SD 57401-4301
ABERDEEN SD 57401-4301
DATE OF ORDER
ORDER FOR SUPPLIES OR SERVICES
SCHEDULE - CONTINUATION
CONTRACT NO.
AMOUNTUNIT
PRICE
UNITQUANTITY
ORDERED
SUPPLIES/SERVICESITEM NO.
IMPORTANT: Mark all packages and papers with contract and/or order numbers.
ORDER NO.
QUANTITY
ACCEPTED
01/25/2021 75H70621P00325
PAGE NO
(a) (b) (c) (d) (e) (f) (g)
Class J & A - COVID-19 Response utilized ?
approved for use by Mr. Craig Wells on
1/21/2021
Admin Office:
Aberdeen Area Indian Health Servic
Federal Building
115 Fourth Ave, SE
Aberdeen SD 57401
Period of Performance: 01/25/2021 to
07/26/2021
1 PINE RIDGE ASHRAE 170 AIR HANDLER 1 UNIT 115,907.75
UPGRADES CONSTRUCTION PROJECT
Project Data:
129163.41235-00109-E.HGFA0000000-ABERD
EEN AREA IHS.32011-Construction in
Progress.01/13/2021
Accounting Info:
2021.J45ACCR.32011 Appr. Yr.: 2021
CAN: J45ACCR Object Class: 32011
Funded: $115,907.75
The "Unit Price" is an all-inclusive cost.
All "inclusive cost" is defined to include travel, lodging, per diem, fringe benefits, i.e., life insurance, social security, federal, state, and local taxes, plus all other costs pertinent to the performance of this purchase order.
Attachments:
- Proposal
- Statement of Work
- HHS Residual Standards of Conduct
- Courtesy & Respect in the Workplace
- Workplace Violence
- Mandatory Seasonal Influenza Immunizations
- Standards of Ethical Conduct
- Wage Determinations No.: 2015-5378
Revision No.: 14
Date of Last Revision: 06/05/2020
INVOICE SUBMISSION AND PAYMENT:
Continued ...
Prescribed by GSA FAR (48 CFR) 53.213(f)
OPTIONAL FORM 348 (Rev. 4/2006)AUTHORIZED FOR LOCAL REPODUCTION
PREVIOUS EDITION NOT USABLE
TOTAL CARRIED FORWARD TO 1ST PAGE (ITEM 17(H)) $115,907.75
ORDER FOR SUPPLIES OR SERVICES
SCHEDULE - CONTINUATION
CONTRACT NO.
AMOUNTUNIT
PRICE
UNITQUANTITY
ORDERED
SUPPLIES/SERVICESITEM NO.
IMPORTANT: Mark all packages and papers with contract and/or order numbers.
ORDER NO.
QUANTITY
ACCEPTED
01/25/2021 75H70621P00325
PAGE NO
(a) (b) (c) (d) (e) (f) (g)
The contractor shall submit a signed and approved invoice to request payment on at least a monthly basis.
A. The contractor shall submit an original invoice to:
The Great Plains Area Indian Health Service
Attn: Accounts Payable
115 4th Avenue SE, Room 309
Federal Building
Aberdeen, South Dakota 57401
The contractor shall submit a copy of the invoice to:
Rapid City IHS Hospital
Attn: Corey Sawatzky, Project Engineer, COR-II
3200 Canyon Lake Dr.
Rapid City, South Dakota 57702
Phone: 605-719-4057
Corey.sawatzky@ihs.gov
B. The contractor shall include the following information on each invoice in accordance with the prompt payment act (5
CFR Part 1315.9(b)):
1. Contractor's name
2. Invoice number and date
3. Entire award number or other authorization number for delivery of goods or services
4. Description (including dates of service), price and quantity of goods and services rendered
5. Shipping and payment terms
6. Duns number and taxpayer identifying number (TIN)
7. Contact name (where practicable), title and telephone number
Payment shall be made by the Great Plains
Continued ...
Prescribed by GSA FAR (48 CFR) 53.213(f)
OPTIONAL FORM 348 (Rev. 4/2006)AUTHORIZED FOR LOCAL REPODUCTION
TOTAL CARRIED FORWARD TO 1ST PAGE (ITEM 17(H)) $0.00
ORDER FOR SUPPLIES OR SERVICES
SCHEDULE - CONTINUATION
CONTRACT NO.
AMOUNTUNIT
PRICE
UNITQUANTITY
ORDERED
SUPPLIES/SERVICESITEM NO.
IMPORTANT: Mark all packages and papers with contract and/or order numbers.
ORDER NO.
QUANTITY
ACCEPTED
01/25/2021 75H70621P00325
PAGE NO
(a) (b) (c) (d) (e) (f) (g)
Area Financial Management Branch, 115 4th
Avenue SE, Room 309, Federal Building, Aberdeen, South Dakota 57401.
The Government reserves the right to accept or reject services, if the level of performance is unacceptable.
The total amount of award: $115,907.75. The obligation for this award is shown in box
17(i).
Prescribed by GSA FAR (48 CFR) 53.213(f)
OPTIONAL FORM 348 (Rev. 4/2006)AUTHORIZED FOR LOCAL REPODUCTION
TOTAL CARRIED FORWARD TO 1ST PAGE (ITEM 17(H)) $0.00
P.O. BOX 9063
RAPID CITY, SD 57709
TELEPHONE 605-343-1144
FAX 605-343-8446
January 25, 2021
To: Pine Ridge Hospital
Attn: Kelly Laroche
Re: Install adiabatic humidification, fan wall and drain pans in Dental AHU
We are pleased to provide you with the following proposal
• Tem-Tech will provide material and labor to install (1) Adiabatic humidifier, (1) primary blower assembly complete, skin AHU with stainless steel and drain pan, replace heating coil to upsized MBH coil.
• We will include new water line ran from existing R.O system, JCI controls to operate new system, startup and testing of new equipment.
• JCI will update controls on AHU
Total Amount:………………………………………………………………..$115,907.75
Excluded is any work not specifically stated above.
Schedule of values;
Total labor + Payroll …………………….$17,241.40 14.88%
Materials + Tax…………………………..$1,595.30 1.38%
Equipment + Tax…………………………$22,048.00 19.02%
Expenses…………………………………..$5,368.00 4.63%
Subcontracts………………………………$39,500.00 34.08%
Insurance / Bond / TERO.……………….$7,746.87 6.68%
Overhead & Profit………………………..$22,408.18 19.33%
Total project………………………………$115,907.75 100%
Respectfully, Jason Duwenhoegger
Jason Duwenhoegger
Service Manager / Estimator
Temperature Technology INC.
NOTE: This proposal may be withdrawn if not accepted within 30 days.
STATEMENT OF WORK
ASHRAE 170 COMPLIANCE - AIR HANDLER 1
UNIT UPGRADES
ABERDEEN AREA IHS
PROJECT # 129163
PINE RIDGE COMPREHENSIVE HEALTH CARE CENTER
PINE RIDGE, SD
JANUARY 2021
TABLE OF CONTENTS
Section Page
1. COORDINATION AND TIMELINE
2. REFERENCES AND ACRONYMS
3. PROJECT INTRODUCTION AND LOCATION
4. SCOPE OF WORK
5. SUPERVISION AND COORDINATION
6. INFECTION CONTROL AND INTERIM LIFE SAFETY MEASURES
7. SAFETY AND SECURITY
8. PLANNING AND SCHEDULEING
9. RESTORATION
10. WARRANTY
11. SUBMITTALS
12. TRIBAL EMPLOYMENT RIGHTS OFFICE (TERO) REQUIREMENTS
13. BASIS FOR AWARD
APPENDIX A – AIR HANDLER 1 EXISTING SYSTEM
APPENDIX B – ASHRAE 170 HUMIDIFICATION REQUIREMENTS
STATEMENT OF WORK
ASHRAE 170 COMPLIANCE – AIR HANDLER 1 DEFICIENCIES
Pine Ridge Service Unit, SD
1. COORDINATION AND TIMELINE
All project execution, construction administration, and scheduling shall be coordinated with the Contracting Officer’s Representative (COR) or the designated IHS project manager (PM).
Contracting Officer Representative (COR) Corey Sawatzky, PE Facilities Engineer corey.sawatzky@ihs.gov Tel: 605-719-4057
The period of this contract will be 180 calendar days from the Contract Award. Notification to the Contractor to begin construction will be by letter.
2. REFERENCES AND ACRONYMS
A. ASHRAE 170 – 2017 STANDARD
B. ASHRAE HANDBOOKS – LATEST PRINT EDITIONS
C. NFPA 99 – HEALTH CARE FACILITIES CODE
D. NEC – NATIONAL ELECTRIC CODE
E. Common acronyms or definitions:
i. IEST – Institute of Environmental Science and Technology
ii. MERV – Minimum Efficiency Reporting Value
iii. ASHRAE – American Society of Heating, Refrigeration, and Air Conditioning Engineers
iv. NEC – National Electric Code
v. NFPA – National Fire Protection Agency
vi. BAS – Building Automation System
vii. DDC – Direct Digital Control
viii. IHS – Indian Health Service
ix. IDIQ – Indefinite Delivery Indefinite Quantity
x. MATOC – Multiple Award Task Order Contract
xi. DES – Department of Engineering Services
xii. CMS or CMMS – Centers for Medicare & Medicaid Services
xiii. PR – Pine Ridge
xiv. Metasys – Name of the existing BAS
xv. CO – Contracting Officer
xvi. COR – Contracting Officer’s Representative
xvii. PM – Project Manager
xviii. IGCE – Independent Government Cost Estimate
xix. A/E – Architectural/Engineering
xx. MEP – Mechanical, Electrical, Plumbing
xxi. LCCA – Life Cycle Cost Analysis
xxii. BIM – Building Information Model
xxiii. LOD – Level of Design
xxiv. CAD – Computer Aided Design
xxv. RFI – Request For Information
xxvi. CA – Construction Administration
xxvii. CCA – Construction Contract Administrator xxviii. CCAS Construction Contract Administration Services
xxix. PID – Piping and Instrumentation Diagram
xxx. SOW – Statement / Scope of Work
3. PROJECT INTRODUCTION & LOCATION
This project will complete improvements at the Pine Ridge IHS Hospital located at the address below.
All work will be conducted in physical plant or mechanical room space, however, the equipment serves medically occupied spaces where staff and patients will be present. Close coordination and scheduling with IHS staff will be required by all contractors. Contractors shall expect and make bids accordingly and expect work or system tie-ins outside of normal business hours on premium time.
Contractors will be required to provide and use medical grade construction barriers, portable barriers, and temporary HEPA filtration ventilation systems only where required in patient care areas and depending on the extent of work and infection control policy, personnel, and procedures dictated by the Pine Ridge Hospital.
All work will be carried out at the address below:
East US HWY 18 Pine Ridge, SD 57770
4. SCOPE OF WORK
The main objective of the project is to re-build and/or correct deficiencies of Air Handler 1 (AH-1). The air handler serves Dental Area B of the Pine ridge Hospital. Certain components shall be carefully demolished and removed from the unit including the pneumatic controls. The existing air handling unit shell shall remain intact and be rebuilt according to this scope of work. Replaced components and all associated accessories shall be completely demolished in their entirety but replaced with new or upgraded components to make the overall air handling system 100% operational and to meet the latest ASHRAE 170 Standard. The existing air handler is located on the second level mezzanine which is housed inside the existing physical plant of the facility. The associated accessories must be removed through existing 3 feet wide by 7 feet wide doorways and taken down existing stairwells or be transported outside to the roof level and be craned or hoisted from the existing flat, membrane roof.
The new air handler components shall be installed in modules small enough to enter through the existing doorways or through the mezzanine roof door after hoisting or craning up to the roof level.
The Contractor shall provide well-trained workers, competent to complete work as specified and as recommended by the manufacturer of the equipment or material that is installed. The Contractor shall provide a turn-key solution and provide a complete and operable system and verify it is 100% operational after completing the entire scope of work shown in the following sections of this document.
A. PROVIDE NEW RO WATER SERVICE TO AH-1 MEZZANINE – Contractor shall provide a new adequately sized RO water service to Air Handler 1 (AH-1) to serve the new adiabatic humidifier called out in section C of this document.
1. Provide and install a new insulated, stainless steel or pre-approved HDPE supply line to the air handler 1 mezzanine that is appropriately sized for the newly planned adiabatic humidifier. Provide a shut off ball valve located at the branch line from the main and a shut off ball valve located just inside the air handler 1 mezzanine.
Contractor shall provide a continuous return line, circuit setter balancing valve sized for ½ GPM, and corresponding isolation valves to meet ASHRAE 170 Section 6.6.3 requirements shown in Appendix B. Contractor shall provide all necessary fittings and accessories that are suitable for domestic use (lead free) and dielectric fittings as required.
2. Insulate the new piping with standard fiber glass insulation rated for domestic water use. Contractor to provide submittals for all piping, insulation, and accessories for IHS staff approval before ordering any new materials.
B. DEMOLISH AND REPLACE THE EXISTING HEATING COIL OF AH-1 – Contractor shall demolish the existing heating coil and replace with a larger coil according to the following criteria.
1. Contractor shall coordinate with the COR, designated PM, and service unit staff for scheduling and shut down of the air handling system before performing any work.
Contractor shall plan to perform work outside of normal business hours.
2. Contractor shall isolate the existing hot water system using the existing isolation valves located on the supply and return lines. The contractor shall drain down the heating water lines and route to the nearest floor drain. This work would include the drain down of the existing freeze protection pump FPP-1, the 3 way valve, and associated piping as required.
3. Contractor shall carefully disconnect the existing hot water coil and remove associated piping, fittings, and accessories if required for removal of the heating coil from the existing air handler. Contractor shall remove the heating coil and all accessories in their entirety and it shall become property of the contractor. The contractor shall remove the existing coil, components, piping, and all accessories not used in the new system.
4. Contractor shall provide and install a new adequately sized heating coil and all accessories to accommodate the new adiabatic humidifier. The new heating coil load must include the anticipated heat loss due to the newly planned adiabatic humidifier.
5. Contractor shall re-route the existing heating water piping as required for connection to the new heating coil. Re-install the existing freeze protection pump FPP-1 and match the previous piping configuration (if required). Contractor shall provide a new DDC start/stop relay as well as a status CT to the existing freeze protection pump FPP-1 and tie into the existing Metasys graphic. Contractor shall demolish the existing 3 way pneumatic valve and provide a new 3 way DDC valve and tie into the existing Metasys BAS to show command and status of the new valve. A new automatic balancing flow valve shall be sized and installed by the contractor according to the new hydronic flow requirements.
6. Contractor shall connect the new heating coil to the existing supply and return heating water main line connections and according to the coil manufacture instructions. All new piping shall be installed and insulated to match the existing system. All items shall be ultimately approved by the COR/PM and the facility manager.
7. Contractor shall re-fill the entire piping system as required and use the manual vents available to purge any air from system. The entire heating water system shall be 100% operational with no air locks before the project is considered substantially completed
C. PROVIDE NEW ADIABATIC HUMIDIFICATION SYSTEM AND STAINLESS STEEL SKIN
TO AH-1 – Contractor shall provide a new adiabatic humidifying system according to the following criteria.
1. The contractor shall provide a new adiabatic (atomizing type) humidification system of adequate size for the existing airflow and humidification requirements. The new system shall use reverse osmosis water as its humidification mechanism and the new RO system shall be sized, provided, and installed by the contractor.
2. All humidification and RO equipment shall be installed inside the air handler 1 mezzanine.
3. The contractor shall provide a new electrical service for powering the new humidifier and controls. The system shall be wired and installed according to the latest NEC.
4. The contractor shall provide and install all necessary piping and accessories and connect it to the newly installed RO supply piping service called out in Section A of this document and located within the existing Air Handler 1 mezzanine.
5. The new humidification system shall have an automatic drain down or recirculation system in the event it is not in use for a period of time and according to ASHRAE 170 requirements shown in Appendix B of this document.
6. The contractor shall provide and install all drainage, waste, or condensate piping and route it to the nearest floor drain inside the mezzanine or physical plant.
7. The contractor shall install pressure/temperature (P/T) ports before and after the humidification system for on the spot testing of water quality at any given time and according to ASHRAE 170 requirements.
8. The humidifier controller shall be capable of communicating Bacnet and shall be tied into the existing Metasys BAS. The required points shall be reviewed and approved by the COR/PM.
9. Moisture eliminators shall be provided to minimize moisture accumulation and according to ASHRAE 170 requirements shown in Appendix B.
10. The contractor shall provide a stainless steel skin and drain pan system that will inhibit the existing unit from rusting due to the new humidification system. The system shall be submitted and approved by the COR/PM and facility manager before ordering any materials.
11. All anticipated equipment installation locations in the existing Air Handler 1 mezzanine shall be coordinated with the facility manager and/or on site engineer.
D. DEMOLISH AND REPLACE THE EXISTING SUPPLY FAN OF AH-1 – Contractor shall demolish the existing squirrel cage supply fan and provide a new fan array for Air Handler 1 and according to the following criteria.
1. Contractor shall coordinate with the COR, designated PM, or service unit staff for scheduling and shut down of the air handling system before performing any work.
Contractor shall plan to perform work outside of normal business hours.
2. Demolish the existing supply fan and corresponding VFD in its entirety. The VFD shall be carefully shut down, removed, and turned over to the service unit staff. The entire fan housing, wheel, and all other accessories shall be disposed of at the contractor’s expense.
3. A new fan array shall be carefully installed and adequately sized to accommodate the existing conditions as well as any new added items to Air Handler 1 as a part of this scope of work. The entire fan array shall be variable speed and capable of controlling to a duct static pressure setpoint identical to the previous system either via a single VFD or a common speed control signal that ramps all fan array EC motors together and at the same speed. If a VFD is used to control fan speed, then a new unit shall be provided and a new unit disconnect shall be installed too.
4. The contractor shall size the new fan total static pressure (TSP) according to the existing system component pressure drops but also add in any new or added static pressure drops per this scope of work.
5. Each fan array motor shall be labeled and tied into the existing BAS with its own individual status point using DDC. No pneumatic controls will be allowed on this project.
6. The new fan array system shall be wired for 460 VAC and according to the latest NEC requirements. The entire fan array system shall be able to vary its speed and control to common duct static pressure sensor located approximately 2/3 the way down the supply duct main located up in the Area B Dental plenum space.
7. The fan array shall be tied into the existing BAS where the speed of the fan shall be shown and be able to be overridden at any time. Each individual motor shall show status for operator to determine when a motor has failed within the array. The entire system shall be able to be commanded on/off by a building operator at the graphics front end.
8. The duct static pressure shall be shown at the front end graphic along with the static pressure setpoint. The duct static pressure setpoint shall be able to be adjustable.
E. DEMOLISH AND REPLACE FINAL FILTER SECTION – Contractor shall demolish the existing 12 inch high efficiency filter system and replace with new according to the following criteria.
1. The existing 12 inch wide high efficiency filter rack may only be re-used if it is suitable for installation of new IEST Type A HEPA filters. Otherwise it shall be deleted and replaced with a filter rack capable of a 12 inch cartridge type, IEST Type A HEPA rated filter.
2. Contractor shall install a new 2 inch or 4 inch wide flat, mid filter rack directly upstream of the new HEPA filter rack and consisting of pleated MERV 12 rated filters or higher.
3. Each new mid and final filter bank shall have an analog filter pressure drop magnehelic measuring station which shall be tied back to the BAS.
4. Contractor shall provide one new set of clean HEPA filters and one new set of MERV 12 filters at startup and commissioning of the unit. Contractor shall provide 2 sets of spare MERV 12 filters and turn over to the facility manager or facility engineer during substantial completion of the project.
F. DEMOLISH AND INSTALL NEW AIR HANDLER 1 CONTROL SYSTEM – Successful contractor shall eliminate all existing pneumatic controls for AH-1 and provide new DDC system according to the following criteria.
1. All existing pneumatic sensors shall be replaced with all new DDC sensors and tied into the existing Metasys graphic. A new return air temperature and humidity sensor shall be installed on the return system for reference or control of the new humidifier.
2. The successful contractor is required to provide all new electrical service to all new control systems. This would include but is not limited to all damper actuator motors, control valve motors, sensors, transducers, and required system controllers (including the new adiabatic humidifier power requirements). All circuits shall be installed per the latest NEC.
3. The existing unit heater controls located inside the mezzanine where Air Handler 1 is located shall be converted over to DDC and tied into the existing BAS. The following items shall be replaced and tied into the BAS. Ensure system is 100% operational at completion of project.
i. NEW ANALOG THERMOSTAT TIED TO BAS
ii. NEW 2 WAY CONTROL VALVE (DIGITAL)
iii. NEW FAN RELAY FOR FAN COMMAND (DIGITAL)
iv. NEW FAN CT FOR STATUS (DIGITAL)
4. The anticipated sensors or items that shall be converted to DDC or replaced with new sensors on the air handler are shown below but the controls contractor shall provide any other new or necessary sensors and graphics tie in as required.
i. NEW RETURN AIR FIRE/SMOKE DAMPER ELECTRONIC ACTUATOR
(DIGITAL)
ii. NEW RETURN AIR RELATIVE HUMIDITY SENSOR (ANALOG)
iii. NEW RETURN AIR TEMPERATURE SENSOR (ANALOG)
iv. NEW MIXED AIR TEMPERATURE SENSOR (ANALOG)
v. NEW LEAVING COIL TEMPERATURE SENSOR (ANALOG)
vi. NEW PRE FILTER PRESSURE DIFFERENTIAL SENSOR (ANALOG)
vii. NEW MID FILTER PRESSURE DIFFERENTIAL SENSOR (ANALOG)
viii. NEW FINAL FILTER PRESSURE DIFFERENTIAL SENSOR (ANALOG)
ix. NEW HEATING WATER CONTROL VALVE ACTUATOR, 3 WAY (ANALOG)
x. NEW CHILLED WATER CONTROL VALVE ACTUATOR 2 WAY (ANALOG)
xi. NEW DUCT STATIC PRESSURE LOW LIMIT SWITCH (DIGITAL)
xii. NEW FAN ARRAY CURRENT TRANSFORMER STATUS SWITCHES FOR
EACH FAN ARRAY FAN MOTOR (DIGITAL)
xiii. NEW BACNET SERIAL COMMUNICATION LINK TO NEW FAN ARRAY VFD
(COMMUNICATION)
xiv. NEW DUCT STATIC PRESSURE HIGH LIMIT SWITCH (DIGITAL)
xv. NEW BACNET SERIAL COMMUNICATION LINK TO NEW ADIABATIC
HUMIDIFIER CONTROLLER (COMMUNICATION)
xvi. NEW LEAVING RELATIVE HUMIDITY SENSOR (ANALOG)
xvii. NEW HUMIDIFIER AIR PROVING SWITCH (DIGITAL)
xviii. NEW DISCHARGE AIR TEMPERATURE SENSOR (ANALOG)
xix. NEW DISCHARGE AIR RELATIVE HUMIDITY SENSOR (ANALOG
xx. NEW DISCHARGE AIR FIRE/SMOKE DAMPER ELECTRONIC ACTUATOR
(DIGITAL)
xxi. NEW DISCHARGE AIR DUCT STATIC PRESSURE SENSOR (ANALOG)
5. SUPERVISION & COORDINATION
Contractor shall provide and designate an on-site supervisor/foreman for coordination and scheduling between IHS and the Contractor laborers and/or sub-contractors. Contractor shall provide 3-days minimum advance notice of any need for assistance from the Pine Ridge maintenance foreman or facility manager to locate building utilities, shut-offs, systems, etc.
6. INFECTION CONTROL & INTERIM LIFE SAFETY MEASURES
Contractor shall be required to follow the requirements of an “Infection Control Construction Permit” and “Interim Life Safety Measures”, which will be developed in conjunction with completion of an Infection Control Risk Assessment (ICRA) and Pre-Construction Risk Assessment (PCRA). The permit and life safety measures assessment will be provided to the contractor following award of the task order.
7. SAFETY AND SECURITY
The contractor shall be responsible for the safe progress of the work to assure that housing occupants, hospital staff, patients, visitors, and children are not allowed access to unsafe areas or conditions during the progress of the work. The contractor and staff shall afford all staff, housing occupants, patients, and visitors’ professional courtesy during the course of the project. Interim life safety measures will be strictly enforced during construction. For details, contact the Safety Officer, Pine Ridge Service Unit.
The hospital and the Indian Health Service staff shall not be responsible for the security of the contractor’s tools, equipment, or material during the course of the project.
8. PLANNING & SCHEDULING
Scheduling will be done in cooperation with the IHS Facility Manager, Facility Engineer, COR, and/or the PM so that disruption to patients and staff will be minimized. The successful contractor shall complete work in the allotted 180 day period. Contractor shall work around weather delays and is responsible for completing work even with anticipated weather delays of the fall season which could include blizzard like conditions as well as rain or hail storms. Contractor shall work with proper IHS staff to create a schedule that allows advance notice to tenants and occupants for adequate preparation before shut down of HVAC system and minimizes down time.
9. RESTORATION
The contractor shall restore all areas disturbed by construction to a condition at least equal to or better than prior condition before construction. The contractor shall dispose of all excess construction materials, equipment, tools, waste, and rubbish. For additional disposal information please contact the Solid Waste Coordinator, Oglala Sioux Tribe.
10. WARRANTY
Unless otherwise specified, the contractor shall guarantee all materials and work performed for a period of one year from the date of substantial completion and shall ensure that the completed system is free from all defects due to faulty materials one year from the date of substantial completion. The contractor shall promptly make such corrections as may be necessary by reason of such defects including the repairs of any damage to other parts of the building system resulting from such defects.
The contractor will give notice of observed defects with reasonable promptness.
11. SUBMITTALS
Following contract award, the contractor shall provide the Indian Health Service submittals on proposed methods, materials, and new equipment to be utilized during the project. The contractor shall provide an electronic set of submittals to the COR and/or PM for approval at least two weeks before a determination is required. At a minimum, submittals are required for the following items:
1. Piping and fitting sizes, material, and any other pertinent information.
2. Piping accessories including valves, thermometers, hangars, and test ports.
3. Piping insulation, facing, and jacketing.
4. Electrical conduit and wiring.
5. Control sensors, devices, components, controllers, sequences, and points lists.
6. Heating coil selection, material, size, and components.
7. Supply fan array selection, material, size, and all other pertinent information.
8. Adiabatic humidification selection, material, equipment, size, components, filtration requirements, water quality requirements, and any other pertinent information.
9. Pre, mid, and final filter selections, material, ratings, spare filters, and any other pertinent information.
10. Any new AH-1 sequence, control diagrams, points list, or other pertinent information.
11. Supply and return fire damper actuator information.
12. TRIBAL EMPLOYMENT RIGHTS OFFICE (TERO) REQUIREMENTS
Contractors engaging in work on the Pine Ridge Indian Reservation will be required to comply with the Indian preference and Indian preference program requirements administered by the Oglala Sioux Tribe Tribal Employment Rights Office (TERO).
Before commencing work, contractors and sub-contractors are required to submit an acceptable “Compliance Agreement” to the TERO office. Copies of this form can be obtained from the TERO office. Typical requirements of TERO include a fee of 4% on the total contract price, and submission of weekly certified payroll reports to TERO.
Additionally, the rules and regulations of the TERO Ordinance require that no person who is not a local Indian shall be employed by a covered employer until a work permit has been obtained for them from TERO. The annual work permit fee for each employee is $250.00.
Contractors are strongly encouraged to contact the TERO office at (605)867-5167 for an explanation of tribal requirements and required fees and permits.
13. BASIS FOR AWARD
An award will be made to the lowest priced, technically acceptable offeror. However, the offeror must be at least 51% “Indian Owned” under the Buy Indian Act 25 U.S.C. 47 and contain “Indian Ownership” under HHSAR 326.03. The offeror shall also possess a small business designation through the Small Business Administration (SBA).
APPENDIX A - AH-1 UNIT DATA
I p•n�--., O
6.6.3 Adiabatic Atomizing Humidifier Requirements
a. Humidifier water shall be treated with a reverse osmosis process, a UV-C sterilization light source, and a submi cron filter. Informative Note: For more infonnation, see ASTM (201 I) in Appendix B.
b. Treated humidifier water shall be continuously circulated from the source to the humidifier valves. All valves, head ers, and piping not part of the recirculation loop shall drain completely not in use.
c. Ports suitable ....... ater quality shall be provided in the treated h piping system.
d. Moisture el· be provided as required to pre-on in ductworL
.7 Air Dis
6,7.J Gene In T abJes 7.1, ation, exce t pn:ssure relationships required modes ofHV AC system oper
• paces that have rcquil'Cd
APPENDIX B - ASHRAE 170
HUMIDIFICATION REQUIREMENTS
CLAUSES INCORPORATED BY REFERENCE
(Firm Fixed-Price, Non-Personal Service Type, Commercial)
FAR CITATION: 52.252-2: Clauses Incorporated by Reference. (FEB 1998) I. Federal Acquisition Regulations (FAR) (48 CFR Chapter 1) Clauses
No. FAR Citation Clause Title Clause Date ____
1. 52.203-12 Limitation on Payments to Influence Certain June 2019 Federal Transactions
2. 52.204-13 System for Award Management Maintenance October 2018
3. 52.204-18 Commercial and Government Entity Code July 2016 Maintenance
4. 52.204-19 Incorporation by Reference of December 2014 Representations and Certifications
5. 52.212-4 Contract Terms and Conditions October 2018
- Commercial Items
6. 52.232-39 Unenforceability of Unauthorized Obligations June 2013
7. 52.232-40 Providing Accelerated Payments to Small December 2013 Business Subcontractors
8. 52.233-3 Protest after Award August 1996
9. 52.253-1 Computer Generated Forms January 1991
CLAUSES INCORPORATED IN FULL TEXT
II. Federal Acquisition Regulations (FAR) (48 CFR Chapter 1) Clauses
No. FAR Citation Clause Title Clause Date ____
1. 52.212-5 Contract Terms and Conditions Required To January 2021 Implement Statues or Executive Orders – Commercial Items (See attached)
2. 52.217-8 Option to Extend the Services November 1999
3. 52.252-2 Clauses Incorporated by Reference February 1998
52.217-8 Option to Extend Services.
As prescribed in 17.208(f), insert a clause substantially the same as the following:
https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2017_2.html#wp1078175
OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.
(End of clause)
52.252-2 Clauses Incorporated by Reference.
As prescribed in 52.107(b), insert the following clause:
CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov
(End of clause) https://www.acquisition.gov/sites/default/files/current/far/html/52_000_107.html#wp1114174
52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders- Commercial Items.
As prescribed in 12.301(b)(4), insert the following clause:
CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE
ORDERS-COMMERCIAL ITEMS (JAN 2021)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2020) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).
(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.]
X_ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUNE 2020), with Alternate I (OCT 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (JUN 2020) (41 U.S.C. 3509)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
X_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).
https://www.acquisition.gov/far/part-12#FAR_12_301 https://www.acquisition.gov/far/part-52#FAR_52_203_19 https://www.acquisition.gov/far/part-52#FAR_52_204_23 https://www.acquisition.gov/far/part-52#FAR_52_204_25 https://www.acquisition.gov/far/part-52#FAR_52_209_10 https://www.acquisition.gov/far/part-52#FAR_52_233_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_233_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_203_6 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_203_13 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_203_15 https://www.acquisition.gov/far/part-52#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim
__ (5) [Reserved].
__ (6) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).
__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).
__ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (JUN 2020) (31 U.S.C. 6101 note).
__ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C. 2313).
__ (10) [Reserved].
__ (11)
(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (MAR 2020) (15 U.S.C. 657a).
__ (ii) Alternate I (MAR 2020) of 52.219-3.
__ (12)
(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (MAR 2020) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
__ (ii) Alternate I (MAR 2020) of 52.219-4.
__ (13) [Reserved]
_X_ (14)
(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
__ (ii) Alternate I (MAR 2020) of 52.219-6.
__ (15)
(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
__ (ii) Alternate I (MAR 2020) of 52.219-7.
__ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C. 637(d)(2) and (3)).
__ (17) https://www.acquisition.gov/far/part-52#FAR_52_204_14 https://www.acquisition.gov/far/part-52#FAR_52_204_15 https://www.acquisition.gov/far/part-52#FAR_52_209_6 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_3 https://www.acquisition.gov/far/part-52#FAR_52_219_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_4 https://www.acquisition.gov/far/part-52#FAR_52_219_6 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_6 https://www.acquisition.gov/far/part-52#FAR_52_219_7 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_7 https://www.acquisition.gov/far/part-52#FAR_52_219_8 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3
(i) 52.219-9, Small Business Subcontracting Plan (JUN 2020) (15 U.S.C. 637(d)(4)).
__ (ii) Alternate I (NOV 2016) of 52.219-9.
__ (iii) Alternate II (NOV 2016) of 52.219-9.
__ (iv) Alternate III (JUN 2020) of 52.219-9.
__ (v) Alternate IV (JUN 2020) of 52.219-9
__ (18)
(i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).
__ (ii) Alternate I (MAR 2020) of 52.219-13.
X_ (19) 52.219-14, Limitations on Subcontracting (MAR 2020) (15 U.S.C. 637(a)(14)).
__ (20) 52.219-16, Liquidated Damages-Subcontracting Plan (JAN 1999) (15 U.S.C. 637(d)(4)(F)(i)).
__ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set- Aside (MAR 2020) (15 U.S.C. 657f).
_X_ (22)
(i) 52.219-28, Post Award Small Business Program Rerepresentation (NOV 2020) (15 U.S.C. 632(a)(2)).
__ (ii) Alternate I (MAR 2020) of 52.219-28.
__ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (MAR 2020) (15 U.S.C. 637(m)).
__ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Mar2020) (15 U.S.C. 637(m)).
__ (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).
__ (26) 52.219-33, Nonmanufacturer Rule (MAR 2020) (15U.S.C. 637(a)(17)).
_X_ (27) 52.222-3, Convict Labor (JUN 2003) (E.O.11755).
__ (28) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (JAN2020) (E.O.13126).
__ (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
https://www.acquisition.gov/far/part-52#FAR_52_219_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_13 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_13 https://www.acquisition.gov/far/part-52#FAR_52_219_14 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_16 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_27 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_28 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_28 https://www.acquisition.gov/far/part-52#FAR_52_219_29 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_30 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_32 https://www.govinfo.gov/content/pkg/USCODE-2018-title15/html/USCODE-2018-title15-chap14A-sec644.htm https://www.acquisition.gov/far/part-52#FAR_52_219_33 https://www.govinfo.gov/content/pkg/USCODE-2018-title15/html/USCODE-2018-title15-chap14A-sec637.htm https://www.acquisition.gov/far/part-52#FAR_52_222_3 https://www.acquisition.gov/far/part-52#FAR_52_222_19 https://www.acquisition.gov/far/part-52#FAR_52_222_21
__ (30)
(i) 52.222-26, Equal Opportunity (SEP 2016) (E.O.11246).
__ (ii) Alternate I (FEB 1999) of 52.222-26.
__ (31)
(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
__ (ii) Alternate I (JUL 2014) of 52.222-35.
X_ (32)
(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
__ (ii) Alternate I (JUL 2014) of 52.222-36.
__ (33) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
__ (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).
_X_ (35)
(i) 52.222-50, Combating Trafficking in Persons (OCT 2020) (22 U.S.C. chapter 78 and E.O. 13627).
__ (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
__ (36) 52.222-54, Employment Eligibility Verification (OCT 2015). (Executive Order 12989).
(Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
__ (37)
(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O. 13693).
__ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693).
__ (40) https://www.acquisition.gov/far/part-52#FAR_52_222_26 https://www.acquisition.gov/far/part-52#FAR_52_222_26 https://www.acquisition.gov/far/part-52#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_35 https://www.acquisition.gov/far/part-52#FAR_52_222_36 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_36 https://www.acquisition.gov/far/part-52#FAR_52_222_37 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_40 https://www.acquisition.gov/far/part-52#FAR_52_222_50 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_50 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_54 https://www.acquisition.gov/far/part-22#FAR_22_1803 https://www.acquisition.gov/far/part-52#FAR_52_223_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_223_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_223_11 https://www.acquisition.gov/far/part-52#FAR_52_223_12
(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).
__ (ii) Alternate I (OCT 2015) of 52.223-13.
__ (41)
(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).
__ (ii) Alternate I (Jun2014) of 52.223-14.
__ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).
__ (43)
(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
__ (ii) Alternate I (JUN 2014) of 52.223-16.
_X_ (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O. 13513).
__ (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).
__ (46) 52.223-21, Foams (Jun2016) (E.O. 13693).
__ (47)
(i) 52.224-3 Privacy Training (JAN 2017) (5 U.S.C. 552 a).
__ (ii) Alternate I (JAN 2017) of 52.224-3.
__ (48) 52.225-1, Buy American-Supplies (JAN 2021) (41 U.S.C. chapter 83).
_X_ (49)
(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (JAN 2021)(41 U.S.C.chapter83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110- 138, 112-41, 112-42, and 112-43.
__ (ii) Alternate I (MAY 2014) of 52.225-3.
__ (iii) Alternate II (MAY 2014) of 52.225-3.
__ (iv) Alternate III (MAY 2014) of 52.225-3.
https://www.acquisition.gov/far/part-52#FAR_52_223_13 https://www.acquisition.gov/far/part-52#FAR_52_223_13 https://www.acquisition.gov/far/part-52#FAR_52_223_14 https://www.acquisition.gov/far/part-52#FAR_52_223_14 https://www.acquisition.gov/far/part-52#FAR_52_223_15 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_223_16 https://www.acquisition.gov/far/part-52#FAR_52_223_16 https://www.acquisition.gov/far/part-52#FAR_52_223_18 https://www.acquisition.gov/far/part-52#FAR_52_223_20 https://www.acquisition.gov/far/part-52#FAR_52_223_21 https://www.acquisition.gov/far/part-52#FAR_52_224_3 https://www.acquisition.gov/far/part-52#FAR_52_224_3 https://www.acquisition.gov/far/part-52#FAR_52_225_1 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_225_3…