This combined synopsis/solicitation seeks proposals for tree and debris removal services along the Natchez Trace Parkway in Mississippi. The selected contractor will be responsible for removing fallen trees, stumps, logs, and root balls from mowing areas between the road and woods edges from mile marker 0 to 37.58. Additional tasks include removing hazardous tree limbs and standing hazard trees that could fall into the motor road. The contractor must reestablish landscape grades, fill stump holes, and seed and mulch bare areas. The performance period is 90 working days. Proposals are due by a specified date and the government intends to make one fixed-price award for all work described.

View the file

Other files for this federal contract opportunity

Other files attached to 2021 WINTER STORM CLEANUP -NATCHEZ MS, newest first.
File Type Posted
B03_wages.txt TXT text file
Sol_140P5221R0031.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PMIS 317726

REMOVE HAZARDOUS LIMBS & TREES

FROM THE NATCHEZ TRACE PARKWAY

POST-WINTER STORM 2021

NATCHEZ DISTRICT

PROJECT DESCRIPTION AND STATEMENT OF WORK

REMOVE HAZARDOUS LIMBS AND TREES

FROM THE

NATCHEZ TRACE PARKWAY

1. SCOPE OF WORK: The contractor shall furnish all transportation, materials, labor, equipment, and all other services necessary to remove fallen trees, including stumps, logs, and root balls and re-establish the landscape within the mowing areas or maintained landscape (defined as the area between the edge of the road and the edge of the woods) in the Natchez District along the Natchez Trace Parkway as described in this document. Work will also include the removal of hazard trees as described in this document.

For the purposes of this contract a hazard tree will be defined as dead or dying trees, or unstable live trees (due to structural defects or other factors) that are within striking distance of the mowing area. Trees will be marked prior to removal.

2. BACKGROUND: During the week of February 15th, 2021 two winter storm systems pushed temperatures below freezing for several days and brought with it ice and snow. The cumulative effect of the ice on the trees caused numerous trees to fall along the Natchez Trace Parkway.

Staff worked to clear the roads of downed trees when conditions were safe to do so, but all fallen trees cleared remain along the road shoulders. There are also downed trees within the mowing areas and along the wood lines that interrupt the clear zone of the roadway. In addition to fallen trees, there are numerous hazardous trees still standing.

a. Task 1 – Removal of Hazardous Limbs

b. Task 2 – Removal of downed trees within the mowing area/maintained landscape

c. Task 3 – Removal of hazardous trees that are in danger of falling into motor road.

d. Task 4 – Re-establishment of Landscape

3. PROJECT LOCATIONS: The following project area is included within this contract.

Project Area 1: Natchez District State: Mississippi Parkway Mile Marker: 0-37.58

Area(s) flagged off will not be included within this contract, as they will represent either culturally or naturally sensitive areas. Contractors shall not work in those specified areas.

4. PROJECT EXECUTION:

a. Task 1: Removal of Hazardous Limbs: In the project areas there are hazardous limbs overhanging the Parkway area that shall be removed in order to mitigate any threat to Parkway visitors and vehicles. The objective in removing these limbs is to create a clear zone in and around the Parkway motor road. Any limb or branch that is within the designated clear zone shall be properly removed. As shown below, the clear zone is defined as a boxed area extending eight feet beyond the pavement edge on both sides of the road, and extending vertically eighteen feet above the surface of the pavement.

In some cases it will be necessary to cut off a limb or branch at the tree trunk. In other cases, the limb may be pruned at a naturally occurring fork or branching point.

In either case, the contractor must exercise good judgment when trimming limbs, and shall not cut limbs in a manner that degrades the beauty of the Parkway scenery.

Snags shall not be allowed (A snag is defined as a limb sticking out and being cut at a point that is not a natural fork or branching point). A successful pruning project must result in a clear zone that does not appear to have been freshly pruned. Limbs are to be properly pruned in an aesthetically pleasing manner in accordance with standard arborist practices.

Because it is anticipated that many of the limbs included in this section are from existing downed/felled trees or hazardous trees, this task shall not be completed until Tasks 2 and 3 are complete.

b. Task 2: Removal of Downed Trees: In the project area, there are trees that are downed or felled within the mowing area. These trees, stumps, limbs, vines, root balls, etc. shall be removed from the Parkway mowing area.

Any trees that protrude from the woods into the mowing area shall be removed to within 25 feet inside of the wooded area from edge of the wood line including all associated

Parkway CenterLine

[---8’-----] [---8’-----]

18’ 18’ stumps, limbs, vines, root balls, etc.; with the exception for instances where the root ball lies within the wooded area, it will not be necessary to remove the root ball, as this is more impactful to the surrounding natural resources. Trees that are completely within the wooded area and beyond 25 feet from the wood line shall be left in place.

No tracked equipment shall enter the woods.

Great caution and care should be taken as to not damage saplings/seedlings in the wood line. At no time shall the contractor push limbs, trees, etc. into ditches, creek, or other drainage ways. All trees, stumps, limbs, vines, root balls, etc. that are removed shall be removed from the parkway entirely, hauled off and properly disposed of by the contractor. Remaining stumps within the mowing area shall be ground to a depth of at least four inches (4”) below ground level and the holes filled. All holes remaining by the root balls shall be filled with topsoil and borrow as specified in the following sections.

c. Task 3: Removal of Hazardous Trees: In the project areas, there are hazardous trees overhanging the Parkway area that are to be removed in order to mitigate any threat to Parkway visitors and vehicles. This includes the removal of all parts of the tree: limbs, vines, etc. The objective in removing these trees is to create a clear zone in and around the Parkway motor road. Trees to be removed will be designated by the contracting officer.

For trees standing Hazardous Trees within the mowing area/maintained landscape:

Tree stumps shall be ground to a depth of at least four inches (4”) below ground level and the holes filled. All holes remaining by the root balls shall be filled with topsoil and borrow as specified in the following sections.

Because trees are grouped together in small areas or are confined to a general area in relation to one another, the contractor shall remove felled hazardous trees from the Parkway entirely where they fall within 25 feet into the woods as measured from the wood line; the contractor shall not move/push them back into the woods. After felling, portions of hazard trees that fall beyond 25 feet from the wood line shall be left in place.

All stumps from hazard trees in wooded areas shall remain in place.

d. Task 3: Re-establishment of Landscape: Once the trees within the project limits have been removed, light grading shall be required to re-establish the slopes and surfaces within the mowing area. In cases where fill material shall be required, the top 6” of depressions shall be filled with topsoil. Depressions deeper than 6” shall be filled for the remainder of the depth below the topsoil with Class B9 Borrow material per the Mississippi Department of Transportation Standard Specifications for Road and Bridge Construction (MDOT Redbook 2017) Section 703. Once all areas within the mowing area are graded to re-establish the original slopes and landscape surfaces, the areas that are bare shall be seeded and mulched per the following specification Section 02921. See Seeding Spec Attachment.

5. PROJECT RESTRICTIONS: The following restrictions apply to this contract.

a. Any damage caused by the contractor’s equipment shall be rehabilitated to the original condition or state. No heavy machinery will be allowed on slopes or beyond mowed areas.

b. In no case will tracked vehicles or log skidders be allowed.

c. Access routes for the Parkway shall be the closest Parkway access to the area where the contractor is working.

d. When hauling on National Park Service roads, do not exceed the following load restrictions:

Single Units Gross Vehicle Weight –Lbs.

2 axles 40,000 3 axles 48,000 4 or more axles 52,000 Combination Units 3 axles 57,000 4 axles 62,000 5 or more axles 66,000

Where the ground is saturated with water or during periods of freezing and thawing, the Contracting Officer may impose further load restrictions or suspend hauling.

Haul vehicles shall turn around only at intersections and parking areas, not on the Park Road.

e. Operate loaded vehicles hauling material at speeds not exceeding 40 MPH and spaced at 500-foot minimum intervals. On bridges, speeds shall not exceed 25 MPH and not more than one loaded hauling vehicle shall be allowed on any bridge at one time.

Hauling of materials, supplies, and equipment over the park road, other than within the limits of the project, shall not be permitted without prior approval of the Contracting Officer. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Contracting Officer. Vehicles shall not be counted for the purpose of load determination unless they are equipped with brakes. Trucks and other heavy equipment shall be confined to the limits of the project on the park road. Hauling of materials, supplies, and equipment over the park road, other than within the limits of the project, shall not be permitted except as is necessary to perform the required work and the contractor shall be required to haul on non-Parkway roads to the maximum extent possible.

f. Material shall not be piled on the Parkway shoulders or allowed to accumulate except during hauling or chipping operations. All road shoulders shall be kept free of debris and left free of debris at the end of each workday. Any necessary interruptions in traffic flow shall be minimized at all times. Extra care is required to make sure material along shoulders do not encroach into the roadway at any time.

g. No unauthorized dumping of the material is acceptable. The contractor is strictly responsible for properly disposing of removed material and shall be liable for any fees or fines associated with improper hauling or disposal.

6. TRAFFIC CONTROL: It is anticipated that this work will involve use of a portion of the roadway in order to load debris into hauling vehicles and remove it from the parkway. The contractor shall utilize shoulder closures or one-lane closures in accordance with Section 01599 and Federal Highway Administration (FHWA) Standard Drawing numbers 635-6 and 635-10 (Sheet Numbers TCP2 and TCP 3).

Where necessary, the contractor may request permission from the COR to utilize temporary full road closures (maximum duration: 30 min) to safely fell trees or to remove debris covering the entire roadway. This shall be done in accordance with Section 01599 and Federal Highway Administration (FHWA) Standard Drawing numbers 635-5 (Sheet Number TCP1).

Necessary traffic control personnel and signage for all shoulder, single-lane or full road closures shall be the responsibility of the contractor.

No section closures or detour closures will be permitted during this work.

7. INSPECTION and TIMES OF WORK: The work will be monitored by a representative of the Contracting Officer and regular meetings with the contractor will be held to assure safety requirements are being met, to resolve problems that arise, and to monitor the general status of the removal process. The contractor, or his designated representative, shall be present at all times while work is being performed. Any contractor representative shall be thoroughly familiar with the project and have authority to act in the absence of the contractor. Normal working hours are Monday through Friday, 7:30 AM to 4:00 PM, excluding Federal Holidays. No work shall be permitted on weekends or Federal Holidays without prior approval from the COR or Contracting Officer.

8. CONTRACTOR RESPONSIBILITY: The contractor shall remove all material from the site in accordance with all local, state, and federal laws and regulations, and all the terms and conditions listed in the contract. The Contractor agrees that personnel and equipment are subject to safety inspections by the Government while on federal property. The Contractor must comply with all Federal and State OSHA requirements. The contractor shall be responsible for the safety of his employees and equipment, and for any injury or damage done to or by them from any source or cause. He shall save and hold the United States free from all claims for damages to any and all persons and (or) property arising from the execution of the work covered by these specifications.

9. PROTECTION OF VEGETATION, STRUCTURES, AND UTILITIES: The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer. The Contractor shall protect from damage all existing improvements and utilities at or near the work site, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

10. SITE VISIT: Each bidder is urged to visit the sites prior to bidding.

11. PREWORK CONFERENCE: Before the start of the work, the Contracting Officer will arrange for a prework conference with the Contractor to determine any requirements that must be resolved to accommodate the work. Upon completion of the meeting and/or resolution of any items required, site work may proceed.

12. PERIOD OF PERFORMANCE: The contractor shall have 90 working days to complete all work awarded under the base items. A working day shall be considered every day that does not fall on a federal holiday, Saturday, or Sunday. In the case of rain, wet soil, or other weather-related delays, time may be extended. The Contractor may provide documentation as to which days within their Period of Performance time should not be charged due to weather to the COR for Review and Approval.

13. MEASUREMENT AND PAYMENT: The estimated quantities shown in this document are approximate and actual quantities may differ from that stated. Potential contractors are cautioned that the estimated quantities indicated are rough counts only. While it may appear that the quantities shown for the tasks indicated are small, the amount and size of the material to be removed from that area may be significant. All potential contractors should thoroughly inspect the project areas before providing quotes for the work. Measurement and Payment shall be per the Lump Sum prices quoted on the price proposal form.

07/2020 01599-1

TRAFFIC AND SAFETY

SECTION 01599

(Rev. 07/2020)

PART 1 GENERAL

1 .1 DESCRIPTION

A. Work under this section consists of the furnishing of all labor, materials, equipment, and signs required by these specifications.

PART 2 PRODUCTS NOT USED

PART 3 EXECUTION

3 .1 PROTECTION OF PUBLIC

A. Flaggers: Where required, the contractor shall furnish two (2) capable, physically and mentally qualified flaggers for maintaining traffic flow during construction operations. The flaggers shall be English speaking. Flaggers shall wear fluorescent orange or green vests and shall be equipped with a standard hand-held warning (Stop/Slow) sign. Flags shall not be allowed for traffic control.

They shall also be equipped with two-way radios that are capable of dependable transmission for one mile.

B. Safety Equipment: All slow moving equipment shall be equipped with slow moving vehicle emblems and high intensity flashing lights. Emblem and flashing lights shall meet OSHA standards.

C. Laws to be Observed: The contractor shall keep fully informed of all federal and state laws, all local laws, ordinances, safety codes, regulations, and all orders and decrees of bodies or tribunals having any jurisdiction or authority, which in any manner affect those engaged or employed on the work, or which in any way affect the conduct of the work. He shall at all times observe and comply with all such laws, ordinances, safety codes, regulations, orders, and decrees; and shall protect and indemnify the Government and its representatives against any claim or liability arising from or based on the violation of any such law, ordinance, safety code, regulation, order, or decree, whether by himself or his employees.

D. Public Convenience and Safety: The contractor shall at all times so conduct his work as to assure the safety and convenience of the general public and the residents along the parkway and to assure the protection of persons and property. Care shall be taken at all times to regulate the operations so as to protect visitors and campers in the park

E. Barricades, Warning Signs, and Other Devices: The contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Suitable warning signs shall be provided to properly control and direct traffic.

Portable construction traffic control devices shall be relocated after each 3000 foot progression of work. During a lane closure, traffic cones/barrels shall be used to delineate the work area. Utilization of all barricades, traffic delineators, warning signs, lights, temporary signals, flagmen and pilot car

07/2020 01599-2 operators and equipment, and other protective devices shall be in accordance with the current edition, Part VI of the Manual on Uniform Traffic Control Devices (MUTCD) for Streets and Highways, published by the U.S. Government Printing Office. Part VI of the manual may be examined by prospective bidders at Natchez Trace Parkway Headquarters, Tupelo, Mississippi. Signing/flagging details, traffic control plans and/or other detailed drawings are included with these specifications.

The contractor shall furnish, erect, maintain, and remove, or otherwise as directed by the COR, all signs shown within the contract documents.

F. “DO NOT PASS”, “NO PASSING ZONE” and “PASS WITH CARE” signs shall be installed at the appropriate locations before any pavement markings are covered by paving operations (when applicable).

PART 4 MEASUREMENT AND PAYMENT

4 .1 Traffic & Safety

No separate payment will be made. Work is considered part of the Statement of Work for Removal of Felled and Hazardous Tree and Limbs due to 2021 Winter Storm on the Natchez Trace Parkway in various counties in Southern Mississippi. Payment for this work along with all other work described in the Statement of Work shall be made per the firm fixed price quoted.

END OF SECTION

01/2020 02912-1

SEEDING, FERTILIZING, AND MULCHING

SECTION 02921

PART 1 GENERAL

1 .1 DESCRIPTION

A. The work of this section consists of seeding, fertilizing, and mulching landscapes with the Natchez Trace Parkway.

1 .2 SUBMITTALS

A. One-cubic-foot sample of mulch, if commercial mulch is used.

1 .3 PRODUCT HANDLING

A. Seed: Deliver in acceptable condition in original, unopened containers.

B. Fertilizer: Deliver in original, unopened containers with analysis, type, and trade name attached.

1 .4 PROJECT CONDITIONS

A. Seed during recommended planting period or as approved.

B. Do not seed during windy weather or when the ground is excessively wet, frozen, snow covered, extremely dry, cloddy, hard pan, or not friable.

PART 2 PRODUCTS

2 .1 FERTILIZER

A. CID A-A-1909, Type I, class 2, with 50 percent of the nitrogen in slowly available form, use a fertilizer with 10-10-10. To be applied at a rate of 500 lbs per acre.

2 .2 SEED

A. A mixture of the following seeds, planted at the rate shown per acre.

Name of Seed September 1st Through

February 28th

LBS/ACRE

March 1st Through August 31st

LBS/ACRE

Bermudagrass, common (unhulled) 20 30 White Clover 25 30 K31 – Tall Fescue 40 25 Annual Ryegrass 15 15

TOTAL SEED 100 100

2 .3 WATER

A. Clean, fresh, free from harmful substances.

01/2020 02912-2

2 .4 MULCH

A. Hydraulic mulch consisting of 100% postconsumer recovered content paper or 100% total recovered content wood/paper, which conforms to the requirements of EPA Comprehensive Procurement Guidelines (CPG), shall be used.

PART 3 EXECUTION

3 .1 BED PREPARATION

A. Grade the seeding area to line and grade. Remove weeds, sticks, stones 2 inches (50 millimeters) in diameter and larger, and other debris detrimental to application, growth, or maintenance of the turf.

B. Apply agricultural limestone or lime at a rate of 3000-4000 pounds per acre to bring the soil pH to

5.5. Follow standard soil testing procedures to determine rate of limestone or lime.

C. Cultivate the seeding area to a minimum depth of 4 inches (100 millimeters) and prepare a firm, but friable seedbed before seeding.

3 .2 FERTILIZING. Apply Fertilizer by the following methods:

(A) Dry method. Incorporate the fertilizer into the upper portion of the seedbed before seeding;

or

(B) Hydraulic method. Add fertilizer to the slurry and mix before adding seed. Apply the seed and fertilizer in one application.

3 .3 SEEDING. Apply Seed by the following methods:

(A) Dry method. Apply the seed with approved power driven seeders, drills, or other mechanical equipment. Hand-operated seeding methods are satisfactory on areas inaccessible to mechanical equipment; or

(B) Hydraulic method. Use hydraulic-type equipment capable of providing a uniform application using water as the carrying agent. Add a tracer material consisting of either wood or grass cellulose fiber mulch to the water. Apply the tracer material at a rate of 400 pounds per acre (450 kilograms per hectare) to provide visible evidence of uniform application. Add the seed to the water slurry no more than 30 minutes before application. Seed by hand areas inaccessible to seeding equipment.

3 .4 MULCHING. If wood chips are used, do not import without approval from the CO. Apply mulch within 48 hours after seeding by the following methods:

(A) Dry method. Spread mulch material, except wood and grass cellulose fibers, by a mulch spreader utilizing forced air to blow the mulch material onto the seeded area. Apply straw or wood cellulose fiber mulch uniformly at a rate of 5000 pounds per acre (½- to 1-inch mat). Anchor the mulch material with an approved tackifier or approved mechanical method. Do not mark or deface structures, pavements, utilities, or plant growth with tackifier; or

(B) Hydraulic method. Apply mulch in a separate application from the seed using hydraulic-type equipment according to Subsection 3.3(B). Apply wood cellulose fiber mulch uniformly at a rate of 2000 pounds per acre (½- to 1-inch mat). Anchor by light disking, cultipacking, walking down with tractor or by use of jute netting.

01/2020 02912-3

(C) Mulch by hand areas inaccessible to mulching equipment.

3 .5 WATERING

A. After mulching, water with a mist spray soaking ground to minimum depth of 2 inches. Water as necessary until grass is established.

3 .6 CLEAN-UP, PROTECTING AND CARING FOR SEEDED AREAS

Upon completion of work, remove debris and leave area in clean, acceptable condition. Protect and care for seeded areas including watering when needed. Repair or apply supplemental applications of seed, mulch, fertilizer, and water as many times as needed until turf is established or final acceptance.

3 .7 ACCEPTANCE

A. The project will not be accepted, until a satisfactory stand of grass is established.

PART 4 MEASUREMENT AND PAYMENT

4 .1 SEEDING, FERTILIZING, AND MULCHING FOR STABILIZED SHOULDER

A. No separate payment will be made. Work is considered part of the Statement of Work for Removal of Felled and Hazardous Tree and Limbs due to 2021 Winter Storm on the Natchez Trace Parkway in various counties in Southern Mississippi. Payment for this work along with all other work described in the Statement of Work shall be made per the firm fixed price quoted.

END OF SECTION

Base Price: (MP 0 - 37.58) Consists of: Task 1: Approx. 20 Trees with Low Limbs

Task 2: Approx. 540 Downed/Felled Trees to be Removed (see estimated quantity schedule below) Task 3: Approx. 200 Hazardous Trees to be Removed (see estimated quantity schedule below) Task 4: Re-establishment of Landscape

Site Restoration where needed, minor/light grading, filling stump holes, seeding and mulching Traffic Control: Temporary Road Closure, Shoulder Closures, One-lane Closures where needed

TOTAL PROPOSED PRICE:

Removal of Felled & Hazardous Trees and Limbs due to 2021 Winter Storm- Natchez District March 2021

PRICE PROPOSAL FORM

GENERAL NOTES:

1. The above quantities are estimates only and the contractor is responsible for visiting the site to verify extent of work to be completed according to the Statement of Work prior to providing a quote.

2. Period of Performance is 90 Working Days total.

3. This is a firm fixed price contract. The total proposed price quoted above shall be for all work described herein including any neccessary materials and/or equipment required to complete all units of the work.

4. Provide a "Unit Price" for each item listed. Proposals with blank unit prices will be considered irregular and non-responsive.

5. In case of descrepancies, the final contract firm-fixed price shall be based on the "Unit Price." Therefore, the "Total Proprosed Price" shall be sum of the "Total" column based on the "Unit Price" per unit quantity for all items listed.

ITEM DESCRIPTION QUANTITY UNIT PRICE TOTAL

1 Limb Removal (per Tree) 20.00 EA 2 Downed Trees (Rootballs removed or stumps ground 541 EA

Standing Trees (Located within Mowing Area) to be cut, removed & stumps ground or left in place/turned upright as provided in SOW) 52 EA

Standing Trees (Located along the Wood Line) to be cut and removed (stump shall remain if not protruding into mow area unless determined otherwise by COR) 100 EA

Standing Trees to be felled (in-place) in wooded area outside of woodline (stumps shall remain- to turned upright as provided in SOW) 58 EA

6 Re-establishment of Landscape 1 LS 7 Traffic Control 1 LS

Natchez District MP 0 - MP 37.58

GENERAL NOTES:

1. END ROAD WORK SIGN NOT REQUIRED FOR

WORK SPACES LESS THAN 1000LF IN LENGTH.

2. PILOT CAR NOT REQUIRED.

MS PMIS 317726/317727 TCP1

WORK SPACES LESS THAN 1000LF IN LENGTH.

2. PILOT CAR NOT REQUIRED.

3. CHANNELIZING DEVICES (CONES/BARRELS) NOT

REQUIRED UNLESS OTHERWISE DIRECTED BY COR.

MS PMIS 317726/317727 TCP2

WORK SPACES LESS THAN 1000LF IN LENGTH.

2. PILOT CAR NOT REQUIRED.

3. CHANNELIZING DEVICES (CONES/BARRELS) NOT

REQUIRED UNLESS OTHERWISE DIRECTED BY COR.

MS PMIS 317726/317727 TCP3