*** LTC PID Packaging Consolidated Text *** PLEASE SEE GLOSSARY AT THE END OF THE DOCUMENT FOR FULL TEXT OF THE ITEM DESCRIPTION

AND PACKAGING REFERENCE NUMBERS CALLED OUT FOR EACH NSN.

NSN:012698849

SEAL ASSEMBLY, SHAFT, SPRING LOADED.

REFERENCE NUMBER:RA001

REFERENCE NUMBER:RQ032

REFERENCE NUMBER:RQ002

REFERENCE NUMBER:RQ009

REFERENCE NUMBER:RQ011

REFERENCE NUMBER:RP001

REFERENCE NUMBER:RT001

REFERENCE NUMBER:ZD064

PER PAGE 26 OF DWG 5773203, ASSEMBLY REQUIRES

PURE CARBON MATERIAL, PROPRIETARY TO MORGAN

ADVANCED MATERIAL CAGE 80894.

DWG 5773203, SHEET 26

REFERENCE NUMBER:ZD080

REFERENCE NUMBER:ZD025

THE MECHANICAL SEAL SHALL BE MANUFACTURED IN ACCORDANCE WITH NAVSEA

5773203, PIECE NO. 10A, DRAWING SHEETS 26 AND 30 WITH THE FOLLOWING

EXCEPTIONS: (1) OUTER SHELL (DETAIL 8-E AND 7-E OF SHEET 30) SHALL BE IN

ACCORDANCE WITH RAM SEAL DRAWING 01-250159 REV B. (2) DRIVE BAND (DETAIL

8-C AND 7-C OF SHEET 30) SHALL BE IN ACCORDANCE RAM SEAL DRAWING

11-250159 REV B (3) SPRING RETAINER (DETAIL 5-C AND 4-C OF SHEET 30)

SHALL BE IN ACCORDANCE WITH RAM SEAL DRAWING 12-250259 REV A. THE SEAL

SHALL CONTAIN AN INSTALLATION KIT TO CONSIST OF THE FOLLOWING:

1 EA. O-RING, P/N 5773203-1.6<(>,<)>

4 EA. O-RING, P/N 5773203-1.7.1<(>,<)>

6 EA. O-RING, P/N 5773203-12.6.4<(>,<)>

2 EA. O-RING, P/N 5773203-1.8.1<(>,<)>

2 EA. O-RING, P/N 5773203-1.9.1<(>,<)>

1 EA. O-RING, P/N 5773203-4.1<(>,<)>

1 EA. O-RING, P/N 5773203-10.11<(>,<)>

6 EA. O-RING, P/N 5773203-12.6.5<(>,<)>

1 EA. P/N 5773203-28 (2 INCH) STEEL SPANNER WRENCH WITH .250 INCH PIN

(FED SPEC GGG-W-665, TYPE 2 GRADE A)

CERTIFICATE OF QUALITY COMPLIANCE APPLIES-DLAD 52.246-9000.

DLAD CLAUSE 52.246-9004, PRODUCT VERIFICATION TESTING IS HEREBY

INCORPORATED, AND MAY BE INVOKED AT THE DISCRETION OF THE PROCUREMENT

ACTIVITY.

REFERENCE NUMBER:CS187

REFERENCE NUMBER:RQ027

CRITICAL APPLICATION ITEM

IAW BASIC DRAWING NR 53711 5773203

REVISION NR G DTD 03/14/2018

PART PIECE NUMBER: 5773203-10A

IAW REFERENCE DRAWING NR 1MCBT 01-250259

REVISION NR B DTD 02/25/2012

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 1MCBT 11-250159

REVISION NR B DTD 02/25/2012

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 1MCBT 12-250259

REVISION NR A DTD 01/25/2012

PART PIECE NUMBER:

PREP FOR DELIVERY

LINE ITEM 00001 TYPE OF COVERAGE: DLA DIRECT, CONUS

PKGING DATA - MIL-STD-2073-1D, 15 DEC 1999

QUP:001 PRES MTHD:10 CLNG/DRY:1 PRESV MAT:00

WRAP MAT:CA CUSH/DUNN MAT:00 CUSH/DUNN THKNESS:0

UNIT CONT:D3 OPI:O

INTRMDTE CONT:DO INTRMDTE CONT QTY:AAA

PACK CODE:U

MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.

SPECIAL MARKING CODE:00 -00 No special marking

PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING

REQUIREMENTS FOR PROCUREMENT

GLOSSARY

PACKAGING TEXT

THE FOLLOWING PARAGRAPH APPLIES TO ALL PACKAGING CALLED OUT IN THIS DOCUMENT:

ITEM DESCRIPTION TEXT

REFERENCE NUMBER RA001

RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS

(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE

DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB

AT:

http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx

FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE

SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE

ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE

APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON

REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.

REFERENCE NUMBER RQ032

RQ032: EXPORT CONTROL OF TECHNICAL DATA

This item has technical data some or all of which is subject to export-control of either the International Traffic in Arms regulations (ITAR) or the Export Administration Regulations (EAR), and cannot be exported without prior authorization from either the Department of State or the Department of Commerce. Export includes disclosure of technical data to foreign persons and nationals whether located in the United States or abroad. This requirement applies equally to foreign national employees and U.S. companies and their foreign subsidiaries. DFARS 252.225-7048 is applicable to this data.

The Defense Logistics Agency (DLA) limits distribution of export-control technical data to DLA contractors that have an approved US/Canada Joint Certification Program (JCP) certification, have completed the Introduction to Proper Handling of DOD Export-Controlled Technical Data Training and the DLA Export-Controlled Technical Data Questionnaire (both are available at the web address given below), and have been approved by the DLA controlling authority to access the export-controlled data. Instructions for obtaining access to the export-controlled data can be found at:

https://www.dla.mil/HQ/LogisticsOperations/EnhancedValidation/

To be eligible for award, offerors and any sources of supply proposed for use are required to have an approved JCP certification and have been approved by the DLA controlling authority to access export-controlled data managed by DLA. DLA will not delay award in order for an offeror or its supplier to apply for and receive approval by the DLA controlling authority to access the export-controlled data.

REFERENCE NUMBER RQ002

RQ002: CONFIGURATION CHANGE MANAGEMENT - ENGINEERING CHANGE PROPOSAL

REQUEST FOR VARIANCE (DEVIATION OR WAIVER)

REFERENCE NUMBER RQ009

RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN

REFERENCE NUMBER RQ011

RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES

REFERENCE NUMBER RP001

RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT

REFERENCE NUMBER RT001

RT001: MEASURING AND TEST EQUIPMENT

REFERENCE NUMBER ZD064

The following Contract Data Requirements Lists (CDRLs), DD Form 1423s, apply to this procurement. Review the Technical Data Package (TDP) for additional information.

REFERENCE NUMBER ZD080

SAMPLING:

THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ

H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE

SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,

STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR

AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF

VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED

ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE

SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER

MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR

PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT

SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT

UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.

REFERENCE NUMBER ZD025

MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL

NOT BE INTENTIONALLY ADDED TO<(>,<)> OR COME IN DIRECT

CONTACT WITH<(>,<)> ANY HARDWARE OR SUPPLIES FURNISHED

UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY

USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED

INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS;

AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA.

PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS

CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN

A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR

MERCURY COMPOUND. (IAW NAVSEA 5100-003D).

REFERENCE NUMBER CS187

CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE

USED NOR INCORPORATED IN ANY ITEMS TO BE

DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION

SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT

DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.

SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR

APPROVAL UNLESS THEY ARE AUTHORIZED BY THE

SPECIFICATION REQUIREMENTS.

REFERENCE NUMBER RQ027

A. Data required by this document will be included in the price of the procured item(s).

B. The supplier shall prepare and furnish one (1) copy of the Certificate of Quality Compliance (COQC) for all delivered supplies. If the supplies delivered under this contract are from more than one manufacturing lot, a separate one (1) copy of the COQC shall be prepared and furnished for each manufacturing lot represented by, manufactured or produced under a product specification, original equipment manufacturer (OEM)/manufacturer's part number, commercial, industry or military standard, or drawings, or other technical data. Each Certificate shall be prepared in accordance with the Supplemental Quality Assurance Provision (SQAP).

C. For contracts assigned for Government inspection at source, the supplier shall have the completed Certificate available for review by the Government representative when the material is presented for acceptance by the Government. The Government representative can sign off on the WAWF receiving report so long as the Contractor complied with the COQC and the documentation is uploaded as an attachment to the Production CLIN in iRAPT.

D. An electronic copy of each COQC, for Government records retention, shall be entered into the Invoicing, Receipt, Acceptance and Property Transfer (iRAPT) system by the supplier via the Attachment tab of the Receiving Report (RR). Instructions for entering Attachments can be found in the iRAPT - Web Based Training Main Menu under "Attachments which can be viewed at https://wawfraid.nit.disa.mil/wawfwbt/xhtml/unaut h/web/wbt/wawfra/Attachments.xhtml. If the supplier offering the material to the Government is not the manufacturer of the material, the supplier is responsible for obtaining a certified test report from the manufacturer, including it as part of this COQC, and for demonstrating that the specific material being offered under this Certificate is covered by the certified test report. The data submittal listed above is in addition to the other iRAPT requirements included in this contract. Whenever access to the iRAPT system is limited or not available, the supplier shall notify the PCO and request permission to submit documents manually until the iRAPT system is again available for use. Unless otherwise specified by the contract, the supplier shall be responsible for retaining the Certificate for a period of 4 years. When requested by the Contracting Officer, the supplier shall make the Certificate available for review by the Government at any time during the period the Certificate is required to be retained.

E. No Certificate of Conformance (COC) or alternate release is authorized.

End of Requirement