Performance Work Statement (PWS).pdf
PDF 465 KB Posted
- Attached to
- Video Wall Display Solution Federal contract opportunity
- Solicitation number
- FA521522Q0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA521522Q0005 Clauses.pdf | ||
| Salient characteristics.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE-BASED WORK
STATEMENT (PWS)
FOR
15 Wing IWOC Tech Refresh
15 WG/XP
16 December 2021
1. General Scope of Work I. Contractor will deliver, unpack and perform installation of all equipment, interconnecting cables, adapters and terminations to installed cables unless otherwise noted. Provide on-site support for configuration of video wall processor and associated video encoders, ensuring system functionality. All equipment is to be installed in the existing owner furnished equipment racks.
Power distribution and UPS units will be mounted inside of the equipment racks.
II. Contractor will provide a video wall processing system. This will allow the workcenter to display multiple video sources simultanesouly onto the wall in any configuration. The system will consist of a 7 card slot video processor populated with the following video cards: 1 4K-K Output, 1 4K-DE Input, 1 4K-D Input and 1 Sclae 4 Appliance. Additionally, the contractor will deliver and install a rack mounted user interface (KVM) to be installed adjacent to the processor system that will provide direct access to the video wall processor for system monitoring and configuration of the Alpha processor.
III. The video wall processors, control points, software and device control hardware will be integrated on an isolated network for security purposes. The contractor will provide a stand-alone out of band network to support the system providing the necessary control and streaming networks. This will be properly pre-configured prior to delivery.
IV. The contractor will install and commission a video wall consisting of displays in the arrangements as defined. The wall will be mounted at the height and width as detailed in drawings/renderings provided to the owners as part of the construction drawing package. 6 55” LCDs will be configured in a 3 wide x 2 high with bezels not to exceed 2mm and a brightness of no less than 500 nits. The contractor will install the wall panels on front accessible mounts, allowing the video wall to be serviced from the front.
V. The contractor will provide and install 1 compact LED signage displays in and around the room. This will provide the owner the ability to show the current status of the room. The content on the display will be custom programmed in software system.
VI. The contractor will provide and install a ControlPoint device. This will be 1 15” no radio touch point. This will provide control aspects to the following devices:
Video Wall, Audio System, Video Conferencing (VTC), CATV/SATV Tuner, LED Signage.
VII. The contractor will install an audio system provided with ceiling speakers. There will be zones driven by an audio amplifire and an audio digital sound processor (DSP) channel. The contractor will program the audio processor to provide discreet audio reinforcement in each zone. There will be 12 6” ceiling speakers, 1 VTC Audio unit, 1 ceiling microphones. Microphone inputs into the system will not be reinforced in the ceiling speakers. Audio for the auxiliary display will be heard through the display speakers. Breakaway audio will not be provided to the auxiliary display.
VIII. The contractor will provide and install a VTC system consisting of 1 remotely operated camera. The Codec hardware will be for the unclassified level. The system will operate on a secured classification network with a remotely operated signal isolator that will optically disconnect the video inputs and outputs to the Codec device to prevent cross-contamination of signals. Soft Codec system will have USB connection to the owner/operator position to allow connection of owner computers for calls. This USB connection will provide video and audio signals over a single cable.
2. Configuration I. The contractor will pre-configure software functionality and device control for all equipment provided. All software functionality, device control, and equipment control will be tested and confirmed by the contractor’s technicians prior to shipment.
II. The contractor’s field technicians will confirm proper functionality of the video wall, video wall processor, audio systems, and all peripheral devices as outlined in this scope of work. Basic software functionality and control will be configured by the installation team and confirmed with the owner/operator. If advanced on-site commissioning is required, installer may offer to have a contractor technician on-site at the end of the installation to perform advanced software programming, integration and commissioning. On-site commissioning will be provided for a daily fee, and will be offered as a line item on the quote provided.
3. Training I. The contractor will spend and coordinate up to 4 hours performing an overview of the installed equipment, its current configuration and other tips that can only be accomplished on the installation site. This will serve as a “hands-on” training session with the installation technicians. This training will be scheduled for the final day or day after full installation completion at the site.
4. Logistics I. The contractor will provide freight FOB to project site. They will facilitate inside delivery of components as required per local site security requirements. Work will be done during normal business hours Monday through Friday on contiguous days, except federal holidays. Daily hours of work are expected to be within 8:00am to 4:00pm. The on-site integration manager and/or site lead may adjust daily work hours with on-site customer personnel, as necessary. Any customer delay, such as physical and/or information assurance issues, access to space, unavailability of customer furnished equipment, may cause a change in the schedule and/or cost. In the event of delays for such reasons, a revised schedule will be coordinated with the appropriate customer point of contact. All hardware and materials will stage at the contractor facilities and delivery to work site will be coordinated with customer point of contact or responsible office.
5. Documentation I. Upon completion of training, the contractor will provide 2 soft copies on disk
(CD- or DVD-ROM) format to include the following:
i. As-Built Drawings including:
1. Minimum of 11”x17” sized appropriately to show a complete representation of the system.
2. Schematic detailed wiring diagrams for video, audio and control showing interconnection of provided components, wiring and cabling diagrams depicting cable types and device designators.
Each component will have a unique designator and use same designator throughout the project. Additionally, equipment rack elevation details and requested facility layout modification plans will be provided.
3. Complete labeling schemes for all cabling and equipment components for project. All labeling will be consistent within the project scope.
ii. Final Equipment List with quantity and Serial Numbers
iii. Project sign-off with itemized delivery receipt
6. Security I. The contractor shall follow existing security procedures and isntructions applicable to Joint Base Pearl Harbor Hickam, HI. The contractor shall be responsible for the physical security of all materials, supplies and equipment, including property that they are utilizing.
II. Pass Requirements: The contractor is responsible for providing the contracting officer with a list of company personnel that will be used to execute the contract.
The list must contain the following information on each person:
i. Full Legal Name
ii. Official Driver’s License Number
iii. The length of time or time period during which the individual will require a pass.
III. The contractor is responsible for providing the Contracting Office with the descriptions of any vehicles to be used during the execution of the contract to include:
i. Make
ii. Model
iii. License Plate Number
iv. Year
v. Color
IV. The contractor shall follow all applicable security escort instructions.
16 September 2005
PERFORMANCE-BASED WORK STATEMENT
TABLE OF CONTENTS
SECTION PAGE
1 DESCRIPTION OF SERVICES 3
2 SERVICES SUMMARY 3
3 GOVERNMENT FURNISHED PROPERTY AND SERVICES 3
4 GENERAL INFORMATION 3/9
5 APPENDICES 10
1. DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to operate and maintain (INSERT SPECIFIC
REQUIREMENTS.)
1.1. BASIC SERVICES.
1.2. SPECIAL REQUIREMENTS.
2. SERVICES SUMMARY.
Performance Objective SOW Para Performance Threshold (Service Required) (Corresponding
Para) (This is a standard to determine if the service is acceptable or unacceptable use a percentage or number of deviations per month)
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES. (LIST GOVERNMENT
FURNISHED PROPERTY/SERVICES/EQUIPMENT, ETC.)
4. GENERAL INFORMATION.
4.1 Security Requirements. (NOTE: USE ONLY APPLICABLE PORTIONS OF THE
PARAGRAPHS BELOW. ALLOW SUFFICIENT TIME BETWEEN CONTRACT AWARD
AND CONTRACT START DATE TO COVER THE SECURITY CLEARANCE PROCESSING
TIMES.)
4.1.1. The contract administrator shall complete a "Request for Identification Credential (AFMC Form 496)" for each employee of the contractor requiring access to JBPHH. The requests shall be submitted to Pass and Registration (Visitors Center).
4.1.2 The contract administrator shall complete an “Unescorted Entry Authorization Certificate” (AF Form 2586) for each employee requiring entry into controlled areas. The request shall be submitted to Pass and Registration (Visitor Center).
4.2 QUALITY CONTROL.
4.2.1. Quality Control Program. In compliance with the clause entitled “Inspection of Services”, 52.246-4, the contractor shall establish a complete Quality Control Program to ensure the requirements of this contract are provided as specified. (NOTE: THE GOVERNMENT WILL
ASK FOR THE ORIGINAL COPY OF THE QUALITY CONTROL PLAN AT THE
PREAWARD SURVEY (OR AS A PART OF THE TECHNICAL PROPOSAL IN
NEGOTIATED CONTRACTS) AS A PRECONTRACT REQUIREMENT. SUBMISSION OF
THE ORIGINAL COPY SHOULD NOT BE MENTIONED HERE, BUT SHOULD BE SHOWN
IN A SOLICITATION PROVISION AS A REQUIRED PREAWARD SURVEY OR
TECHNICAL PROPOSAL SUBMISSION.) The contracting officer will notify the contractor of acceptance or required modifications to the plan before the contract start date. The contractor shall make appropriate modifications (at no additional costs to the government) and obtain acceptance of the plan by the contracting officer before the start of the first operational performance period.
(NOTE: AMEND THE TIMES FOR SUBMISSION AS APPROPRIATE FOR THE
ACQUISITION; THE TIMES MUST ALLOW FOR ACCEPTED PLAN BEFORE THE FIRST
DAY OF THE FIRST OPERATIONAL PERFORMANCE PERIOD UNLESS THE CHIEF OF
THE CONTRACTING OFFICER AND THE FUNCTIONAL DIRECTOR/FUNCTIONAL
COMMANDER HAVE MADE A WRITTEN DETERMINATION FOR THE CONTRACT FILE
THAT THE URGENCY OF CONTRACT START PRECLUDES ACCEPTANCE OF THE
PLAN BEFORE THE FIRST DAY OF THE FIRST OPERATIONAL PERFORMANCE
PERIOD).
4.3 QUALITY ASSURANCE. The government will periodically evaluate the contractor’s performance by appointing a representative(s) to monitor performance to ensure services are received. The government representative will evaluate the contractor’s performance through intermittent on-site inspections of the contractor's quality control program and receipt of complaints from base personnel. The government may inspect each task as completed or increase the number of quality control inspections if deemed appropriate because of repeated failures discovered during quality control inspections or because of repeated customer complaints.
Likewise, the government may decrease the number of quality control inspections if merited by performance. The government will also investigate complaints received from various customers located on the installation. The contractor shall be responsible for initially validating customer complaints. However, the government representative shall make final determination of the validity of customer complaint(s) in cases of disagreement with customer(s).
4.3.1 Quality Assurance Personnel (QAP):
4.3.2 The Quality Assurance Personnel (QAP(s) is the authorized government representative(s) who will perform assessments of the contractor’s performance. Subsequent to contract award, the identity of the QAP(s), with a letter defining their duties and authority will be promptly furnished to the successful bidder/offeror.
4.3.3 The QAP(s) or alternate(s) will inform the contract manager in person when discrepancies occur and will request corrective action. The QAP(s) or alternate(s) will make a notation of the discrepancy on their surveillance checklist with the date and time the discrepancy was noted and will request the contract manager (or authorized representative) to initial the entry on the checklist.
4.3.4 Any matter concerning a change to the scope, prices, terms or conditions of this contract shall be referred to the Contracting Officer and not to the QAP(s).
4.3.5. The services to be performed by the contractor during the period of this contract shall at all times and places be subject to review by the Contracting Officer or authorized representative(s).
4.4. PHYSICAL SECURITY. The contractor shall be responsible for safeguarding all government property provided for contractor use. At the close of each work period, government facilities, property, and materials shall be secured. .
4.4.1. Key Control. The contractor shall establish and implement methods of ensuring that all keys/key cards issued to the contractor by the government are not lost or misplaced and are not used by unauthorized persons. (NOTE: ALL REFERENCES TO KEYS ALSO INCLUDE KEY
CARDS. NO KEYS ISSUED TO THE CONTRACTOR BY THE GOVERNMENT SHALL BE
DUPLICATED. THE CONTRACTOR SHALL DEVELOP PROCEDURES COVERING KEY
CONTROL THAT SHALL BE INCLUDED IN THE QUALITY CONTROL PLAN. SUCH
PROCEDURES SHALL INCLUDE TURN-IN OF ANY ISSUED KEYS BY PERSONNEL
WHO NO LONGER REQUIRE ACCESS TO LOCKED AREAS).
4.4.1.1. The contractor shall immediately report the occurrences of a lost of duplicate key to the contracting officer.
4.4.1.2. In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon written direction of the contracting officer, rekey or replace the affected lock or locks; however, the government, at its option, may replace the affected lock or locks or perform rekeying. When the replacement of locks or rekeying is performed by the government, the total cost of rekeying or the replacement of the lock or locks shall be deducted from the monthly payment due the contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the government and the total cost deducted from the monthly payment due the contractor.
4.4.1.3. The contractor shall prohibit the use of keys issued by the government by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contractor’s employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.
4.4.2. Lock Combinations. (NOTE: OPTIONAL DEPENDING ON LOCAL
REQUIREMENTS). The contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the contractor’s Quality Control Plan.
4.5. HOURS OF OPERATION.
4.5.1. Normal Hours of Operation. The contractor shall perform the services required under this contract during the following hours: (NOTE: LIST NORMAL WORK WEEK
AND HOURS (E.G., “MON - FRI, 0800-1700, EXCEPT FEDERAL HOLIDAYS,” “24 HOURS
DAILY INCLUDING FEDERAL HOLIDAYS,”, ETC.) PROVIDE THE CONTRACTOR THE
WIDEST RANGE OF WORK HOURS POSSIBLE FOR FLEXIBILITY OF WORKFORCE
MANAGEMENT). The contractor may work, with prior approval of the Contracting Officer, extended hours to ensure timely completion of work at no additional cost to the government.
4.5.1.1. Recognized Holidays. The contractor is not required to provide service on the following days: New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Days, Thanksgiving Day and Christmas Day. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.
4.5.2. Emergency Services. On occasion, services may be required to support an activation or exercise of contingency plans outside the normal duty hours described above. The contractor’s responsibilities for emergency support are described in Section 1.
4.6. CONSERVATION OF UTILITIES. The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions which prevent the waste of utilities which include the following:
4.6.1. Lights shall be used only in areas where and when work is actually being performed.
4.6.2. Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by the contractor or by contractor employees unless authorized.
4.6.3. Water faucets or valves shall be turned off after the required use has been accomplished.
4.6.4. Government telephones shall be used only for official government business.
4.7. RECORDS. The contractor shall be responsible for creating, maintaining, and disposing of only those government required records that are specifically cited in this SOW or required by the provisions of a mandatory directive listed in (LIST APPLICABLE APPENDICE), Applicable Publications and Forms. If requested by the Government, the contractor shall provide the original record, or a reproducible copy of any such record within five working days of receipt of the request.
4.8. ENVIRONMENTAL CONTROLS:
4.8.1. Compliance with Laws and Regulations. The contractor shall be knowledgeable of and comply with all applicable Interstate, Federal, State, and Local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws come into effect. If there is an increase or decrease in cost as a result of the change, the contractor shall inform the Contracting Officer pursuant to notice requirements and negotiate a modification to the contract.
4.8.2. Material Storage and Use. The contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling. This includes hazardous materials.
4.9. GOVERNMENT OBSERVATIONS. Government personnel, other than contracting officers (COs) and quality assurance personnel (QAPs), may from time-to-time, with CO coordination, observe contractor operations. However, these personnel may not interfere with contractor performance or make any changes to the contract.
4.10. SAFETY REQUIREMENTS. In performing work under this contract, the contractor shall:
4.10.1. Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.
4.10.2. Take such additional immediate precautions as the contracting officer may reasonably require for safety and mishap prevention purposes.
4.10.3. Develop and provide at the start of the orientation period or the start of the first operational performance period (if there is no orientation period) a safety plan for the protection of government facilities and property and to provide a safe work environment for contractor personnel. (NOTE: FOR NEGOTIATED CONTRACTS, RESERVE THIS PARAGRAPH AND
REQUIRE BIDDERS TO INCLUDE THE SAFETY PLAN IN THEIR TECHNICAL
PROPOSALS IF APPLICABLE.)
4.10.4. Provide protection to government property to prevent damage during the period of time the property is under the control or in possession of the contractor.
4.10.5. Include a clause in all subcontracts to require subcontractors to comply with the safety provisions of this contract as applicable.
4.10.6. Record and report promptly (within one hour) to the contracting officer or designated government representative (GR), all available facts relating to each instance of damage to government property or injury to either contractor or government personnel.
4.10.7. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the contracting officer.
4.10.8. If the government elects to conduct an investigation of the accident/mishap, the contractor shall cooperate fully and assist government personnel in the conduct of investigation until the investigation is completed.
4.10.9. Include a clause in each applicable subcontract requiring the subcontractor's cooperation and assistance in accident reporting and investigation.
(NOTE: SPECIFIC SAFETY REQUIREMENTS, TAILORED TO THE FUNCTION UNDER
STUDY OR BEING COMPETED BETWEEN CONTRACTORS SHOULD BE SET OUT IN A
“SAFETY REQUIREMENTS” TECHNICAL EXHIBIT.)
4.11. TRAINING (NOTE: LIST SPECIAL TRAINING AN EMPLOYEE MUST POSSESS
OR RECEIVE TO BE EMPLOYED. SPECIFY ANY TRAINING RECORDS THAT MUST BE
MAINTAINED BY THE CONTRACTOR. SPECIFY WHAT TRAINING THE
GOVERNMENT WILL PROVIDE AND, IF APPLICABLE, WHAT TRAINING THE
CONTRACTOR SHALL PROVIDE. CONTRACTOR COMPLIANCE WITH MANDATORY
TRAINING AND CERTIFICATION REQUIREMENTS FOR CONTRACTOR EMPLOYEES
MAY BE INCLUDED AS A LINE ITEM IN THE SDS.)
4.12. SPECIAL QUALIFICATIONS. (NOTE: INSERT ANY ADDITIONAL SPECIAL
CERTIFICATIONS OR REQUIREMENTS FOR EMPLOYEES IF DEEMED NECESSARY.)
4.13. PARTNERING AGREEMENT. (OPTIONAL) The contracting officer may require a partnering agreement between the government and the contractor to ensure joint cooperation and a sound partnership of all parties involved in the execution of this contract. Partnering is the creation of a government-contractor relationship that promotes achievement of mutually beneficial goals. It involves an agreement in principle to share the risks involved in completing the project and to establish and promote a nurturing partnership environment. Representatives from each organization are encouraged to participate in developing the partnering agreement. Suggested representation is the civil engineer manager, the government inspector, the government contract administrator, the contractor’s manager and the contractor’s quality control person. All costs for the partnership agreement should be shared equally between the government and contractor. This group is responsible for developing a formal partnering agreement that should be signed by all parties involved. The agreement should contain as a minimum: specific goals to be reached and a list of objectives to reach the goals, a set of metrics to evaluate the objectives, a frequency for meetings to review the metrics, and a statement of cooperation to execute the terms of the agreement. (NOTE: INSTALLATIONS MAY WANT TO REQUIRE AN INDEPENDENT
MEDIATOR.)
4.14 CONTINUATION OF ESSENTIAL DOD CONTRACTOR SERVICES DURING
CRISIS IAW DoDI 3020.37
(IDENTIFY SERVICES DETERMINED TO BE ESSENTIAL FOR PERFORMANCE DURING
CRISIS ACCORDING TO DODI 3020.37 (click here). FOLLOW THE INSTRICTIONS
PROVIDED (PARA 6) TO PROPERLY DOCUMENT THE INFORMATION IN YOUR
CONTRACT/PWS. IT IS THE RESPONSIBILITY OF THE FD/FC TO MAKE THE
DETERMINATION. IF THE REQUIREMENT IS NOT ESSENTIAL ADD THE FOLLOWING
STATEMENT UNDER THIS HEADING). IAW AFI 63-124, para 2.7.1, and DODI 3020.37 this requirement is not considered mission essential.
4.15 PHASE OUT:
4.15.1 If there is a change in contractor or if the operation reverts to in-house, the incumbent contractor will provide familiarization, to the government or the follow-on contractor, whichever the case may be. During the phase-out familiarization period, the incumbent will be fully responsible for the operation of .
4.15.2 The government reserves the right to conduct site visits in all contractor operated facilities in conjunction with the solicitation of offers for the follow-on contract. In the event the follow-on contract is awarded to other than the incumbent, the incumbent contractor will cooperate to the extent required to permit an orderly change over to the successful contractor. With regard to the successor contractor’s access to incumbent employees, a recruitment notice may be placed in each facility.
4.16 PUBLICATIONS:
4.16.1 Compliance with all publications, regulations and operating instructions provided by the Government is required when:
4.16.2 They pertain to the procedures for materials expediting herein and where the contractor is authorized by the statement of work to accomplish the work specified in the publication, regulation or operating instructions.
4.16.3 The publications prescribe USAF policies, use of materials, procedures and processes applicable to the work requirements.
4.16.4 The contractor is required to acquire and work on the latest version of the publication
5. APPENDICES
A. Acronyms & Abbreviations List
B. Estimated Workload Data
C. Maps and/or Site Plans
D. Government Furnished Property/Services/Equipment
E. Publications/Forms
(NOTE: ADD ANY OTHER APPENDICES THAT MAY BE NEEDED)
APPENDIX A
ACRONYMS AND ABBREVIATIONS LIST
Acronym/Abbreviation Definition
AF Air Force
AFB Air Force Base
CFR Code Federal Regulation
CO Contracting Officer
DEPT Department
DOD Department of Defense
FAR Federal Acquisition Regulation
GR Government Representative
OSHA Occupational Safety and Health Act
PBSA Performance Based Service Acquisition
PWS Performance-Based Work Statement
QA Quality Assurance
QAP Quality Assurance Personnel
QCP Quality Control Program
SS Services Summary
USAF United States Air Force
(NOTE: TAILOR TO WHAT IS REFERENCED IN YOUR PWS, INCLUDE TECHNICAL
TERMS)
APPENDIX B
ESTIMATED WORKLOAD DATA
ITEM
NAME
ESTIMATED QUANTITY
(NOTE: ADD OTHER WORKLOAD DATA AS CONSIDERED APPROPRIATE.)
APPENDIX C
MAPS AND/OR SITE PLANS
SUGGESTED MAPS ARE:
AUTHORIZED GATE ENTRY POINTS
BASE MAP OF ALL PERTINENT OFFICES
(NOTE: ADD MAPS/PLANS AS CONSIDERED APPROPRIATE.)
APPENDIX D
GOVERNMENT FURNISHED PROPERTY/SERVICES/EQUIPMENT
POSSIBLE ITEMS ARE:
(NOTE: ADD DATA AS CONSIDERED APPROPRIATE.)
APPENDIX E
PUBLICATIONS/INSTRUCTIONS
Applicable SOW Publication/Instruction /Name Date Paragraph/Chapter Paragraph
(NOTE: WHEN ENTIRE PUBLICATION IS REQUIRED/MANDATORY PUT (ENTIRE
DOCUMENT APPLICABLE) INSTEAD OF CITING PARAGRAPH OR CHAPTER)
File details come from the government source that posted it. Updated .