Performance Work Statement.pdf

PDF 2 MB Posted

Attached to
BLRI 2020A CYCLIC VISTA CLEARING-VA Federal contract opportunity
Solicitation number
140P5320R0032
Issued by
Department of the Interior National Park Service Southeast Region

View the file

Other files for this federal contract opportunity

Other files attached to BLRI 2020A CYCLIC VISTA CLEARING-VA, newest first.
File Type Posted
Sol_140P5320R0032_Amd_0001.pdf PDF
Sol_140P5320R0032.pdf PDF
SCA Wages Attachment 2.pdf PDF
7A Bid Sheet 2020 BLRI Cyclic Vista Clearing.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

2020A Clearing Scenic Vistas in Virginia

Blue Ridge Parkway

Blue Ridge Parkway National Park Service

Department of the Interior 199 Hemphill Knob Road

Asheville, North Carolina 28803

Clearing Scenic Vistas in Virginia Page 2 Performance Work Statement (PWS)

Blue Ridge Parkway FY2021

1. Background

The Blue Ridge Parkway is a 469-mile scenic highway that provides views from the many scenic vistas of the mountain ranges in Virginia. Most vistas are located on remote, steep, vegetated, and or rocky mountain slopes at various elevations. The services to be provided within this Performance Work Statement (PWS) consist of clearing scenic vistas along the Blue Ridge Parkway at designated locations in Virginia. These services include cutting trees, shrubs, brush, briars and vines within specified depths of designated vistas, along with some application of herbicide in specified areas, to provide vistas with clear and unobstructed views.

The requirements in this PWS continue the vista maintenance cycle begun in 2011 to lessen the impact on native species, the Northern Flying Squirrel, and reduce or slow down the growth of invasive plants at vista sites. The new approach also provides latitude in reshaping and redirecting visitor views to enhance the scenic experience and reduce degraded views adjacent development that may be impacting the view shed.

There are three basic types of scenic vistas along the Blue Ridge Parkway:

• Parking Vistas (Overlooks) (PV): Views from roadside parking areas often referred to as overlooks. These vistas may include the roadside areas on either or both sides of the parking area or the area across the Parkway from the parking area.

• Roadside Vistas (RSV): Views from the roadside that are areas immediately behind the grass shoulder, guardrails and rock walls and are primarily viewed through the windshield of a moving vehicle.

• Canopy/Axial Vistas (CAV): Roadside views through stands of trees and shrubs. May also be views from a parking overlook or utilized to enhance a shrub or grass bay area.

2. Key Government Personnel

• Contracting Officer (CO): the only person with authority to enter into, administer, modify and/or terminate the contract.

• The Contracting Officer’s Representative (COR): a program official designated by the

CO to assist in administering technical aspects of the contract. The COR cannot modify the contract.

• Project Inspector (PI): a program official designated by the CO to assist the COR with day-to-day documentation of contract activities and other contract administration activities. The PI cannot modify the contract.

3. Location and Access

Location: Approximate vista locations are listed on the attached Vista Logsheets by Parkway milepost to the nearest tenth. Contractor must verify all locations prior to starting work and confirm with COR as needed.

Clearing Scenic Vistas in Virginia Page 3

Blue Ridge Parkway FY2021

Access: Access to the work sites shall be via the nearest state road intersecting the Blue Ridge Parkway. Access is subject to variable road conditions, Parkway road closures and the ability to access the sites safely.

4. Required Services

A. PERFORMANCE REQUIREMENTS SUMMARY (PRS): The Contractor performance requirements are summarized into the major required services that define successful contract completion. The performance standard identifies the minimum acceptable levels of service allowed.

Performance Objective PWS Reference

Performance Standard/Threshold

Surveillance Method

Incentive/Remedy

Cut designated vegetation to prescribed depth and proper height, and lay flat and parallel to ground, according to PWS and Vista Log Sheet

Para 1-1;

2-5;

100% compliance/ Without Deviation

COR

Acceptance

All rework and/or restoration shall be accomplished by contractor at no additional cost to the government;

Performance will be annotated in the CPARS Rating

Treat cut stubs with designated herbicide immediately after cutting stem or trunk according to PWS and Vista Log Sheet

Para 1-1;

2-5;

100% compliance/ Without Deviation

COR

Acceptance

All rework shall be accomplished by contractor at no additional cost to the government;

Performance will be annotated in the CPARS Rating

Compliance with safety, traffic & environmental standards per federal, state, NPS regulations and as required within the PWS

Para 1-6;

Para 2-4

100% compliance/ Without Deviation

Random Inspection

Performance will be annotated in the CPARS Rating

Protection of natural resources and protected plant and animal species

Para 1-6 100% compliance/ Without Deviation

Random Inspection

Cutting of plants not identified to be cut per the contract or vista log instructions will result in a 50% reduction in payment for the vista. Performance will be annotated in the CPARS Rating

Clearing Scenic Vistas in Virginia Page 4

Blue Ridge Parkway FY2021

B. SCHEDULING:

1. No vista clearing work shall be performed between dusk and dawn.

2. At least 14 days prior to starting work, the Contractor shall submit a proposed schedule for vista cutting indicating what dates each vista will be cut. The Park will review for compliance with timing of natural resource requirements. The Park may require revision of the schedule to meet these natural resource requirements or elimination of certain vistas from the work.

C. TRAFFIC CONTROL:

The Contractor shall provide all necessary personnel and equipment to maintain safe traffic flow through the work area.

1. Staging:

a. Staging and parking for vehicles, equipment and materials shall be confined to paved overlooks and parking areas.

b. Other staging areas may be approved by the CO upon request to the COR.

2. Signs:

a. All signage must conform to Manual on Uniform Traffic Control Devices (MUTCD) requirements.

b. If permitted, when vehicles or personnel are staged on the road shoulder, warning signs (WORKERS AHEAD) with advisory speed limit signs (25 MPH) shall be placed along the mainline Parkway road 500 feet in advance of the work zone to alert drivers approaching from either direction.

c. Staging in grassy bays or paved overlooks, away from road shoulder, does not require signage.

3. Traffic Delays: No traffic delays will be permitted without a request submitted for approval by the COR at least five days in advance.

D. CLEARING:

1. Vista Logsheets:

a. The vistas to be cleared are specified on the Vista Logsheets which is attached to these contract requirements. The Vista Logsheets identifies each vista by an identification number, milepost number, vista type, location on the Parkway (left or right side of Parkway from a parkway north to south orientation), cut length and depth.

b. In addition to the following general and vista type clearing standards, there is information for each vista relating to cutting standards, clearing limitations and specific instructions given in the Special Instructions column of the Vista Logsheets.

The Special Instructions provide information on the extent of clearing, depth of clearing and type of vegetation to clear for each site.

c. Please note that sites marked in pink in the Vista Logsheets have been removed from the Vista Clearing Contract.

Clearing Scenic Vistas in Virginia Page 5

Blue Ridge Parkway FY2021

d. There are sites are not to be cleared this year as part of this contract. They are noted in the Special Instructions column as “No contractor work necessary this contract period”.

e. As listed in the Vista Log sheet – Vista Milepost 0 to Milepost 216 (Virginia). The majority of the vistas will be cut to the full 2/3 depth.

2. Seasonal Vista Clearing Limitations: Due to environmental compliance regulations affecting Park resources, the following must be adhered to by the Contractor for successful completion of the required work. No vista clearing work shall be performed in the time periods listed as follows:

a. Virginia - March 1st and August 15th

b. Sites with indicated wetlands and/or T&E species safe dates must be cut during the available timeframe. Restrictions due to the available work window shall be considered in the estimates.

3. Vista Site Work Limits:

a. Each vista width has been marked using PK-nails driven flush in the outer edge of the Parkway motor road, however some nails may have been displaced or are difficult to find.

b. Depth of cut perpendicular to the width for each vista is listed in the attached Vista Logsheets. Most vistas have been previously cut and are identifiable by the open spaces along the Parkway that match the distance noted in the Vista Logsheets.

c. If requested by the Contractor, assistance will be available to determine the start point and end point (width) for specific vistas. These work limits can be reestablished by the Government at the Contractor’s request.

4. Vista Clearing Shape:

a. Generally, vistas are to be tapered on each end from the markers to the full depth of the vista to prolong the view and provide a natural appearance.

b. Long vistas may have an established mature tree line that runs the full cut depth approximately parallel to the roadway between the ends of the tapers.

c. Smaller vistas may have a “v”, semi-elliptical, or irregular shape.

d. The limits of clearing lines should not be perfectly straight but slightly staggered to produce a varied and natural appearance.

5. General Vista Clearing Standards:

a. All vegetation cut shall be left on site to decompose.

b. All vegetation within the limits of the contract shall be cut, de-limbed, and made to lay flat and parallel to the ground unless otherwise specified.

c. Laying flat requires that all vegetation be within 12 inches of the existing grade or brush currently covering the ground except tree trunks and limbs 6 inches in diameter or larger.

d. Final cuts shall be at grade level or no higher than 3 inches above the grade.

e. At vistas where it is noted to retain certain trees or shrubs, the Contractor shall remove all vines from the retained vegetation and then treat any cut vines with herbicide.

Clearing Scenic Vistas in Virginia Page 6

Blue Ridge Parkway FY2021

f. Where Vista Logsheets calls for retention of specimen trees and dogwood, contractor shall visually inspect tree trunks for vines growing up into trees. If vines are present cut out a 12” to 18” section of vine and treat the vine stem with herbicide. Remove vines from vegetation only where specified in the Vista Logsheets from rhododendron and Mt. Laurel.

g. All small trees, brush, vines and other vegetation shall be cut to grade level or no greater than 3 inches above grade level and laid flat and parallel to the ground.

Large vegetation may require additional cuts and de-limbing after falling to meet this requirement.

h. Vegetation should remain where it falls after cutting unless otherwise specified. All fallen vegetation must lie flat. Brush falling on trail or plants shall be removed and randomly placed a minimum of 10 feet below the road shoulder or trail, and flat and parallel to the ground as described above.

i. When brush must be removed, the Contractor has the option of chipping and spreading the brush evenly below the road shoulder or trail at a depth no greater than 4 inches, or hauling the brush off-site for proper disposal.

j. Species to remain include:

• Beech

• Chestnut

• Cucumber magnolia

• Flowering dogwood

• Mountain ash

• Service-berry

• Silver bell

• Deciduous azaleas (example: pinxter flower, swamp azalea, azalea vaseyi, flame azalea)

• All evergreen species (example: mountain laurel, rhododendron, pieris or fetter-bush, leucothoe, fir, spruce, balsam, or holly) other than pine unless otherwise directed in the Vista Logsheets.

k. Refer to the Vista Logsheets for each site’s details. Specific instructions to the contractor require removal of evergreen shrubs and conifer species where the view has been blocked by shrubs and flowering trees. In those locations, instructions state the length and depth of shrubs to be removed. Rhododendron and laurel to be cut shall be chipped and broadcast downslope into the vista or chipped and removed from park lands. The Government can supply assistance with species identification upon receiving a proper advanced request from the Contractor.

6. Specific Type of Vista Clearing Standards:

a. Parking and Roadside Vistas (Standard Cut):

i. Cut all vegetation in accordance with work limits and the general vista clearing standards of the contract.

ii. In designated sites, treat all cut stubs except rhododendron and laurel with the approved herbicide. Check the Vista Log sheets for sites designated to receive herbicide.

iii. The maximum vista area to be cut is defined by the cut length (area between pavement nails) and cut depth (measured perpendicular to the Parkway from the

Clearing Scenic Vistas in Virginia Page 7

Blue Ridge Parkway FY2021 mowed grass edge at the deepest point) shown on the attached Vista Logsheets.

Follow the existing tree line and taper cuts from the road shoulder to the deepest point or to where the tree line is parallel to the Parkway.

b. Canopy/Axial Vistas (Canopy Cut):

i. Cut only the understory (shrubs and trees smaller than 10-inch diameter at breast height (DBH)) and limbs less than 15 feet above the ground near the Parkway to provide a distant view under the trees unless otherwise specified.

ii. In designated sites, treat all cut stubs except rhododendron and laurel with the approved herbicide. Check the Vista Logsheets for sites designated to receive herbicide.

iii. The maximum vista area to be cut is defined by the cut length (area between pavement nails) and cut depth (measured perpendicular to the Parkway from the mowed grass edge at the deepest point) shown on the attached Vista Logsheets.

Follow the existing tree line and taper cuts from the road shoulder to the deepest point or to where the tree line is parallel to the Parkway.

c. Application of Herbicide:

i. The Contractor shall furnish all personnel, equipment and materials required to apply the approved herbicide to the designated vistas.

ii. Herbicide shall be applied by a licensed applicator in accordance with all applicable federal, state and local regulations and with the herbicide manufacturer’s instructions and guidelines.

iii. All vista sites shown on the Vista Logsheets shall have herbicide applied to cut stubs, except those marked with an asterisk in the second column of the Vista Logsheets. Within asterisk designated vistas, herbicide shall be used on all Paulownia & Ailanthus stubs (estimated to be found in approximately no more than 10 percent of vistas in this contract phase).

iv. Apply only in the first 30' of vista depth where herbicide use is authorized. For vines, Ailanthus, and Paulownia, cut and treat with herbicide immediately after cutting to the vista depth stated in the special instructions.

v. Apply the herbicide mixture immediately (no more than 90 seconds) to the freshly cut stubs in the designated vista area. Recommend that stubs are treated prior to stepping away to further cut vegetation. Use a wick applicator or backpack sprayer with a narrow angle nozzle to reduce and control over-spraying and completely coat the cut surface of the stub. Use a wick applicator or backpack sprayer with a narrow angle nozzle to reduce and control over-spraying and completely coat the cut surface of the stub.

vi. All rhododendron, laurel, and conifer stubs are not to be treated.

vii. Garlon 3A herbicide is the approved herbicide for use in this contract. The Garlon

3A shall be mixed with water to obtain a half strength mixture for application.

Add an approved blue dye to the mixture in accordance with the manufacturer instructions.

viii. In freezing conditions, propylene glycol may be added to prevent freezing of the herbicide solution. Ethylene glycol is prohibited.

ix. Do not apply if weather conditions are unsuitable for meeting these requirements per manufacturer instructions.

x. Do not apply herbicide in close proximity to other personnel or designated protected plants.

Clearing Scenic Vistas in Virginia Page 8

E. CLEANUP: Remove any incidental trash and all equipment from the work site each day.

Repair any direct or indirect damage to Government property caused by the Contractor’s personnel or equipment.

5. Safety & Environmental Compliance

A. HEALTH & SAFETY

1. Protection of the Public: The vista sites are in public areas that often receive many park visitors. The Contractor shall provide suitable signs and barriers, barrier tape or barricades necessary to warn people of and protect people from the contract operations.

2. Worker Safety: The Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to all Contractor or Sub-contractor employees on the job. Safety requirements are governed by OSHA regulations. The Contractor and its subcontractor(s) shall provide its employees with the proper personal protection equipment prescribed for the type of work involved. All personal protection equipment shall be maintained in a workable and protective condition. Each worksite shall have readily available the following items: first aid kit; bee sting kit; two-way radios or cellular phones for communications in the remote areas of the Blue Ridge Parkway; and a vehicle available for emergency transportation to a medical facility.

3. Fire Prevention: Contractor shall take all necessary precautions to prevent fire during this contract work. Internal combustion equipment shall be located by the Contractor so that exhausts discharge away from combustible materials. The Contractor shall provide a minimum of one fire extinguisher at the job site that is appropriate for each type of fire that could occur on the job.

4. Contractor Conduct: While at the work site or traveling within in the boundaries of the

Blue Ridge Parkway, the Contractor shall comply with all rules and regulations of the National Park Service governing the park in general and the work site in specific, (specific guidance can be provided upon request).

5. Accident Reporting: Report all accidents on the jobsite to the area Ranger, and COR or

Project Inspector.

Clearing Scenic Vistas in Virginia Page 9

Blue Ridge Parkway FY2021

B. ENVIRONMENTAL COMPLIANCE

1. Air & Water Pollution Control: Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during this contract work. Do not dispose of volatile wastes or oils in storm or sanitary drains.

2. Preservation of Existing Features

a. Confine all operations within the work limits of the project.

b. Exercise special care to maintain natural surroundings undamaged. Protect all existing structures, vegetation, equipment or utilities from damage. All vegetation, structures, equipment, or utilities damaged by the Contractor shall be restored, repaired or replaced by the Contractor to the satisfaction of the CO at no additional cost to the Government.

c. Contractor shall provide a Hazardous Substance Spill Cleanup Plan listing the procedures, equipment and materials to be used to prevent spillage of and provide cleanup of any hazardous substance spills that might occur in the park as a result of the operations of this contract. The plan should address cleanup methods not only for spills along grassed shoulders or adjacent natural ground landscapes, but also along the asphalt surfaces of parking areas and roads. Crews shall have readily available all materials and equipment required to clean up hazardous waste spills as approved in the Hazardous Substance Spill Cleanup Plan.

6. Insurance: Maintain insurance in accordance with the Commonwealth of Virginia regulations. The Government is not responsible for damage to Contractor’s equipment, vehicles, tools or materials or their employees and the personal property brought on-site. The Government will not accept any liability due to contractor employee negligence.

• Workers Compensation: Furnish proof of workers compensation insurance to the CO for those employees performing work related to this contract and comply with the Workman’s Compensation Laws of the Commonwealth of Virginia.

• Liability: Maintain a level of insurance that will protect the contractor and the Government from any claims as a result of bodily injury (including death) and property damage which may arise from and during the performance of this contract, and submit proof of insurance to the CO.

7. Contractor’s Use of Premises: Confine on-site material storage, equipment and vehicle parking, and staging to paved parking areas or other areas specifically designated by the COR. Keep project area neat, orderly and in a safe condition at all times. Provide for daily pickup and disposal of refuse and construction debris. Dispose of waste in a legal manner at private or public approved dumping areas outside the park. Do not burn or bury refuse in the park.

8. Park-Specific Conditions and Limitations:

The Blue Ridge Parkway is wholly located along the ridges of the Appalachian Mountain range in parts of Virginia. The following conditions may be applicable to work sites inside Parkway boundaries:

Clearing Scenic Vistas in Virginia Page 10

Blue Ridge Parkway FY2021

• WEATHER: Sudden and dramatic changes in climate conditions are common. The Contractor must be prepared to alter work plans and provide protection for workers and equipment.

• CLOSURES: Parkway officials may close portions of the Parkway at any time to protect visitors from hazardous conditions or to implement official duties of the Parkway.

• REMOTENESS: Many portions of the Parkway are of extreme distance to typical services available in developed areas, including cellular, food, fuel, and emergency services. The Contractor must arrange and account for appropriate precautions and plans prior to bid submission.

• SITE SECURITY: Nearly all Parkway land is accessible by the public 24-hours a day throughout the year. Parkway law enforcement officers and other staff will not be designated to provide extra security to protect project sites from visitor intrusion.

Therefore, it is the responsibility of the Contractor to take measures to prevent vandalism, theft, or destruction of project materials and equipment. Any proposed security measures that may affect ongoing access or use of areas otherwise not already included in the construction zone (including remote security cameras or alarms) must be approved by the COR prior to use. Any security issues must be reported to the TL immediately upon notice. Parkway law enforcement staff may request official statements or other information from Contractor personnel needed to follow up on reported issues.

• RESOURCES: As a unit of the National Park System, the Blue Ridge Parkway is tasked to preserve unimpaired its natural and cultural resources and values. The Contractor must make every effort to ensure no impacts are made deleterious to these resources. It is expected that the project site and access areas will be minimally impacted only as necessary for the performance of contract requirements. Mitigations approved by the COR will be taken to restore pre-existing conditions.

• INVASIVE EXOTICS: To reduce the chance that harmful, non-native plants or organisms will be transported from off-Park locations to the work site, the contractor, prior to entering the Parkway, must clean all soils, roots, seeds, and other sources of plant parts and pathogens from any equipment used for the application of grasses and all heavy equipment, such as dump trucks, front end loader, and graders, which have previously been operating off the park.

• WILDLIFE: All wildlife is protected within the park boundaries, and some species, which occur within the park, receive special State and Federal protection due to their rare, threatened or endangered status. Very few wildlife species present any danger to persons working within the park. Even species which have the potential to do harm to persons, can usually be avoided. Unless wildlife is presenting an immediate threat to persons, harassment or destruction of wildlife is prohibited.

9. Replacement of Contractor Employee for Security Reasons: The Government retains the right to request removal of the contractor’s employee(s), regardless of prior clearances.

10. Non-Payment for Additional Work: Any additional contractor performed services not specified in contract, either at its own volition or at the request of an individual other than an appointed CO, except as may be explicitly authorized in the contract, shall be performed at

Clearing Scenic Vistas in Virginia Page 11

Blue Ridge Parkway FY2021 the financial risk of the contractor. Only an appointed CO is authorized to bind the Government to a change in specifications, contract terms, or conditions.

11. Conflict of Interest: The contractor shall not employ off-duty COR’s or other Government employees if such employment would create a conflict of interest or be contrary to the policies contained in conflict-of-interest directives utilized by the BLRI.

12. Quality Control: The contractor shall establish and maintain a Quality Control Plan (QCP) to ensure the work performed conforms to the contract requirements. The Performance Requirements Summary establishes performance standards that are the minimum requirements for acceptable performance of required services. The contractor’s QCP shall address methods for remedying poor performance. The Contractor shall develop QCP and submit with proposal package. The Contractor’s QCP includes:

• Required services identified in Performance Requirements Summary

• Contractor’s surveillance methodology

• Method and timeframe for responding to COR or customer complaints

• Progress meetings with Government stakeholders

13. Quality Assurance: The COR will monitor the contractor’s performance under this contract using the quality assurance procedures specified in the Government’s Quality Assurance Surveillance Plan (QASP). The QASP may be modified after contract award upon review and acceptance of the contractor’s QCP to ensure both plans are mutually supportive. The purpose of the QASP is to ensure that the required services are performed in accordance with the contract requirements. The plan ensures reliable and continued operation by precluding unnecessary complaints and unacceptable performance. Government’s QASP includes:

• Acceptance of the contractor’s quality control plan

• Random inspection of the contractor’s work

• Communicating customer complaints

• Progress meetings with the contractor

The implementation of this QASP does not relieve the contractor of its responsibility to implement and abide by the QCP incorporated into this contract, and to provide acceptable performance of all required services listed herein. At the CO’s discretion, the contractor may incur a payment deduction for lack of compliance with the QCP, PWS or PRS.

14. Sustainability: The Contractor will make their best effort to perform required tasks in a method that meets general sustainability goals. These may include reducing waste materials, minimizing climate change practices, improving socio-economic impacts, or other actions relevant to the work involved. Goals and practices should be stated as part for the Contractor’s technical approach.

15. Contractor’s Proposal Package: The following deliverables are to be submitted with offer in response to RFQ (no more than 10 pages including attachments). Include all required and optional items in the proposal package.

Clearing Scenic Vistas in Virginia Page 12

Blue Ridge Parkway FY2021

• Past performance references.

• Technical approach to perform required services.

• Proposed project schedule.

• Contractor’s safety plan.

• Contractor’s Quality Control Plan.

• Hazardous Substance Spill Cleanup Plan.

• Proof of Insurance–Business Liability & Workers Compensation.

• Relevant professional certifications.

16. Inspection and Acceptance:

A. The Government will conduct inspection of services and deliverables throughout contract performance. Final payment will be processed upon confirming that all noted contractor performance deficiencies have been satisfactorily corrected.

B. Any vista not cut completely based on Park inspection will not be paid any partial payment until completed and accepted by the Government.

17. Attached Documentation:

A. Vista Log Sheet – Virginia - Milepost 0 to Mile Post 54.3.

B. Acceptable Vista Clearings.

Clearing Scenic Vistas in Virginia Page 13

ATTACHMENTS

ID No * MILEPOST NAME TYPE LOC. VISTA

LENGTH VISTA DEPTH SPECIAL INSTRUCTIONS

BLUE RIDGE PARKWAY VISTA

LOGSHEET

PKWY Blue Ridge Parkway PV Parking Vista MP Milepost RSV Roadside Vista OL Overlook CAV Canopy-Axial Vista

* Herbicide NOT Approved. Do not treat cut Rhododendron & Conifer R Right on Parkway Traveling South stubs L Left on Parkway Traveling South

Where noted to retain trees or shrubs within vistas contractor to remove vines from retained vegetation & treat cut vines with herbicide where permitted. Cut all Ailanthus and Paulownia in vista & treat with herbicide where permitted immediately after cutting. In vistas with American Chestnut clumps cut all stems dead & alive leave one dominate live stem in each clump. All vegetation except leave species shall be cut, a maximum of 6" above ground surface and treated with herbicide.

I.D. No. * MILEPOST NAME TYPE LOC. VISTA

LENGTH VISTA DEPTH SPECIAL INSTRUCTIONS

0 MP 0.0

1 MP 0.1 - 0.3 AFTON OVERLOOK PV L 1184' 240'

STD. CUT Contractor to cut vegetation in 1st 240' of vista as measured from edge of mowed area. Cut all vegetation within the designated area except for featured large trees at parking area. Begin to reshape vista at north and south end before and after parking area to angle view around curve.

2 MP 0.6 RSV L 595' 200' STD. CUT Contractor to cut vegetation in 1st 200' of vista as measured from edge of mowed area. Cut all vegetation within the designated area treat all cut stubs.

3 MP 1.1 RSV L 357' 170' STD. CUT Contractor to cut vegetation in 1st 170' of vista as measured from edge of mowed area. Cut all vegetation within the designated area treat all cut stubs.

4 MP 1.35-1.65 ROCKFISH VALLEY OVERLOOK, 3 VISTAS:

4A MP 1.4 RSV L 375' 200' South End-375' at North End

STD. CUT Contractor to cut vegetation in 1st 200-375' at north end of vista and 70' along center and south end of vista as measured from edge of mowed area. Cut all vegetation within the designated area treat all cut stubs.

4B MP 1.5-1.6 PV L 555' 350' STD. CUT Contractor to cut vegetation in 1st 350' vista as measured from edge of mowed area. Cut all vegetation within the designated area.

4C MP 1.7 RSV L 470' 250'

STD. CUT Contractor to cut vegetation in 1st 250' of vista as measured from edge of mowed area. Cut all vegetation within the designated area treat all cut stubs. Begin to reshape vista at north end by tapering to deepest point on the south end.

MP 2.9 SHENANDOAH VALLEY OVERLOOK PV R REFERENCE ONLY. (GRASS TO RD. BELOW)

5 MP 3.4 RSV R 350' 200' STD. CUT Contractor to cut vegetation in 1st 200' of vista as measured from edge of mowed area. Cut all vegetation within the designated area treat all cut stubs. Vista edge 50' beyond state road below.

6 MP 3.6 RSV R 537' 100' STD. CUT Contractor to cut vegetation in 1st 100' of vista as measured from edge of mowed area. Cut all vegetation within the designated area treat all cut stubs. Vista edge at state road below.

6A MP 3.95 CAV R 925' 325'

STD. CANOPY CUT- Contractor to begin restoration of this canopy by cutting non-flowering species 6" diameter or less to the dimensions on the contract (125' beyond state road this tapers) keep large trees.

Limb trees over 6" in diameter to a height of 15' above ground.

6b MP 4.1 CAV R 1310' 350' STD. CANOPY CUT- Contractor to begin restoration of this canopy by cutting non-flowering species 6" diameter or less to the dimensions on the contract (150' beyond state road tapers) keep large trees. Limb trees over 6" in diameter to a height of 15' above ground.

7 * MP 6.8 - 7.1 RSV R 1530' 165' STD. CUT Contractor to cut vegetation in 1st 165' of vista as measured from edge of mowed area behind guardrail. Cut all vegetation within the designated area.

8 * MP 7.2 RSV R 760' 180' STD. CUT Contractor to cut vegetation in 1st 180' of vista as measured from edge of mowed area behind guardrail. Cut all vegetation within the designated area.

9 * MP 7.6 - 7.65 RSV R 350' 180'

STD. CUT Contractor to cut vegetation in 1st 180' of vista as measured from edge of mowed area. Cut all vegetation within the designated area. Clear all shrubs on knob and rock outcrop at south end of vista.

Leave Serviceberry, Azaleas, and Mtn. Laurel remove vines if present.

10 * MP 7.7 - 7.8 RSV R 650' 225'

STD. CUT Contractor to cut vegetation in 1st 225' of vista as measured from edge of mowed area. Cut all vegetation within the designated area. Clear all shrubs on knob and rock outcrop at north end of vista.

Leave Serviceberry, Azaleas, and Mtn. Laurel remove vines if present.

11 MP 7.8 RSV R 538' 180'

STD. CUT Contractor to cut vegetation in 1st 180' of vista as measured from edge of mowed area. Cut all vegetation within the designated area treat all cut stubs. Cut and lop large damaged tree in the center of vista.

12 MP 8.8 GREENSTONE OVERLOOK PV R 330' 150' STD. CUT Contractor to cut vegetation in 1st150' of vista as measured from edge of mowed area. Cut all vegetation within the designated area treat all cut stubs.

13 MP 8.9 - 9.0 RSV R 1085' 115'

STD. CUT Contractor to cut vegetation in 1st 115' of vista as measured from edge of mowed area. Cut all vegetation within the designated area treat all cut stubs. Remove all vegetation from rock outcrop at north end.

14 MP 9.1 RSV R 580' 130' STD. CUT Contractor to cut vegetation in 1st 130' of vista as measured from edge of mowed area behind guardrail. Cut all vegetation within the designated area treat all cut stubs.

15 MP 9.5 RSV R 300' 150' STD. CUT Contractor to cut vegetation in 1st 150' of vista as measured from edge of mowed area. Cut all vegetation within the designated area treat all cut stubs.

16 MP 9.6 CAV R 60' 150'

STD. CANOPY CUT Contractor to cut vegetation in entire vista as measured from edge of mowed area.

Treat as a canopy vista and cut all trees and shrubs less than 6"dbh within the designated area. Keep brush from Appalachian trail. Limb large trees to 15' height.

17 MP 10.4 - 10.5 ROCK POINT OVERLOOK PV R 655' 130' STD. CUT Contractor to cut vegetation in 1st 130' of vista as measured from edge of mowed area. Cut all vegetation within the designated area treat all cut stubs.

18 MP 10.7 RAVEN'S ROOST OVERLOOK PV R 235' 75' STD. CUT Contractor to cut vegetation to edge of drop off as measured from face of wall. Cut all vegetation within the designated area treat all cut stubs.

19 * MP 10.9 RSV R 440' 200' STD. CUT Contractor to cut vegetation in 1st 200' of vista as measured from edge of mowed area. Cut all vegetation within the designated area. Remove all vegetation around rock outcrop at north end.

20 MP 11.1 - 11.2 RSV &

CAV R 730' 200'

STD. CUT Contractor to cut vegetation in 1st 200' of vista as measured from edge of mowed area. Cut all vegetation within the designated area treat all cut stubs. Standard canopy cut at south end of vista treat to a depth of 100' cut all trees and shrubs 6" dbh and less. Limb large trees to 15' height.

21 MP 11.7 - 11.8 HICKORY SPRING WIDENING PV R 812' 175'

STD. CUT Contractor to cut vegetation in 1st 175' of vista as measured from edge of mowed area. Cut all vegetation within the designated area treat all cut stubs. Standard canopy cut at south end of vista treat to edge of cliff cut all trees and shrubs 6" dbh and less. Limb large trees to 15' height.

22 MP 12.6 - 12.7 RSV R 1030' 160' STD. CUT Contractor to cut vegetation in 1st 160' of vista as measured from edge of mowed area. Cut all vegetation within the designated area treat all cut stubs.

23 MP 13.1 THREE RIDGES MTN OVERLOOK PV L 540' 350'

STD. CUT This vista was recently restored so vista dimensions have changed. Measure from south end of vista intersection back north. Contractor to cut vegetation in 1st 350' as measured from back of curb or edge of motor road. Treat and remove all vines from rock out crops.

24 MP 13.3 RSV R 611' 130' STD. CUT Contractor to cut vegetation in 1st 130' of vista as measured from edge of mowed area. Cut all vegetation within the designated area treat all cut stubs.

25 * MP 14.1 RSV R 640' 150' STD. CUT Contractor to cut vegetation in 1st 150' of vista as measured from edge of mowed area. Cut all vegetation within the designated area.

26 * MP 14.4 RSV R 259' 220' STD. CUT Contractor to cut vegetation in 1st 220' of vista as measured from edge of mowed area. Cut all vegetation within the designated area.

27 * MP 14.8 RSV R 310' 200' STD. CUT Contractor to cut vegetation in 1st 200' of vista as measured from edge of mowed area. Cut all vegetation within the designated area.

28 * MP 16.6 RSV L 360' 180' STD. CUT Contractor to cut vegetation in 1st 180' of vista as measured from edge of mowed area. Cut all vegetation within the designated area.

28a MP 17.6 THE PRIEST OVERLOOK PV L 1015' 90' STD. CUT Contractor to cut vegetation in 1st 90' of vista as measured from edge of mowed area. Cut all vegetation within the designated area.

29 MP 17.9 RSV R 395' 180' STD. CUT Contractor to cut vegetation in 1st 180' of vista as measured from edge of mowed area. Cut all vegetation within the designated area treat all cut stubs.

30 MP 18.7 - 18.8 RSV L 610' 130' STD. CUT Contractor to cut vegetation in 1st 130' of vista as measured from edge of mowed area. Cut all vegetation within the designated area treat all cut stubs.

31 MP 18.9 - 19.0 20 MINUTE CLIFF OVERLOOK PV L 1085' 120' STD. CUT Contractor to cut vegetation in 1st 120' of vista as measured from edge of mowed area. Cut all vegetation within the designated area treat all cut stubs. At parking area cut to a depth of 50'

32 MP 19.1 RSV L 340' 120' STD. CUT Contractor to cut vegetation in 1st 120' of vista as measured from edge of mowed area. Cut all vegetation within the designated area treat all cut stubs.

33 * MP 19.2 RSV L 470' 100' STD. CUT Contractor to cut vegetation in 1st 100' of vista as measured from edge of mowed area. Cut all vegetation within the designated area.

I.D. No. * MILEPOST NAME TYPE LOC. VISTA

34 * MP 19.9 THE SLACKS PARKING OVERLOOK PV &

CAV R 150' behind curb (Vista) 150'

STD. CUT Contractor to cut vegetation in 1st 150' of vista as measured from edge of mowed area. Cut all vegetation within the designated area. Treat as a canopy vista behind the parking area curb cut all trees and shrubs 6" dbh or less to specified depth of 150'. Limb large trees to 15' height. Treat the entire island between the parkway and the parking area as a canopy vista cut all trees and shrubs 6" dbh or less. Cut area behind picnic table as vista.

34a MP 19.9 THE SLACKS PARKING OVERLOOK CAV R Entire Island Limb large trees to 15' height. Treat the entire island between the parkway and the parking area as a canopy vista cut all trees and shrubs 6" dbh or less.

35 * MP 21.0 RSV L 770' 120' STD. CUT Contractor to cut vegetation in 1st 120' of vista as measured from edge of mowed area down to 60' beyond the top of wall. Cut all vegetation within the designated area.

36 * MP 21.2 RSV L 360' 135' STD. CUT Contractor to cut vegetation in 1st 135' of vista as measured from edge of mowed area. Cut all vegetation within the designated area.

37 * MP 21.3 RSV L 650' 120' STD. CUT Contractor to cut vegetation in the 1st 120' as measured from the bottom of the wall. Cut all vegetation within the designated area.

38 * MP 21.35 - 22.3 6 SMALL VISTAS MARKED AS ONE PAID

SEPERATLY RSV L 3100' 120'

38a * MP 21.35-21.4 RSV 516' 120' STD. CUT Contractor to cut vegetation in the 1st 120' as measured from the edge of mowed area. Cut all vegetation within the designated area.

38b MP 21.4 - 21.5 RSV L 516' 120' STD. CUT Contractor to cut vegetation in the 1st 120' as measured from the edge of mowed area. Cut all vegetation within the designated area treat all cut stubs.

38c MP 21.6 RSV L 516' 120' STD. CUT Contractor to cut vegetation in the 1st 120' as measured from the edge of mowed area. Cut all vegetation within the designated area treat all cut stubs. Treat as a canopy vista and remove all vegetation 6" dbh and less to a depth of 120' near the north end of vista. Limb large trees to 15' height.

38d MP 21.7 - 21.9 RSV L 516' 120' STD. CUT Contractor to cut vegetation in the 1st 120' as measured from the edge of mowed area. Cut all vegetation within the designated area treat all cut stubs.

38e MP 22.0 - 22.1 RSV L 516' 120' STD. CUT Contractor to cut vegetation in the 1st 120' as measured from the bottom of the wall. Remove all deciduous vegetation within the rhododendron. Remove & treat vines if present.

38f MP 22.2 RSV L 620' 120' @ South End & 70' @ North End

STD. CUT Contractor to cut vegetation in the 1st 120'-70' as measured from the bottom of the wall. Remove all deciduous vegetation within the rhododendron. Remove & treat vines if present.

39 MP 22.4 BALD MOUNTAIN OVERLOOK PV R 590' 150' STD. CUT Contractor to cut vegetation in the 1st 150' as measured from the edge of mowed area. Cut all vegetation within the designated area except for flowering species & specimen tree.

40 MP 22.9 FORK MOUTAIN OVERLOOK PV L 308' 180' STD. CUT Contractor to cut vegetation in the 1st 180' as measured from the edge of mowed area. Cut all vegetation within the designated area treat all cut stubs. South end is mowed annually.

41 MP 23.4 RSV L 400' 170' STD. CUT Contractor to cut vegetation in the 1st 170' as measured from the edge of mowed area. Cut all vegetation within the designated area treat all cut stubs.

42 MP 23.7 REMOVE FROM VISTA CONTRACT RSV L 400' 150' NO WORK THIS CONTRACT.

43 MP 23.8 RSV R 450' 120' STD. CUT Contractor to cut vegetation in the 1st 120' as measured from the edge of mowed area. Cut all vegetation within the designated area treat all cut stubs. Leave large white pine.

44 MP 26.0 RSV R 500' 130' STD. CUT Contractor to cut vegetation in the 1st 130' as measured from the edge of mowed area. Cut all vegetation within the designated area treat all cut stubs. Leave large specimen trees within vista.

45 MP 27.9 RSV R 342' 180' STD. CUT Contractor to cut vegetation in the 1st 180' as measured from the edge of mowed area. Cut all vegetation within the designated area treat all cut stubs. Leave large specimen trees within vista.

46 MP 28.0 RSV R 526' 160' STD. CUT Contractor to cut vegetation in the 1st 160' as measured from the edge of mowed area. Cut all vegetation within the designated area treat all cut stubs. Leave large specimen trees within vista.

47 MP 28.1 RSV R 278' 180' STD. CUT Contractor to cut vegetation in the 1st 180' as measured from the edge of mowed area. Cut all vegetation within the designated area treat all cut stubs.

48 MP 32.4 REMOVE FROM VISTA CONTRACT RSV R 450' 125' NO WORK THIS CONTRACT.

49 * MP 33.5 RSV R 540' 200' STD. CUT Contractor to cut vegetation in the 1st 200' as measured from the edge of mowed area. Cut all vegetation within the designated area treat all cut stubs. Leave specimen trees within vista.

50 MP 34.9 REMOVE FROM VISTA CONTRACT RSV R 295' 145' (Measured 300' down drainage) NO WORK THIS CONTRACT.

51 MP 35.45 RSV R 450' 180' STD. CUT Contractor to cut vegetation in the 1st 180' as measured from the edge of mowed area. Cut all vegetation within the designated area treat all cut stubs. Leave specimen tree within vista.

52 MP 35.6 RSV R 479' 75' STD. CUT Contractor to cut vegetation in the 1st 75' as measured from the base of the wall. Cut all vegetation within the designated area treat all cut stubs. Remove all vegetation from rock outcrops.

53 MP 35.8 RSV R 353' 150' @ North End & 200 @ South End.

STD. CUT Contractor to cut vegetation in the 1st 150-200' as measured from the edge of the mowed area.

Cut all vegetation within the designated area treat all cut stubs.

54 MP 35.9 RSV R 317' 175' STD. CUT Contractor to cut vegetation in the 1st 175' as measured from the edge of the mowed area. Cut all vegetation within the designated area treat all cut stubs.

55 MP 36.05 REMOVE FROM VISTA CONTRACT RSV R 344' 190' (Measured 215') NO WORK THIS CONTRACT.

56 MP 36.2 SNAKE DEN HOLLOW RSV R 411' 190' STD. CUT Contractor to cut vegetation in the 1st 190' as measured from the edge of the mowed area. Cut all vegetation within the designated area treat all cut stubs.

57 * MP 36.2 RSV L 150' 50'

STD. CUT Contractor to cut vegetation within the contract dimensions. Treat as a canopy vista cut all vegetation except evergreen vegetation in vista to enhance waterfall. Limb large trees to 15' height. Do not cut Dog Hobble (Leucothoe fontanesiana) in vista.

58 MP 36.7 RSV R 374' 300' STD. CUT Contractor to cut vegetation in the 1st 300' as measured from the edge of the mowed area. Cut all vegetation within the designated area treat all cut stubs. Keep specimen trees within vista.

59 MP 36.9 RSV R 269' 200' STD. CUT Contractor to cut vegetation in the 1st 200' as measured from the edge of the mowed area. Cut all vegetation within the designated area treat all cut stubs. Keep dead snag within vista.

60 MP 37.9 REMOVE FROM VISTA CONTRACT RSV R 300' 175' NO WORK THIS CONTRACT.

61 MP 38.2 RSV R 570' 225'

STD. CUT Contractor to cut vegetation in the 1st 225' as measured from the edge of the mowed area. Cut all vegetation within the designated area treat all cut stubs. Keep all dogwood within vista. Reconfigure vista (reduce length) stop cutting at large pine at north end of vista.

62 MP 38.6 RSV R 290' 150' STD. CUT Contractor to cut vegetation in the 1st 150' as measured from the edge of the mowed area. Cut all vegetation within the designated area treat all cut stubs. Keep all dogwood within vista.

63 MP 38.7 RSV R 585' 260' STD. CUT Contractor to cut vegetation in the 1st 260' as measured from the edge of the mowed area. Cut all vegetation within the designated area treat all cut stubs. Keep all dogwood within vista.

64 MP 38.8 BOSTON KNOB PARKING AREA PV R 360' 175' STD. CUT Contractor to cut vegetation in the 1st 175' as measured from the edge of the mowed area. Cut all vegetation within the designated area treat all cut stubs. Keep all dogwood within vista.

65 MP 39.3 RSV R 371' 150' STD. CUT Contractor to cut vegetation in the 1st 150' as measured from the edge of the mowed area. Cut all vegetation within the designated area treat all cut stubs. Keep specimen tree at south end.

66 MP 39.6 RSV R 445' 150' STD. CUT Contractor to cut vegetation in the 1st 150' as measured from the edge of the mowed area. Cut all vegetation within the designated area treat all cut stubs.

67 MP 39.7 RSV R 524' 150' STD. CUT Contractor to cut vegetation in the 1st 150' as measured from the base of the wall. Cut all vegetation within the designated area treat all cut stubs. Leave specimen tree at end of the wall.

68 MP 39.8 RSV R 350' 150' STD. CUT Contractor to cut vegetation in the 1st 150' as measured from the base of the wall. Cut all vegetation within the designated area treat all cut stubs. Leave specimen trees near parkway.

69 MP 39.9 RSV R 232' 200' STD. CUT Contractor to cut vegetation in the 1st 200' as measured from the edge of the mowed area. Cut all vegetation within the designated area treat all cut stubs. Keep all dogwood within vista.

70 MP 40.5 RSV R 524' 190' STD. CUT Contractor to cut vegetation in the 1st 190' as measured from the edge of the mowed area. Cut all vegetation within the designated area treat all cut stubs. Keep all dogwood within vista.

71 MP 41.8 RSV L 584' 180' STD. CUT Contractor to cut vegetation in the 1st 180' as measured from the edge of the mowed area. Cut all vegetation within the designated area treat all cut stubs. Keep specimen tree within vista.

72 MP 41.85 - 42.0 RSV R 896' 150'

STD. CUT Contractor to cut vegetation in the 1st 150' as measured from the edge of the mowed area. Cut all vegetation within the designated area treat all cut stubs. Keep all dogwood & specimen trees within vista.

Remove all vegetation from rock outcrop

73 MP 42.05 RSV R 375' 150' STD. CUT Contractor to cut vegetation in the 1st 150' as measured from the edge of the mowed area. Cut all vegetation within the designated area treat all cut stubs.

74 MP 42.1 RSV R 424' 120' STD. CUT Contractor to cut vegetation in the 1st 120' as measured from the edge of the mowed area. Cut all vegetation within the designated area treat all cut stubs.

75 MP 42.2 RSV R 320' 100' STD. CUT Contractor to cut vegetation in the 1st 100' as measured from the edge of the mowed area. Cut all vegetation within the designated area treat all cut stubs.

76 MP 42.4 IRISH CREEK VALLEY WIDENING PV R 907' 100'

STD. CUT Contractor to cut vegetation in the 1st 100' as measured from the edge of the mowed area behind the guardrail. At the north end cut 50' deep until vegetation bisects vista. Cut all vegetation within the designated area treat all cut stubs. Keep all dogwood within vista.

77 MP 42.6 RSV R 465' 125'

STD. CUT Contractor to cut vegetation in the 1st 125' as measured from the edge of the mowed area. Cut all vegetation within the designated area treat all cut stubs. Keep all Mtn. Laurel within vista remove vines if present.

78 MP 42.85 CAV R 552' 150' STD. CANOPY CUT- Contractor to cut non flowering species 6" diameter or less to the dimensions on the contract keep large trees. Limb large trees to 15' height.

79 MP 42.9 RSV L 350' 150' STD. CUT Contractor to cut vegetation in the 1st 150' as measured from the edge of the mowed area. Cut all vegetation within the designated area treat all cut stubs.

80 MP 43.0 CAV R 555' 175' STD. CANOPY CUT- Contractor to cut non flowering species 6" diameter or less to the dimensions on the contract keep large trees. Limb large trees to 15' height.

81 MP 43.0 CAV L 555' 200' STD. CANOPY CUT- Contractor to cut non flowering species 6" diameter or less to the dimensions on the contract keep large trees. Limb large trees to 15' height.

82 MP 43.1 CAV R 400' 150' STD. CANOPY CUT- Contractor to cut non flowering species 6" diameter or less to the dimensions on the contract keep large trees.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .