Performance Work Statement.pdf

PDF 283 KB Posted

Attached to
Air Handler Maintenance Federal contract opportunity
Solicitation number
FA8601-20-Q-0092
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Air Handler Maintenance, newest first.
File Type Posted
Synopsitation - FA860120Q0092.pdf PDF
Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I

PERFORMANCE WORK STATEMENT

LIEBERT AIR HANDLER, IN-ROW CHILLER, AND HEAT EXCHANGER

MAINTENANCE

83rd Network Operations Squadron, Operating Location - Alpha

Version 1.0

16 Jan 2020

1.0. INTRODUCTION

The 83rd Network Operations Squadron, Operating Location Alpha (83 NOS OL-A) at Wright

Patterson AFB (WPAFB) requires maintenance support for all Liebert air handlers, in-row chillers, and heat exchanger located in the 83 NOS Det 3 network environment.

2.0. BACKGROUND

The 83 NOS OL-A utilizes various servers to provide core network services to over 150,000 users throughout the Air Force and these servers require cooling from Liebert air handlers, in-row chillers, and heat exchanger as outlined in the Bill of Materials of this contract. 83 NOS OL-A requires maintenance support in order to properly maintain these units. This ensures network equipment operates within acceptable temperature ranges. The subject maintenance support will promote higher system availability during normal operations and faster recovery from failures.

3.0. SCOPE

3.0.1. The contractor shall accomplish Liebert air handler, in-row chiller, and heat exchanger maintenance in accordance with the terms of this Performance Work Statement ("PWS"). The contractor shall respond to all requests for hardware maintenance, to include emergency fix actions, 24 hours per day, 7 days per week, and 365 days per year with a certified Liebert technician arriving on-site within four (4) hours after receipt of the service call. The technician will continue to work on-site until the functionality issue identified in the service call is rectified, or, an alternate time, if such time is designated by the Government in its sole discretion.

3.0.2. The contractor shall perform quarterly preventative maintenance inspections, four (4) total for the duration of this contract, with approximately 90 days between inspections. These inspections will be scheduled during Monday-Friday, 8am - 5pm EST.

3.0.3. The contractor shall provide replacement parts as necessary to maintain air handler, in-row chiller, and heat exchanger system availability.

3.0.4. The contractor shall provide certified Liebert technicians when completing air handler, in row chiller, and heat exchanger maintenance pursuant to this PWS.

3.0.5. The contractor shall maintain a single point of contact for this action, and shall provide contact information for this individual immediately following contract award.

3.0.6. The services provided for in this PWS are essential for performance during crisis pursuant to DODI 3020.37.

4.0. SERVICE DELIVERY SUMMARY

Air handler, in-row chiller, and heat 3.0.1 On site within 4 hours of service exchanger Maintenance shall be call 100% of the time.

accomplished per PWS

Repairs completed within agreed time 100% of the time.

Air handler, in-row chiller, and heat 3.0.2 Periodic Maintenance Inspections exchanger Periodic Maintenance completed four (4) times within

Inspections accomplished quarterly the duration of this contract's period of performance with approximately 90 days between inspections during M-F, 8a-5p

EST.

5.0. CONTRACT SECURITY

The contractor must ensure technicians have access to the locations listed in the Bill of Materials of this contract. See Appendix I of this PWS. The Government shall provide an escort for the contractor at all times while it is performing repairs pursuant to this PWS.

Appendix I

Bill of Materials - LIEBERT AIR HANDLER, IN-ROW CHILLER, AND HEAT

EXCHANGER MAINTENANCE

83 NOS OL-A POC:

MSgt Parker Garrett email: parker.garrett@us.af.mil office: (937) 257-0914

Validated:

16 Jan 2020

Additional requirement(s):

Full maintenance service must include:

• Guaranteed 4-hour response 24 hours/day, 7 days/week

• Emergency service labor and travel coverage

• Parts coverage

• Quarterly (4 total) preventive maintenance visits scheduled Monday-Friday, 8 am - 5 pm

Location:

2721 Sacramento St., Bldg 271

Wright Patterson, OH 45433

Liebert CRC Air Handler

CRD40RC1C3X541

Yl2KBOD015

Liebert In-Row Chiller XDH32DKP-O

XDH32DKP-O

Liebert In-Row Chiller XDH32DKP-O

Liebert ln-Row Chiller XDH32DKP-O

Liebert In-Row Chiller XDH32DKP-0

Liebert In-Row Chiller

Liebert XDP Heat Exchanger

XDPl 6DRA--l mailto:parker.garrett@us.af.mil

Voluntary Protection Program - The Voluntary Protection Program (VPP) promotes effective worksite-based safety and health. In the VPP, management, labor, and OSHA establish cooperative relationships at workplaces that have implemented a comprehensive safety and health management system. Approval into

VPP is OSHA’s official recognition of the outstanding efforts of employers and employees who have achieved exemplary occupational safety and health.

REQUIREMENTS:

Wright-Patterson AFB is in the process of pursuing VPP recognition or has already been recognized under the

OSHA Voluntary Protection Program (VPP). VPP impacts all “applicable contractors” operating on Air Force

Installations. The contractor shall be responsible for ensuring their employees and managers have a comprehensive understanding of VPP as well as full compliance with OSHA requirements. The contractor shall follow the safety and health rules of the installation or VPP site. Detailed information on VPP is available on the OSHA website at http://www/osha.gov/dcsp/vpp/index.html.

The contractor shall submit a Safety and Health Plan and corresponding site safety checklist to the Contracting

Officer not later than 10 calendar days after contract award. The contractor’s plan shall include appropriate measures to ensure the contractor reacts promptly to investigate, correct, and track alleged safety and health violations and/or uncontrolled hazards in contractor work areas. The plan shall:

Demonstrate a management commitment to employee safety and health;

Identify the application of the safety and health plan to subcontractors;

Identify the roles and responsibilities of the following individuals with respect to safety and VPP:

Management, Supervisors, Employees, and Safety Coordinator;

Identify applicable safety rules and regulations;

Include a worksite hazard analysis to include base-line hazard identification and required control measures;

Include a job site analysis to include hazards of tasks required to control measures;

Identify employee safety and health training requirements and the documentation process;

Include a workplace inspection frequency, to include identifying the individual conducting the inspections;

Include employee hazard reporting procedures;

Identify individual(s) responsible for corrective action of hazards;

Identify first aid/injury procedures;

Identify procedures for accident investigation and reporting;

Identify emergency response procedures; and

Identify the process for tracking controlled hazards in contractor work areas.

The contractor shall submit their Total Case Incidence Rate (TCIR) and Days Away, Restricted, and or http://www/osha.gov/dcsp/vpp/index.html

Transfer Case Incident Rate (DART) rates and OSHA Form 300A annually to the contracting office for consolidation and submission as part of the installation’s annual VPP Safety and Health Management report.

TCIR and DART rates are due by the 15th of January of each year.

The contractor’s Quality Control Plan shall identify the processes and procedures the contractor will use to track compliance with the Safety and Health Plan, and the process and procedures that will be used to correct violations.

The contractor shall establish these VPP requirements for all subcontractors who qualify as applicable contractors under the resulting contract.

File details come from the government source that posted it. Updated .