PD.docx
DOCX document 34 KB Posted
- Attached to
- T1616 Grinding Machine Spindle Assembly Federal contract opportunity
- Solicitation number
- FA857121Q0054
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - FA857121Q0054_25 June.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PURCHASE DESCRIPTION
T1616 Grinding Machine Spindle Assembly 26 May 2021
1.0. DESCRIPTION: The Contractor shall provide all parts, materials, equipment, labor and shipping required to provide two (2) each T1616 Grinding Machine Spindle Assembly, for the WR000810 /WR000811 Blade Thrust Ring Grinding Machines, to the 402d Maintenance Support Squadron (MXSS) in Bldg. 321 at Robins Air Force Base, Georgia. The Government will provide installation, training and future maintenance.
1.1. Contractor shall provide the following items:
| Item |
| Manufacturer Part Number |
| Description |
| Qty |
| 1 |
| T1616 |
| Spindle Assembly |
| 2 |
2.0 . SUPPORT.
2.1. Warranty. Contractor shall provide the manufacturer’s 1-year warranty to include all parts and labor beginning on the date of acceptance of all items.
2.2. Delivery. The contractor shall deliver all items no later than 70 calendar days/FOB Destination after contract is awarded and delivered to representatives in Paragraph 2.3.
2.3. Government Points of Contact (POC) and Delivery Address.
| Primary |
| Alternate |
Walter Jordan
402 MXSS/MXDPM
235 Robins Pkwy Station 15 Bldg. 321 Robins AFB, GA 31098 DoDAAC: F3QCCM
(478) 926-8971 walter.jordan@us.af.mil
Toby Amerson
402 MXSS/MXDPM
235 Robins Pkwy Station 15 Bldg. 321 Robins AFB, GA 31098 DoDAAC: F3QCCM 478-926-8823 toby.amerson@us.af.mil
3.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES. None
4.0 GENERAL INFORMATION.
4.1 Agency Affirmative Procurement Programs (formerly GPP). In accordance with FAR 23.404(b)(1), 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program] and/or United States Department of Agriculture (USDA)-designated products included in the bio-based product listings [http://www.biopreferred.gov] shall meet the EPA or USDA standards for recovered materials or bio based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.
4.1.1 In accordance with FAR 23.404(a)(iii), the Contractor shall provide estimates and verification of recovered material for EPA-designated CPG products and certification for both EPA-designated CPG products and USDA-designated bio based products. In accordance with the Robins AFB Green Procurement Program (GPP) Plan, the Contractor shall provide estimates and certifications to the Government for completion of the applicable attachment(s) to be included in the Purchase Request (PR) package.
4.2 Supply Chain Risk Management. The Contractor shall implement risk management procedures to ensure that system, equipment, components, software, maintenance equipment, and supplies do not incorporate counterfeit parts, malicious code, or other elements that would allow adversaries to gain access to data and critical program information and disrupt operations. Contractor risk management procedures shall comply with Air Force Pamphlet (AFPAM) 63-113, Program Protection Planning for Life Cycle Management, SAE Aerospace Standard AS5553, Counterfeit Electronic Parts: Avoidance, Detection, Mitigation, and Disposition, and National Institute of Standards and Technology (NIST) Special Publication 800-53, Revision 4, Security and Privacy Controls for Federal Information Systems and Organizations
5.0 APPENDICES.
5.1 Appendix A, References
| Name of Publication |
| Sections that Apply |
| Date of Publication |
| Title of Publication |
| AFPAM 63-113 |
| Entirety |
| 17 Oct 13 |
| Program Protection Planning for Life Cycle Management |
| SAE Aerospace Standard AS5553 |
| Entirety |
| 02 Apr 09 |
| Counterfeit Electronic Parts: Avoidance, Detection, Mitigation, and Disposition |
| NIST Special Publication 800-53, REV 4 |
| Entirety |
| 22 Jan 15 |
| Security and Privacy Controls for Federal Information Systems and Organizations |
File details come from the government source that posted it. Updated .