187 SFS Awning Summary.pdf
PDF 446 KB Posted
- Attached to
- 187 FW Presolicitation Site Visit, Construct Awning Federal contract opportunity
- Solicitation number
- PANNGB-20-P-0000-001985
About this file
This document provides a summary of a construction project and notice of a pre-solicitation site visit. The 187th Fighter Wing of the Alabama Army National Guard is planning to construct an awning and extend an existing concrete area at Building 1502, Dannelly Field in Montgomery, Alabama. The project value is estimated between $350,000 to $500,000. The North American Industry Classification System code is 236220 for commercial and institutional building construction. The acquisition will utilize a full and open competition small business set-aside for HUBZone certified small businesses. An invitation for bids solicitation will be issued with responses due in December 2019. A pre-solicitation site visit is scheduled for December 12, 2019 at 0900 hours Central Time to review the project details. Those interested in attending must RSVP by December 10 and provide name and identification information for base access.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1234566713N Draft
Security Forces Storage Canopy 13055.02 6 May 2016 187th Fighter Wing - Dannelly Field - Montgomery, AL FAKZ 162007
SUMMARY 01 1000 - 1
SECTION 01 1000 - SUMMARY
PART 1 GENERAL
1.01 PROJECT
A. Project Name: Security Forces Storage Canopy.
B. Owner's Name: The Government.
C. The Project consists of the extension of existing aluminum canopy and extension of existing cement concrete paving systems at Building1502, 187th Fighter Wing, Dannelly Field, Montgomery, AL.
1.02 CONTRACT DESCRIPTION
A. Contract Type: A single prime contract based on a Stipulated Price as described in front end documents.
1.03 CONTRACT DURATION:
A. Project shall be substantially complete within 180 calendar days from the notice to proceed.
1.04 DESCRIPTION OF ALTERATIONS WORK
A. Scope of demolition and removal work is shown on drawings and specified in Section
02 4100.
1.05 GOVERNMENT OCCUPANCY
A. The Government intends to continue to occupy adjacent portions of the existing buildings during the entire construction period.
B. The Government intends to fully occupy the Project upon Substantial Completion.
C. Cooperate with Contracting Officer to minimize conflict and to facilitate Contracting
Officer's operations.
D. Schedule the Work to accommodate Contracting Officer occupancy.
1.06 CONTRACTOR USE OF SITE AND PREMISES
A. Arrange use of site and premises to allow:
1. The Government's occupancy.
B. Provide access to and from site as required by law and by Contracting Officer
Representative (COR):
Security Forces Storage Canopy 13055.02 6 May 2016 187th Fighter Wing - Dannelly Field - Montgomery, AL FAKZ 162007
SUMMARY 01 1000 - 2
1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered.
2. Do not obstruct roadways, sidewalks, or other public ways without permit.
3. Coordinate site lay down and storage areas with Government's operations and access required to adjacent shed building for temporary occupancy of the adjacent shed building during construction duration.
C. Existing building spaces may not be used for storage.
D. Utility Outages and Shutdown:
1. Limit disruption of utility services to weekends and Mondays, as these are the hours the building is unoccupied. Please provide 1 week advanced notice, to the COR, of any utility disruption.
2. Do not disrupt or shut down life safety systems, including but not limited to fire sprinklers and fire alarm system, without 7 days notice to Contracting Officer and authorities having jurisdiction.
1.07 Phasing the Work
A. The work of this project shall be completed in one phase. However, the Contractor shall coordinate the work with the Government as required to ensure full and continuous operation of the facility's mission throughout the entirety of the construction duration.
END OF SECTION