Pages from Other Than Full and Open Memo Redacted_Redacted.pdf

PDF 192 KB Posted

Attached to
USNS MATTHEW PERRY CARGO BRINE VALVES Federal contract opportunity
Solicitation number
N3220524Q0269
Issued by
Department of the Navy Military Sealift Command

About this file

This document is a Memorandum regarding the use of other than full and open competition for an acquisition under the simplified acquisition threshold. It provides justification for sole-source procurement of Trident Maritime Systems parts to replace worn or damaged brine valves for the USNS MATTHEW PERRY.

The key details are:

  • The acquisition is for Trident Maritime Systems parts with a required delivery date of 09/30/2024.
  • Justification for sole-source is based on Trident Maritime Systems having proprietary rights, exclusive licensing, and being the only manufacturer that can provide the required form, fit, and function.
  • MSC does not have the manufacturing and technical information required to evaluate equivalent non-OEM parts.
  • The related federal contract opportunity is Solicitation Number N3220524Q0269 for USNS MATTHEW PERRY CARGO BRINE VALVES.

View the file

Other files for this federal contract opportunity

Other files attached to USNS MATTHEW PERRY CARGO BRINE VALVES, newest first.
File Type Posted
Combined_Synopsis_Solicitation.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 Ver 2.0 (01 June 2018)

Date: 5/09/2024

MEMORANDUM

Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER

THE SIMPLIFIED ACQUISITION THRESHOLD

Ref: (a) PR Number(s): REQ# N2319941344029 / ERP# 1301162489

I. BACKGROUND:

1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:

1. Provide a description of the item or service required, to include Trident Maritime Systems PARTS

a) the name of the required source or brand name

Trident Maritime Systems.

b) the required delivery date/period of performance and

09/30/2024

c) its intended use.

TO REPLACE WORN OR DAMAGED BRINE Valves

2. List the source(s) or known vendor(s) who are able to provide the above described item or service.

Trident Maritime Systems

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED

ON THE FOLLOWING (select all that apply):

A. __X___ Only one responsible source (select all that apply):

1. __X__ RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.

a. Explain what is subject to the restrictive rights.

Trident Maritime Systems. OWNS THE PROPRIETARY RIGHTS TO THE

DRAWINGS OF THE MATERIAL.

b. If drawings are included, who is identified as “owning” the drawings.

2 Ver 2.0 (01 June 2018)

Trident Maritime Systems.

2. __X___ EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.

a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.

Trident Maritime Systems., INC. ONLY SELLS DIRECT AND HAS NO

AUTHORIZED DISTRIBUTORS.

b. Identify the distributor / authorized technical representative for the item or service.

Provide evidence of the exclusive licensing agreement as an attachment to this document.

(NOTE: If there is more than one distributor / authorized technical representative, then use Part B – Brand Name.)

3. __X___ OTHER REASON:

a. __ ___ CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.

i. SMS Procedure Number:

b. __X__ STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.

i. Identify Make / Model Number(s): Trident Maritime Systems

ii. Identify other vessels with this Make / Model:

T-AKE CLASS

c. ____ FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.

i. Identify Make / Model of existing equipment:

ii. Describe how the equipment must be compatible with the existing configuration.

d. _X___ OTHER:

MSC does not have manufacturing and technical information required to evaluate and determine whether non-OEM components and replacement parts offered are equivalent to the OEM components and replacement parts. The Responsible Source has access to equipment, parts, provide service and technical data / drawings as required to properly repair, replace and maintain the equipment.

3 Ver 2.0 (01 June 2018)

4. _____ UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:

a. Date on which the requirement was identified:

b. Required delivery date / Period of Performance:

c. If the difference between a. and b. is more than one week, explain the delay in submitting the requirement.

d. Estimated production lead time: .

e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)

f. CASREP Number:

File details come from the government source that posted it. Updated .