Responses to Questions from Site Visit
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| P16PS02001_SF_30.pdf | ||
| Site_Visit_Sign-in.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Officer in Charge Compound Roofing Questions and Responses
1.) What is the opening on top of the pump house Roof?
This is for access to the pumping equipment inside and will remain as part of the roof.
2.) Are the roofs to be replaced with “In Kind” material?
No, they will be replaced with stained Alaskan Yellow Cedar shingle as per specifications.
3.) What is the substrate?
The substrate is 1x8 shiplap that form a solid substrate.
4.) Is there as square footage calculation for the roofs?
If there is it is in the bid package.
5.) How was the square footage calculated?
If the calculations were done, they would be based on dimensions we have in the files for the buildings.
6.) Are the downspouts to be round to match the original?
Gutters and downspouts are not part of this bid package.
7.) Is this bid one total bid or three separate bids.
Bids are specified in the bid package.
8.) Can the period of performance be extended due to the delivery time for the specially stained shingles?
Yes, the period of performance will be extended to a total of 60 days after the notice to proceed is issued to allow time to obtain the materials.
9.) Has an asbestos content test been done on the roofing paper?
No, these roofs are on an average of 10 – 15 years old so should not be needed.
10.) Will a portable toilet be allowed on the jobsite?
Yes, at the contractors expense and must be removed on completion of work
11). Should quotes be prepared using stained or unstained shingles?
Stained, see the Statement of Work in the bid package.